Method, system and equipment for evaluating old utilization scheme of built facility and medium

By evaluating the existing facilities of the mountain tunnel and evaluating the suitability evaluation index system, determining the suitability score and adjusting the old-fashioned plan, the problem of tunnel old-fashioned evaluation in the existing technology is solved, and the problem of lack of scientificity and universality in the existing technology is improved. The safe and economic operation of the tunnel.

CN119130221APending Publication Date: 2024-12-13PIPECHINA SOUTH CHINA CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411056834.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-13

AI Technical Summary

Technical Problem

The existing technology lacks scientific and universal methods for assessing the suitability of existing facilities in mountain tunnels, resulting in a lack of data foundation and technical support for tunnel planning, affecting the safety, economic and stable operation of the tunnel.

Method used

Provide a method for evaluation of old-prepared schemes for the built-in facilities of mountain tunnels. Through exploration and collection of basic evaluation parameters, combined with preset suitability evaluation index system, the suitability score is determined, and the old-prepared scheme is adjusted according to the score to form a four-layer structure evaluating the tunnel's advantageous suitability.

Benefits of technology

It has achieved a comprehensive identification of factors that affect before and after the mountain tunnel, provided more accurate evaluation results for the old-fashioned plan, and can adjust the built-in facilities according to the evaluation results to improve the suitability and operation stability of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119130221A_ABST
    Figure CN119130221A_ABST
Patent Text Reader

Abstract

The invention discloses an old utilization scheme evaluation method, system, equipment and medium for a built facility, and relates to the technical field of oil and gas pipeline engineering technology evaluation.The method comprises the steps that exploration collection is conducted on a mountain tunnel to be evaluated, and basic evaluation parameters corresponding to the mountain tunnel to be evaluated are obtained; determining a score corresponding to each index in the basic evaluation parameters through a preset suitability evaluation index system according to the basic evaluation parameters; determining a suitability score corresponding to the to-be-evaluated mountain tunnel on the basis of the score corresponding to each index in combination with the weight corresponding to each index; and determining an old utilization scheme evaluation result of the built facilities of the mountain tunnel to be evaluated according to the suitability score. According to the method, on the basis of the preset suitability evaluation index system, on-site detection results of the built facilities in the mountain tunnel are combined, main factors of the suitability of old utilization of the tunnel are better fitted, and meanwhile, the technical problem that no related evaluation method for old utilization of the tunnel exists at present in China is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] The construction of oil and gas pipelines has entered a peak period, and the total mileage of pipelines has shown explosive growth. In view of the rapid development of the region and safety considerations, long-distance pipelines are currently mostly laid in mountainous areas; considering the damage to the ecological environment caused by the construction of long-distance pipelines, the built pipelines usually use tunnels to pass through the mountains. In order to achieve a wide coverage and diversified structure of the oil and gas pipeline network system, taking into account the uniqueness of the pipeline route, the protection of the ecological environment and the economy of the project investment and other key factors, it has become a trend to use existing tunnels to lay new pipelines.

[0003] The mountain tunnel of oil and gas pipeline is mainly composed of the external environment, the tunnel body, and the existing facilities in the mountain tunnel. Among them, the existing facilities in the mountain tunnel are the key factors affecting whether the tunnel can be reused. Therefore, conducting a study on the suitability evaluation of the reuse of the existing facilities in the mountain tunnel is of vital importance to promote the safe, economical and stable operation of the pipeline in the mountain tunnel.

[0004] At present, the current evaluation methods for the suitability of existing facilities in mountain tunnels are mostly based on specific engineering cases. Through simple geometric calculations, suggestions are provided for existing facilities in mountain tunnels under certain working conditions. There is a lack of a universal evaluation system based on data and scientific research methods. There are almost no literature and patents on the evaluation methods for the suitability of existing facilities in mountain tunnels, and there is no mature evaluation method for the suitability of existing facilities in mountain tunnels. Therefore, it is urgent to form patent results for new evaluation methods for the suitability of existing facilities in mountain tunnels to provide solutions for engineering. Summary of the invention

[0005] The technical problem to be solved by the present invention is to address the deficiencies of the prior art and specifically provide a method, system, device and medium for evaluating a reuse plan for existing facilities, as follows:

[0006] 1) In the first aspect, the present invention provides a method for evaluating a reuse plan for existing facilities in a mountain tunnel, and the specific technical scheme is as follows:

[0007] Conducting exploration and collection of the mountain tunnel to be evaluated to obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated;

[0008] According to the basic evaluation parameters, by presetting a suitability evaluation index system, determining the score corresponding to each indicator in the basic evaluation parameters;

[0009] Based on the score corresponding to each indicator and the weight corresponding to each indicator, determine the suitability score corresponding to the mountain tunnel to be evaluated;

[0010] An evaluation result of a reuse plan for the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

[0011] The beneficial effects of the method for evaluating the reuse scheme of existing facilities in a mountain tunnel provided by the present invention are as follows:

[0012] The present invention, based on a preset suitability evaluation index system, combines the on-site inspection results of existing facilities in mountain tunnels, fully identifies the influencing factors of mountain tunnels under single-tube operation before reuse and under double-tube operation after reuse, and is more in line with the main factors of tunnel reuse suitability. It also solves the technical problem that there is currently no relevant evaluation method for tunnel reuse in China. At the same time, the evaluation method does not restrict the operating parameters and has strong generalization ability. In addition, according to the evaluation results, the existing facilities can be adjusted more accurately.

[0013] Based on the above solution, the present invention can also be improved as follows.

[0014] Furthermore, the preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to the first-level index, the second-level index, the third-level index and the fourth-level index respectively.

[0015] Furthermore, based on the score corresponding to each indicator and in combination with the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows:

[0016] Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

[0017] Further, the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the process of adjusting the existing facilities according to the reuse scheme evaluation result is specifically as follows:

[0018] Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

[0019] 2) In a second aspect, the present invention further provides a system for evaluating reuse plans for existing facilities in mountain tunnels, and the specific technical solutions are as follows:

[0020] The acquisition module is used to: perform exploration and acquisition on the mountain tunnel to be evaluated, and obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated;

[0021] The first determination module is used to: determine the score corresponding to each indicator in the basic evaluation parameters according to the basic evaluation parameters by presetting the suitability evaluation indicator system;

[0022] The second determination module is used to determine the suitability score corresponding to the mountain tunnel to be evaluated based on the score corresponding to each indicator and the weight corresponding to each indicator;

[0023] The evaluation module is used to determine the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjust the existing facilities according to the evaluation result of the reuse plan.

[0024] Based on the above solution, the present invention can also be improved as follows.

[0025] Furthermore, the preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to the first-level index, the second-level index, the third-level index and the fourth-level index respectively.

[0026] Furthermore, based on the score corresponding to each indicator and in combination with the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows:

[0027] Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

[0028] Further, the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the process of adjusting the existing facilities according to the reuse scheme evaluation result is specifically as follows:

[0029] Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

[0030] 3) In a third aspect, the present invention further provides an electronic device, comprising a processor, wherein the processor is coupled to a memory, wherein at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor so that the electronic device implements any of the above methods.

[0031] 4) In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein at least one computer program is stored in the computer-readable storage medium, and the at least one computer program is loaded and executed by a processor so that a computer implements any of the above methods.

[0032] It should be noted that the beneficial effects achieved by the technical solutions of the second to fourth aspects of the present invention and the corresponding possible implementation methods can be found in the above-mentioned technical effects of the first aspect and its corresponding possible implementation methods, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0034] Figure 1 A schematic diagram of a flow chart of a method for evaluating a reuse plan for existing facilities in a mountain tunnel according to an embodiment of the present invention;

[0035] Figure 2 The present invention is a structural framework diagram of an electronic device. DETAILED DESCRIPTION

[0036] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0037] like Figure 1 As shown, a method for evaluating a reuse plan for existing facilities in a mountain tunnel according to an embodiment of the present invention includes the following steps:

[0038] S1, performing exploration and collection on the mountain tunnel to be evaluated to obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated;

[0039] S2, according to the basic evaluation parameters, by presetting a suitability evaluation index system, determining the score corresponding to each indicator in the basic evaluation parameters;

[0040] S3, determining the suitability score corresponding to the mountain tunnel to be evaluated based on the score corresponding to each indicator and the weight corresponding to each indicator;

[0041] S4, determining the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjusting the existing facilities according to the evaluation result of the reuse plan.

[0042] The beneficial effects of the method for evaluating the reuse scheme of existing facilities in a mountain tunnel provided by the present invention are as follows:

[0043] Based on a preset suitability evaluation index system, the present invention combines the on-site inspection results of existing facilities in mountain tunnels, fully identifies the influencing factors of mountain tunnels under single-tube operation before reuse and under double-tube operation after reuse, and is more in line with the main factors of tunnel reuse suitability.

[0044] S1, perform exploration and collection on the mountain tunnel to be evaluated to obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated. Among them:

[0045] The basic evaluation parameters are shown in Table 1, which shows a data reference table of existing facilities in mountain tunnels.

[0046] Table 1

[0047]

[0048]

[0049] S2, according to the basic evaluation parameters, by presetting the suitability evaluation index system, determining the score corresponding to each indicator in the basic evaluation parameters.

[0050] The preset suitability evaluation index system is shown in Table 2.

[0051] Table 2

[0052]

[0053]

[0054] The preset suitability evaluation index system has a four-layer structure. The first-level index W is the suitability of the existing utility in the mountain tunnel; there are two second-level indicators, namely the suitability X1 before the existing utility in the mountain tunnel and the suitability X2 after the existing utility in the mountain tunnel; 9 third-level indicators, including Y11~Y15, Y21~Y24; 29 fourth-level indicators, including Z111~Z115, Z121~Z122, Z131~Z132, Z141~Z145, Z151~Z154, Z211, Z221, Z231~Z235, and Z241~Z243.

[0055] The process of determining the score corresponding to each indicator in the basic evaluation parameters is as follows:

[0056] The values ​​corresponding to each indicator in the basic evaluation parameters are determined through the contents shown in Table 3. The values ​​corresponding to any indicator are usually displayed as the mean of the scores corresponding to the suitability evaluation indicators.

[0057] Table 3

[0058]

[0059]

[0060]

[0061]

[0062] Pmax is the maximum safe operating pressure of the pipeline, MPa; MAOP is the maximum allowable operating pressure of the pipeline, MPa; PLs is the ultimate internal pressure of the pipeline, MPa; σ is the peeling strength of the pipeline anti-corrosion layer, N·cm -1 ; K is the relative depression depth of the pipeline, %; R is the radius of curvature of the pipeline, m; D is the outer diameter of the pipeline, m; LA is the moving distance of the anchor pier, mm; θ is the proportion of concrete peeling piers, %; Lc is the carbonization depth of concrete, mm; λ is the proportion of piers with mesh cracks, %; η is the amount of exposed reinforcement corrosion, %; We is the amount of corrosion of embedded anchors, %; δ is the amount of corrosion of pipe supports and pipe clamps, %; c is the number of pipe clamps that fall off; τ is the amount of corrosion of connecting bolts, %; α is the proportion of loose connecting bolts, %; rcorr is the annual corrosion rate, μm / a.

[0063] S3, based on the score corresponding to each indicator and the weight corresponding to each indicator, determine the suitability score corresponding to the mountain tunnel to be evaluated. Wherein:

[0064] The weight corresponding to each indicator is pre-set, as shown in Table 4.

[0065] Table 4

[0066]

[0067]

[0068] The process of determining the suitability score corresponding to the mountain tunnel to be evaluated is as follows:

[0069] The third-level index score is calculated by formula (1); the second-level index score is calculated by formula (2); the first-level index score and the suitability score of the existing facilities in the mountain tunnel are calculated by formula (3).

[0070]

[0071] Where W is the score of the first-level index (suitability of existing construction facilities in mountain tunnels); X i is the suitability score of the i-th secondary indicator; Y ij Z is the suitability score of the jth third-level indicator under the i-th second-level indicator; ijk is the suitability score of the kth fourth-level evaluation index under the jth third-level index; l is the number of second-level evaluation indicators; m is the number of third-level evaluation indicators, and n is the number of fourth-level evaluation indicators; w i is the weight of the secondary index to the target layer; w ij is the weight of the jth third-level evaluation index in the i-th second-level evaluation index; w ijk is the weight of the kth fourth-level evaluation indicator in the jth third-level evaluation indicator.

[0072] The suitability score of the existing construction in the mountain tunnel is up to 100 points, and the suitability score of the secondary evaluation index is X i The highest score is 100, and the suitability score of the three-level evaluation indicators is Y ij The highest score is 100, and the suitability score of the four-level evaluation indicators is Z ijk Maximum 100 points.

[0073] S4, determining the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjusting the existing facilities according to the evaluation result of the reuse plan.

[0074] The specific process is:

[0075] a) If W∈(90-100], the suitability level is high and reuse can be carried out directly without taking additional technical and management precautions;

[0076] b) If W∈(75-90], the suitability level is high and reuse can be carried out after taking simple additional technical and management precautions;

[0077] c) If W∈(60-75], the suitability level is medium and reuse can be carried out after taking additional technical and management precautions;

[0078] d) If W∈(45-60], the suitability level is low and effective measures should be taken before continuing to evaluate the suitability of reuse;

[0079] e) If W∈[0-45], the suitability level is low and cannot be reused.

[0080] Furthermore, the preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to the first-level index, the second-level index, the third-level index and the fourth-level index respectively.

[0081] Furthermore, based on the score corresponding to each indicator and in combination with the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows:

[0082] Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

[0083] Further, the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the process of adjusting the existing facilities according to the reuse scheme evaluation result is specifically as follows:

[0084] Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

[0085] Embodiment 1: This embodiment provides a method for evaluating a reuse plan for existing facilities in a mountain tunnel, comprising the following steps:

[0086] 1. Data Collection

[0087] Through field investigation, communication with pipeline management personnel and review of relevant literature, basic information, construction and operation status, test and evaluation data, and maintenance information of existing facilities in typical mountain tunnels were collected, as shown in Table 5.

[0088] Table 5

[0089]

[0090]

[0091] Calculation of quantitative scores for level II and IV indicators

[0092] By collecting the basic data of existing facilities in typical mountain tunnels before reuse, and using the BPNNs method to build a prediction model, quantitative scoring of various indicators after reuse is performed. The specific scoring results are shown in Table 6.

[0093] Table 6 Four-level index scoring table for suitability of existing construction sites in mountain tunnels

[0094]

[0095]

[0096]

[0097] III. Calculation of suitability scores for existing construction sites in mountain tunnels

[0098] 1. Factors affecting pipeline defects before reuse include:

[0099] a) Corrosion defects inside the pipeline body; b) Corrosion defects outside the pipeline body; c) Pipeline manufacturing defects; d) Abnormal girth welds; e) Abnormal spiral welds; f) Abnormal straight welds;

[0100] The suitability score of pipeline defects before reuse is:

[0101] Y11=Z111×w111+Z112×w112+Z113×w113+Z114×w114+Z115×w115+Z116×w116=95.55

[0102] Among them, w111 is the weight of the corrosion defect inside the pipeline body, w112 is the weight of the corrosion defect outside the pipeline body, w113 is the weight of the pipeline manufacturing defect, w114 is the abnormal weight of the girth weld, w115 is the abnormal weight of the spiral weld, w116 is the abnormal weight of the straight weld, w111=0.092, w112=0.092, w113=0.066, w114=0.25, w115=0.25, w116=0.25; Z111 is the score of the corrosion defect inside the pipeline body; Z112 is the score of the corrosion defect outside the pipeline body; Z113 is the score of the pipeline manufacturing defect; Z114 is the abnormal score of the girth weld; Z115 is the abnormal score of the spiral weld; Z116 is the abnormal score of the straight weld.

[0103] 2. Factors affecting pipeline protection before reuse include:

[0104] a) Pipeline anti-corrosion layer is damaged; b) Pipeline is damaged;

[0105] The suitability score of pipeline protection before reuse is:

[0106] Y12=Z121×w121+Z122×w122=81.77

[0107] Among them, w121 is the pipeline anti-corrosion layer damage weight, w122 is the pipeline smashing weight, w121=0.366, w122=0.634; Z121 is the pipeline anti-corrosion layer damage score; Z122 is the pipeline smashing score.

[0108] 3. Factors affecting the reuse of pipeline structures include:

[0109] a) Pipeline deformation; b) Anchor pier movement;

[0110] The score of the pipeline structure before reuse is:

[0111] Y13=Z131×w131+Z132×w132=71.58

[0112] Among them, w131 is the pipeline deformation weight, w132 is the anchor pier movement weight, w131=0.568, w132=0.431; Z131 is the pipeline deformation score; Z132 is the anchor pier movement score.

[0113] 4. Factors affecting the reuse of pipeline piers include:

[0114] a) Concrete peeling; b) Concrete carbonization; c) Net-like cracks; d) Exposed reinforcement corrosion; e) Embedded anchor corrosion;

[0115] The suitability score of the pipeline support before reuse is:

[0116] Y14=Z141×w141+Z142×w142+Z143×w143+Z144×w144+Z145×w145=91.40

[0117] Among them, w141 is the concrete stripping weight, w142 is the concrete carbonization weight, w143 is the network crack weight, w144 is the exposed steel bar corrosion weight, w145 is the embedded anchor corrosion weight, w141 = 0.264, w142 = 0.264, w143 = 0.202, w144 = 0.116, w145 = 0.154; Z141 is the concrete stripping score; Z142 is the concrete carbonization score; Z143 is the network crack score; Z144 is the exposed steel bar corrosion score; Z145 is the embedded anchor corrosion score.

[0118] 5. Factors affecting pipeline connection before reuse include:

[0119] a) Pipe support and pipe clamp are corroded; b) Pipe clamp falls off; c) Connecting bolts are corroded; d) Connecting bolts are loose;

[0120] Suitability score before pipeline connection and reuse:

[0121] Y15=Z151×w151+Z152×w152+Z153×w153+Z154×w154=91.40

[0122] w151 is the corrosion weight of pipe supports and pipe clamps, w152 is the weight for pipe clamp falling off, w153 is the weight for connecting bolts corrosion, w154 is the weight for connecting bolts loosening, w151=0.185, w152=0.430, w153=0.141, w154=0.244; Z151 is the corrosion score of pipe supports and pipe clamps; Z152 is the score for pipe clamp falling off; Z153 is the score for connecting bolts corrosion; Z154 is the score for connecting bolts loosening.

[0123] 6. Factors affecting pipeline defects after reuse include:

[0124] a) External corrosion defects of the pipeline body;

[0125] The suitability score of pipeline defects after reuse is:

[0126] Y21=Z211×w211=88.51

[0127] Among them, w211 is the external corrosion defect weight of the pipeline body, w211=1; Z211-the external corrosion defect score of the pipeline body.

[0128] 7. The factors affecting pipeline protection after reuse include:

[0129] a) Pipeline anti-corrosion layer is damaged;

[0130] The suitability score of pipeline protection after reuse is:

[0131] Y221=Z221×w221=75.2

[0132] w221 is the external corrosion defect weight of the pipeline body, w221=1; Z221 is the pipeline anti-corrosion layer damage score.

[0133] 8. Factors affecting the reuse of pipeline piers include:

[0134] a) Concrete peeling; b) Concrete carbonization; c) Net-like cracks; d) Exposed reinforcement corrosion; e) Embedded anchor corrosion;

[0135] The points of the pipeline support pier after reuse are:

[0136] Y23=Z231×w231+Z232×w232+Z233×w233+Z234×w234+Z234×w234=78.04

[0137] Among them, w231 is the concrete stripping weight, w232 is the concrete carbonization weight, w233 is the network crack weight, w234 is the exposed steel bar corrosion weight, w235 is the embedded anchor corrosion weight, w231 = 0.264, w232 = 0.264, w233 = 0.201, w234 = 0.116, w235 = 0.155; Z231 is the concrete stripping score; Z232 is the concrete carbonization score; Z233 is the network crack score; Z234 is the exposed steel bar corrosion score; Z185 is the embedded anchor corrosion score.

[0138] 9. The factors affecting the reuse of pipeline connections include:

[0139] a) Pipe supports and pipe clamps are corroded; b) Connecting bolts are corroded; c) Connecting bolts are loose;

[0140] The suitability score of the pipeline after reuse is:

[0141] Y24=Z241×w241+Z242×w242+Z243×w243=87.99

[0142] Among them, w241 is the corrosion weight of pipe supports and pipe clamps, w242 is the corrosion weight of connecting bolts, w243 is the loosening weight of connecting bolts, w241=0.264, w242=0.264, w243=0.201; Z241 is the corrosion score of pipe supports and pipe clamps; Z242 is the corrosion score of connecting bolts; Z243 is the loosening score of connecting bolts.

[0143] 10. The factors affecting the suitability of existing construction in mountain tunnels include:

[0144] a) Before reuse of pipeline defects; b) Before reuse of pipeline protection; c) Before reuse of pipeline structure; d) Before reuse of pipeline support piers; e) Before reuse of pipeline connections;

[0145] The suitability scores of existing construction sites in mountain tunnels are:

[0146] X1=Y11×w11+Y12×w12+Y13×w13+Y14×w14+Y15×w15=89.47

[0147] Among them, w11 is the weight of pipeline defects before reuse, w12 is the weight of pipeline protection before reuse, w13 is the weight of pipeline structure before reuse, w14 is the weight of pipeline piers before reuse, and w15 is the weight of pipeline connection before reuse, w11=0.507, w12=0.128, w13=0.169, w14=0.098, w15=0.098; Y11 is the score of pipeline defects before reuse; Y12 is the score of pipeline protection before reuse; Y13 is the score of pipeline structure before reuse; Y14 is the score of pipeline piers before reuse; Y15 is the score of pipeline connection before reuse.

[0148] 11. The factors affecting the suitability of existing construction in mountain tunnels include:

[0149] a) Pipeline defects after reuse; b) Pipeline protection after reuse; c) Pipeline support piers after reuse; d) Pipeline connections after reuse;

[0150] The old scores of the Shili tunnels built in the mountain tunnels are:

[0151] X2=Y21×w21+Y22×w22+Y23×w23+Y24×w24=83.41

[0152] Among them, w21 is the weight of pipeline defects after reuse, w22 is the weight of pipeline protection after reuse, w23 is the weight of pipeline piers after reuse, and w24 is the weight of pipeline connection after reuse, w21=0.407, w22=0.235, w23=0.179, w24=0.179; Y11 is the score of pipeline defects after reuse; Y12 is the score of pipeline protection after reuse; Y13 is the score of pipeline piers after reuse; Y14 is the score of pipeline connection after reuse.

[0153] 12. The factors affecting the suitability of existing construction in mountain tunnels include:

[0154] a) Suitability before the construction of the mountain tunnel; b) Suitability after the construction of the mountain tunnel.

[0155] The calculation formula is:

[0156] W=X1×w1+X2×w2=88.24

[0157] Among them, w1 is the suitability weight before the construction and operation of the mountain tunnel, w2 is the suitability weight after the construction and operation of the mountain tunnel, w1=0.798, w1=0.202; X1 is the suitability score before the construction and operation of the mountain tunnel; X2 is the suitability score after the construction and operation of the mountain tunnel.

[0158] IV. Suitability level of existing construction sites in mountain tunnels

[0159] Based on the above analysis, the suitability score for reuse of existing structures in this typical mountain tunnel is 88.24 points. According to the suitability grade classification standard, the suitability grade of reuse of existing structures in this mountain tunnel is relatively high, and it can be reused after taking simple additional technical and management preventive measures. This is consistent with the conclusion of reuse of the mountain tunnel in actual engineering conditions, and preliminarily verifies the practicality of the evaluation model.

[0160] In the above embodiments, although the steps are numbered S1, S2, etc., these are only specific embodiments given by the present invention. Those skilled in the art may adjust the execution order of S1, S2, etc. according to actual conditions, which is also within the protection scope of the present invention. It can be understood that in some embodiments, some or all of the above embodiments may be included.

[0161] The present invention also provides a system for evaluating reuse plans for existing facilities in mountain tunnels, and the specific technical solutions are as follows:

[0162] The acquisition module is used to: perform exploration and acquisition on the mountain tunnel to be evaluated, and obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated;

[0163] The first determination module is used to: determine the score corresponding to each indicator in the basic evaluation parameters according to the basic evaluation parameters by presetting the suitability evaluation indicator system;

[0164] The second determination module is used to determine the suitability score corresponding to the mountain tunnel to be evaluated based on the score corresponding to each indicator and the weight corresponding to each indicator;

[0165] The evaluation module is used to determine the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjust the existing facilities according to the evaluation result of the reuse plan.

[0166] Based on the above solution, the present invention can also be improved as follows.

[0167] Furthermore, the preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to the first-level index, the second-level index, the third-level index and the fourth-level index respectively.

[0168] Furthermore, based on the score corresponding to each indicator and in combination with the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows:

[0169] Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

[0170] Further, the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the process of adjusting the existing facilities according to the reuse scheme evaluation result is specifically as follows:

[0171] Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

[0172] It should be noted that the beneficial effects of the system for evaluating the reuse of existing facilities in a mountain tunnel provided in the above embodiment are the same as the beneficial effects of the method for evaluating the reuse of existing facilities in a mountain tunnel provided in the above embodiment, which will not be repeated here. In addition, when realizing its functions, the system provided in the above embodiment only uses the division of the above functional modules as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the system can be divided into different functional modules according to actual conditions to complete all or part of the functions described above. In addition, the system and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0173] like Figure 2 As shown, an electronic device 300 according to an embodiment of the present invention includes a processor 320, the processor 320 is coupled to a memory 310, and the memory 310 stores at least one computer program 330, and the at least one computer program 330 is loaded and executed by the processor 320, so that the electronic device 300 implements any of the above methods, specifically:

[0174] The electronic device 300 may have relatively large differences due to different configurations or performances, and may include one or more processors 320 (Central Processing Units, CPU) and one or more memories 310, wherein the one or more memories 310 store at least one computer program 330, and the at least one computer program 330 is loaded and executed by the one or more processors 320, so that the electronic device 300 implements a method for evaluating the reuse of existing facilities in a mountain tunnel provided in the above embodiment. Of course, the electronic device 300 may also have components such as a wired or wireless network interface, a keyboard, and an input and output interface for input and output, and the electronic device 300 may also include other components for realizing the functions of the device, which will not be described in detail here.

[0175] A computer-readable storage medium according to an embodiment of the present invention stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that a computer implements any one of the above methods.

[0176] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, and the like.

[0177] In an exemplary embodiment, a computer program product or a computer program is also provided, the computer program product or the computer program comprising computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the electronic device performs any of the above methods.

[0178] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects and represent the definition of a specific order or sequence. The order of use of similar objects can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than the order shown or described.

[0179] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present disclosure can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), or it can be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.

[0180] Any combination of one or more computer-readable media may be used. A computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device, or device.

[0181] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for evaluating a reuse plan for existing facilities in a mountain tunnel, characterized in that: include: Conducting exploration and collection of the mountain tunnel to be evaluated to obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated; According to the basic evaluation parameters, by presetting a suitability evaluation index system, determining the score corresponding to each indicator in the basic evaluation parameters; Based on the score corresponding to each indicator and the weight corresponding to each indicator, determine the suitability score corresponding to the mountain tunnel to be evaluated; An evaluation result of a reuse plan for the existing facilities of the mountain tunnel to be evaluated is determined according to the suitability score, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

2. The method for evaluating reuse plans for existing facilities in mountain tunnels according to claim 1, characterized in that: The preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to a primary index, a secondary index, a tertiary index and a quaternary index, respectively.

3. The method for evaluating reuse plans for existing facilities in mountain tunnels according to claim 1, characterized in that: Based on the score corresponding to each indicator and the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows: Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

4. The method for evaluating reuse plans for existing facilities in mountain tunnels according to claim 1, characterized in that: Determine the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjust the existing facilities according to the evaluation result of the reuse scheme as follows: Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

5. A system for evaluating reuse plans for existing facilities in mountain tunnels, characterized in that: include: The acquisition module is used to: perform exploration and acquisition on the mountain tunnel to be evaluated, and obtain basic evaluation parameters corresponding to the mountain tunnel to be evaluated; The first determination module is used to: determine the score corresponding to each indicator in the basic evaluation parameters according to the basic evaluation parameters by presetting the suitability evaluation indicator system; The second determination module is used to determine the suitability score corresponding to the mountain tunnel to be evaluated based on the score corresponding to each indicator and the weight corresponding to each indicator; The evaluation module is used to determine the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjust the existing facilities according to the evaluation result of the reuse plan.

6. The system for evaluating reuse plans for existing facilities in mountain tunnels according to claim 5, characterized in that: The preset suitability evaluation index system includes a four-layer structure, and the four-layer structure corresponds to a primary index, a secondary index, a tertiary index and a quaternary index, respectively.

7. The system for evaluating reuse plans for existing facilities in mountain tunnels according to claim 5, characterized in that: Based on the score corresponding to each indicator and the weight corresponding to each indicator, the process of determining the suitability score corresponding to the mountain tunnel to be evaluated is specifically as follows: Determine the level corresponding to any indicator, and calculate the initial suitability score of the indicators with level two, level three or level four according to the calculation methods corresponding to different levels combined with the weight corresponding to each indicator, and add up all the initial suitability scores to obtain the initial suitability score corresponding to the first-level indicator. The initial suitability score corresponding to the first-level indicator is the suitability score corresponding to the mountain tunnel to be evaluated.

8. The system for evaluating reuse plans for existing facilities in mountain tunnels according to claim 5, characterized in that: Determine the evaluation result of the reuse scheme of the existing facilities of the mountain tunnel to be evaluated according to the suitability score, and adjust the existing facilities according to the evaluation result of the reuse scheme as follows: Based on a preset grade range, the target grade corresponding to the suitability score is determined, and based on the target grade, the evaluation result of the reuse plan of the existing facilities of the mountain tunnel to be evaluated is determined, and the existing facilities are adjusted according to the evaluation result of the reuse plan.

9. An electronic device, characterized in that: The electronic device comprises a processor, the processor is coupled to a memory, at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor so that the electronic device implements the method according to any one of claims 1 to 4.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that a computer implements the method according to any one of claims 1 to 4.