Fabricated slope protection structure and construction method thereof

Through the prefabricated foundation and the pull beam anchor rod connection of the prefabricated slope protection structure, combined with the grouting node, the problem of tight and difficult slope protection construction time is solved, and a fast and high-quality slope protection effect is achieved.

CN119195177AInactive Publication Date: 2024-12-27CHINA MCC17 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411607829.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In slope protection construction, the construction time is tight, difficult and poor results, resulting in long construction time.

Method used

The prefabricated slope protection structure is adopted, including prefabricated foundation and prefabricated pull beams connected by anchors, and firm connection is achieved using reserved steel bars and grouting nodes, simplifying the construction process and improving quality.

Benefits of technology

Through standardized construction and grouting connection of prefabricated components, the construction period is significantly shortened, the construction quality and connection firmness are improved, and an effective overall slope protection structure is formed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119195177A_ABST
    Figure CN119195177A_ABST
Patent Text Reader

Abstract

The invention discloses an assembly type slope protection structure and a construction method thereof, and the component part comprises a plane structure, which comprises a prefabricated foundation and a prefabricated straining beam matched with the foundation, and the prefabricated foundation is connected with a slope structure through an anchor rod; the connecting node comprises a prefabricated foundation, a prefabricated straining beam, a reserved reinforcing steel bar, a grouting reserved node and a reserved anchor rod hole. According to the fabricated slope protection structure and the construction method thereof, the prefabricated foundation and the prefabricated straining beam can be effectively connected into a whole through fabricated grouting joint connection, and the prefabricated foundation and the slope are connected through anchor rod construction. Therefore, an effective whole is formed, and the problems that during slope protection, the slope protection construction time is short, and in the construction process, the construction difficulty is large, the construction effect is poor, and the construction time is long are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to an assembled slope protection structure and a construction method thereof. Background Art

[0002] In terms of landslide prevention and control in my country, prevention is the main approach, with prevention being more important than treatment. Treatment emphasizes the unified consideration of various factors affecting slope stability, and the prevention and control of landslides is carried out in a prioritized, prioritized, and selective manner according to the role of each factor. At present, the main landslide prevention and control measures are to avoid, improve the drainage system, resist sliding support, and improve the sliding belt soil. In order to meet the purpose of treatment, these prevention and control measures are generally used in combination in landslide prevention and control. For the protection of artificial slopes, plants are often used at the same time to prevent topsoil erosion, consolidate slopes, and beautify the environment. In general, landslide protection technologies can be mainly divided into the following three categories.

[0003] 1. Engineering protection

[0004] Engineering protection includes drainage measures (setting up drainage ditches, etc.), slope protection measures (skeleton slope protection, stone slope protection, flexible protection, etc.), anti-slip support measures (local load reduction, retaining walls, soil nails, anti-slip piles, frame-anchor structures, etc.) and soil improvement measures (grouting reinforcement, etc.).

[0005] 2. Plant protection

[0006] Plant protection is to protect the slope from atmospheric precipitation and surface runoff by using the covering effect of vegetation and the reinforcement effect of plant roots, so as to achieve the effect of strengthening the slope and protecting the ecology. Plant protection has limitations, that is, it can only prevent slope erosion and surface soil collapse. In the case of unstable slope or concentrated water flow, slope collapse and water damage may still occur. Therefore, plant protection must be used on the basis of slope stability, or combined with engineering protection technology.

[0007] 3. Comprehensive protection

[0008] Comprehensive protection is a measure that uses plants, engineering and other applicable measures according to local conditions to control slope problems such as landslides and water damage. Summary of the invention

[0009] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0010] In view of the above problems existing in the existing assembled slope protection structure, the present invention is proposed.

[0011] Therefore, the purpose of the present invention is to provide an assembled slope protection structure, which is suitable for solving the problems of tight slope protection construction time, great construction difficulty, poor construction effect and long construction time during the construction process.

[0012] In order to solve the above technical problems, the present invention provides the following technical solutions: an assembled slope protection structure, the component parts include:

[0013] The plane structure includes a prefabricated foundation and a prefabricated tension beam installed to match the foundation, and the prefabricated foundation and the slope structure are connected by anchor rods;

[0014] The connection node includes a prefabricated foundation, a prefabricated tension beam, reserved steel bars, a grouting reserved node, and reserved anchor holes.

[0015] After the reserved foundation is installed, the anchor slope is connected through the reserved anchor holes, and the reserved steel bars on the prefabricated tension beam are extended into the reserved grouting connection node area of ​​the prefabricated foundation to connect the nodes by grouting.

[0016] As a preferred solution of the assembled slope protection structure described in the present invention, the prefabricated foundation and the prefabricated tension beam can be constructed in a standardized manner, which can greatly shorten the construction period and improve the construction quality.

[0017] As a preferred solution of the assembled slope protection structure described in the present invention, the prefabricated foundation is provided with a reserved grouting connection node area, which is connected and fixed to the reserved steel bars of the prefabricated tension beam.

[0018] As a preferred solution of the assembled slope protection structure described in the present invention, the prefabricated foundation is provided with anchor holes, which are connected and fixed to the slope through construction anchors.

[0019] As a preferred solution of the assembled slope protection structure described in the present invention, the connection surface of the prefabricated foundation and the prefabricated tension beam is grouted with grouting material, which can greatly improve the firmness of the connection.

[0020] A method for constructing an assembled slope protection structure, the method being applicable to any one of the structural forms in claims 1 to 4 above, characterized in that the method comprises the following steps:

[0021] S1: According to the on-site slope conditions, deepen the drawings and process prefabricated foundations and prefabricated tension beams.

[0022] S2: Laying out and positioning at the construction site;

[0023] S3: On-site hoisting of prefabricated components, first installing the prefabricated foundation, fixing anchor bolts at the anchor bolt reserved holes, and then installing the prefabricated tension beams;

[0024] S4: After the installation of the prefabricated tie beam is completed, the reserved connection nodes are grouted and the reserved joints between the prefabricated tie beam and the prefabricated foundation connection surface are grouted.

[0025] The beneficial effects of the present invention are as follows: the prefabricated foundation and the prefabricated tension beam can be effectively connected as a whole through the assembled grouting node connection, and the prefabricated foundation and the slope can be connected through the anchor rod construction, thereby forming an effective whole. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0027] Figure 1 This is a schematic diagram of the overall structure of an assembled slope protection structure proposed by the present invention;

[0028] Figure 2 A schematic diagram of a connection node of an assembled slope protection structure proposed by the present invention;

[0029] Figure 3 This is a schematic diagram of the AA section structure of an assembled slope protection structure proposed by the present invention;

[0030] Figure 4 This is a schematic diagram of the BB section structure of an assembled slope protection structure proposed by the present invention;

[0031] Figure 5 It is a schematic diagram of the process of the present invention. Description of the drawings:

[0033] Prefabricated tension beam (101), prefabricated foundation (102), prefabricated tension beam (103), anchor rod (104), prefabricated foundation (201), prefabricated tension beam (202), reserved steel bars (203, 204), reserved nodes for grouting (206), reserved anchor rod holes (205), prefabricated tension beam (301), prefabricated foundation (302), anchor rod (303), prefabricated tension beam (304), prefabricated foundation (401), grouting area (402), prefabricated foundation (403), anchor rod (404), grouting area (405), prefabricated foundation (406). DETAILED DESCRIPTION

[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0035] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0036] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0037] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0038] Reference Figure 1-Figure 4 , which is an embodiment of the present invention, provides a piling device for building construction, including a plane structure and a connection node.

[0039] The plane structure includes a prefabricated tension beam 101, a prefabricated foundation 102, a prefabricated tension beam 103, and an anchor rod 104;

[0040] The connection nodes, including the reserved steel bars 203 and 204 of the prefabricated foundation 201 and the prefabricated tension beam 202, are connected through the grouting reserved node 206, and the prefabricated foundation is connected to the slope through the construction anchors of the reserved anchor holes 205.

[0041] A method for constructing an assembled slope protection structure, the method being applicable to any one of the structural forms in claims 1 to 4 above, characterized in that the method comprises the following steps:

[0042] S1: According to the on-site slope conditions, deepen the drawings and process prefabricated foundations and prefabricated tension beams.

[0043] S2: Laying out and positioning at the construction site;

[0044] S3: On-site hoisting of prefabricated components, first installing the prefabricated foundation, fixing anchor bolts at the anchor bolt reserved holes, and then installing the prefabricated tension beams;

[0045] S4: After the installation of the prefabricated tension beam is completed, the reserved connection nodes are grouted, and the reserved joints between the prefabricated tension beam and the prefabricated foundation connection surface are grouted.

[0046] During the construction process, the positions of the prefabricated tie beams 101 and prefabricated foundations 102 are confirmed by positioning and laying out the slopes on site, and then the prefabricated foundation components are hoisted and installed, and anchors 104 are constructed through the reserved anchor holes 205 of the prefabricated foundation 102 to fix the tie beams to the slopes. Then the prefabricated tie beams 101 are hoisted and installed, and after the reserved steel bars 203 and 204 are deeply inserted into the reserved grouting nodes 206, the reserved areas are grouted and fixed.

[0047] Repeat the above construction process to complete the slope protection operation.

[0048] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An assembled slope protection structure, characterized in that: include: The planar structure includes a prefabricated tension beam (101), a prefabricated foundation (102), a prefabricated tension beam (103), and an anchor rod (104).

2. The assembled slope protection structure according to claim 1 is characterized in that: The connection node includes the reserved steel bars (203, 204) of the prefabricated foundation (201) and the prefabricated tension beam (202) being connected through the grouting reserved node (206), and the prefabricated foundation is connected to the slope through the anchor rod construction through the reserved anchor rod hole (205).

3. The assembled slope protection structure according to claim 1 is characterized in that : The AA cross-sectional view of the connection node includes a prefabricated tension beam (301), a prefabricated foundation (302), an anchor rod (303), and a prefabricated tension beam (304).

4. The assembled slope protection structure according to claim 1 is characterized in that: The BB cross-sectional view of the connection node includes a precast foundation (401), a grouting area (402), a precast foundation (403), an anchor rod (404), a grouting area (405), and a precast foundation (406).

5. A method for constructing an assembled slope protection structure, characterized in that: The prefabricated slope protection structure according to claim 1 is specifically operated as follows: S1: According to the on-site slope conditions, deepen the drawings and process prefabricated foundations and prefabricated tension beams. S2: Laying out and positioning at the construction site; S3: On-site hoisting of prefabricated components, first installing the prefabricated foundation, fixing anchor bolts at the anchor bolt reserved holes, and then installing the prefabricated tension beams; S4: After the installation of the prefabricated tie beam is completed, the reserved connection nodes are grouted and the reserved joints between the prefabricated tie beam and the prefabricated foundation connection surface are grouted.

Citation Information

Patent Citations

  • Wet connection honeycomb fabricated lattice beam slope protection structure

    CN113502835A