Treatment method and device for internal leakage points of waste heat boiler module

By cutting channels and setting up protection structures in the waste heat boiler module, it is easy for staff to find and repair leak points, solving the problem of leak handling within the module, and achieving rapid repair and leakage prevention effects.

CN119084925APending Publication Date: 2024-12-06SHENZHEN GUANGQIAN ELECTRIC POWER
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411173944.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art is difficult to effectively deal with the leakage problem of internal components of waste heat boiler modules, especially in environments with dense pipes, which are inconvenient for maintenance and low leakage repair efficiency.

Method used

The cutting machine is used to cut the fin tube to form a rectangular inlet/output channel, and protective measures are set to prevent leakage. The use of a mobile platform and a regulating protection structure allows staff to enter and find and repair the leak points, and repair it through sealing, grinding and welding.

Benefits of technology

It realizes rapid repair of leakage points inside the waste heat boiler module, facilitates on-site processing, improves maintenance efficiency, prevents further leakage of fin tubes, simplifies the protection structure, and enhances the reliability of repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084925A_ABST
    Figure CN119084925A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power generation industrial equipment, and particularly relates to a method and a device for treating internal leakage points of a waste heat boiler module, which are characterized in that a plurality of bottom moving platforms are manufactured as special equipment for module repair; a cutting machine is used for cutting part of the finned tube to form a rectangular inlet / outlet channel, and the height of the inlet / outlet channel is 1-2 m, so that workers and the moving platform can enter / exit conveniently; protection measures are taken for the finned tubes on the two sides of the inlet / outlet channel to form a protection structure for the finned tubes, and leakage of the finned tubes is prevented; and field treatment is conducted on leakage points, after all the leakage points are plugged, grinding is conducted row by row from inside to outside, the recovered conical pipe sections are welded, 100% ray inspection is conducted on welded junctions on the field, and the inspection is qualified. The method has the beneficial effects of on-site treatment of leakage points in the waste heat boiler module, convenience in maintenance and prevention of leakage of the finned tube.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The present invention belongs to the technical field of power generation industrial equipment and specifically relates to a method and device for treating leakage points inside a waste heat boiler module, which is suitable for rapid repair when leakage occurs inside a module with many and densely packed tube rows. Background technology:

[0002] In the existing power production practice, the waste heat boiler equipped with 9F combined cycle units is generally designed and manufactured in a modular manner, which is easy to install, has the characteristics of high heat transfer efficiency, convenient site layout and reduced investment cost, but has the following problems:

[0003] (1) It is not conducive to on-site inspection and maintenance. During design, the modules are usually designed to be closely arranged. Some modules are composed of multiple rows of fin tubes of different systems and materials. The passages and spaces between modules are narrow, which is not conducive to on-site inspection and maintenance.

[0004] (2) Tube bursts are likely to occur. After long-term use under daily start-stop conditions, the heating surface is prone to wear and corrosion, causing leakage of the finned tubes or header components inside the module, which must be repaired on site.

[0005] After searching the Chinese patent announcements, although the Chinese patent announcements also disclose some technical solutions for rapid leak detection methods, for example: the invention with application number 2016106486671 and name is a method for judging the water leakage of the built-in waste heat boiler in the large flue of a sintering machine, which mainly collects the temperature value data information of the upper and lower walls of the large flue of the sintering machine after each group of heat exchangers in real time through a collection unit; the collected upper and lower wall temperature value data information is transmitted to a data processing unit, and the upper wall temperature value of the large flue of the sintering machine per second and the lower wall temperature value of the large flue of the sintering machine per second are respectively accumulated at fixed time unit intervals, and the difference is obtained to obtain the temperature value difference of the upper and lower walls of the large flue of the sintering machine, and the deviation growth value of the temperature value of the upper and lower walls of the large flue of the sintering machine is calculated. The observer observes the change trend of the temperature value deviation value of the upper and lower walls of the large flue of the sintering machine through the display unit in real time, and then judges whether the waste heat boiler water is leaking. There are problems such as complex process, low efficiency and high cost. The invention with application number 2024101616565 and name is a method for quickly checking leakage of a waste heat boiler fixed cover. It is to drill a certain size of circular holes on the inner side of the boiler fixed cover at a certain distance from the lower edge of the U-shaped bend of the boiler fixed cover for multiple boiler water-cooled wall pipes that are estimated to leak. At this time, the water stored in the U-shaped bend of the boiler fixed cover will continue to flow out from the drilled holes until the water stored in the U-shaped bend of the boiler water-cooled wall pipe is completely emptied; when the water stops flowing at all the drilled holes, open the water injection valve and use the pre-prepared water injection pipe to inject water into the U-shaped bend of the boiler until the water level rises to the header pipe above the U-shaped bend of the fixed cover; the boiler pipes that have water flowing again at the drilled holes are judged to be leaking pipes. There are problems such as complex process, easy damage to equipment, low accuracy, and low efficiency. Although the technical solution can solve the problem of external leakage detection of the waste heat boiler and has certain technical effects, it cannot solve the problem of on-site treatment of leakage of internal components of the pipe array of the waste heat boiler module. Therefore, it is necessary to provide a method and device for handling leakage of internal components of the waste heat boiler module. Summary of the invention:

[0006] One of the purposes of the present invention is to solve the problem of difficult on-site treatment and inconvenient maintenance of leakage of internal components of the tube bank of the waste heat boiler module, and to provide a method for treating leakage points inside the waste heat boiler module. The method has the beneficial effects of on-site treatment of leakage points inside the waste heat boiler module, convenient maintenance, rapid on-site repair and prevention of fin tube leakage.

[0007] The second purpose of the present invention is to solve the problem of difficult on-site treatment and inconvenient maintenance of leakage of internal components of the tube bank of the waste heat boiler module, and provide a device for treating leakage points inside the waste heat boiler module. The device has the beneficial effects of on-site treatment of leakage points inside the waste heat boiler module, convenient maintenance, rapid on-site repair and prevention of fin tube leakage.

[0008] In order to achieve one of the purposes of the present invention, the following technical solutions can be adopted:

[0009] The method for processing the internal leakage point of the waste heat boiler module is characterized by:

[0010] 1) Make several bottom mobile platforms as special equipment for module repair;

[0011] 2) Use a cutting machine to cut part of the fin tube to form a rectangular inlet / outlet channel with a height of 1-2 meters to facilitate the entry / exit of staff and mobile platforms;

[0012] 3) providing protective measures for the fin tubes on both sides of the inlet / outlet channel to form a protective structure for the fin tubes and prevent leakage of the fin tubes;

[0013] 4) The staff follows the mobile platform to enter / exit to search for the leak point. If found, the staff marks the leak point, then stops and prepares to repair the leak. If not found, the staff continues to cut part of the fin tube to extend the inlet / exit channel, and sets protective measures on the fin tubes on both sides of the inlet / exit channel of the extended part to form a protective structure for the fin tube. The staff continues to follow the mobile platform to enter / exit to search for the leak point until the leak point is found.

[0014] 5) Carry out on-site treatment of the leakage points. After sealing all the leakage points, grind and weld them row by row from the inside to the outside to restore the tapered pipe section. Carry out 100% radiographic inspection on each on-site weld and pass the inspection.

[0015] In order to achieve one of the purposes of the present invention, the following technical solutions can also be adopted:

[0016] Furthermore, when forming a rectangular inlet / outlet channel opening, the bottom pipe of the cut opening is first blocked, a mobile platform is installed, and then the inner pipe section is gradually cut inward until the maintenance staff finds the leak point.

[0017] Furthermore, in the process of finding the leakage point, the internal leakage point is determined through observation and the repair plan is determined. First, the finned tube closest to the channel tube screen is selected, and a frame is set up to lead to the treatment area; each bottom pipe incision is sealed to prevent debris from falling into the pipe; pay attention to cutting the lower end of the pipe section first, and then cutting the upper end of the pipe section after temporary sealing to reduce iron filings entering the pipe.

[0018] Furthermore, when installing the bottom moving platform, after fixing it with U-shaped clamp bolts, wooden boards are laid on it and then construction work is carried out; or when installing the bottom moving platform, two fixing angle steels are welded at the lower part of the wide sides of the rectangular hole, and the angle steels are provided with moving grooves.

[0019] Furthermore, the U-shaped iron clamps lock the uncut pipes on both sides and the bottom moving platform with nuts and washers; after the height and level of the fixed bottom moving platform are adjusted, two wooden boards are laid.

[0020] In order to achieve the second purpose of the present invention, the following technical solutions can be adopted:

[0021] The device for processing leakage points inside a waste heat boiler module has the following structural features: it includes a mobile platform and an adjustment and protection structure; the mobile platform is rectangular, and includes a rigid frame welded from a plurality of angle steels and a flat plate laid on the frame; the adjustment and protection structure includes a plurality of U-shaped metal hoops and a plurality of elastic blocks, the hoop body of the U-shaped metal hoop is connected to the uncut fin tubes on both sides, the tail ends of the two extended limbs of the U-shaped metal hoop are provided with screw threads and are connected to the mobile platform through nuts to form an easy-to-assemble and disassemble connection structure, the elastic block is arranged at the connection between the mobile platform and the fin tube to form an elastic telescopic connection structure, so as to form a protection structure for the fin tube and an adjustment structure for the gap between the fin tube and the mobile platform.

[0022] In order to achieve the second purpose of the present invention, the following technical solution can also be adopted:

[0023] Furthermore, the frame of the mobile platform is welded from seven 60x60 angle steels to form a rectangle with a length of 980mm and a width of 600mm; the length of the flat plate laid on the frame is slightly smaller than the length inside the frame of the mobile platform, with widths of 36mm and 20mm respectively and a thickness of 25mm. After laying, it is basically stuck in the frame of the bottom mobile platform and is tightened with wire to prevent the wooden board from moving and dislocating.

[0024] Furthermore, the elastic block is made of a wooden block and has elasticity to adjust the clamping force of the U-shaped metal hoop.

[0025] Furthermore, long grooves are left on both sides of the mobile platform so that the U-shaped metal hoop can slide in the groove to form a mobile connection structure.

[0026] Furthermore, a pair of U-shaped metal hoops are symmetrically installed, and the mobile platform can bear a load of 100kg; two pairs of U-shaped metal hoops 2-1 are symmetrically installed, and the mobile platform can bear a load of 150kg.

[0027] The present invention has the following beneficial effects:

[0028] 1. The method for processing the internal leakage point of the waste heat boiler module of the present invention uses a cutting machine to cut part of the fin tube to form a rectangular inlet / outlet channel to facilitate the entry / exit of the staff and the mobile platform; protective measures are set for the fin tubes on both sides of the inlet / outlet channel to form a protective structure for the fin tubes and prevent the fin tubes from leaking; the staff enters the inlet / out with the mobile platform to find the leakage point, if found, the leakage point is marked, and then stops moving forward and prepares to repair the leakage; if not found, continue to cut part of the fin tube to extend the inlet / outlet channel, set protective measures on the fin tubes on both sides of the inlet / outlet channel of the extended part to form a protective structure for the fin tube, and the staff continues to enter the inlet / out with the mobile platform to find the leakage point until the leakage point is found. Therefore, the problem of difficult on-site processing and inconvenient maintenance of the internal components of the tube row of the waste heat boiler module is solved, and it has the beneficial effects of on-site processing of the internal leakage point of the waste heat boiler module, convenient maintenance, rapid on-site repair and prevention of fin tube leakage.

[0029] 2. The device for processing the internal leakage point of the waste heat boiler module of the present invention comprises a mobile platform and an adjustment and protection structure; the mobile platform is rectangular, comprising a rigid frame welded by a plurality of angle steels and a flat plate laid on the frame; the adjustment and protection structure comprises a plurality of U-shaped metal hoops and a plurality of elastic blocks, the hoop body of the U-shaped metal hoop is connected to the uncut fin tubes on both sides, the tail ends of the two extended limbs of the U-shaped metal hoop are provided with screw threads and connected to the mobile platform through nuts to form an easy-to-assemble and disassemble connection structure, and the elastic block is arranged at the connection between the mobile platform and the fin tube to form an elastic telescopic connection structure to form a protection structure for the fin tube and an adjustment structure for the gap between the fin tube and the mobile platform. Therefore, the problem of difficult on-site processing and inconvenient maintenance of the internal components of the tube row of the waste heat boiler module is solved, and the beneficial effects of on-site processing, convenient maintenance, rapid on-site repair and prevention of fin tube leakage of the internal leakage point of the waste heat boiler module are achieved.

[0030] 3. In the present invention, since protective measures are provided for the fin tubes on both sides of the inlet / outlet channel to form a protective structure for the fin tubes, the nearby fin tubes will not be affected during on-site inspection and treatment of leakage points, and the fin tubes around the inlet / outlet channel can be well protected, which has the beneficial effects of simple protective structure and good protective effect.

[0031] 4. The present invention has long grooves on both sides of the mobile platform at the bottom, so that the U-shaped metal hoop can slide in the groove to form a mobile connection structure, and the U-shaped metal hoop structure can be flexibly arranged, so it has the beneficial effects of flexible and convenient combined structure and strong bearing capacity of the mobile platform. Description of the drawings:

[0032] Figure 1 It is a structural side view of the inlet / outlet channel involved in the present invention.

[0033] Figure 2 It is a structural front view of the inlet / outlet channel involved in the present invention.

[0034] Figure 3 It is a schematic diagram of the structure of the processing device of the present invention.

[0035] Figure 4 yes Figure 3 AA structural section view. Specific implementation method: Specific embodiment 1:

[0037] Reference Figure 1-Figure 4 The device for processing the internal leakage point of the waste heat boiler module involved in this embodiment includes a mobile platform 1 and an adjustment and protection structure 2; the mobile platform 1 is rectangular, including a rigid frame 1-1 welded by a plurality of angle steels and a flat plate laid on the frame 1-1; the adjustment and protection structure 2 includes a plurality of U-shaped metal hoops 2-1 and a plurality of elastic blocks 2-2, the hoop body of the U-shaped metal hoop 2-1 is connected to the uncut fin tubes 3-2 on both sides, the tail ends of the two extended limbs of the U-shaped metal hoop 2-1 are provided with screw threads and are connected to the mobile platform 1 through nuts to form an easy-to-assemble and disassemble connection structure, the elastic block 2-2 is arranged at the connection between the mobile platform 1 and the fin tube 3 to form an elastic telescopic connection structure, so as to form a protection structure for the fin tube 3 and an adjustment structure for the gap between the fin tube 3 and the mobile platform 1.

[0038] In this embodiment:

[0039] The frame 1-1 of the mobile platform 1 is welded by seven 60x60 angle steels to form a rectangle with a length of 980mm and a width of 600mm. The length of the flat plate laid on the frame 1-1 is slightly smaller than the length inside the frame of the mobile platform 1, with widths of 36mm and 20mm respectively and a thickness of 25mm. After laying, it is basically stuck in the frame of the bottom mobile platform and is tightened with wire to prevent the wooden board from moving and dislocating.

[0040] The elastic block 2-2 is made of a wooden block and has elasticity to adjust the clamping force of the U-shaped metal hoop 2-1.

[0041] Long grooves 1-3 are left on both sides of the mobile platform 1, so that the U-shaped metal hoop 2-1 can slide in the grooves 1-3 to form a mobile connection structure.

[0042] A pair of U-shaped metal hoops 2-1 are symmetrically installed, and the mobile platform can bear a load of 100kg; two pairs of U-shaped metal hoops 2-1 are symmetrically installed, and the mobile platform can bear a load of 150kg.

[0043] The method for processing the internal leakage point of the waste heat boiler module involved in this embodiment is characterized by:

[0044] 1) Make several bottom mobile platforms as special equipment for module repair;

[0045] 2) Use a cutting machine to cut part of the fin tube to form a rectangular inlet / outlet channel with a height of 1-2 meters to facilitate the entry / exit of staff and mobile platforms;

[0046] 3) providing protective measures for the fin tubes on both sides of the inlet / outlet channel to form a protective structure for the fin tubes and prevent leakage of the fin tubes;

[0047] 4) The staff follows the mobile platform into the inlet / outlet to search for the leak (enter from the inlet / outlet IN). If found, the staff mark the leak, then stop and prepare to repair the leak; if not found, the staff continue to cut part of the fin tube to extend the inlet / outlet channel, and the fin tubes on both sides of the extended inlet / outlet channel are provided with protective measures to form a protective structure for the fin tube. The staff continues to follow the mobile platform into the inlet / outlet to search for the leak until the leak is found;

[0048] 5) Carry out on-site treatment of the leakage points. After sealing all the leakage points, grind and weld them row by row from the inside to the outside to restore the tapered pipe section. Carry out 100% radiographic inspection on each on-site weld and pass the inspection.

[0049] Furthermore, when forming a rectangular inlet / outlet channel opening, the bottom pipe of the cut opening is first blocked, a mobile platform is installed, and then the inner pipe section is gradually cut inward until the maintenance staff finds the leak point.

[0050] Furthermore, in the process of finding the leakage point, the internal leakage point is determined through observation and the repair plan is determined. First, the finned tube closest to the channel tube screen is selected, and a frame is set up to lead to the treatment area; each bottom pipe incision is sealed to prevent debris from falling into the pipe; pay attention to cutting the lower end of the pipe section first, and then cutting the upper end of the pipe section after temporary sealing to reduce iron filings entering the pipe.

[0051] Furthermore, when installing the bottom moving platform, after fixing it with U-shaped clamp bolts, wooden boards are laid on it and then construction work is carried out; or when installing the bottom moving platform, two fixing angle steels are welded at the lower part of the wide sides of the rectangular hole, and the angle steels are provided with moving grooves.

[0052] Furthermore, the U-shaped iron clamps lock the uncut pipes on both sides and the bottom moving platform with nuts and washers; after the height and level of the fixed bottom moving platform are adjusted, two wooden boards are laid.

[0053] In summary, by using the present invention, when leakage occurs in the internal components of the waste heat boiler module with many tube rows and dense arrangement, the present invention can quickly repair the leakage point inside the module.

[0054] Other embodiments of the present invention are characterized by:

[0055] After the leak point is determined, first select the finned tube closest to the channel tube screen and build a frame leading to the treatment area.

[0056] Use a cutting machine to cut off some fin tube sections to form a hole shape as a repair construction channel.

[0057] Seal the bottom pipe and install the bottom mobile platform.

[0058] The internal parts leakage points were repaired by grinding and welding and passed the inspection.

[0059] The conical pipe sections were restored by grinding and welding row by row from the inside to the outside and passed the inspection.

[0060] Loosen the fixation and move the bottom movable platform outward to expose a row of blocked bottom pipe openings. Grind and weld to restore this row of pipe sections and pass the inspection.

[0061] Move the mobile platform outward, and weld the cut fin tubes row by row from the inside to the outside, and the test is qualified.

[0062] When the inner pipe row is processed and it is necessary to move the mobile platform outward to process the bottom pipe opening, the fixing bolts of the U-shaped metal hoop 2-1 can be loosened, and the mobile platform can be moved outward to a suitable position and then fixed, or a wooden board of the mobile platform can be removed to expose a row of pipe openings near the inside to a suitable recovery position.

[0063] The mobile platform is rectangular in shape, suitable for two people to enter for construction.

[0064] Two fixing angle steels are welded to the lower wide parts on both sides, and movable grooves are provided on the angle steels.

[0065] The U-shaped metal hoop 2-1 locks the uncut pipes on both sides and the bottom moving platform with nuts and washers. After the fixed bottom moving platform is adjusted to the height and level, two wooden boards are laid.

[0066] According to the predicted leakage point location, a certain number of fin tube sections are cut from the outside to the inside to form the hole shape of the leakage repair construction channel. The shape is a cuboid on the outside and a cone near the inside. The width and height of the cuboid are between 1000-1300mm, and the depth of the cone is no more than 500mm. The leakage point is based on the upper middle position in front of the cone.

[0067] The size of the U-shaped metal hoop 2-1 can wrap around the light tube, and there are threads on the two extended limbs. After the platform is leveled, it is tightened and reinforced on the fin tube light tube with washers and nuts, and the gap is adjusted with wooden blocks. If necessary, thick iron wire can be used instead of the U-shaped iron clip to directly tie the platform to the adjacent fin tube.

[0068] After cutting off the finned tube section, make the lower cut basically on the same horizontal plane, and after blocking the pipe opening, make the installed bottom moving platform and floor planks press on each lower pipe opening.

[0069] 1) Make several bottom platforms in advance as module repair tools.

[0070] 2) After predicting the internal leakage point through observation and determining the repair plan, first select the finned tube closest to the channel tube screen and build a frame to the treatment area.

[0071] 3) Use a cutting machine to cut off some of the outer rows of fin tube sections to form a rectangular hole shape, first seal the bottom pipeline, install the bottom moving platform, and then further cut off the inner cone space tube section.

[0072] 4) Seal each bottom pipe to prevent debris from falling into the pipe; be sure to cut the lower end of the pipe first, temporarily seal it, and then cut the upper end of the pipe to reduce iron filings entering the pipe.

[0073] 5) Grind and weld each row from the inside to the outside to restore the tapered pipe section. Perform 100% X-ray inspection on each weld on site and pass the inspection.

[0074] 6) Based on the number of repairs, pass the water pressure test of 1-1.5 times the working pressure as required by regulations.

[0075] 7) Before starting the machine, flush out the debris inside the pipe of the module.

[0076] 8) Using this pipe cutting method and the bottom mobile platform can reduce the construction workload and ensure the repair quality, making the construction process safer and more reliable.

Claims

1. A method for treating leakage points inside a waste heat boiler module, characterized in that: 1) Make several bottom mobile platforms as special equipment for module repair; 2) Use a cutting machine to cut part of the fin tube to form a rectangular inlet / outlet channel with a height of 1-2 meters to facilitate the entry / exit of staff and mobile platforms; 3) providing protective measures for the fin tubes on both sides of the inlet / outlet channel to form a protective structure for the fin tubes and prevent leakage of the fin tubes; 4) The staff follows the mobile platform to enter / exit to search for the leak point. If found, the staff mark the leak point, then stop and prepare to repair the leak. If not found, the staff continues to cut part of the fin tube to extend the inlet / exit channel, and sets protective measures on the fin tubes on both sides of the inlet / exit channel of the extended part to form a protective structure for the fin tube. The staff continues to follow the mobile platform to enter / exit to search for the leak point until the leak point is found. 5) Carry out on-site treatment of the leakage points. After sealing all the leakage points, grind and weld them row by row from the inside to the outside to restore the tapered pipe section. Carry out 100% radiographic inspection on each on-site weld and pass the inspection.

2. The method for treating the internal leakage point of the waste heat boiler module according to claim 1 is characterized in that: When forming a rectangular inlet / outlet channel, first seal the bottom pipe of the cut opening, install the mobile platform, and then gradually cut the inner pipe section inward until the maintenance staff finds the leak point.

3. The method for treating leakage points inside a waste heat boiler module according to claim 1, characterized in that: In the process of finding the leakage point, the internal leakage point is determined through observation and the repair plan is determined. First, the finned tube closest to the channel tube screen is selected, and a frame is set up to lead to the treatment area; each bottom pipe incision is sealed to prevent debris from falling into the pipe; pay attention to cutting the lower end of the pipe section first, and then cutting the upper end of the pipe section after temporary sealing to reduce iron filings entering the pipe.

4. The method for treating leakage points inside a waste heat boiler module according to claim 1, characterized in that: When installing the bottom moving platform, fix it with U-shaped clamp bolts, lay wooden boards on it, and then carry out construction work; or when installing the bottom moving platform, weld two fixing angle steels at the lower part of the wide sides of the rectangular holes, and the angle steels have moving grooves.

5. The method for processing leakage points inside a waste heat boiler module according to claim 1, characterized in that: The U-shaped iron clamps lock the uncut pipes on both sides and the bottom moving platform with nuts and washers; after the fixed bottom moving platform is adjusted in height and level, two wooden boards are laid.

6. A device for treating leakage points inside a waste heat boiler module, characterized in that: The invention comprises a mobile platform (1) and an adjustment and protection structure (2); the mobile platform (1) is rectangular and comprises a rigid frame (1-1) welded from a plurality of angle steels and a flat plate laid on the frame (1-1); the adjustment and protection structure (2) comprises a plurality of U-shaped metal hoops (2-1) and a plurality of elastic blocks (2-2); the hoop body of the U-shaped metal hoop (2-1) is connected to the uncut fin tubes (3-2) on both sides; the tail ends of the two extended limbs of the U-shaped metal hoop (2-1) are provided with screw threads and are connected to the mobile platform (1) through nuts to form an easily assembled and disassembled connection structure; the elastic block (2-2) is arranged at the connection between the mobile platform (1) and the fin tube (3) to form an elastic telescopic connection structure to form a protection structure for the fin tube (3) and an adjustment structure for the gap between the fin tube (3) and the mobile platform (1).

7. The device for processing leakage points inside a waste heat boiler module according to claim 6, characterized in that: The frame (1-1) of the mobile platform (1) is welded from seven 60x60 angle steels to form a rectangle with a length of 980 mm and a width of 600 mm. The length of the plate laid on the frame (1-1) is slightly smaller than the length inside the frame of the mobile platform (1), with widths of 36 mm and 20 mm respectively and a thickness of 25 mm. After laying, it is basically stuck in the frame of the bottom mobile platform and is fastened with iron wire to prevent the wooden board from moving and misaligning.

8. The device for processing leakage points inside a waste heat boiler module according to claim 6, characterized in that: The elastic block (2-2) is made of a wooden block and has elasticity for adjusting the clamping force of the U-shaped metal hoop (2-1).

9. The device for processing leakage points inside a waste heat boiler module according to claim 6, characterized in that: Long grooves (1-3) are left on both sides of the mobile platform (1) so that the U-shaped metal hoop (2-1) can slide in the grooves (1-3) to form a mobile connection structure.

10. The device for processing leakage points inside a waste heat boiler module according to claim 6, characterized in that: A pair of U-shaped metal hoops (2-1) are symmetrically installed, and the mobile platform can bear a load of 100 kg; two pairs of U-shaped metal hoops (2-1) are symmetrically installed, and the mobile platform can bear a load of 150 kg.

Citation Information

Patent Citations

  • Judgment method for water leakage of internally-arranged waste heat boilers of large flues of sintering machines

    CN106224931A