Fabricated stone unit curtain wall system
Through the prefabricated stone unit curtain wall system, the main body production and welding are completed in the factory, combined with components such as chromium-based waterproof aluminum plate thermal insulation rock wool, the existing stone curtain wall construction efficiency and environmental protection problems are solved, and an efficient and green construction process and building quality are achieved. promote.
CN119122162APending Publication Date: 2024-12-13DECORATION CO LTD OF CHINA CONSTR 3RD ENG BUREAU
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202411429858.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-12-13
Smart Images

Figure CN119122162A_ABST
Abstract
The invention discloses an assembly type stone unit curtain wall system which comprises a building main body structure, a groove type embedded part, a first hot-dip galvanized steel machined part, a bolt and a second hot-dip galvanized steel machined part, the bolt is arranged on the second hot-dip galvanized steel machined part, the first hot-dip galvanized steel machined part is arranged on the bolt, and the first hot-dip galvanized steel machined part is arranged on the second hot-dip galvanized steel machined part. The first hot-dip galvanized steel machined part is connected with a building main body structure through a groove type embedded part, the lower end of the second hot-dip galvanized steel machined part is connected with chromized waterproof aluminum plate heat preservation rock wool, and the lower end of the chromized waterproof aluminum plate heat preservation rock wool is provided with a fourth hot-dip galvanized steel machined part. A third stainless steel adjusting bolt is connected to the side end of the fourth hot-dip galvanized steel machined part, a third hot-dip galvanized steel machined part is connected to the side end of the third stainless steel adjusting bolt, and a third hot-dip galvanized steel square pipe is connected to the other side of the fourth hot-dip galvanized steel machined part. And the lower end of the third hot-dip galvanized steel square tube is connected with an assembly type steel truss. According to the assembly type stone unit curtain wall system, the purpose of curtain wall installation is achieved through the arrangement of the structure.
Need to check novelty before this filing date? Find Prior Art
