Ship liquefied gas filling system and filling method
By using top and bottom filling lines and liquid level sensor control in the liquefied gas filling system, the evaporated gas is solved, and the problem of rising storage tank pressure during liquefied gas filling is achieved efficient liquefied gas supply and pressure manage.
Patent Information
- Application Number
- CN202380036497.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-04-27
- Filing Date
- 2023-04-26
- Publication Date
- 2024-12-06
AI Technical Summary
During the filling process of liquefied gas, the pressure inside the storage tank may rise rapidly, resulting in deformation and damage of the storage tank. The prior art is difficult to effectively reduce the amount of evaporated gas generated and the increase in the storage tank pressure.
A marine liquefied gas filling system was designed, using top and bottom filling lines and combining liquid level sensors and control parts to control valve opening by adjusting the supply and flow of liquefied gas, using the injection pipeline and injector to condense the evaporated gas, and control the valve opening. degree and temperature sensor monitoring, optimize the supply of liquefied gas to reduce tank pressure.
A large amount of liquefied gas is supplied in a short period of time, while minimizing the increase in the tank pressure, effectively suppressing the rise in the tank pressure and extending the service life of the tank.
Smart Images

Figure CN119095765A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a ship liquefied gas filling system and a filling method. Background Art
[0002] As the International Maritime Organization (IMO) strengthens regulations on greenhouse gas and various air pollutant emissions, the shipbuilding and shipping industries are increasingly using natural gas, a clean energy source, as ship fuel gas to replace existing fuels such as heavy fuel oil and diesel.
[0003] Natural gas, which is widely used as fuel gas, is mainly composed of methane, which is usually converted into liquefied gas with a volume reduced to 1 / 600. This liquefied gas is stored and transported in insulated tanks installed on the hull.
[0004] Meanwhile, during the filling process of injecting liquefied gas (e.g., LNG) into a storage tank, the pressure inside the storage tank may increase rapidly. Specifically, gas may be generated when the pipeline conveying the liquefied gas is cooled, and gas may be generated when the storage tank is cooled by LNG. The boil-off gas accumulated inside the storage tank may increase the internal pressure of the storage tank and cause deformation and damage to the storage tank, so it is necessary to reduce the amount of boil-off gas generated.
[0005] Traditionally, the gas (boil-off gas) generated during the filling process is compressed by a compressor and returned to the liquefied gas supply side for re-liquefaction, or is burned or discharged to the outside.
[0006] Therefore, there is a need to improve the conventional filling process, such as by performing the filling efficiently to minimize the amount of boil-off gas generated or to minimize the increase in tank pressure. Summary of the invention
[0007] Technical issues to be solved
[0008] Embodiments of the present invention are directed to providing a ship liquefied gas filling system and filling method, which are capable of supplying a large amount of liquefied gas in a short period of time while minimizing the pressure increase of a storage tank receiving the liquefied gas during filling.
[0009] Technical Solution
[0010] According to one aspect of the present invention, a ship liquefied gas filling system can be provided, comprising: a storage tank, arranged on a ship to store liquefied gas; a top filling line, supplying liquefied gas to an inner upper portion of the storage tank; a bottom filling line, supplying liquefied gas to an inner lower portion of the storage tank; a liquid level sensor, measuring the liquid level of the liquefied gas supplied to the storage tank; and a control unit, regulating the supply amount of liquefied gas supplied through the top filling line and the supply amount of liquefied gas supplied through the bottom filling line according to the value measured by the liquid level sensor.
[0011] The top filling line may be connected to an upper portion of the storage tank, and the bottom filling line may be branched from the top filling line and extend to an inner lower portion of the storage tank.
[0012] The top filling line may be connected to an upper portion of the storage tank, and the bottom filling line may be connected to a bottom portion of the storage tank.
[0013] It may further include: a first valve provided at the top filling line to adjust the supply amount of the liquefied gas supplied through the top filling line; and a second valve provided at the bottom filling line to adjust the supply amount of the liquefied gas supplied through the bottom filling line.
[0014] The top filling line may include an injection line configured to inject the liquefied gas into the inside of the storage tank.
[0015] The injection line may include a plurality of holes disposed at prescribed intervals to inject the fluid directly to the liquefied gas interface.
[0016] The invention may further include an ejector provided in at least one of the top filling line and the bottom filling line to suck part of the boil-off gas from the storage tank and condense the part into liquefied gas supplied to the ejection line.
[0017] The method may further include: a steam pipeline for supplying part of the boil-off gas in the storage tank to the ejector, wherein the steam pipeline includes a check valve and a control valve, which are arranged in the steam pipeline to adjust the flow rate or pressure of the boil-off gas.
[0018] It may further include: a first temperature sensor for measuring the temperature of the top filling line; and a second temperature sensor for measuring the temperature inside the storage tank.
[0019] The second temperature sensor may include: a third temperature sensor measuring a temperature of a lower portion of the storage tank; and a fourth temperature sensor measuring a temperature of an upper portion of the storage tank.
[0020] The invention may further include: a flow sensor disposed on the top filling line to measure the flow rate of the liquefied gas supplied through the top filling line.
[0021] The invention may further include: a first pressure sensor disposed at the top filling line to measure the pressure of the top filling line; and a second pressure sensor disposed at the storage tank to measure the pressure inside the storage tank.
[0022] According to another aspect of the present invention, a method for filling a ship with liquefied gas may be provided, comprising the following steps: (a) during filling, supplying liquefied gas to the inside of the storage tank via a top filling line connected to the upper part of the ship storage tank; and (b) when the liquid level of the liquefied gas supplied to the storage tank via the top filling line reaches a first set value, supplying liquefied gas to the inside of the storage tank via a bottom filling line connected to the bottom of the storage tank; wherein, at the beginning and the end of the filling process, the amount of liquefied gas supplied via the top filling line is greater than the amount of liquefied gas supplied via the bottom filling line, wherein the beginning of the filling process is to fill the storage tank with liquefied gas until the first set value is reached, and the end of the filling process is to fill the liquefied gas to the upper liquid level of the storage tank until the second set value is reached.
[0023] A method for filling liquefied gas on a ship can be provided, wherein, in the step (a), at the initial stage of the filling process, liquefied gas flows into the interior of the storage tank through the top filling line, and the temperature of the top filling line and the temperature of the interior of the storage tank are measured, and when the temperature difference between the top filling line and the interior of the storage tank is reduced to a set value, the opening of the first valve arranged on the top filling line is expanded to increase the supply of liquefied gas.
[0024] A method for filling a ship with liquefied gas can be provided, wherein, in the step (b), the liquid level of the liquefied gas supplied to the storage tank is measured, and when the measured liquid level reaches a first set value, the opening of the first valve arranged on the top filling line is reduced, and the opening of the second valve arranged on the bottom filling line is expanded.
[0025] A method for filling liquefied gas on a ship can be provided, further comprising the following steps: when the top filling line and the bottom filling line are used simultaneously to supply liquefied gas, the temperatures of the lower and upper sides of the storage tank are measured respectively; when the temperature difference between the lower and upper sides of the storage tank exceeds a set value, the opening of the first valve arranged on the top filling line is expanded so that the amount of liquefied gas supplied through the top filling line is greater than the amount of liquefied gas supplied through the bottom filling line.
[0026] A method for filling a ship with liquefied gas can be provided, wherein the top filling line is connected to an injection pipeline, the injection pipeline is arranged on the upper inner side of the storage tank and forms a plurality of holes, and the method for filling a ship with liquefied gas further comprises the following steps: based on the pressure difference between the top filling line and the inside of the storage tank, controlling the opening of the first valve of the top filling line so that the flow rate flowing out through the plurality of holes of the injection pipeline is uniform.
[0027] A method for filling liquefied gas on a ship can be provided, wherein the opening of the first valve of the top filling line is controlled so that the porous C in the following mathematical formula d Value increase:
[0028] <Mathematical formula>
[0029]
[0030] In the above mathematical formula, Q is the flow rate of liquefied gas supplied through the top filling line, C d is the injection efficiency of the multiple holes, A is the cross-sectional area of the entire multiple holes, ΔP is the difference between the pressure at the top filling line and the internal pressure of the tank, and ρ is the fluid density at the top filling line.
[0031] A method for filling a ship with liquefied gas may be provided, wherein the first valve is used to control the Q value so that the Cd value is greater than 0.6.
[0032] Beneficial Effects
[0033] The ship liquefied gas filling system and filling method according to the embodiments of the present invention can supply a large amount of liquefied gas in a short time while minimizing the pressure increase of the storage tank receiving the liquefied gas during filling.
[0034] Furthermore, by increasing the amount of liquefied gas supplied through the top filling line at the beginning and end of the filling process, the pressure rise in the tank is suppressed, and when the top filling line and bottom filling line are used simultaneously, efficient filling is achieved by determining the flow rate ratio between the two while minimizing the pressure rise in the tank.
[0035] The effects of the present invention are not limited to the above-mentioned effects, and other effects not mentioned will be clearly understood by those skilled in the art from the description of the claims. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 The diagram shows a state in which, during a ship liquefied gas filling process according to a first embodiment of the present invention, filling is performed based on the temperature of the top filling line and the temperature inside the tank at the beginning of the filling process.
[0037] Figure 2The diagram shows a state in which the flow rate is determined by controlling the valve opening of the top filling line according to the tank liquid level during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0038] Figure 3 1 shows a state in which the flow rate of liquefied gas supplied through the top filling line is controlled based on the temperature of the lower and upper sides of the tank during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0039] Figure 4 The diagram shows a state in which the flow rate of liquefied gas supplied through the top filling line is controlled based on the pressure of the top filling line and the pressure value inside the storage tank during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0040] Figure 5 A graph showing a flow rate supply state according to a liquid level of liquefied gas in a storage tank according to a first embodiment of the present invention.
[0041] Figure 6 A ship liquefied gas filling system according to a second embodiment of the present invention is shown.
[0042] Figure 7 A ship liquefied gas filling system according to a third embodiment of the present invention is shown. DETAILED DESCRIPTION
[0043] Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The embodiments described below are provided only as examples so that those skilled in the art can fully convey the idea of the present invention. The present invention is not limited to the embodiments described below and may be implemented in other forms. In order to clearly explain the present invention, parts irrelevant to the description are omitted in the accompanying drawings, and in the accompanying drawings, the width, length, thickness, etc. of the components may be exaggerated for convenience. Throughout the specification, the same reference numerals refer to the same elements.
[0044] Figure 1 The figure shows the state of filling based on the temperature of the top filling line and the temperature inside the tank at the beginning of the filling process in the process of filling liquefied gas for a ship according to the first embodiment of the present invention, Figure 2 The diagram shows a state in which the flow rate is determined by controlling the valve opening of the top filling line according to the tank liquid level during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0045] The ship liquefied gas filling process according to the first embodiment of the present invention can be applied to various liquefied fuel propelled ships, liquefied fuel RV (Regasification Vessel), container ships, general merchant ships, LNG FPSO (Floating, Production, Storage and Off-loading), LNG FSRU (Floating Storage and Regasification Unit), etc.
[0046] In addition, the liquefied gas stored in the storage tank 101 may be any one of LNG (Liquefied Natural Gas), LPG (Liquefied Petroleum Gas), DME (Dimethylether) and ethane (Ethane) that can be stored in a liquid state, but is not limited thereto. In the first embodiment of the present invention, LNG is used as an example of liquefied gas.
[0047] The storage tank 101 may include a membrane tank, an A-type tank, a B-type tank, and the like that stores fuel in a liquefied state while maintaining a heat-insulated state.
[0048] The top filling line 110 supplies liquefied gas to the upper inner portion of the storage tank 101. The top filling line 110 is connected to the upper inner portion of the storage tank 101, and a spray line 112 connected to the top filling line 110 is provided at the upper inner portion of the storage tank 101. During the filling process, the liquefied gas supplied through the top filling line 110 may be sprayed to the inner side of the storage tank 101 through the spray line 112.
[0049] A plurality of holes H are formed on the injection line 112, and each hole H is arranged at a specified interval, so that the liquefied gas can be injected into the storage tank 101. The fluid can be directly injected to the liquefied gas interface through the plurality of holes H, and the droplets generated by the collision between the liquid surface and the injected liquefied gas can effectively promote the cooling of the storage tank 101. At this time, as the diameter of the hole H decreases, the pressure loss generated in the hole H increases, but the flow deviation between the holes H decreases. Therefore, the supplied flow rate can reflect the loss coefficient of the plurality of holes H according to the flow rate, and different plurality of holes H can be designed according to the size and type of the storage tank 101.
[0050] The bottom filling line 120 supplies liquefied gas to the lower inner portion of the storage tank 101. The bottom filling line 120 is connected to the bottom of the storage tank 101 and supplies liquefied gas to the inside of the storage tank 101. The diameter of the bottom filling line 120 may be manufactured to be larger than the diameter of the top filling line 110.
[0051] Hereinafter, a liquefied gas filling process for a ship according to a first embodiment of the present invention will be described.
[0052] like Figure 1As shown, at the beginning of the filling process, liquefied gas is supplied to the inside of the tank 101 through the top filling line 110 connected to the upper part of the ship tank 101. For example, the tank 101 side of a liquefied gas tank truck, a fixed liquefied gas storage tank on land, a liquefied gas terminal or an offshore floating liquefied gas storage vessel can be filled.
[0053] At this time, when a minimum amount of liquefied gas flows into the interior of the storage tank 101 through the top filling line 110, the temperature of the top filling line 110 and the temperature inside the storage tank 101 are measured by the first and second temperature sensors T1 and T2, respectively. The flow rate of liquefied gas supplied through the top filling line 110 is measured by the flow sensor F1.
[0054] The control unit 130 performs control operations in combination with various means to ensure that the liquefied gas filling process is effectively performed. When the temperature difference between the top filling line 110 and the inside of the storage tank 101 decreases to a set value, the control unit 130 expands the opening of the first valve V11 set on the top filling line 110 based on the liquefied gas flow rate measured by the flow sensor F1 to increase the flow rate of the liquefied gas supplied through the top filling line 110.
[0055] At the beginning of the filling process, when liquefied gas is supplied through the top filling line 110, boil-off gas is generated in the pipe through which the liquefied gas flows, which causes an increase in the pressure of the storage tank 101. Therefore, in the first embodiment of the present invention, the time point when the cooling of the pipe is completed is determined based on the temperature difference between the top filling line 110 and the inside of the storage tank 101, and the flow rate of the top filling line 110 is increased to achieve formal filling.
[0056] When the flow rate of the top filling line 110 increases, the gas can be condensed to suppress the pressure rise of the storage tank 101. The flow rate of the top filling line 110 increased in the early stage of the filling process condenses the gas generated during the pipeline cooling process, and the flow rate of the top filling line 110 increased in the later stage controls the sensitive pressure behavior of the small volume of gas.
[0057] The ejector 140 may be provided at least one of the top filling line 110 and the bottom filling line 120. The ejector 140 may be installed at a position close to the ejection line 112 on the top filling line 110. The purpose of providing the ejector 140 is to absorb part of the boil-off gas from the storage tank 101 and condense it into liquefied gas supplied to the ejection line 112. To this end, a steam line 130 is provided to supply part of the boil-off gas in the storage tank 101 to the ejector 140.
[0058] The ejector 140 uses the Bernoulli principle of the ejector to draw the high-pressure liquid fuel and boil-off gas inside the storage tank 101 into the vapor line 130 , so that the boil-off gas and the liquid fuel are mixed together and supplied to the injection line 112 .
[0059] Therefore, when the boil-off gas in the tank 101 flows into the ejector 140, it can guide the decompression of the tank 101. In addition, since the boil-off gas in the tank 101 condenses into the liquid fuel supplied through the top filling line 110, the boil-off gas in the tank 101 can be continuously supplied to the ejector 140.
[0060] In addition, the steam line 130 may be provided with a check valve 132 and a control valve 131 for adjusting the flow rate or pressure of the boil-off gas supplied to the ejector 140, wherein the control valve 131 is a flow control valve or a pressure control valve, so that the boil-off gas passing through the steam line 130 is supplied to the ejector 140 at a constant pressure or flow rate.
[0061] Next, refer to Figure 2 When the liquid level of the liquefied gas supplied to the storage tank 101 through the top filling line 110 reaches a first set value, the liquefied gas is supplied to the inside of the storage tank 101 through the bottom filling line 120 connected to the bottom of the storage tank 101 .
[0062] In this way, by simultaneously supplying liquefied gas through the top filling line 110 and the bottom filling line 110 , a larger flow rate can be effectively supplied to the storage tank 101 .
[0063] The liquid level of the liquefied gas supplied to the storage tank 101 may be measured by the liquid level sensor L1 , and the control portion 130 may control the openings of the first valve V11 of the top filling line 110 and the second valve V12 of the bottom filling line 120 based on the value measured by the liquid level sensor L1 .
[0064] Specifically, as an example, until the 20% liquid level (first set value) of the storage tank 101, in order to cool the upper part of the storage tank 101, the opening of the first valve V11 of the top filling line 110 is expanded to increase the supply amount of liquefied gas supplied to the storage tank 101 side.
[0065] In addition, when the liquid level of the storage tank 101 is between 20% and 80%, the second valve V2 of the bottom filling line 120 is fully opened, and the opening of the first valve V11 of the top filling line 110 is controlled and adjusted so that the amount of liquefied gas supplied through the top filling line 110 is less than the amount of liquefied gas supplied through the bottom filling line 120.
[0066] In addition, when the liquid level of the storage tank 101 exceeds 80% (the second set value), the opening of the first valve V11 of the top filling line 110 is again expanded so that it is greater than the opening of the second valve V12 of the bottom filling line 120, and adjustment is performed so that the amount of liquefied gas supplied through the top filling line 110 is greater than the amount of liquefied gas supplied through the bottom filling line 120.
[0067] Thereby, the flow rate of liquefied gas supplied to the top filling line 110 of the storage tank 101 at the initial and later stages of filling can be increased, and the cooling and condensation of the gas can be promoted to minimize the pressure rise of the storage tank 101 .
[0068] Figure 3 1 shows a state in which the flow rate of liquefied gas supplied through the top filling line is controlled based on the temperature of the lower and upper sides of the tank during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0069] At the same time, refer to Figure 3 In the process of filling liquefied gas through the above-mentioned top filling line 110 and the bottom filling line 120, the temperatures of the lower and upper sides of the storage tank 101 are measured by the third and fourth temperature sensors T3 and T4 respectively. When the temperature difference between the lower and upper sides of the storage tank 101 exceeds the set value, the control unit 130 can expand the opening of the first valve V11 set on the top filling line 110, so that the amount of liquefied gas injected through the top filling line 110 is greater than the amount of liquefied gas injected through the bottom filling line 120.
[0070] That is, by increasing the opening of the first valve V11 of the top filling line 110 to increase the flow rate of the liquefied gas supplied to the storage tank 101, the pressure rise of the storage tank 101 can be suppressed, thereby reducing the temperature difference between the lower part and the upper part of the storage tank 101. The temperature difference between the lower part and the upper part of the storage tank 101 can be used as a basis for determining the flow rate ratio of the top filling line 110 and the bottom filling line 120.
[0071] The third and fourth temperature sensors T3 and T4 are respectively attached to the upper and lower sides of the wall of the storage tank 101 and measure the temperature. The temperature of the wall of the storage tank 101 increases with the increase of the pressure of the evaporation gas. In order to suppress the pressure of the storage tank 101 during the filling process, the temperature of the upper part of the storage tank 101 must be reduced. If the temperature difference between the upper wall and the lower wall of the storage tank 101 increases, it indirectly proves that temperature stratification has occurred in the liquid area. At this time, the opening of the first valve V11 of the top filling line 110 is expanded to increase the supply of liquefied gas to the upper side of the storage tank 101.
[0072] In this way, the temperature difference control process between the lower and upper parts of the storage tank 101 can be used in the middle of filling when the top filling line 110 and the bottom filling line 120 are used simultaneously, so that the flow rate ratio of the top filling line 110 and the bottom filling line 120 can be determined.
[0073] Figure 4 The diagram shows a state in which the flow rate of liquefied gas supplied through the top filling line is controlled based on the pressure of the top filling line and the pressure value inside the storage tank during the ship liquefied gas filling process according to the first embodiment of the present invention.
[0074] Reference Figure 4During the liquefied gas filling process through the above-mentioned top filling line 110 and the bottom filling line 120, the pressure of the top filling line 110 and the pressure inside the storage tank 101 are respectively measured by pressure gauges P1 and P2, and the control unit 130 controls the opening of the first valve V11 of the top filling line 110 based on the measured pressure values, so that the flow rate flowing out through the multiple holes H of the injection line 112 is uniform.
[0075] By supplying a uniform flow rate through the plurality of holes H, effective cooling and condensation of the gas can be achieved.
[0076] At this time, the control unit 130 can control the opening of the first valve V11 of the top filling line 110 so that the C of the plurality of holes in the following mathematical formula is d The value increases.
[0077] <Mathematical formula>
[0078]
[0079] In the above mathematical formula, Q is the flow rate of liquefied gas supplied through the top filling line, C d is the injection efficiency of the plurality of holes H, A is the cross-sectional area of the entire plurality of holes H, ΔP is the difference between the pressure of the top filling line and the internal pressure of the tank, and ρ is the fluid density of the top filling line. At this time, the first valve can be used to control the Q value so that C d The value is preferably 0.6 or more.
[0080] As the flow rate of liquefied natural gas through the multiple holes H increases, the resistance of the multiple holes H decreases. As the flow rate of liquefied gas increases, the resistance of the multiple holes H decreases rapidly and then gradually, which means that the flow rate flows out uniformly through the multiple holes H. Therefore, based on the above mathematical formula, the operating condition in which the resistance of the multiple holes H gradually decreases can be maintained, so that a large flow rate can be supplied with a small pressure drop, thereby achieving efficient filling.
[0081] The performance of the injection line 112 formed with a plurality of holes H varies according to the flow rate. By injecting a uniform flow of liquefied gas from each hole H into the inside of the storage tank 101, pressure loss can be effectively reduced, and the filling process can be performed quickly and efficiently.
[0082] Figure 5 A graph showing a flow rate supply state according to a liquid level of liquefied gas in a storage tank according to a first embodiment of the present invention.
[0083] Reference Figure 5 As described above, at the beginning of the filling process, liquefied gas is supplied to the inside of the storage tank 101 through the top filling line 110 until the liquid level of the liquefied gas in the storage tank 101 reaches a first set value.
[0084] Then, after reaching the first set value, the second valve V12 of the bottom filling line 120 is fully opened, and the first valve V11 of the top filling line 110 is adjusted so that the amount of liquefied gas supplied through the bottom filling line 120 is greater than the amount supplied through the top filling line 110.
[0085] Furthermore, at the end of the filling process, when the upper liquid level of the liquefied gas rushed into the storage tank 101 reaches a second set value, the first valve V11 of the top filling line 110 and the second valve V12 of the bottom filling line 120 are adjusted so that the supply amount of liquefied gas supplied through the top filling line 110 is greater than the supply amount of liquefied gas supplied through the bottom filling line 120.
[0086] When the first valve V11 of the top filling line 110 and the second valve V12 of the bottom filling line 120 are used simultaneously, as Figure 3 and Figure 4 As shown, the amount of liquefied gas supplied through the top filling line 110 is adjusted based on the temperature difference between the lower and upper parts of the storage tank 101 and the pressure difference between the top filling line 110 and the inside of the storage tank 101, thereby suppressing the generation of evaporation gas, adjusting the pressure inside the storage tank 101 and ensuring the effective injection of liquefied gas, so that the filling is carried out efficiently.
[0087] Figure 6 A ship liquefied gas filling system according to a second embodiment of the present invention is shown.
[0088] Reference Figure 6 Compared with the first embodiment, the ship liquefied gas filling system according to the second embodiment of the present invention has a different connection structure of the bottom filling line 120, and other structures and operation modes of the structures are the same as those of the first embodiment.
[0089] Specifically, the bottom filling line 120 of the second embodiment branches from the top filling line 110 and extends to the inner lower portion of the storage tank 101. In the second embodiment, the ejector 140 is provided in the top filling line 110, and the bottom filling line 120 branches from the portion of the top filling line 110 passing through the ejector 140, but the connection structure of the bottom filling line 120 is not limited thereto, and may branch from the portion before passing through the ejector 140.
[0090] Figure 7 A ship liquefied gas filling system according to a third embodiment of the present invention is shown.
[0091] Reference Figure 7 Compared with the second embodiment, the ship liquefied gas filling system according to the third embodiment of the present invention has a different configuration structure of the ejector 140, and other structures and operation modes of the structures are the same as those of the second embodiment.
[0092] Specifically, the ejector 140 of the third embodiment is provided in the bottom filling line 120 .
[0093] The above is an illustration and description of specific embodiments, but the present invention is not limited thereto, and a person skilled in the art should be able to make various changes without departing from the spirit of the technical concept of the present invention as described in the appended claims.
Claims
1. A ship liquefied gas filling system, in, include: Storage tanks, installed on ships to store liquefied gas; a top filling line for supplying liquefied gas to the inner upper portion of the storage tank; a bottom filling line for supplying liquefied gas to the inner lower portion of the storage tank; a liquid level sensor to measure the liquid level of the liquefied gas supplied to the storage tank; as well as A control part adjusts a supply amount of the liquefied gas supplied through the top filling line and a supply amount of the liquefied gas supplied through the bottom filling line according to a value measured by the liquid level sensor.
2. The ship liquefied gas filling system according to claim 1, in, The top filling line is connected to the upper part of the tank, The bottom filling line branches off from the top filling line and extends to an inner lower portion of the storage tank.
3. The ship liquefied gas filling system according to claim 1, in, The top filling line is connected to the upper part of the tank, The bottom filling line is connected to the bottom of the tank.
4. The ship liquefied gas filling system according to claim 1, in, Further including: a first valve disposed at the top filling line to adjust a supply amount of liquefied gas supplied through the top filling line; and A second valve is provided at the bottom filling line to adjust the supply amount of the liquefied gas supplied through the bottom filling line.
5. The ship liquefied gas filling system according to claim 1, in, The top filling line includes: The injection pipeline is configured to inject the liquefied gas into the inner side of the storage tank.
6. The ship liquefied gas filling system according to claim 5, in, The injection pipeline comprises: A plurality of holes are arranged at specified intervals to directly spray the fluid onto the liquefied gas interface.
7. The ship liquefied gas filling system according to claim 1, in, Further including: An ejector is provided in at least one of the top filling line and the bottom filling line to suck part of the boil-off gas from the storage tank and condense it into liquefied gas supplied to the ejection line.
8. The ship liquefied gas filling system according to claim 7, in, Further including: a steam line for supplying part of the boil-off gas in the storage tank to the ejector; The steam pipeline includes a check valve and a control valve, which are arranged in the steam pipeline to adjust the flow rate or pressure of the boil-off gas.
9. The ship liquefied gas filling system according to claim 1, in, Further including: a first temperature sensor to measure the temperature of the top filling line; and The second temperature sensor measures the temperature inside the storage tank.
10. The ship liquefied gas filling system according to claim 9, in, The second temperature sensor comprises: a third temperature sensor, measuring the temperature of the lower portion of the storage tank; and The fourth temperature sensor measures the temperature of the upper portion of the storage tank.
11. The ship liquefied gas filling system according to claim 1, in, Further including: A flow sensor is provided on the top filling line to measure the flow of the liquefied gas supplied through the top filling line.
12. The ship liquefied gas filling system according to claim 1, in, Further including: A first pressure sensor is disposed at the top filling line to measure the pressure of the top filling line; and The second pressure sensor is disposed in the storage tank to measure the pressure inside the storage tank.
13. A method for filling liquefied gas on a ship, in, The following steps are involved: (a) during filling, the liquefied gas is supplied to the inside of the tank through a top filling line connected to the upper part of the tank of the vessel, and (b) when the liquid level of the liquefied gas supplied to the storage tank through the top filling line reaches a first set value, supplying the liquefied gas into the inside of the storage tank through a bottom filling line connected to the bottom of the storage tank; Among them, at the initial stage and the end stage of the filling process, the supply amount of liquefied gas supplied through the top filling line is greater than the supply amount of liquefied gas supplied through the bottom filling line, wherein the initial stage of the filling process is to fill the storage tank with liquefied gas until the first set value is reached, and the end stage of the filling process is to fill the liquefied gas to the upper liquid level of the storage tank to reach the second set value.
14. The method for filling a ship with liquefied gas according to claim 13, in, In the step (a), At the beginning of the filling process, liquefied gas flows into the interior of the storage tank through the top filling line, and the temperature of the top filling line and the temperature inside the storage tank are measured, When the temperature difference between the top filling line and the inside of the storage tank is reduced to a set value, the opening of the first valve arranged on the top filling line is expanded to increase the supply amount of the liquefied gas.
15. The method for filling a ship with liquefied gas according to claim 13, in, In the step (b), measuring the level of liquefied gas supplied to the tank, and When the measured liquid level reaches a first set value, the opening of the first valve arranged on the top filling line is reduced, and the opening of the second valve arranged on the bottom filling line is expanded.
16. The method for filling a ship with liquefied gas according to claim 13, in, Further comprising the steps of: When the top filling line and the bottom filling line are used to supply liquefied gas at the same time, measuring the temperatures of the lower and upper sides of the tank respectively; When the temperature difference between the lower and upper sides of the storage tank exceeds a set value, the opening of the first valve arranged on the top filling line is expanded so that the liquefied gas supply through the top filling line is greater than the liquefied gas supply through the bottom filling line.
17. The method for filling liquefied gas for a ship according to claim 13, in, The top filling line is connected to a spray line, which is arranged at the upper inner side of the storage tank and is formed with a plurality of holes. The ship liquefied gas filling method further comprises the following steps: Based on the pressure difference between the top filling line and the inside of the storage tank, the opening of the first valve of the top filling line is controlled so that the flow rates flowing out through the plurality of holes of the injection line are uniform.
18. The method for filling liquefied gas for a ship according to claim 17, in, Control the opening of the first valve of the top filling line so that the C of the multiple holes in the following mathematical formula is d Value increase: <Mathematical formula> In the above mathematical formula, Q is the flow rate of liquefied gas supplied through the top filling line, C d is the injection efficiency of the multiple holes, A is the cross-sectional area of the entire multiple holes, ΔP is the difference between the pressure at the top filling line and the internal pressure of the tank, and ρ is the fluid density at the top filling line.
19. The method for filling a ship with liquefied gas according to claim 18, in, The Q value is controlled by using the first valve so that the Cd value is greater than 0.6.
