Raw material vulcanizing device for rubber band production
By designing automatic pressure relief and exhaust gas purification devices in rubber band production, the problems of internal pressure monitoring and toxic gas purification of vulcanization tanks are solved, the degree of vulcanization automation and safety are improved, workers' health is protected and production costs are reduced.
Patent Information
- Application Number
- CN202411288494.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-12-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the rubber band production process, it is difficult for the existing technology to monitor the internal pressure of the vulcanized tank in real time, resulting in the risk of tank rupture, and the toxic gases generated during the vulcanization process are not effectively purified, affecting workers' health.
A raw material vulcanization device for rubber band production is designed, equipped with an automatic pressure relief mechanism and a waste gas purification mechanism. The automatic pressure relief mechanism adjusts the pressure through the pressure relief tube and the liquid storage tank, and the waste gas purification mechanism passes through the washing box, activated carbon adsorption and gas-liquid separation components. Purify harmful gases.
The adaptive adjustment of the internal pressure of the vulcanized tank is achieved, which avoids the tank body rupture, and effectively removes harmful gases through multiple purification treatments, improves the degree of automation of vulcanization and processing safety, protects workers' health, and saves the cost of activated carbon replacement.
Smart Images

Figure CN119141745A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rubber band production, in particular to a raw material vulcanization device for rubber band production. Background Art
[0002] In the production process of rubber bands, chemicals such as sulfur need to be incorporated into the rubber band raw materials to make them more elastic. For example, Chinese patent No. CN116214790A discloses a vulcanization device for rubber band production. The vulcanization operation of the rubber raw materials is realized through the cooperation of components such as a dosing chamber and a dosing cylinder. By rotating the stirring blades installed in the dosing chamber, the rubber blocks can be broken into small pieces during the vulcanization process, so that the mixing with the chemicals is more uniform, which solves the problem of uneven mixing inside and outside the rubber blocks in the traditional vulcanization process, thereby improving the vulcanization effect of the rubber raw materials.
[0003] During the vulcanization process of rubber raw materials, the vulcanization temperature, pressure and vulcanization time need to be strictly controlled, otherwise under-vulcanization or over-vulcanization may occur, which will affect the quality of the rubber finished product. Especially during the vulcanization process, the interior of the tank is under high temperature and high pressure, and it is necessary to pay attention to the pressure inside the tank in real time to avoid excessive pressure and cause the tank to rupture. In addition, a certain amount of toxic gas will be generated during the vulcanization process, which will be inhaled by the human body and affect health. However, in the process of vulcanizing the rubber raw materials, the vulcanization device in the above application is not sufficient to fully and evenly vulcanize the rubber raw materials by simply stirring, and the whole is not sealed enough. During the vulcanization process, harmful gases will diffuse in the processing site, affecting the health of the workers. Therefore, there are certain limitations. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a raw material vulcanization device for rubber band production, which solves the technical problems in the prior art of needing to observe the internal pressure of a vulcanization tank in real time to avoid the tank body from rupturing due to excessive pressure, and purifying harmful gases generated during the vulcanization process, thereby achieving the purpose of improving the degree of automation of vulcanization and the safety of vulcanization processing.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a raw material vulcanization device for rubber band production, comprising a sealed tank door installed at one end of a vulcanization tank, an automatic pressure relief mechanism for adaptively adjusting the internal pressure of the vulcanization tank is installed on one side of the vulcanization tank, and an exhaust gas purification mechanism for purifying toxic gases generated during the vulcanization process is installed on the top of the vulcanization tank.
[0006] The automatic pressure relief mechanism includes a pressure relief pipe installed on one side of the vulcanization tank. A liquid storage tank is installed on one side of the vulcanization tank, and pure water is poured into the interior of the pressure relief pipe. The pressure relief pipe extends into the water body in the liquid storage tank. The spring is installed on the bottom wall of the pressure relief pipe. A sealing piston slidably connected to the inner wall of the pressure relief pipe is installed on the top of the spring. A pressure relief hole is opened below the outer surface of the pressure relief pipe.
[0007] Preferably, the sealing piston is made of rubber material, and the pressure relief hole is located below the sealing piston in normal state.
[0008] Preferably, an observation window is installed on the front of the liquid storage tank, and a water injection pipe and a sewage pipe are installed on the top and bottom of the right side of the liquid storage tank respectively, and electric valves are installed on both.
[0009] Preferably, the exhaust gas purification mechanism includes a water washing box installed on the top of the vulcanization tank, which is filled with pure water, an air pump is installed on the left side of the water washing box, an exhaust pipe is installed at the air suction port of the air pump, and the other end of the exhaust pipe extends into the interior of the vulcanization tank, a connecting pipe is installed at the exhaust port of the air pump, and the other end of the connecting pipe extends into the water body in the water washing box, and an adsorption component for adsorbing and removing odors from the exhaust gas after water washing purification is installed on the right side of the water washing box.
[0010] Preferably, the adsorption assembly includes an adsorption tower installed on the right side of a water washing box, two activated carbon plates are installed in the middle part of the adsorption tower, a gas pipe is installed on the top of the water washing box, and the other end of the gas pipe extends into the interior of the adsorption tower, a discharge pipe is installed on the top of the adsorption tower, and a desorption assembly for high-temperature desorption of the activated carbon plate after adsorption saturation is installed on the rear side of the adsorption tower.
[0011] Preferably, the desorption component includes an electric heating tube installed between two activated carbon plates, the connecting air pump is installed on the rear side of the adsorption tower, the air suction port of the connecting air pump is installed with an air suction pipe, and the top of the air suction pipe extends into the interior of the adsorption tower and is located above the activated carbon plate, the air outlet of the connecting air pump is installed with a rewashing pipe, the other end of which extends into the water body in the water washing box, and a separation component for gas-liquid separation of the exhaust gas is installed above the interior of the water washing box.
[0012] Preferably, the separation assembly includes a swirl plate installed above the inside of the adsorption tower, a guide plate is installed on the inner wall of the adsorption tower and is located below the swirl plate, and a water outlet pipe is installed on the right side of the adsorption tower and an electric valve is also installed on it.
[0013] Preferably, a temperature and pressure gauge is installed on the top of the vulcanization tank, and bases are installed on both sides of the bottom of the vulcanization tank.
[0014] By means of the above technical solution, the present invention provides a raw material vulcanization device for rubber band production, which has at least the following beneficial effects:
[0015] 1. When the pressure inside the vulcanizer is too high, the high-pressure gas rushes into the pressure relief pipe and pushes the sealing piston downward to squeeze the spring until the sealing piston moves below the pressure relief hole. At this time, the high-pressure gas is discharged into the water body inside the liquid storage tank through the pressure relief hole, thereby completing automatic pressure relief.
[0016] 2. The present invention purifies harmful gases in the vulcanization process by washing with water, adsorbing activated carbon, and finally separating the exhaust gas into gas and liquid through a cyclone plate, thereby completing multiple purification of harmful gases, avoiding harmful gases from spreading in the processing site, and better protecting the health of workers.
[0017] 3. The present invention uses an electric heating tube to perform high-temperature desorption on two activated carbon plates, thereby realizing the reuse of the activated carbon plates. There is no need to frequently replace the activated carbon plates, saving production costs. The harmful gases generated during the desorption process are subjected to secondary rewashing and purification to prevent the harmful gases from damaging the health of workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0019] In the attached picture:
[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0021] Figure 2 It is a schematic diagram of the independent structure of the exhaust gas purification mechanism of the present invention;
[0022] Figure 3 This is a schematic diagram of the independent rear view structure of the exhaust gas purification mechanism of the present invention;
[0023] Figure 4 This is a schematic diagram of the internal structure of the adsorption tower of the present invention;
[0024] Figure 5 It is a schematic diagram of the independent structure of the automatic pressure relief mechanism of the present invention;
[0025] Figure 6 It is a schematic diagram of the internal structure of the automatic pressure relief mechanism of the present invention in cross section.
[0026] In the figure: 1. vulcanizing tank; 2. sealed tank door; 3. automatic pressure relief mechanism; 301. pressure relief pipe; 302. liquid storage tank; 303. spring; 304. sealing piston; 305. pressure relief hole; 306. observation window; 307. water injection pipe; 308. sewage pipe; 309. electric valve; 4. exhaust gas purification mechanism; 401. water washing box; 402 air pump; 403. exhaust pipe; 404. connecting pipe; 4 05. Adsorption component; 4051. Adsorption tower; 4052. Activated carbon plate; 4053. Gas pipe; 4054. Discharge pipe; 406. Desorption component; 4061. Electric heating pipe; 4062. Connecting air pump; 4063. Air extraction pipe; 4064. Rewashing pipe; 407. Separation component; 4071. Cyclone plate; 4072. Guide plate; 4073. Water outlet pipe; 5. Temperature and pressure gauge; 6. Base. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] Example 1
[0029] Based on the existing problems that the internal pressure of the vulcanization tank 1 needs to be observed in real time to avoid the tank body from rupturing due to excessive pressure, increasing labor costs, and the harmful gases generated during the vulcanization process spreading in the processing site and affecting the health of workers, this embodiment provides a raw material vulcanization device for rubber band production, please refer to Figure 1-Figure 6 The embodiment provides a raw material vulcanization device for rubber band production, which can improve the automation degree of vulcanization and the safety of vulcanization processing. The raw material vulcanization device for rubber band production includes a sealed tank door 2 installed at one end of a vulcanization tank 1, an automatic pressure relief mechanism 3 for adaptively adjusting the internal pressure of the vulcanization tank 1 is installed on one side of the vulcanization tank 1, and an exhaust gas purification mechanism 4 for purifying toxic gases generated during the vulcanization process is installed on the top of the vulcanization tank 1. When the rubber raw material inside the vulcanization tank 1 is vulcanized, when the internal pressure is too high, the pressure inside the vulcanization tank 1 is adaptively adjusted by the automatic pressure relief mechanism 3 to avoid damage to the vulcanization tank 1 caused by excessive pressure, and after the vulcanization is completed, the harmful gases generated during the vulcanization process are extracted and purified by the exhaust gas purification mechanism 4 to avoid the harmful gases from spreading in the processing site and affecting the health of the workers.
[0030] Since the existing technology needs to observe the internal pressure of the vulcanization tank 1 in real time to avoid the tank body from rupturing due to excessive pressure, which increases the labor cost, an automatic pressure relief mechanism 3 is proposed, which can automatically adjust the internal pressure of the tank body when the internal pressure of the vulcanization tank 1 is too high. The automatic pressure relief mechanism 3 includes a pressure relief pipe 301 installed on one side of the vulcanization tank 1, a liquid storage tank 302 is installed on one side of the vulcanization tank 1, and pure water is perfused inside the liquid storage tank 302. The pressure relief pipe 301 extends into the water body in the liquid storage tank 302, and a spring 303 is installed on the bottom wall of the pressure relief pipe 301. A sealing piston 304 slidably connected to the inner wall of the pressure relief pipe 301 is installed on the top of the spring 303. The pressure relief pipe 301 A pressure relief hole 305 is provided below the outer surface of the autoclave 1, and the sealing piston 304 is made of rubber material. The pressure relief hole 305 is located below the sealing piston 304 under normal conditions. When the pressure inside the autoclave 1 is too high, the high-pressure gas rushes into the interior of the pressure relief pipe 301 and pushes the sealing piston 304 to move downward to squeeze the spring 303 until the sealing piston 304 moves to below the pressure relief hole 305 provided on the pressure relief pipe 301. At this time, the high-pressure gas is discharged into the water body inside the liquid storage tank 302 through the pressure relief hole 305, thereby completing automatic pressure relief. After the pressure relief is completed, the spring 303 pushes the sealing piston 304 to reset under its own elasticity, so that the autoclave 1 remains airtight.
[0031] Since an observation window 306 is installed on the front of the liquid storage tank 302, a water injection pipe 307 and a sewage pipe 308 are respectively installed on the top and bottom of the right side of the liquid storage tank 302, and an electric valve 309 is installed on both. During the pressure relief process, the harmful gas inside the vulcanizer 1 is discharged into the water body in the liquid storage tank 302, the turbidity of the water body is observed through the observation window 306, the electric valve 309 is started regularly, the sewage is discharged through the sewage pipe 308, and crystal water is injected through the water injection pipe 307.
[0032] Harmful gases will be generated during the vulcanization process of rubber raw materials. If they are not purified and diffused in the processing site, they will affect the health of workers. Therefore, the device is also provided with an exhaust gas purification mechanism 4, which includes a water washing box 401 installed on the top of the vulcanization tank 1, which is filled with pure water. An air pump 402 is installed on the left side of the water washing box 401, and an exhaust pipe 403 is installed at the air suction port of the air pump 402, and the other end of the exhaust pipe 403 extends into the interior of the vulcanization tank 1. A connecting pipe 404 is installed at the exhaust port of the air pump 402, and the other end of the exhaust pipe 404 extends into the water body in the water washing box 401. An adsorption component 405 for adsorbing and removing odors from the waste gas after water washing and purification is installed on the right side of the water washing box 401. After vulcanization is completed, the air pump 402 is started to extract the harmful gases in the vulcanization tank 1 through the exhaust pipe 403, and discharge them into the interior of the water washing box 401 through the connecting pipe 404, and the particulate impurities in the harmful gases and some toxic substances soluble in water are washed and purified.
[0033] Due to the use of different vulcanizing agents, the harmful gas components generated in the vulcanization process are different. Simply relying on water washing and purification is not enough to completely eliminate the hidden dangers. Therefore, the device is also provided with an adsorption component 405, which includes an adsorption tower 4051 installed on the right side of the water washing box 401, two activated carbon plates 4052 are installed in the middle of the interior of the adsorption tower 4051, and a gas pipeline 4053 is installed on the top of the water washing box 401, and the other end thereof extends into the interior of the adsorption tower 4051. A discharge pipe 4054 is installed on the top of the adsorption tower 4051, and a desorption component 406 for high-temperature desorption of the activated carbon plate 4052 after adsorption saturation is installed on the rear side of the adsorption tower 4051. The gas after water washing and purification is discharged into the interior of the adsorption tower 4051 through the gas pipeline 4053, and passes through the activated carbon plate 4052 when drifting upward, and the residual harmful substances therein are adsorbed and purified by the activated carbon plate 4052, thereby improving the purification effect and better protecting the health of the workers.
[0034] Since the activated carbon plate 4052 has an adsorption saturation value, it needs to be replaced frequently, which not only increases the production cost but also makes the operation more complicated. Therefore, the device is also provided with a desorption component 406 for high-temperature desorption of the activated carbon plate 4052. The desorption component 406 includes an electric heating tube 4061 installed between the two activated carbon plates 4052, an air pump 4062 connected to the rear side of the adsorption tower 4051, an air suction port connected to the air pump 4062 is installed with an air suction pipe 4063, and the top of the air suction pipe 4063 extends into the interior of the adsorption tower 4051 and is located above the activated carbon plate 4052, and the air outlet connected to the air pump 4062 is installed with a rewashing pipe 4064, and the other end of the rewashing pipe 4064 extends into the water outlet. Inside the water body in the washing box 401, a separation component 407 for gas-liquid separation of the exhaust gas is installed above the inside of the washing box 401. When the activated carbon plate 4052 is saturated with adsorption, the electric heating tube 4061 is started to desorb the two activated carbon plates 4052 at high temperature, thereby realizing the reuse of the activated carbon plates 4052. There is no need to frequently replace the activated carbon plates 4052, and regular replacement is sufficient. At the same time, the connected air pump 4062 is started to pump the gas generated during the desorption process into the inside of the re-washing pipe 4064 through the exhaust pipe 4063, and finally discharged into the washing box 401 for re-washing and purification, so as to avoid the overflow of harmful gases generated during desorption and affect the health of the workers.
[0035] A temperature and pressure gauge 5 is installed on the top of the vulcanization tank 1, and bases 6 are installed on both sides of the bottom of the vulcanization tank 1. The temperature and pressure gauge 5 displays the temperature and pressure inside the vulcanization tank 1 in real time, which is convenient for workers to control the vulcanization process.
[0036] Example 2
[0037] On the basis of Example 1, Figure 1-Figure 6As shown, since the harmful gas is purified by water washing, the discharged gas contains a certain amount of moisture, including a certain amount of water vapor generated when the activated carbon plate 4052 is subjected to high-temperature desorption, and the direct discharge of water vapor will cause the construction environment to be too humid. Therefore, the device is also provided with a separation component 407, and the separation component 407 includes a cyclone plate 4071 installed above the inside of the adsorption tower 4051, and the inner wall of the adsorption tower 4051 is installed with a guide plate 4072, and it is located on the cyclone plate 4071. Below, a water outlet pipe 4073 is installed on the right side of the adsorption tower 4051, and an electric valve 309 is also installed on it. Water vapor passes through the swirl plate 4071, and under the guidance of the blades of the swirl plate 4071, the gas generates a rotational motion when passing through the swirl plate 4071. The centrifugal force generated causes the liquid droplets in the gas to be thrown to the inner wall of the adsorption tower 4051, and under the action of gravity, they flow down along the wall into the interior of the guide plate 4072, and are finally discharged through the water outlet pipe 4073, thereby realizing gas-liquid separation.
[0038] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A raw material vulcanizing device for rubber band production, comprising a sealed tank door (2) mounted at one end of a vulcanizing tank (1), Features: An automatic pressure relief mechanism (3) for adaptively adjusting the internal pressure of the vulcanization tank (1) is installed on one side of the vulcanization tank (1), and an exhaust gas purification mechanism (4) for purifying toxic gases generated during the vulcanization process is installed on the top of the vulcanization tank (1); The automatic pressure relief mechanism (3) comprises a pressure relief pipe (301) installed on one side of the vulcanization tank (1); a liquid storage tank (302) is installed on one side of the vulcanization tank (1), and the interior of the liquid storage tank (302) is filled with pure water; the pressure relief pipe (301) extends into the water body in the liquid storage tank (302); the spring (303) is installed on the bottom wall of the pressure relief pipe (301); a sealing piston (304) slidably connected to the inner wall of the pressure relief pipe (301) is installed on the top of the spring (303); and a pressure relief hole (305) is opened below the outer surface of the pressure relief pipe (301).
2. A raw material vulcanizing device for rubber band production according to claim 1, Features: The sealing piston (304) is made of rubber material, and the pressure relief hole (305) is located below the sealing piston (304) in a normal state.
3. A raw material vulcanizing device for rubber band production according to claim 1, Features: An observation window (306) is installed on the front of the liquid storage tank (302), and a water injection pipe (307) and a sewage discharge pipe (308) are installed on the top and bottom of the right side of the liquid storage tank (302), respectively, and electric valves (309) are installed on both.
4. A raw material vulcanizing device for rubber band production according to claim 1, Features: The waste gas purification mechanism (4) comprises a water washing box (401) installed on the top of the vulcanizing tank (1), wherein the interior of the water washing box is filled with pure water; an air pump (402) is installed on the left side of the water washing box (401); an exhaust pipe (403) is installed at the air suction port of the air pump (402), and the other end of the exhaust pipe (403) extends into the interior of the vulcanizing tank (1); a connecting pipe (404) is installed at the exhaust port of the air pump (402), and the other end of the connecting pipe (404) extends into the water body in the water washing box (401); and an adsorption component (405) for adsorbing and removing odor from the waste gas after water washing and purification is installed on the right side of the water washing box (401).
5. A raw material vulcanizing device for rubber band production according to claim 4, Features: The adsorption component (405) includes an adsorption tower (4051) installed on the right side of the water washing box (401), two activated carbon plates (4052) are installed in the middle of the interior of the adsorption tower (4051), a gas supply pipe (4053) is installed on the top of the water washing box (401), and the other end of the gas supply pipe (4053) extends into the interior of the adsorption tower (4051), a discharge pipe (4054) is installed on the top of the adsorption tower (4051), and a desorption component (406) for high-temperature desorption of the activated carbon plate (4052) after adsorption saturation is installed on the rear side of the adsorption tower (4051).
6. A raw material vulcanizing device for rubber band production according to claim 5, Features: The desorption component (406) includes an electric heating tube (4061) installed between two activated carbon plates (4052), the connecting air pump (4062) is installed on the rear side of the adsorption tower (4051), the air suction port of the connecting air pump (4062) is installed with an air suction pipe (4063), and the top of the air suction pipe extends into the interior of the adsorption tower (4051) and is located above the activated carbon plate (4052), the air outlet of the connecting air pump (4062) is installed with a rewashing pipe (4064), the other end of which extends into the water body in the water washing box (401), and a separation component (407) for gas-liquid separation of the exhaust gas is installed above the interior of the water washing box (401).
7. A raw material vulcanizing device for rubber band production according to claim 6, Features: The separation component (407) includes a swirl plate (4071) installed on the upper part of the adsorption tower (4051), and a guide plate (4072) is installed on the inner wall of the adsorption tower (4051) and is located below the swirl plate (4071). A water outlet pipe (4073) is installed on the right side of the adsorption tower (4051) and an electric valve (309) is also installed on it.
8. A raw material vulcanizing device for rubber band production according to claim 1, Features: A temperature and pressure gauge (5) is installed on the top of the vulcanization tank (1), and bases (6) are installed on both sides of the bottom of the vulcanization tank (1).
Citation Information
Patent Citations
Vulcanizing device for rubber band production
CN116214790A
Cited By
Strip extruding device for producing residual oil hydrogenation catalyst
CN120191075A
Grease trace metal continuous adsorption tower with multistage honeycomb ceramic carrier
CN120290255A
