Device for detecting impact resistance of building curtain wall
By designing the adjustment mechanism and trigger mechanism, the operation process of the impact resistance detection device of the building curtain wall is simplified, the problems of cumbersome operation and poor detection effect in the existing technology are solved, and the impact point is quickly adjusted and simplified operation is improved. Detection efficiency and portability.
Patent Information
- Application Number
- CN202411439929.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing architectural curtain wall impact resistance detection device is cumbersome to operate and cannot easily adjust the impact position, resulting in poor detection results and a waste of time and energy.
A construction curtain wall impact resistance detection device including adjustment mechanism and trigger mechanism is designed. Through components such as threaded rods, springs and guide rails, the impact point is quickly adjusted, simplified the operation process and optimized the detection effect.
It greatly simplifies the operation steps, saves staff time and energy, reduces the space occupied by the device, expands the application scenarios, and improves detection efficiency and portability.
Smart Images

Figure CN119085993A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of impact resistance detection, in particular to a device for detecting the impact resistance performance of a building curtain wall. Background Art
[0002] Curtain wall refers to the non-load-bearing outer wall enclosure of a building. Because it is non-load-bearing and is hung up like a curtain, it is also called a suspended wall. It is a lightweight wall with decorative effects commonly used in modern large and high-rise buildings. It is usually composed of panels and a supporting structure behind it. It can have a certain displacement ability relative to the main structure. It is a building external protective structure or decorative structure that does not share the effects on the main structure. Curtain wall has become an irreplaceable component in modern buildings, especially super high-rise buildings. In engineering, various performance tests are generally used to verify the safety and normal use of curtain wall. In actual use, curtain wall glass shatters and panel falls off from time to time, posing a safety threat. Threats and adverse social impacts can be said to be one of the focal issues of curtain wall projects. In addition to glass explosions and improper panel installation, a considerable part of these situations are caused by various impacts. The relevant technical standards for building curtain walls have put forward corresponding requirements for the wind pressure resistance, water tightness, air tightness, thermal performance, air sound insulation, in-plane deformation, impact resistance, optical performance and load-bearing performance of curtain walls. Among these performances, the detection of wind pressure resistance, water tightness, air tightness, in-plane deformation and other performances has become more popular with the help of standardization, while the impact resistance performance detection is still less known. Except for the extra-large curtain wall projects in some developed areas, this detection is rarely carried out;
[0003] The common building curtain wall impact resistance testing devices currently on the market cannot easily adjust the impact position during use, the testing effect is poor, and the operation is cumbersome, which wastes the time and energy of the staff. Summary of the invention
[0004] The purpose of the present invention is to provide a device for detecting the impact resistance of a building curtain wall to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned object, the present invention provides the following technical solutions: a device for testing the impact resistance performance of a building curtain wall, comprising a test wall, wherein a base is placed at the bottom end of the front side of the test wall;
[0006] The adjustment mechanism comprises a first threaded rod, a first screw sleeve, a connecting block and a fixing frame, wherein the first threaded rod is mounted on the left rear end of the top end of the base through a bearing, the first screw sleeve is sleeved on the first threaded rod, the connecting block is mounted on the right side of the first screw sleeve through bolts, and the fixing frame is mounted on the right side of the connecting block through bolts;
[0007] The trigger mechanism comprises a second spring and a trigger block. The second spring is installed at both ends of the front side of the fixing frame by bolts, and the trigger block is installed at one end of the second spring away from the test wall by bolts.
[0008] Preferably, the adjustment mechanism also includes a guide rail and a second threaded rod, the guide rail is installed on the right rear end of the top of the base by bolts, a slider is slidably connected inside the guide rail, and a fixed frame is fixedly installed on the left side of the slider by bolts, and the second threaded rod is installed on the left side of the rear end of the fixed frame by a bearing.
[0009] Preferably, the adjustment mechanism also includes a turntable and a second screw sleeve, the turntable is installed on the right end of the second threaded rod by bolts, the end of the turntable away from the second threaded rod is installed on the right side of the rear end inside the fixed frame by a bearing, and the second screw sleeve is sleeved on the second threaded rod.
[0010] Preferably, the adjustment mechanism further comprises a movable rod and a limiting groove, wherein the movable rod is mounted on the front side of the second screw sleeve by means of bolts, and the limiting groove is provided on the movable rod.
[0011] Preferably, the adjustment mechanism further comprises a movable sleeve and a fixed sleeve, the movable sleeve is sleeved on the movable rod, and the fixed sleeve is installed on the top of the movable sleeve by bolts.
[0012] Preferably, the adjustment mechanism further comprises a limit block and a fixed plate, the limit block is slidably connected inside the limit slot, and the fixed plate is mounted on the top of the limit block by bolts.
[0013] Preferably, the adjustment mechanism also includes a first spring, a handle and a collision block, the first spring is installed on the top of the movable sleeve by bolts, the end of the first spring away from the movable sleeve is connected to the fixed plate by bolts, and the collision block is installed on the bottom of the movable sleeve by bolts.
[0014] Preferably, the trigger mechanism further comprises a third spring and an extrusion block, a groove is provided at the front end of the movable rod, the third spring is installed at the rear end of the groove by bolts, and an extrusion block is installed at the end of the third spring away from the test wall by bolts.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. The present invention is designed and installed with an adjustment mechanism, so that when testing the curtain wall, the impact point can be adjusted very quickly and conveniently, which greatly optimizes the testing effect, greatly simplifies the operation steps, and greatly saves the time and energy of the staff;
[0017] 2. The present invention greatly simplifies the structure of the entire device by designing and installing a trigger mechanism, greatly saves the space occupied by the device, makes the device more convenient to carry and use, and greatly expands the application scenarios of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of the overall structure provided by an embodiment of the present invention;
[0019] Figure 2 A schematic diagram of the three-dimensional structure of an adjustment mechanism provided in an embodiment of the present invention;
[0020] Figure 3 A schematic diagram of a vertical cross-sectional structure of a movable rod and a fixed sleeve provided in an embodiment of the present invention;
[0021] Figure 4 A schematic diagram of the three-dimensional structure of a second spring and a trigger block provided in an embodiment of the present invention;
[0022] Figure 5 A schematic diagram of the vertical cross-sectional structure of the limiting groove and the extrusion block provided in an embodiment of the present invention.
[0023] In the figure: 1. test wall; 2. base; 3. adjustment mechanism; 301. first threaded rod; 302. first screw sleeve; 303. connection block; 304. fixed frame; 305. guide rail; 306. second threaded rod; 307. turntable; 308. second screw sleeve; 309. movable rod; 310. limit groove; 311. movable sleeve; 312. fixed sleeve; 313. limit block; 314. fixed plate; 315. first spring; 316. handle; 317. collision block; 4. trigger mechanism; 401. second spring; 402. trigger block; 403. third spring; 404. extrusion block. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figures 1 to 5 , the present invention provides a technical solution: a device for testing the impact resistance of a building curtain wall, comprising a test wall 1, a base 2 is placed at the bottom end of the front side of the test wall 1;
[0026] The adjustment mechanism 3 includes a first threaded rod 301, a first screw sleeve 302, a connecting block 303 and a fixing frame 304. The first threaded rod 301 is mounted on the left rear end of the top end of the base 2 through a bearing, the first screw sleeve 302 is sleeved on the first threaded rod 301, the connecting block 303 is mounted on the right side of the first screw sleeve 302 through bolts, and the fixing frame 304 is mounted on the right side of the connecting block 303 through bolts;
[0027] The trigger mechanism 4 comprises a second spring 401 and a trigger block 402 . The second spring 401 is installed at both ends of the front side of the fixing frame 304 by bolts, and the trigger block 402 is installed at one end of the second spring 401 away from the test wall 1 by bolts.
[0028] The adjustment mechanism 3 also includes a guide rail 305 and a second threaded rod 306. The guide rail 305 is installed on the right rear end of the top of the base 2 by bolts. A slider is slidably connected inside the guide rail 305, and a fixed frame 304 is fixedly installed on the left side of the slider by bolts. The second threaded rod 306 is installed on the left side of the rear end of the fixed frame 304 by a bearing. The lifting movement of the connecting block 303 drives the fixed frame 304 to perform lifting movement together, and the lifting movement of the fixed frame 304 drives the slider to perform lifting movement inside the guide rail 305, so as to ensure that the fixed frame 304 can perform lifting movement stably.
[0029] The adjustment mechanism 3 also includes a rotating disk 307 and a second screw sleeve 308. The rotating disk 307 is installed on the right end of the second threaded rod 306 by bolts. The end of the rotating disk 307 away from the second threaded rod 306 is installed on the right side of the rear end of the fixed frame 304 by a bearing. The second screw sleeve 308 is sleeved on the second threaded rod 306. By rotating the rotating disk 307, the rotation of the rotating disk 307 will drive the second threaded rod 306 to rotate together, and the rotation of the second threaded rod 306 will cause the second screw sleeve 308 to move horizontally on the second threaded rod 306.
[0030] The adjustment mechanism 3 also includes a movable rod 309 and a limiting groove 310. The movable rod 309 is installed on the front side of the second screw sleeve 308 by bolts, and the limiting groove 310 is provided on the movable rod 309. The movable rod 309 is driven to move horizontally by the horizontal movement of the second screw sleeve 308, so that the movable rod 309 can be adjusted to a desired horizontal position. At this point, the vertical height and horizontal height of the movable rod 309 are adjusted.
[0031] The adjustment mechanism 3 further includes a movable sleeve 311 and a fixed sleeve 312. The movable sleeve 311 is sleeved on the movable rod 309, and the fixed sleeve 312 is installed on the top of the movable sleeve 311 by bolts. The staff grasps the handle 316 and lifts the handle 316 upward, so that the handle 316 moves upward inside the fixed sleeve 312, and the upward movement of the handle 316 drives the fixed plate 314 to move upward inside the fixed sleeve 312.
[0032] The adjustment mechanism 3 also includes a limit block 313 and a fixed plate 314. The limit block 313 is slidably connected to the inside of the limit slot 310, and the fixed plate 314 is installed on the top of the limit block 313 by bolts; the limit block 313 is driven to move upward by the upward movement of the fixed plate 314 until the limit block 313 completely leaves the limit slot 310. At this time, the fixed plate 314 also drives the first spring 315 to move upward, so that the first spring 315 is in a stretched state. At this time, since the limit block 313 is no longer inserted in the limit slot 310, the limit block 313 no longer restricts the position of the movable sleeve 311, so that the staff can adjust the movable sleeve 311 to slide back and forth on the movable rod 309;
[0033] The adjustment mechanism 3 also includes a first spring 315, a handle 316 and a collision block 317. The first spring 315 is installed at the top of the movable sleeve 311 by bolts, and the end of the first spring 315 away from the movable sleeve 311 is connected to the fixed plate 314 by bolts, and the collision block 317 is installed at the bottom of the movable sleeve 311 by bolts; when the staff loosens the handle 316, since the first spring 315 is in a stretched state at this time, the first spring 315 at this time has a downward pulling force on the fixed plate 314, so the first spring 315 will pull the fixed plate 314 to move downward, and the downward movement of the fixed plate 314 will drive the handle 316 to move downward, and at the same time, the downward movement of the fixed plate 314 will drive the limit block 313 to move downward, so that the limit block 313 is reinserted into the limiting groove 310, thereby fixing the position of the movable sleeve 311;
[0034] The trigger mechanism 4 also includes a third spring 403 and an extrusion block 404. A groove is provided at the front end of the movable rod 309. The third spring 403 is installed at the rear end of the groove by bolts. The end of the third spring 403 away from the test wall 1 is installed with an extrusion block 404 by bolts. By pushing the trigger block 402 backward, the movement of the trigger block 402 will push the extrusion block 404 to move backward together, so that the extrusion block 404 squeezes the third spring 403 to move backward until the extrusion block 404 is completely retracted into the movable rod 309. At this time, the staff stops pushing the trigger block 402. Since the second spring 401 is compressed, the second spring 401 will give the trigger block 402 a forward thrust, so that the trigger block 402 can return to the initial position, at which time the extrusion block 404 no longer supports the movable rod 309, causing the movable rod 309 to fall downward and make a quarter circular motion, and the movement of the movable rod 309 will drive the movable sleeve 311 to move together, and the movement of the movable sleeve 311 will drive the collision block 317 to move together, and finally the collision block 317 will hit the test wall 1. After the collision is completed, the staff manually lifts the movable rod 309 to make it return to a horizontal state. At this time, the condition of the test wall 1 after the collision is recorded, and then the height, horizontal position and front and rear position of the collision block 317 can be adjusted to hit different positions of the test wall 1, so as to achieve a more comprehensive measurement effect.
[0035] Working principle: When the present invention is used, the base 2 is first placed in front of the test wall 1, and the first threaded rod 301 is rotated at this time. The rotation of the first threaded rod 301 will drive the first screw sleeve 302 to do lifting movement on the first threaded rod 301, and the lifting movement of the first screw sleeve 302 will drive the connecting block 303 to do lifting movement together, and the lifting movement of the connecting block 303 will drive the fixed frame 304 to do lifting movement together, and the lifting movement of the fixed frame 304 will drive the slider to do lifting movement inside the guide rail 305, so as to ensure that the fixed frame 304 The movable rod 309 can be stably lifted and lowered. After the fixed frame 304 is adjusted to the required height, the turntable 307 is rotated. At this time, the rotation of the turntable 307 drives the second threaded rod 306 to rotate together, and the rotation of the second threaded rod 306 causes the second screw sleeve 308 to move horizontally on the second threaded rod 306. The horizontal movement of the second screw sleeve 308 drives the movable rod 309 to move horizontally together. In this way, the movable rod 309 can be adjusted to the required horizontal position. At this point, the vertical height and horizontal height of the movable rod 309 are adjusted.
[0036] The locking cam 314 is in the unlocked position and the locking cam 316 is in the unlocked position. At this time, the staff can adjust the movable sleeve 311 to slide forward and backward on the movable rod 309 until the movable sleeve 311 is adjusted to a suitable position. At this time, the staff releases the handle 316. Since the first spring 315 is in a stretched state at this time, the first spring 315 has a downward pulling force on the fixed plate 314. Therefore, the first spring 315 will pull the fixed plate 314 to move downward, and the downward movement of the fixed plate 314 will drive the handle 316 to move downward. At the same time, the downward movement of the fixed plate 314 will drive the limit block 313 to move downward, so that the limit block 313 is reinserted into the limit groove 310, thereby fixing the position of the movable sleeve 311.
[0037] At this time, the staff member pushes the trigger block 402 backward, and the movement of the trigger block 402 pushes the squeezing block 404 to move backward together, so that the squeezing block 404 squeezes the third spring 403 to move backward until the squeezing block 404 is completely retracted into the movable rod 309. At this time, the staff member stops pushing the trigger block 402. Since the second spring 401 is compressed, the second spring 401 will give the trigger block 402 a forward thrust, so that the trigger block 402 can return to its initial position. At this time, the squeezing block 404 no longer supports the movable rod 309, so that the movable rod 309 It falls downward and makes a quarter circle motion, and the movement of the movable rod 309 will drive the movable sleeve 311 to move together, and the movement of the movable sleeve 311 will drive the collision block 317 to move together, and finally the collision block 317 will hit the test wall 1. After the collision, the staff manually lifts the movable rod 309 to make it return to a horizontal state. At this time, the condition of the test wall 1 after the collision is recorded, and then the height, horizontal position and front and rear position of the collision block 317 can be adjusted to hit different positions of the test wall 1, so as to achieve a more comprehensive measurement effect.
[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A device for testing the impact resistance of a building curtain wall, comprising a test wall (1), wherein a base (2) is movably mounted at the bottom of the front side of the test wall (1), and characterized in that: An adjustment mechanism (3), the adjustment mechanism (3) comprising a first threaded rod (301), a first screw sleeve (302), a connecting block (303) and a fixing frame (304), the first threaded rod (301) being movably mounted at the left rear end of the top end of the base (2), the first screw sleeve (302) being movably mounted on the first threaded rod (301), the connecting block (303) being fixedly mounted on the right side of the first screw sleeve (302), and the fixing frame (304) being fixedly mounted on the right side of the connecting block (303); A trigger mechanism (4), the trigger mechanism (4) comprising a second spring (401) and a trigger block (402), the second spring (401) being fixedly mounted at both ends of the front side of the fixed frame (304), and the trigger block (402) being fixedly mounted at one end of the second spring (401) away from the test wall (1).
2. A device for detecting the impact resistance of a building curtain wall according to claim 1, characterized in that: The adjustment mechanism (3) further comprises a guide rail (305) and a second threaded rod (306); the guide rail (305) is mounted on the right rear end of the top end of the base (2) by means of bolts; a slider is slidably connected inside the guide rail (305), and a fixed frame (304) is fixedly mounted on the left side of the slider by means of bolts; the second threaded rod (306) is mounted on the left side of the rear end inside the fixed frame (304) by means of a bearing.
3. A device for detecting the impact resistance of a building curtain wall according to claim 2, characterized in that: The adjustment mechanism (3) further comprises a rotating disk (307) and a second screw sleeve (308); the rotating disk (307) is mounted on the right end of the second threaded rod (306) by means of bolts; an end of the rotating disk (307) away from the second threaded rod (306) is mounted on the right side of the rear end inside the fixed frame (304) by means of a bearing; and the second screw sleeve (308) is sleeved on the second threaded rod (306).
4. A device for detecting the impact resistance of a building curtain wall according to claim 3, characterized in that: The adjustment mechanism (3) further comprises a movable rod (309) and a limiting groove (310); the movable rod (309) is mounted on the front side of the second screw sleeve (308) by means of bolts; and the limiting groove (310) is provided on the movable rod (309).
5. A device for detecting the impact resistance of a building curtain wall according to claim 4, characterized in that: The adjustment mechanism (3) further comprises a movable sleeve (311) and a fixed sleeve (312); the movable sleeve (311) is sleeved on the movable rod (309); and the fixed sleeve (312) is mounted on the top of the movable sleeve (311) by means of bolts.
6. A device for detecting the impact resistance of a building curtain wall according to claim 5, characterized in that: The adjustment mechanism (3) further comprises a limit block (313) and a fixed plate (314); the limit block (313) is slidably connected inside the limit slot (310); and the fixed plate (314) is mounted on the top of the limit block (313) by means of bolts.
7. A device for detecting the impact resistance of a building curtain wall according to claim 6, characterized in that: The adjustment mechanism (3) further comprises a first spring (315), a handle (316) and a collision block (317); the first spring (315) is mounted on the top of the movable sleeve (311) by means of bolts; one end of the first spring (315) away from the movable sleeve (311) is connected to the fixed plate (314) by means of bolts; and the collision block (317) is mounted on the bottom of the movable sleeve (311) by means of bolts.
8. The device for detecting the impact resistance of a building curtain wall according to claim 7, characterized in that: The trigger mechanism (4) further comprises a third spring (403) and an extrusion block (404); a groove is provided at the front end of the movable rod (309); the third spring (403) is mounted at the rear end of the groove by means of bolts; and an extrusion block (404) is mounted at one end of the third spring (403) away from the test wall (1) by means of bolts.