Production equipment of air conditioner bracket and use method of production equipment

By introducing adjustment components and hydraulic cylinders into the air-conditioning bracket production equipment, the problem that existing equipment cannot efficiently produce different types of air-conditioning brackets is solved, and the production capacity of flexibly adjusting punching parameters is achieved, and the production efficiency is improved.

CN119237586APending Publication Date: 2025-01-03DANYANG SANNENG ELECTRIC APPLIANCE FITTINGS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411441414.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

The existing air conditioning bracket production equipment cannot efficiently drill holes on different models of air conditioning brackets, and the existing hole punching devices are inefficient in operation, so they need to frequently disassemble and assemble molds to change the punching position.

Method used

An air conditioning bracket production equipment is designed to adjust the number, spacing and width of punches by adjusting the components, including sliding connections, hydraulic cylinders and threaded columns, so as to realize the production of different models of air conditioning brackets.

Benefits of technology

It improves the operating efficiency of production equipment, can flexibly adjust the number, spacing and width of punches, adapts to the production of different models of air conditioning brackets, and reduces the complexity and time cost of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119237586A_ABST
    Figure CN119237586A_ABST
Patent Text Reader

Abstract

The invention discloses air conditioner support production equipment and a using method thereof.The air conditioner support production equipment comprises a rack, a punching mechanism is arranged at the top of the rack and comprises a second shell fixed to the upper surface of the rack, a power assembly is arranged at the top of the inner side of the second shell, and punching assemblies are symmetrically arranged below the power assembly; and the punching assembly comprises second moving plates which are symmetrically and slidably connected to the interior of the second shell, a first adjusting component is arranged in the first mounting sleeve, a second adjusting component is arranged between the C-shaped moving frame and the second moving plates, and a third adjusting component is arranged between the second moving plates and the second shell. According to the production equipment of the air conditioner support, the number of punched holes in the surface of a steel plate is adjusted through a first adjusting component, the distance between C-shaped moving frames is adjusted through a second adjusting component, and the distance from a first upper die to the two sides of the steel plate is adjusted through a third adjusting component, so that the device can punch air conditioner supports of different models.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air conditioner bracket production, and in particular to a production device for an air conditioner bracket and a use method thereof. Background Art

[0002] The air conditioner bracket is a device used to install and fix the air conditioner. It can help users install and use the air conditioner more conveniently, and also protect the air conditioner from damage. The air conditioner bracket can raise the air conditioner to a certain height, so that it can be more convenient to clean and maintain the air conditioner. At the same time, the air conditioner bracket can also reduce the impact of ground vibration on the air conditioner and ensure the stability of the air conditioner. The air conditioner bracket can fix the air conditioner on the wall or the ground, so as to prevent the air conditioner from shifting or falling due to external force, thereby causing damage. In addition, the air conditioner bracket can also reduce the friction between the air conditioner and the ground, and extend the service life of the air conditioner. As for the structure of the air conditioner bracket, it is connected by two sections of angle iron. In order to enhance the firmness of the connection, a diagonal brace is also set to connect the two to form a triangular support structure.

[0003] For example, a production equipment and a production method for customized air-conditioning brackets with publication number CN116810402A, the production equipment includes a frame, a plurality of pairs of upper rollers and lower rollers arranged in sequence along the direction of the assembly line are provided on the frame, the front and rear ends of the plurality of pairs of upper rollers and lower rollers are respectively provided with feeding devices and cutting devices, the front end of the feeding device is also provided with an offset device, the offset device includes a left base plate and a right base plate arranged relatively to each other, the feeding device includes an upper feeding roller and a lower offset shaft, the lower offset shaft includes an axis core and a sleeve sleeved on the axis core, annular left offset parts and right offset parts are respectively provided at both ends outside the sleeve, the cutting device includes a base and a first output seat and a second output seat provided on the base, the first output seat is provided with a first discharge port with a 90-degree angle, the second output seat is provided with a second discharge port with a 90-degree angle, the first discharge port and the second discharge port are provided for the roll-formed sheet to pass through.

[0004] Based on the search of the above patents and in combination with the devices in the prior art, it is found that the existing air-conditioning bracket production equipment is unable to perform punching operations on the air-conditioning bracket. Since the air-conditioning bracket has been pressed, it is difficult to use an additional air-conditioning bracket punching device to perform the punching operation. In addition, the positions of the upper mold and the lower mold of the existing air-conditioning bracket punching device are fixed. When punching holes in air-conditioning brackets of different models, the mold needs to be disassembled and reassembled to change the punching position of the mold, and its operating efficiency is low. In order to solve the problems existing in the prior art, the present application proposes a production equipment for air-conditioning brackets and a method of using the same. Summary of the invention

[0005] Based on this, it is necessary to provide a production equipment and a method of using an air-conditioning bracket to address the above-mentioned technical problems. The soft and hard connection between the pressure head and the first mounting sleeve is adjusted by a first adjusting component, thereby adjusting the number of holes punched on the surface of the steel plate, so that the device can produce air-conditioning brackets with different numbers of holes punched. The second adjusting component is used to adjust the spacing between the C-shaped movable frames, so that the device can produce air-conditioning brackets with different punching spacings. The third adjusting component is used to adjust the distance from the first upper mold to the two sides of the steel plate, so that the device can punch steel plates of different widths.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] A production device for an air conditioner bracket specifically comprises: a frame, a punching mechanism and a pressing mechanism are arranged on the top of the frame, the punching mechanism comprises a second shell fixed to the upper surface of the frame, inlet and outlet holes are opened at both ends of the second shell, a power assembly is arranged on the top of the inner side of the second shell, and a punching assembly is symmetrically arranged below the power assembly;

[0008] The punching assembly includes a second movable plate symmetrically and slidably connected to the inside of the second shell, and a plurality of C-shaped movable frames are slidably connected to the second movable plate, a first guide sleeve is fixed to one end of the top of the C-shaped movable frame, a first upper mold is slidably connected to the inside of the first guide sleeve, a first lower mold is fixed to one end of the bottom of the C-shaped movable frame and located at a position corresponding to the first upper mold, a pillow plate is fixed on the upper surface of the frame and located inside the second shell, the top of the pillow plate is slidably connected to one end of the bottom of the C-shaped movable frame, a first mounting sleeve is fixed to the top of the first upper mold and located above the C-shaped movable frame, a first spring is arranged between the first mounting sleeve and the C-shaped movable frame, a pressure head is slidably connected to the top of the first mounting sleeve, a first adjusting component is arranged inside the first mounting sleeve, a second adjusting component is arranged between the C-shaped movable frame and the second movable plate, and a third adjusting component is arranged between the second movable plate and the second shell.

[0009] As a preferred embodiment of the production equipment of an air-conditioning bracket provided by the present invention, the first adjusting component includes a slider slidably connected to the inside of the first mounting sleeve, the bottom of the pressure head is fixed to the top of the slider, a first limiting hole is opened inside the slider, a second limiting hole is symmetrically opened on the surface of the first mounting sleeve and located at a position corresponding to the first limiting hole, an insertion rod is commonly inserted into the insides of the first limiting hole and the second limiting hole, a second through groove is opened on one side of the first limiting hole, a first through groove is opened on one side of the second limiting hole and located at a position corresponding to the second through groove, a pull ring is fixed at one end of the insertion rod, and an anti-drop block is fixed at the other end of the insertion rod, and the anti-drop block passes through the first through groove and the second through groove.

[0010] As a preferred embodiment of the production equipment of the air-conditioning bracket provided by the present invention, a third spring is arranged between the first mounting sleeve and the slider, the third spring is located inside the first mounting sleeve, guide grooves are symmetrically opened on the outer side of the slider, guide rails are symmetrically fixed on the inner wall of the first mounting sleeve, and the guide grooves are slidably connected to the inside of the guide rails.

[0011] As a preferred embodiment of the production equipment of an air-conditioning bracket provided by the present invention, the second adjusting component includes a plurality of clamping threaded columns, the other end of the bottom of the C-shaped movable frame is slidably connected to the surface of the second movable plate, and a plurality of pressure blocks are slidably connected to the inner side of the second movable plate, an avoidance groove is opened inside the second movable plate, and a second mounting sleeve is fixed inside the pressure block, and the clamping threaded columns are respectively slidably connected to the inside of the second mounting sleeve, one end of the clamping threaded column passes through the avoidance groove and is threadedly connected to the C-shaped movable frame, and the other end of the clamping threaded column is fixed with a hexagonal screw head, and a second spring is arranged between the hexagonal screw head and the pressure block, and the second spring is located on the outside of the second mounting sleeve.

[0012] As a preferred embodiment of the production equipment of the air-conditioning bracket provided by the present invention, a first anti-loosening groove is symmetrically opened on the top of the inner side of the second movable plate, and a second anti-loosening groove is opened on the top of the pressing block, and the second anti-loosening groove is clamped with the first anti-loosening groove.

[0013] As a preferred embodiment of the production equipment of an air-conditioning bracket provided by the present invention, the third adjusting component includes second guide rods symmetrically fixed at both ends of the inner bottom of the second shell, first movable plates are respectively fixed at both ends of the second movable plate, the first movable plate is slidably connected to the second guide rod, an adjustment plate is fixed between the two first movable plates, and adjusting threaded rods are respectively rotatably connected on both sides of the adjusting plate, the adjusting threaded rod is threadedly connected to the adjusting plate, and an adjustment dial is fixed at the end of the adjusting threaded rod away from the pillow plate.

[0014] As a preferred embodiment of the production equipment of an air-conditioning bracket provided by the present invention, the power assembly includes a second hydraulic cylinder fixed on the top of a second shell, a pressure plate is slidably connected to the top of the inner side of the second shell, first guide rods are symmetrically fixed at both ends of the top of the inner side of the second shell, both ends of the pressure plate are slidably connected to the first guide rod, and the output end of the second hydraulic cylinder passes through the second shell and is fixed to the top of the pressure plate.

[0015] As a preferred embodiment of the production equipment of an air-conditioning bracket provided by the present invention, the pressing mechanism includes a first shell fixed on the upper surface of the frame, the first shell is located on one side of the second shell, a second lower mold is fixed to the bottom of the inner side of the first shell, a second upper mold is slidably connected to the top of the inner side of the first shell and located at a position corresponding to the second lower mold, a first hydraulic cylinder is fixed to the top of the first shell, the output end of the first hydraulic cylinder passes through the first shell and is fixed to the second upper mold, a second guide sleeve is symmetrically fixed to the top of the first shell, a third guide rod is slidably connected to the inside of the second guide sleeve, and the bottom of the third guide rod is fixed to the second upper mold.

[0016] As a preferred embodiment of the production equipment of the air-conditioning bracket provided by the present invention, a right-angle cutting knife is fixed to the side of the second upper mold close to the second shell, a mounting plate is fixed to the side of the first shell close to the second shell, and a plane cutting knife is fixed to the top of the mounting plate and at the position corresponding to the right-angle cutting knife.

[0017] As a method for using the air conditioner bracket production equipment provided by the present invention, the steps are as follows:

[0018] S1. The staff inserts a corresponding number of insertion rods into the first limiting hole and the second limiting hole through the pull ring;

[0019] S2. The staff places the C-shaped mobile rack in a suitable position;

[0020] S3, the staff turns the hexagonal screw head to lock the C-shaped movable frame and the second movable plate;

[0021] S4. The staff adjusts the distance between the first upper die and the two sides of the steel plate by turning the adjustment dial by hand;

[0022] S5. The staff operates the feeding device to feed the steel plate into the punching mechanism and the pressing mechanism and starts the second hydraulic cylinder and the first hydraulic cylinder.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. When adjusting the hard-soft connection between the pressure head and the first mounting sleeve, the insertion rod is inserted into the first limiting hole and the second limiting hole through the pull ring to lock the slider, so that the pressure head and the first mounting sleeve become hard-connected. When the insertion rod is pulled out, the pressure head and the first mounting sleeve become soft-connected, thereby adjusting the number of punching holes on the steel plate surface, so that the device can produce air-conditioning brackets with different numbers of punching holes.

[0025] 2. Through the setting of the anti-drop block, when the insertion rod passes through the first limiting hole and the second limiting hole, the anti-drop block and the second through groove and the first through groove are not aligned, which can effectively prevent the insertion rod from accidentally falling during punching. The guide groove and the guide rail are used to guide and limit the slider to prevent the position of the first limiting hole and the second limiting hole from shifting. The third spring is used to drive the slider to reset, so that the first limiting hole and the second limiting hole can always be aligned, which is convenient for the staff to insert the insertion rod into the first limiting hole and the second limiting hole.

[0026] 3. The staff uses a tool to rotate the hexagonal screw head to drive the compression threaded column to rotate, and drives the hexagonal screw head to move toward the second movable plate through the compression threaded column, and compresses the pressing block and the second movable plate through the second mounting sleeve and the hexagonal screw head, and locks the C-shaped movable frame and the second movable plate through the second anti-loosening groove and the first anti-loosening groove, thereby adjusting the spacing of the C-shaped movable frame, and then adjusting the spacing of the punching holes, so that the device can produce air-conditioning brackets with different punching hole spacings.

[0027] 4. By turning the adjusting dial by hand, the adjusting threaded rod is driven to rotate, and the adjusting threaded rod is driven to move the adjusting plate, the first movable plate and the second movable plate to adjust the distance from the first upper die to the two sides of the steel plate, so that the device can perform punching operations on steel plates of different widths.

[0028] 5. The first hydraulic cylinder drives the compression thread column to move downward, and drives the right-angle cutting knife to move downward. The steel plate is gradually cut during the pressing process. During the pressing process, the steel plate in the connected state can play a limiting role during the pressing process to avoid position displacement of the separated steel plate when it falls. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the scheme of the present invention, a brief introduction is given below to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0030] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0031] Figure 2 A structural schematic diagram of an enlarged position of the punching mechanism provided by the present invention;

[0032] Figure 3 A schematic diagram of the structure inside the second shell provided by the present invention;

[0033] Figure 4A schematic structural diagram of the bottom of the second movable plate provided by the present invention;

[0034] Figure 5 A schematic diagram of the structure of the second adjusting component provided by the present invention;

[0035] Figure 6 A schematic structural diagram of a first adjusting component provided by the present invention;

[0036] Figure 7 This is a schematic diagram of the structure inside the first shell provided by the present invention.

[0037] The markings in the figure are as follows:

[0038] 1. Frame; 2. Punching mechanism; 3. Pressing mechanism; 4. Steel plate; 5. First housing; 6. First hydraulic cylinder; 7. Second housing; 8. Second hydraulic cylinder; 9. First guide rod; 10. Pressing plate; 11. C-shaped moving frame; 12. First moving plate; 13. Adjusting plate; 14. Adjusting dial; 15. Adjusting threaded rod; 16. Second moving plate; 17. Second guide rod; 18. Pressing head; 19. First mounting sleeve; 20. First spring; 21. Pillow plate; 22. Hexagonal screw head; 23. Second spring; 24. Pressing threaded column; 25. First anti-loosening groove; 26. Avoid 1. the first upper die; 2. the second lower die; 3. the second through-slot; 4. the first stopper; 5. the first guide sleeve; 6. the second anti-loosening slot; 7. the third guide rod; 8. the first guide sleeve; 9. the second upper die; 10. the second lower die; 11. the second through-slot; 12. the first stopper; 13. the second inlet and outlet; 14. the second stopper; 15. the second guide sleeve; 16. the second guide sleeve; 17. the second spring; 18. the first guide sleeve; 19. the second anti-loosening slot; 20. the third guide rod; 21. the second guide sleeve; 22. the second upper die; 23. the second lower die; 24. the second mounting plate; 25. the plane cutting knife; 26. the right-angle cutting knife; 27. the inserting rod; 28. the first through-slot; 29. ​​the anti-dropping block; 30. the pull ring; 34. the slider; 35. the guide slot; 36. the guide rail; 37. the third spring; 38. the first guide sleeve; 39. the second anti-loosening slot; 40. the third guide rod; 41. the second guide sleeve; 42. the second upper die; 43. the second lower die; 44. the mounting plate; 45. the plane cutting knife; 46. the right-angle cutting knife; 47. the second through-slot; 48. the first limiting hole; 49. the entry and exit hole; 50. the second limiting hole; 51. the second mounting sleeve. DETAILED DESCRIPTION

[0039] All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without creative work should fall within the scope of protection of the present invention.

[0040] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings.

[0041] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.

[0042] Please refer to Figure 1-6 ,

[0043] The machine comprises a frame 1, a punching mechanism 2 and a pressing mechanism 3 are arranged on the top of the frame 1, the punching mechanism 2 comprises a second shell 7 fixed on the upper surface of the frame 1, both ends of the second shell 7 are provided with inlet and outlet holes 49, the steel plate 4 passes through the inside of the second shell 7 through the inlet and outlet holes 49, a power assembly is arranged on the top of the inner side of the second shell 7, and a punching assembly is symmetrically arranged below the power assembly, and the power assembly is used to drive the punching assembly to punch the steel plate 4;

[0044] The punching assembly includes a second movable plate 16 symmetrically slidably connected to the inside of the second shell 7, and a plurality of C-shaped movable frames 11 are slidably connected to the second movable plate 16. A first guide sleeve 38 is fixed to one end of the top of the C-shaped movable frame 11, and a first upper mold 28 is slidably connected to the inside of the first guide sleeve 38, and the first guide sleeve 38 is used to guide and limit the first upper mold 28. A first lower mold 29 is fixed to one end of the bottom of the C-shaped movable frame 11 and is located at a position corresponding to the first upper mold 28. The first lower mold 29 is embedded in the inside of the C-shaped movable frame 11 and fixed by screws. A pillow plate 21 is fixed to the upper surface of the frame 1 and is located inside the second shell 7. The top of the pillow plate 21 is slidably connected to one end of the bottom of the C-shaped movable frame 11, and the C-shaped movable frame 11 is supported by the pillow plate 21 and the second movable plate 16 to improve the stability of the C-shaped movable frame 11 during punching. A first mounting sleeve 1 is fixed to the top of the first upper mold 28 and is located above the C-shaped movable frame 11 9. A first spring 20 is arranged between the first mounting sleeve 19 and the C-shaped movable frame 11. After the first upper die 28 completes punching of the steel plate 4, the first upper die 28 is reset by the elastic action of the first spring 20 to facilitate punching again. A pressure head 18 is slidably connected to the top of the first mounting sleeve 19. A first adjusting component is arranged inside the first mounting sleeve 19. The first adjusting component is used to control the connection state between the pressure head 18 and the first mounting sleeve 19. When the pressure head 18 and the first mounting sleeve 19 are softly connected, the pressure head 18 will slide inside the first mounting sleeve 19 when it moves downward, and will not drive the first upper die 28 to move downward. When the pressure head 18 and the first mounting sleeve 19 are hard connected, the pressure head 18 will drive the first mounting sleeve 19 to move downward when it moves downward, and drive the first upper die 28 to move downward to complete the punching action, thereby adjusting the number of holes punched on the surface of the steel plate 4, so that the device can produce air-conditioning brackets with different numbers of punching holes;

[0045] A second adjusting component is provided between the C-shaped movable frame 11 and the second movable plate 16, and the second adjusting component is used to adjust the spacing between the C-shaped movable frames 11, so that the device can produce air conditioner brackets with different punching spacings;

[0046] A third adjusting component is provided between the second movable plate 16 and the second housing 7, and the third adjusting component is used to adjust the distance between the first upper die 28 and the two sides of the steel plate 4, so that the device can perform punching operations on steel plates 4 of different widths;

[0047] The first adjusting component includes a slider 34 slidably connected to the inside of the first mounting sleeve 19, the bottom of the pressure head 18 is fixed to the top of the slider 34, a first limiting hole 48 is opened inside the slider 34, and a second limiting hole 50 is symmetrically opened on the surface of the first mounting sleeve 19 and located at a position corresponding to the first limiting hole 48. The first limiting hole 48 and the second limiting hole 50 are jointly inserted with an insertion rod 30. When the insertion rod 30 is inserted into the second limiting hole 50 and the first limiting hole 48, it is used to lock the slider 34, so that the pressure head 18 and the first mounting sleeve 19 become hard connected. A second groove 47 is opened on one side of the first limiting hole 48, and a first groove 31 is opened on one side of the second limiting hole 50 and located at a position corresponding to the second groove 47. A pull ring 33 is fixed to one end of the insertion rod 30, and an anti-drop block 32 is fixed to the other end of the insertion rod 30. The anti-drop block 32 passes through the first groove 31 and the second groove 47. When the insertion rod 30 When penetrating the first limiting hole 48 and the second limiting hole 50, the anti-drop block 32 forms a misalignment with the second through groove 47 and the first through groove 31, which can effectively prevent the insertion rod 30 from accidentally falling during punching, thereby improving the stability of the device. A third spring 37 is arranged between the first mounting sleeve 19 and the slider 34, and the third spring 37 is located inside the first mounting sleeve 19. The outer side of the slider 34 is symmetrically provided with guide grooves 35, and the inner wall of the first mounting sleeve 19 is symmetrically fixed with guide rails 36. The guide grooves 35 are slidably connected to the inside of the guide rails 36. The guide grooves 35 and the guide rails 36 are used to guide and limit the slider 34 to prevent the first limiting hole 48 and the second limiting hole 50 from being offset. The third spring 37 is used to drive the slider 34 to reset, so that the first limiting hole 48 and the second limiting hole 50 can always be aligned, which is convenient for the staff to insert the insertion rod 30 into the first limiting hole 48 and the second limiting hole 50.

[0048] Please refer to Figure 1-5 ,

[0049] The second adjusting component includes a plurality of clamping threaded columns 24. The other end of the bottom of the C-shaped movable frame 11 is slidably connected to the surface of the second movable plate 16. A plurality of pressing blocks 27 are slidably connected to the inner side of the second movable plate 16. An avoidance groove 26 is provided inside the second movable plate 16. A second mounting sleeve 51 is fixed inside the pressing block 27. The clamping threaded columns 24 are respectively slidably connected to the inside of the second mounting sleeve 51. One end of the clamping threaded column 24 passes through the avoidance groove 26 and is threadedly connected to the C-shaped movable frame 11. A hexagonal screw head 22 is fixed to the other end of the clamping threaded column 24. A second spring 23 is provided between the hexagonal screw head 22 and the pressing block 27. The second spring 23 is provided between the hexagonal screw head 22 and the pressing block 27. The spring 23 is located on the outside of the second installation sleeve 51. Specifically, when adjusting the spacing between the C-shaped moving frames 11, the staff first places the C-shaped moving frame 11 in a suitable position, and uses a tool to rotate the hexagonal screw head 22 to drive the pressing threaded column 24 to rotate, and the hexagonal screw head 22 is driven by the pressing threaded column 24 to move toward the direction close to the second moving plate 16, and the pressing block 27 and the second moving plate 16 are pressed by the second installation sleeve 51 and the hexagonal screw head 22 to lock the C-shaped moving frame 11 and the second moving plate 16, so as to adjust the spacing of the C-shaped moving frame 11, and then adjust the spacing of the punching holes;

[0050] A first anti-loosening groove 25 is symmetrically provided on the top of the inner side of the second movable plate 16, and a second anti-loosening groove 39 is provided on the top of the pressure block 27. The second anti-loosening groove 39 is engaged with the first anti-loosening groove 25. When the C-shaped movable frame 11 and the second movable plate 16 are locked, the second anti-loosening groove 39 is engaged with the first anti-loosening groove 25, which can effectively avoid loosening between the pressure block 27 and the second movable plate 16 during punching, thereby further improving the stability of the device.

[0051] Please refer to Figure 1-3 ,

[0052] The third adjusting component includes a second guide rod 17 symmetrically fixed at both ends of the bottom inner side of the second shell 7, and the second guide rod 17 is used to guide and limit the first movable plate 12, and the first movable plate 12 is respectively fixed at both ends of the second movable plate 16, and the first movable plate 12 is slidably connected to the second guide rod 17, and an adjusting plate 13 is fixed between the two first movable plates 12, and the two sides of the adjusting plate 13 are respectively rotatably connected with adjusting threaded rods 15, and the adjusting threaded rod 15 is threadedly connected to the adjusting plate 13, and the adjusting threaded rod 15 is fixed to the end away from the pillow plate 21 with an adjusting dial 14. Specifically, the staff drives the adjusting threaded rod 15 to rotate by manually rotating the adjusting dial 14, and drives the adjusting plate 13, the first movable plate 12 and the second movable plate 16 to move by adjusting the threaded rod 15 to adjust the distance from the first upper mold 28 to the two sides of the steel plate 4, so that the device can punch steel plates 4 of different widths.

[0053] Please refer to Figure 2-3 ,

[0054] The power assembly includes a second hydraulic cylinder 8 fixed on the top of the second shell 7, a pressure plate 10 is slidably connected to the top of the inner side of the second shell 7, and first guide rods 9 are symmetrically fixed at both ends of the inner side of the second shell 7. The first guide rods 9 are used to guide and limit the pressure plate 10. The two ends of the pressure plate 10 are slidably connected to the first guide rods 9. The output end of the second hydraulic cylinder 8 passes through the second shell 7 and is fixed to the top of the pressure plate 10. Specifically, the pressure plate 10 is driven to move downward by the second hydraulic cylinder 8, and all the pressure heads 18 are driven to move downward by the pressure plate 10, thereby driving the first upper mold 28 to move downward to complete the punching operation of the steel plate 4.

[0055] Please refer to Figure 1 and Figure 7 ,

[0056] The pressing mechanism 3 includes a first shell 5 fixed on the upper surface of the frame 1, the first shell 5 is located on one side of the second shell 7, a second lower die 43 is fixed to the bottom of the inner side of the first shell 5, a second upper die 42 is slidably connected to the top of the inner side of the first shell 5 and located at a position corresponding to the second lower die 43, a first hydraulic cylinder 6 is fixed to the top of the first shell 5, the output end of the first hydraulic cylinder 6 passes through the first shell 5 and is fixed to the second upper die 42, a second guide sleeve 41 is symmetrically fixed to the top of the first shell 5, a third guide rod 40 is slidably connected inside the second guide sleeve 41, the bottom of the third guide rod 40 is fixed to the second upper die 42, the third guide rod 40 and the second guide sleeve 41 are used to guide and limit the second upper die 42, and a right-angle cutting knife 46 is fixed to the side of the second upper die 42 close to the second shell 7 A mounting plate 44 is fixed to one side of the first shell 5 close to the second shell 7, and a plane cutting knife 45 is fixed to the top of the mounting plate 44 and at the position corresponding to the right-angle cutting knife 46. When the second upper die 42 moves downward, it cooperates with the second lower die 43 to complete the pressing of the steel plate 4, and drives the right-angle cutting knife 46 to move downward. The right-angle cutting knife 46 and the plane cutting knife 45 cooperate with each other to complete the cutting of the steel plate 4. Specifically, the first hydraulic cylinder 6 drives the clamping thread column 24 to move downward, and drives the right-angle cutting knife 46 to move downward. In the process of pressing the steel plate 4, the steel plate 4 is gradually cut. In the process of pressing the steel plate 4, the steel plate 4 in the connected state can play a limiting role in the pressing process to avoid the position displacement of the separated steel plate 4 when it falls.

[0057] Instructions for use: When in use, the staff inserts the corresponding number of insertion rods 30 into the first limiting hole 48 and the second limiting hole 50 through the pull ring 33, and places the C-shaped movable frame 11 in a suitable position. The staff rotates the hexagonal screw head 22 to move the hexagonal screw head 22 toward the second movable plate 16, and presses the pressing block 27 and the second movable plate 16 through the second mounting sleeve 51 and the hexagonal screw head 22 to lock the C-shaped movable frame 11 and the second movable plate 16. The staff adjusts the distance from the first upper mold 28 to the two sides of the steel plate 4 by manually rotating the adjusting dial 14, leaving enough distance between the punching position and the two sides of the steel plate 4. The staff operates the feeding device to feed the steel plate 4 into the punching mechanism 2 and the pressing mechanism 3 and starts the second hydraulic cylinder 8 and the first hydraulic cylinder 6 to punch and press the air-conditioning bracket.

[0058] The production equipment and the use method of the air conditioner bracket provided by the present invention are used as follows:

[0059] Technical principle: When adjusting the hard-soft connection between the pressure head 18 and the first mounting sleeve 19, the insertion rod 30 is inserted into the first limiting hole 48 and the second limiting hole 50 through the pull ring 33 to lock the slider 34, so that the pressure head 18 and the first mounting sleeve 19 become hard-connected. When the insertion rod 30 is pulled out, the pressure head 18 and the first mounting sleeve 19 become soft-connected. By setting the anti-drop block 32, when the insertion rod 30 passes through the first limiting hole 48 and the second limiting hole 50, the anti-drop block 32 The second through groove 47 and the first through groove 31 are not aligned, which can effectively prevent the insertion rod 30 from accidentally falling off during punching. The guide groove 35 and the guide rail 36 are used to guide and limit the slider 34 to prevent the first limiting hole 48 and the second limiting hole 50 from shifting. The third spring 37 is used to drive the slider 34 to reset, so that the first limiting hole 48 and the second limiting hole 50 can always be aligned, which is convenient for the staff to insert the insertion rod 30 into the first limiting hole 48 and the second limiting hole 50. When adjusting the spacing between the C-shaped movable frames 11, the staff first places the C-shaped movable frame 11 in a suitable position, and uses a tool to rotate the hexagonal screw head 22 to drive the pressing threaded column 24 to rotate, and the hexagonal screw head 22 is driven by the pressing threaded column 24 to move in the direction close to the second movable plate 16, and the pressing block 27 and the second movable plate 16 are pressed by the second mounting sleeve 51 and the hexagonal screw head 22, and the second anti-loosening groove 39 is engaged with the first anti-loosening groove 25 to lock the C-shaped movable frame 11 and the second movable plate 16, so as to adjust the spacing of the C-shaped movable frame 11, and then adjust the spacing of the punching holes, and drive the adjusting threaded rod 15 to rotate by hand to drive the adjusting plate 13, the first movable plate 12 and the second movable plate 16 to move by the adjusting threaded rod 15, so as to adjust the distance from the first upper die 28 to the two sides of the steel plate 4, so that the device can perform punching operations on steel plates 4 of different widths;

[0060] When the air-conditioning bracket is produced, the pressing plate 10 is driven downward by the second hydraulic cylinder 8, and all the pressing heads 18 are driven downward by the pressing plate 10, and the first upper mold 28 is driven downward to complete the punching operation of the steel plate 4. The steel plate 4 is driven to move to the position between the second upper mold 42 and the second lower mold 43 by the feeding device, and the second upper mold 42 is driven downward again by the first hydraulic cylinder 6. The second upper mold 42 cooperates with the second lower mold 43 to complete the pressing of the steel plate 4, and drives the right-angle cutting knife 46 to move downward. The right-angle cutting knife 46 cooperates with the plane cutting knife 45 to complete the cutting of the steel plate 4.

[0061] Obviously, the embodiments described above are only some embodiments of the present invention, rather than all embodiments. The preferred embodiments of the present invention are given in the accompanying drawings, but they do not limit the patent scope of the present invention. The present invention can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive. Although the present invention has been described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific implementation methods, or to replace some of the technical features therein with equivalents. Any equivalent structure made using the contents of the specification and drawings of the present invention, directly or indirectly used in other related technical fields, is also within the scope of patent protection of the present invention.

Claims

1. A production equipment for air conditioner bracket, characterized in that: The invention comprises a frame (1), wherein a punching mechanism (2) and a pressing mechanism (3) are arranged on the top of the frame (1), wherein the punching mechanism (2) comprises a second shell (7) fixed on the upper surface of the frame (1), wherein inlet and outlet holes (49) are provided at both ends of the second shell (7), a power assembly is arranged on the top of the inner side of the second shell (7), and a punching assembly is symmetrically arranged below the power assembly; The punching assembly comprises a second movable plate (16) symmetrically slidably connected to the inside of a second shell (7); a plurality of C-shaped movable frames (11) are slidably connected to the second movable plate (16); a first guide sleeve (38) is fixed to one end of the top of the C-shaped movable frame (11); a first upper die (28) is slidably connected to the inside of the first guide sleeve (38); a first lower die (29) is fixed to one end of the bottom of the C-shaped movable frame (11) and located at a position corresponding to the first upper die (28); a pillow plate (21) is fixed to the upper surface of the frame (1) and located inside the second shell (7); the top of the pillow plate (21) A first mounting sleeve (19) is slidably connected to one end of the bottom of the C-shaped movable frame (11); a first mounting sleeve (19) is fixed to the top of the first upper mold (28) and above the C-shaped movable frame (11); a first spring (20) is arranged between the first mounting sleeve (19) and the C-shaped movable frame (11); a pressure head (18) is slidably connected to the top of the first mounting sleeve (19); a first adjusting component is arranged inside the first mounting sleeve (19); a second adjusting component is arranged between the C-shaped movable frame (11) and the second movable plate (16); and a third adjusting component is arranged between the second movable plate (16) and the second shell (7).

2. The production equipment of an air conditioner bracket according to claim 1, characterized in that: The first adjusting component comprises a slider (34) slidably connected to the inside of the first mounting sleeve (19); the bottom of the pressure head (18) is fixed to the top of the slider (34); a first limiting hole (48) is provided inside the slider (34); a second limiting hole (50) is symmetrically provided on the surface of the first mounting sleeve (19) and located at a position corresponding to the first limiting hole (48); an insert rod (30) is inserted into the inside of the first limiting hole (48) and the second limiting hole (50); a second slot (47) is provided on one side of the first limiting hole (48); a first slot (31) is provided on one side of the second limiting hole (50) and located at a position corresponding to the second slot (47); a pull ring (33) is fixed to one end of the insert rod (30); and an anti-drop block (32) is fixed to the other end of the insert rod (30); the anti-drop block (32) passes through the first slot (31) and the second slot (47).

3. The production equipment of an air conditioner bracket according to claim 2, characterized in that: A third spring (37) is provided between the first mounting sleeve (19) and the slider (34), and the third spring (37) is located inside the first mounting sleeve (19). A guide groove (35) is symmetrically provided on the outer side of the slider (34), and a guide rail (36) is symmetrically fixed on the inner wall of the first mounting sleeve (19), and the guide groove (35) is slidably connected inside the guide rail (36).

4. The production equipment of an air conditioner bracket according to claim 3, characterized in that: The second adjusting component comprises a plurality of clamping threaded columns (24), the other end of the bottom of the C-shaped movable frame (11) is slidably connected to the surface of the second movable plate (16), a plurality of pressing blocks (27) are slidably connected to the inner side of the second movable plate (16), an avoidance groove (26) is provided inside the second movable plate (16), a second mounting sleeve (51) is fixed inside the pressing block (27), the clamping threaded columns (24) are respectively slidably connected to the inside of the second mounting sleeve (51), one end of the clamping threaded column (24) passes through the avoidance groove (26) and is threadedly connected to the C-shaped movable frame (11), the other end of the clamping threaded column (24) is fixed with a hexagonal screw head (22), a second spring (23) is provided between the hexagonal screw head (22) and the pressing block (27), and the second spring (23) is located on the outer side of the second mounting sleeve (51).

5. The production equipment of an air conditioner bracket according to claim 4, characterized in that: A first anti-loosening groove (25) is symmetrically provided at the top of the inner side of the second movable plate (16), and a second anti-loosening groove (39) is provided at the top of each pressing block (27), and the second anti-loosening groove (39) is clamped with the first anti-loosening groove (25).

6. The production equipment of an air conditioner bracket according to claim 5, characterized in that: The third adjustment component comprises a second guide rod (17) symmetrically fixed at two ends of the inner bottom of the second shell (7); the first movable plates (12) are respectively fixed at two ends of the second movable plate (16); the first movable plate (12) is slidably connected to the second guide rod (17); an adjustment plate (13) is fixed between the two first movable plates (12); the two sides of the adjustment plate (13) are respectively rotatably connected with adjustment threaded rods (15); the adjustment threaded rod (15) is threadedly connected to the adjustment plate (13); and an adjustment dial (14) is fixed to one end of the adjustment threaded rod (15) away from the pillow plate (21).

7. The production equipment of an air conditioner bracket according to claim 6, characterized in that: The power assembly comprises a second hydraulic cylinder (8) fixed on the top of a second housing (7); a pressure plate (10) is slidably connected to the top of the inner side of the second housing (7); first guide rods (9) are symmetrically fixed at both ends of the inner side of the second housing (7); both ends of the pressure plate (10) are slidably connected to the first guide rods (9); and an output end of the second hydraulic cylinder (8) passes through the second housing (7) and is fixed to the top of the pressure plate (10).

8. The production equipment of an air conditioner bracket according to claim 1, characterized in that: The pressing mechanism (3) comprises a first shell (5) fixed on the upper surface of the frame (1), the first shell (5) being located on one side of the second shell (7), a second lower die (43) being fixed to the bottom of the inner side of the first shell (5), a second upper die (42) being slidably connected to the top of the inner side of the first shell (5) and located at a position corresponding to the second lower die (43), a first hydraulic cylinder (6) being fixed to the top of the first shell (5), an output end of the first hydraulic cylinder (6) passing through the first shell (5) and being fixed to the second upper die (42), a second guide sleeve (41) being symmetrically fixed to the top of the first shell (5), a third guide rod (40) being slidably connected to the interior of the second guide sleeve (41), and a bottom of the third guide rod (40) being fixed to the second upper die (42).

9. The production equipment of an air conditioner bracket according to claim 8, characterized in that: A right-angle cutting knife (46) is fixed to a side of the second upper mold (42) close to the second shell (7), a mounting plate (44) is fixed to a side of the first shell (5) close to the second shell (7), and a plane cutting knife (45) is fixed to the top of the mounting plate (44) at a position corresponding to the right-angle cutting knife (46).

10. A method for using air conditioner bracket production equipment, used for a drill bit salvaging device according to any one of claims 1 to 9, the steps are as follows: S1. A staff member inserts a corresponding number of insertion rods (30) into the first limiting hole (48) and the second limiting hole (50) through the pull ring (33); S2, the staff puts the C-shaped mobile frame (11) in a suitable position; S3, the staff rotates the hexagonal screw head (22) to lock the C-shaped movable frame (11) and the second movable plate (16); S4, the staff adjusts the distance between the first upper mold (28) and the two sides of the steel plate (4) by manually rotating the adjustment dial (14); S5. The staff operates the feeding device to feed the steel plate (4) into the punching mechanism (2) and the pressing mechanism (3) and starts the second hydraulic cylinder (8) and the first hydraulic cylinder (6).

Citation Information

Patent Citations

  • A production equipment and method for custom air conditioner brackets

    CN116810402A