By designing guide plates and fixed connection units in the hydraulic crawling mold of the bridge high pier, combined with hydraulic cylinders and electromagnet technology, the problem of poor clamping table joint stability is solved, and higher construction stability and strength are achieved.

CN119243591APending Publication Date: 2025-01-03JIANGXI NONFERROUS CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411541442.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

In the construction of hydraulic climbing molds of high piers on the bridge, the clamping table and longitudinal track are not stable, which affects the construction stability.

Method used

A hydraulic climbing mold of the high pier of the bridge was designed. By installing a guide plate and a fixed connection unit on the longitudinal track, the hydraulic cylinder, guide plate, clamp plate and spring can be used to achieve stable connection between the crawler table and the fixed connection unit, combined with Negative pressure adsorption technology of electromagnets and suction cups enhances clamping strength and stability.

Benefits of technology

It effectively improves the clamping stability and fixing strength between the crawler table and the fixed block, ensuring the stable installation of the crawler frame and the reliability of high pier construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119243591A_ABST
    Figure CN119243591A_ABST
Patent Text Reader

Abstract

The invention discloses a bridge high pier hydraulic creeping formwork and a construction method thereof.The bridge high pier hydraulic creeping formwork comprises a high pier and a longitudinal rail, the longitudinal rail is installed on the side wall of the high pier and fixedly installed through installation nails, a longitudinal creeping assembly is installed on the longitudinal rail, and a creeping formwork frame is installed on the longitudinal creeping assembly; the climbing formwork frame moves upwards along the longitudinal rails through the longitudinal climbing assembly to conduct height adjustment, the longitudinal climbing assembly comprises an upper climbing table and a lower climbing table, a hydraulic cylinder is fixedly installed at the bottom end of the upper climbing table, the output end of the hydraulic cylinder is fixedly connected with the lower climbing table, and guide plates are symmetrically installed on the sides, close to the longitudinal rails, of the climbing tables. A crawling clamping unit is mounted in the crawling table; according to the climbing platform, when a baffle shields a middle through groove, a clamping plate is inserted into a first inserting groove, a clamping rod is clamped into a first clamping groove, after the baffle is opened, a middle inserting block is clamped into a second inserting groove under the elastic force effect of a third spring, and the clamping stability between the climbing platform and the fixing block is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hydraulic climbing formwork, and in particular relates to a hydraulic climbing formwork for a high bridge pier and a construction method thereof. Background Art

[0002] In recent years, with the rapid development of transportation, when building highway projects in mountainous areas and crossing mountain valleys or rivers, the bridge piers are designed to be high, which not only prolongs the construction period, but also brings certain difficulties to the construction. Hydraulic climbing formwork is an advanced construction method that uses hydraulic equipment to make the formwork automatically climb up along the pier column without the need for lifting equipment. When in use, a set of hydraulic climbing formwork is installed on the side of the pier column. Through two crawling platforms and hydraulic cylinders, the crawling platforms are driven to move upward along the longitudinal track in an alternating manner, thereby driving the climbing formwork frame to move upward. During the movement, the crawling platform needs to be connected with the positioning piece on the longitudinal track when moving, but there are the following defects: During the crawling process, the crawling platform needs to be frequently engaged and disengaged with the positioning parts to facilitate the upward movement of the crawling platform and the climbing formwork. When the crawling frame needs to be fixed for construction of high piers, the engagement stability of the crawling platform may become loose, resulting in poor stability of the climbing formwork and affecting the construction of the high piers. Summary of the invention

[0003] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a hydraulic climbing formwork for a high bridge pier and a construction method thereof, which effectively solves the problem that the crawling platform needs to be frequently connected and separated from the longitudinal track when crawling, which may result in poor connection stability when fixed.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a hydraulic climbing formwork for a high bridge pier, comprising a high pier and a longitudinal track, wherein the longitudinal track is installed on the side wall of the high pier and fixedly installed by means of mounting nails, a longitudinal crawling assembly is installed on the longitudinal track, a climbing formwork frame is installed on the longitudinal crawling assembly, and the climbing formwork frame is moved upward along the longitudinal track by the longitudinal crawling assembly to adjust its height; The longitudinal crawling assembly includes two crawling platforms, one above and one below. A hydraulic cylinder is fixedly installed at the bottom of the upper crawling platform. The output end of the hydraulic cylinder is fixedly connected to the crawling platform below. A guide plate is symmetrically installed on one side of the crawling platform close to the longitudinal track. A crawling card connection unit is installed inside the crawling platform. The longitudinal track includes a track body, and guide side grooves are symmetrically opened on both sides of the track body. The guide plates are slidably connected to the guide side grooves. Fixed connection units are equidistantly installed on the side of the track body away from the high pier, and the crawling platform can be clamped with the fixed connection unit through a crawling clamping unit.

[0005] Preferably, the fixed connection unit includes a fixed block equidistantly fixedly installed on the rail body, two first slots are symmetrically provided on the fixed block, a second slot is provided on the fixed block, the second slot is located between the two first slots, first card slots are symmetrically provided on both sides of the second slot, the two first card slots are respectively connected with the two first slots, second card slots are provided on the bottom wall and the top wall of the second slot, two contacts are installed on the side wall of the upper second card slot, a suction cup is installed on the inner wall of one side away from the two first slots, fans are symmetrically installed on both sides of the fixed block, two side connecting slots are symmetrically provided on the fixed block, and the suction cup is connected to the inner cavity of the fan through the side connecting slots.

[0006] Preferably, the crawling card connection unit includes an internal groove opened inside the crawling platform, and hydraulic cylinders are symmetrically opened on one side of the internal groove close to the track body, and the two hydraulic cylinders correspond to the two first slots. An internal plate is movably installed inside the internal groove, and a card plate is symmetrically installed on one side of the internal plate close to the track body. The card plate passes through the through groove of the plate body, a movable driving part is installed on the internal plate, and a side card connection unit is installed inside the card plate.

[0007] Preferably, the movable driving member includes a middle groove opened on the internal plate, a middle column rod is movably installed inside the middle groove, an end plate is installed on the end of the middle column rod away from the track body, a first magnetic block is installed on the end plate, a first electromagnet is installed on the inner wall of the end of the internal groove away from the track body, vertical plates are installed on the upper and lower sides of the other end of the middle column rod, guide rods are symmetrically installed on the side of the vertical plate close to the internal plate, the guide rods pass through the guide grooves, and the guide grooves are symmetrically opened on the internal plate, a first spring is fixedly installed on the side of the vertical plate close to the internal plate, one end of the first spring is fixedly connected to the internal plate, and a fixed clamping unit is installed on the end of the middle column rod close to the track body.

[0008] Preferably, the side clamping unit includes a plate movable groove opened inside the crawling clamping unit, a rod movable groove is opened at one end of the plate movable groove away from the guide plate, the two rod movable grooves respectively penetrate to the side of the two crawling clamping units close to each other, a movable plate is movably installed inside the plate movable groove, a clamping rod is movably installed inside the clamping groove of the rod, a first connecting rod is hingedly installed on the side of the movable plate close to the clamping rod, the other end of the first connecting rod is hinged to the clamping rod, when the movable plate moves toward one side of the clamping rod, the clamping rod is pushed by the first connecting rod to move toward the outside of the crawling clamping unit, a second spring is symmetrically installed on the other side of the movable plate, one end of the second spring is fixedly connected to the end inner wall of the plate movable groove, a pressure rod is installed on the side of the movable plate away from the clamping rod, and the end of the pressure rod penetrates to the side of the guide plate close to the end plate.

[0009] Preferably, the fixed card-connecting unit includes a middle plug block arranged on the side of the middle column rod close to the rail body, a limiting inner groove is arranged inside the middle plug block, a limiting inner plate is movably installed inside the limiting inner groove, a fixing rod is installed on the side of the limiting inner plate close to the guide plate, one end of the fixing rod passes through the outside of the middle plug block, and one end of the fixing rod is fixedly connected to the middle column rod, a third spring is symmetrically installed on the side of the limiting inner plate close to the middle column rod, one end of the third spring is fixedly connected to the end of the limiting inner groove, and an auxiliary fixing unit is installed on the middle plug block.

[0010] Preferably, a middle through groove is opened at one end of the internal groove close to the rail body, the middle through groove corresponds to the middle plug-in block, plate grooves are symmetrically opened at the top and bottom ends of the middle through groove, a baffle is movably installed inside the plate groove, a fourth spring is symmetrically installed at one end where the two baffles are away from each other, the end of the fourth spring is fixedly connected to the inner wall of the plate groove, the middle through groove is closed when the two baffles are in contact, a second magnetic block is installed on the baffle, and a second electromagnet is installed on the inner wall at one end where the two plate grooves are away from each other.

[0011] Preferably, the auxiliary fixing unit includes transverse displacement grooves symmetrically opened inside the middle plug block, the two transverse displacement grooves are symmetrically arranged on both sides of the limiting inner groove, the two transverse displacement grooves are each provided with a transverse groove on the side away from each other, two longitudinal displacement grooves are opened between the two transverse displacement grooves, the two longitudinal displacement grooves are symmetrically arranged on the upper and lower sides of the limiting inner groove, and the two longitudinal displacement grooves are each provided with a longitudinal groove on the side away from each other.

[0012] Preferably, a transverse plate is movably installed inside the transverse slot, and transverse blocks are installed on the sides of the two transverse plates away from each other, and the transverse blocks are located inside the transverse slot. A longitudinal plate is movably installed inside the longitudinal slot, and longitudinal blocks are installed on the sides of the two longitudinal plates away from each other, and a conductive rod is installed on the upper longitudinal block. Second connecting rods are hingedly installed at both ends of the longitudinal plates, and the other end of the second connecting rod is hingedly installed to the transverse plate, and a fifth spring is symmetrically installed on one side of the transverse plate close to the limiting inner slot.

[0013] Preferably, a construction method of a hydraulic climbing formwork for a high bridge pier is as follows: S1. Install the track body on the side wall of the high pier through the installation nails, alternately connect the upper and lower crawling platforms with the corresponding fixed blocks, and drive the two crawling platforms to crawl upward alternately through the hydraulic cylinder, thereby driving the climbing formwork frame to move upward; S2, when crawling, the baffle is in a state of closing the middle through slot, and the first electromagnet drives the card plate to be inserted into the first slot, so that the card rod is inserted into the first card slot, the crawling platform is clamped, and the card plate and the first card slot are conveniently moved back, so as to facilitate climbing; S3, when fixing, after the card plate is inserted into the first slot and the card rod is inserted into the first slot, the middle slot is opened, so that the middle plug block moves outward and is inserted into the second slot, and then the middle column continues to move, so that the card rod is inserted into the transverse slot, and the longitudinal moving block is pushed into the second slot by the second connecting rod, and the fan is powered on to fix the suction cup and the card plate by negative pressure adsorption; S4. After the two crawling platforms are connected and fixed with the fixed blocks, the construction workers carry out construction on the high pier on the climbing formwork.

[0014] Compared with the prior art, the present invention has the following beneficial effects: 1) During operation, when the middle through slot is blocked by the baffle, the card plate is inserted into the first slot, and the card rod is inserted into the first slot, which fixes the crawling platform and facilitates the retraction and release of the card plate, thereby facilitating the movement of the crawling platform. After the baffle is opened, the middle insert block is inserted into the second slot under the elastic force of the third spring, thereby enhancing the card connection stability between the crawling platform and the fixed block when the climbing formwork frame needs to be fixed; 2) During operation, when the middle plug block is blocked by the baffle plate, the end plate pushes the clamping rod into the first clamping slot. When the middle through slot is opened, the middle plug block enters the second slot, so that the middle column rod can continue to move toward the side of the track body, so that the end plate pushes the pressure rod to continue to move, so that the clamping rod continues to move outward into the second slot and is clamped into the transverse slot, so that the crawling platform is clamped and self-locked, further improving the installation stability of the climbing formwork frame; 3) During operation, when the provided clamping rod enters the transverse groove, the two transverse plates are pushed closer to each other, and under the action of the second connecting rod on the transverse plate, the two longitudinal plates are pushed away from each other, and the longitudinal block is pushed into the second clamping groove, thereby further clamping the middle plug block to improve the fixing strength of the crawling platform. At the same time, the two ends of the conductive rod are respectively in contact with the two contacts, so that the fan is turned on, and the suction cup and the clamping plate are fixed by negative pressure adsorption, thereby further improving the fixing strength. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0016] In the attached picture: Figure 1 It is a structural schematic diagram of a hydraulic climbing formwork for a high bridge pier and a construction method thereof of the present invention; Figure 2 It is a schematic diagram of the longitudinal track structure of the present invention; Figure 3 It is a schematic diagram of the structure of the fixing block of the present invention; Figure 4is a schematic diagram of the second slot structure of the present invention; Figure 5 It is a schematic diagram of the fan structure of the present invention; Figure 6 It is a schematic diagram of the crawling platform structure of the present invention; Figure 7 It is a schematic diagram of the structure of the crawling card connection unit of the present invention; Figure 8 It is a schematic diagram of the middle column structure of the present invention; Fig. 9 It is a schematic diagram of the structure of the side clamping member of the present invention; Fig.10 It is a schematic diagram of the structure of the middle plug block of the present invention; Fig.11 It is a schematic diagram of the middle through groove structure of the present invention; Fig.12 It is a schematic diagram of the structure of the auxiliary fixing unit of the present invention.

[0017] In the figure: 1, high pier; 2, longitudinal track; 201, track body; 202, guide side groove; 203, fixed connection unit; 2031, fixed block; 2032, first slot; 2033, second slot; 2034, first slot; 2035, second slot; 2036, contact; 2037, side connecting slot; 2038, suction cup; 2039, fan; 3, mounting nail; 4, longitudinal crawling assembly; 401, crawling platform; 4 02, hydraulic cylinder; 403, guide plate; 404, crawling clamping unit; 4041, internal groove; 4042, plate groove; 4043, internal plate; 4044, clamping plate; 4045, first electromagnet; 4046, middle groove; 4047, middle column; 4048, end plate; 4049, first magnetic block; 40410, guide groove; 40411, guide rod; 40412, first spring; 405, side clamping unit ... 051, plate movable groove; 4052, rod movable groove; 4053, movable plate; 4054, clamping rod; 4055, first connecting rod; 4056, second spring; 4057, pressing rod; 406, fixed clamping unit; 4061, middle plug block; 4062, limiting inner groove; 4063, limiting inner plate; 4064, fixing rod; 4065, third spring; 4066, middle through groove; 4067, plate groove; 4068, baffle; 4069, fourth spring; 40610, second magnetic block; 40611, second electromagnet; 407, auxiliary fixing unit; 4071, transverse slot; 4072, transverse slot; 4073, transverse plate; 4074, transverse block; 4075, longitudinal slot; 4076, longitudinal slot; 4077, longitudinal plate; 4078, longitudinal block; 4079, conductive rod; 40710, second connecting rod; 40711, fifth spring; 5, climbing formwork frame. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0019] Depend on Figure 1-12 The present invention relates to a hydraulic climbing formwork for a high pier of a bridge, comprising a high pier 1 and a longitudinal track 2, wherein the longitudinal track 2 is installed on the side wall of the high pier 1 and is fixedly installed by installing nails 3, a longitudinal crawling component 4 is installed on the longitudinal track 2, a climbing formwork frame 5 is installed on the longitudinal crawling component 4, and the climbing formwork frame 5 is moved upward along the longitudinal track 2 by the longitudinal crawling component 4 to adjust its height.

[0020] The longitudinal track 2 includes a track body 201, and guide side grooves 202 are symmetrically provided on both sides of the track body 201. The guide plates 403 are slidably connected to the guide side grooves 202. A fixed connection unit 203 is equidistantly installed on one side of the track body 201 away from the high pier 1. The crawling platform 401 can be clamped with the fixed connection unit 203 through a crawling clamping unit 404. The fixed connection unit 203 includes a fixed block 2031 fixedly installed on the track body 201 at an equidistant distance. Two first slots 2032 are symmetrically provided on the fixed block 2031. A second slot 2033 is provided on the fixed block 2031. The second slot 2033 is located between the two first slots 20 32, first card slots 2034 are symmetrically provided on both sides of the second slot 2033, the two first card slots 2034 are respectively connected with the two first slots 2032, the bottom wall and the top wall of the second slot 2033 are both provided with second card slots 2035, two contacts 2036 are installed on the side wall of the upper second card slot 2035, a suction cup 2038 is installed on the inner wall of one side away from the two first slots 2032, fans 2039 are symmetrically installed on both sides of the fixing block 2031, and two side connecting grooves 2037 are symmetrically provided on the fixing block 2031, and the suction cup 2038 is connected with the inner cavity of the fan 2039 through the side connecting groove 2037.

[0021] The longitudinal crawling assembly 4 includes two upper and lower crawling platforms 401. A hydraulic cylinder 402 is fixedly installed at the bottom end of the upper crawling platform 401. The output end of the hydraulic cylinder 402 is fixedly connected to the lower crawling platform 401. A guide plate 403 is symmetrically installed on one side of the crawling platform 401 close to the longitudinal track 2, and a crawling card connection unit 404 is installed inside the crawling platform 401.

[0022] The crawling card connection unit 404 includes an internal groove 4041 opened inside the crawling platform 401, and a hydraulic cylinder 402 is symmetrically opened on one side of the internal groove 4041 close to the track body 201, and the two hydraulic cylinders 402 correspond to the two first slots 2032. An internal plate 4043 is movably installed inside the internal groove 4041, and a card plate 4044 is symmetrically installed on one side of the internal plate 4043 close to the track body 201. The card plate 4044 passes through the plate body through groove 4042. A moving drive member is installed on the internal plate 4043, and a side card connection unit 405 is installed inside the card plate 4044. The moving drive member includes a middle groove 4046 opened on the internal plate 4043, and a middle column 4047 is movably installed inside the middle groove 4046. The middle column 4047 An end plate 4048 is installed at the end away from the track body 201, and a first magnetic block 4049 is installed on the end plate 4048. A first electromagnet 4045 is installed on the inner wall of the end of the internal groove 4041 away from the track body 201, and vertical plates are installed on the upper and lower sides of the other end of the middle column 4047. A guide rod 40411 is symmetrically installed on the side of the vertical plate close to the internal plate 4043. The guide rod 40411 passes through the guide groove 40410, and the guide groove 40410 is symmetrically opened on the internal plate 4043. A first spring 40412 is fixedly installed on the side of the vertical plate close to the internal plate 4043, and one end of the first spring 40412 is fixedly connected to the internal plate 4043. A fixed clamping unit 406 is installed on the end of the middle column 4047 close to the track body 201.

[0023] The side clamping unit 405 includes a plate movable groove 4051 opened inside the crawling clamping unit 404, and a rod movable groove 4052 is opened at one end of the plate movable groove 4051 away from the guide plate 403. The two rod movable grooves 4052 respectively penetrate to the sides of the two crawling clamping units 404 that are close to each other. A movable plate 4053 is movably installed inside the plate movable groove 4051, and a clamping rod 4054 is movably installed inside the rod movable groove 4052. A first connecting rod 4055 is hingedly installed on one side of the movable plate 4053 close to the clamping rod 4054. The first connecting rod 4055 The other end of the rod 4055 is hinged to the locking rod 4054. When the movable plate 4053 moves toward one side of the locking rod 4054, the first connecting rod 4055 pushes the locking rod 4054 to move toward the outside of the crawling locking unit 404. A second spring 4056 is symmetrically installed on the other side of the movable plate 4053. One end of the second spring 4056 is fixedly connected to the inner wall of the end of the movable groove 4051 of the plate body. A pressure rod 4057 is installed on the side of the movable plate 4053 away from the locking rod 4054. The end of the pressure rod 4057 passes through the side of the guide plate 403 close to the end plate 4048.

[0024] The fixed clamping unit 406 includes a middle plug block 4061 arranged on the side of the middle column 4047 close to the rail body 201, the middle plug block 4061 is provided with a limited inner groove 4062 inside, and a limited inner plate 4063 is movably installed inside the limited inner groove 4062, and a fixing rod 4064 is installed on the side of the limited inner plate 4063 close to the guide plate 403, one end of the fixing rod 4064 passes through the outside of the middle plug block 4061, and one end of the fixing rod 4064 is fixedly connected to the middle column 4047, and a third spring 4065 is symmetrically installed on the side of the limited inner plate 4063 close to the middle column 4047, and one end of the third spring 4065 is connected to the guide plate 403. The end of the limiting inner groove 4062 is fixedly connected, and an auxiliary fixing unit 407 is installed on the middle plug block 4061. A middle through groove 4066 is opened at one end of the inner groove 4041 close to the track body 201. The middle through groove 4066 corresponds to the middle plug block 4061. The top and bottom ends of the middle through groove 4066 are symmetrically opened with plate grooves 4067. A baffle 4068 is movably installed inside the plate groove 4067. When the baffle 4068 blocks the middle through groove 4066, the card plate 4044 is inserted into the first slot 2032, and the card rod 4054 is inserted into the first card slot 2034, which fixes the crawling platform 401 and facilitates the retraction of the card plate 4044. The clamping connection is released to facilitate the movement of the crawling platform 401. After the baffle 4068 is opened, the middle plug block 4061 is clamped into the second slot 2033 under the elastic force of the third spring 4065, so that when the climbing formwork frame 5 needs to be fixed, the clamping stability between the crawling platform 401 and the fixed block 2031 is enhanced. The fourth spring 4069 is symmetrically installed at one end of the two baffles 4068 away from each other, and the end of the fourth spring 4069 is fixedly connected to the inner wall of the plate groove 4067. When the two baffles 4068 are in contact, the middle through groove 4066 is closed. A second magnetic block 40610 is installed on the baffle 4068. The inner wall of the two plate grooves 4067 away from each other is provided with a second magnetic block 40610. A second electromagnet 40611 is installed on the wall. When the middle plug block 4061 is blocked by the baffle plate 4068, the end plate 4048 pushes the locking rod 4054 to enter the first locking groove 2034. When the middle through groove 4066 is opened, the middle plug block 4061 enters the second slot 2033, so that the middle column rod 4047 can continue to move toward the side of the track body 201, so that the end plate 4048 pushes the pressure rod 4057 to continue to move, so that the locking rod 4054 continues to move outward into the second slot 2033 and is locked into the transverse groove 4072, so that the crawling platform 401 is locked and self-locked, further improving the installation stability of the climbing formwork frame 5.

[0025] The auxiliary fixing unit 407 includes a transverse slot 4071 symmetrically arranged inside the middle plug block 4061, two transverse slots 4071 are symmetrically arranged on both sides of the limiting inner slot 4062, a transverse slot 4072 is arranged on the side away from each other of the two transverse slots 4071, two longitudinal slots 4075 are arranged between the two transverse slots 4071, the two longitudinal slots 4075 are symmetrically arranged on the upper and lower sides of the limiting inner slot 4062, and a longitudinal slot 4076 is arranged on the side away from each other of the two longitudinal slots 4075, a transverse plate 4073 is movably installed inside the transverse slot 4071, a transverse block 4074 is installed on the side away from each other of the two transverse plates 4073, and the transverse block 4074 is located inside the transverse slot 4072, a longitudinal plate 4077 is movably installed inside the longitudinal slot 4075, and a longitudinal block 4078 is installed on the side away from each other of the two longitudinal plates 4077, and the upper longitudinal block 407 A conductive rod 4079 is installed on 8, and second connecting rods 40710 are hingedly installed at both ends of the longitudinal moving plate 4077, and the other end of the second connecting rod 40710 is hingedly installed with the transverse moving plate 4073. A fifth spring 40711 is symmetrically installed on the side of the transverse moving plate 4073 close to the limiting inner groove 4062. When the clamping rod 4054 enters the transverse groove 4072, it pushes the two transverse moving plates 4073 to approach each other, and under the action of the second connecting rod 40710 on the transverse moving plate 4073, it pushes the two longitudinal moving plates 4077 away from each other, and pushes the longitudinal moving block 4078 to be stuck in the second clamping groove 2035, thereby further clamping the middle plug block 4061, thereby improving the fixing strength of the crawling platform 401, and at the same time, the two ends of the conductive rod 4079 are respectively in contact with the two contacts 2036, so that the fan 2039 is turned on, so that the suction cup 2038 and the clamping plate 4044 are fixed by negative pressure adsorption, thereby further improving the fixing strength.

[0026] Working principle: When working, first install the track body 201 longitudinally on the high pier of the bridge through the installation nails 3, and then climb upward through the staggered two crawling platforms 401, driving the climbing formwork frame 5 to move upward, wherein when the output end of the hydraulic cylinder 402 is in a fully extended state, the span of the two crawling platforms 401 is three fixed blocks 2031, and when the output end of the hydraulic cylinder 402 is in a fully retracted state, the span of the two crawling platforms 401 is two fixed blocks 2031. When crawling upward, in the original state, the output end of the hydraulic cylinder 402 is in a fully extended state, at this time, the upper crawling platform 401 and the fixed connection unit 2 03 clamping, control the output end of the hydraulic cylinder 402 to retract, pull the lower crawling platform 401 to move upward, and then control the lower crawling platform 401 to clamp with the corresponding fixed connection unit 203, while the upper crawling platform 401 is disengaged from the fixed connection unit 203, control the output end of the hydraulic cylinder 402 to extend, and under the action of the reverse force, the upper crawling platform 401 moves upward, and then the cycle is repeated, so that the two crawling platforms 401 move upward, thereby driving the climbing formwork frame 5 to move upward. When the climbing formwork frame 5 moves upward to the required height, both crawling platforms 401 are clamped with the fixed connection unit 203; During the crawling process, when the crawling platform 401 needs to be connected with the fixed connection unit 203, the first electromagnet 4045 is controlled to be energized to generate a repulsive force on the first magnetic block 4049, thereby pushing the middle column 4047 to move toward the side of the track body 201. After the middle column 4047 moves, the elastic force of the first spring 40412 pulls the inner plate 4043 toward the fixed block 2031, pushing the two clamping plates 4044 to be inserted into the first slot 2032. After the clamping plates 4044 are inserted into the first slot 2032, the middle column 404 7 continues to move so that the end plate 4048 generates a thrust on the pressure rod 4057, pushing the movable plate 4053 to move, and pushing the clamping rod 4054 toward the inner side of the second slot 2033 through the first connecting rod 4055 to clamp into the first clamping groove 2034, thereby further improving the clamping stability of the single crawling platform 401 and the fixed block 2031. At this time, the other crawling platform 401 is disengaged from the fixed block 2031, and then the loose crawling platform 401 is driven to move by the hydraulic cylinder 402, thereby driving the climbing formwork frame 5 to climb upward along the track body 201; When the climbing formwork needs to be fixed, the first electromagnet 4045 is energized to insert the clamping plate 4044 into the first slot 2032 and to clamp the clamping rod 4054 into the first clamping slot 2034. In this stage, the middle through slot 4066 is closed by the two baffles 4068, so that the end of the middle plug block 4061 is blocked by the baffle 4068. When the middle column 4047 moves toward the side of the track body 201, the limiting inner plate 4063 moves relative to the middle plug block 4061 toward the inside of the limiting inner slot 4062, so that the third spring 4065 is stretched. Then, the second electromagnet 40611 is energized to generate an attraction force on the second magnetic block 40610, so that the baffle 4068 enters the plate slot 4067, thereby opening the middle slot 4066. At this time, the baffle 4068 no longer blocks the middle plug block 4061. At this time, the middle plug block 4061 passes through the middle slot 4066 and enters the second slot 2033 under the elastic force of the third spring 4065, thereby improving the clamping stability. After the middle plug block 4061 enters the second slot 2033, the limiting inner plate 4063 is in the limiting position. A movement margin is generated inside the inner groove 4062, so that the middle column rod 4047 can continue to move toward the side of the fixed block 2031, so that the end plate 4048 continues to push the pressure rod 4057 to move, thereby continuing to push the clamping rod 4054 to move along the first clamping groove 2034 toward the inside of the second slot 2033, so that the clamping rod 4054 is inserted into the inside of the transverse groove 4072, so that the crawling clamping unit 404 is clamped with the middle plug block 4061, so that the crawling platform 401 is clamped and self-locked, thereby improving the fixing stability of the crawling platform 401; When the clamping rod 4054 is inserted into the transverse groove 4072, the transverse block 4074 is pushed to move along the transverse groove 4072, thereby pushing the two transverse plates 4073 closer to each other, and then the two longitudinal plates 4077 are pushed away from each other through the second connecting rod 40710, pushing the longitudinal block 4078 to move outward from the longitudinal groove 4076 and clamped into the contact point 2036, thereby further clamping the crawling platform 401 and improving the fixing stability of the crawling platform 401 When the upper longitudinal moving block 4078 enters into the contact 2036, the two ends of the conductive rod 4079 are respectively in contact with the two contacts 2036, so that the fan 2039 is energized, and when the card plate 4044 is inserted into the first slot 2032, the end face of the suction cup 2038 is tightly attached to the side wall of the card plate 4044. Under the action of the fan 2039, the suction cup 2038 and the card plate 4044 are negatively adsorbed, thereby producing an auxiliary fixing effect, thereby improving the installation stability of the climbing formwork frame 5.

[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A hydraulic climbing formwork for a high bridge pier, comprising a high pier (1) and a longitudinal track (2), characterized in that: The longitudinal track (2) is installed on the side wall of the high pier (1) and is fixedly installed by means of installation nails (3); a longitudinal crawling assembly (4) is installed on the longitudinal track (2); a climbing formwork frame (5) is installed on the longitudinal crawling assembly (4); the climbing formwork frame (5) is moved upward along the longitudinal track (2) by means of the longitudinal crawling assembly (4) to adjust its height; The longitudinal crawling assembly (4) comprises two crawling platforms (401) one above the other; a hydraulic cylinder (402) is fixedly mounted at the bottom end of the upper crawling platform (401); an output end of the hydraulic cylinder (402) is fixedly connected to the crawling platform (401) below; a guide plate (403) is symmetrically mounted on one side of the crawling platform (401) close to the longitudinal track (2); and a crawling card connection unit (404) is mounted inside the crawling platform (401); The longitudinal track (2) comprises a track body (201), guide side grooves (202) are symmetrically provided on both sides of the track body (201), the guide plates (403) are slidably connected to the guide side grooves (202), fixed connection units (203) are equidistantly installed on one side of the track body (201) away from the high pier (1), and the crawling platform (401) can be clamped with the fixed connection unit (203) via a crawling clamping unit (404).

2. A hydraulic climbing formwork for high bridge piers according to claim 1, characterized in that: The fixed connection unit (203) comprises a fixed block (2031) fixedly mounted on the track body (201) at equal intervals, two first slots (2032) being symmetrically provided on the fixed block (2031), a second slot (2033) being provided on the fixed block (2031), the second slot (2033) being located between the two first slots (2032), first card slots (2034) being symmetrically provided on both sides of the second slot (2033), the two first card slots (2034) being respectively connected to the two first slots (2032), and the second card slots (2034) being respectively connected to the two first slots (2032). The bottom wall and the top wall of the slot (2033) are both provided with a second slot (2035); two contacts (2036) are installed on the side wall of the upper second slot (2035); a suction cup (2038) is installed on the inner wall of the two first slots (2032) away from each other; fans (2039) are symmetrically installed on both sides of the fixed block (2031); two side connecting grooves (2037) are symmetrically provided on the fixed block (2031); and the suction cup (2038) is connected to the inner cavity of the fan (2039) through the side connecting grooves (2037).

3. The hydraulic climbing formwork for high bridge piers according to claim 1 is characterized in that: The crawling card connection unit (404) comprises an internal groove (4041) opened inside the crawling platform (401); a hydraulic cylinder (402) is symmetrically opened on one side of the internal groove (4041) close to the track body (201); the two hydraulic cylinders (402) correspond to the two first slots (2032); an internal plate (4043) is movably installed inside the internal groove (4041); a card plate (4044) is symmetrically installed on one side of the internal plate (4043) close to the track body (201); the card plate (4044) passes through the inside of the plate body through groove (4042); a movable driving component is installed on the internal plate (4043); and a side card connection unit (405) is installed inside the card plate (4044).

4. A hydraulic climbing formwork for high bridge piers according to claim 3, characterized in that: The mobile driving member comprises a middle groove (4046) formed on the inner plate (4043), a middle column (4047) being movably mounted inside the middle groove (4046), an end plate (4048) being mounted on one end of the middle column (4047) away from the track body (201), a first magnetic block (4049) being mounted on the end plate (4048), a first electromagnet (4045) being mounted on the inner wall of one end of the inner groove (4041) away from the track body (201), and a second electromagnet (4045) being mounted on the upper and lower sides of the other end of the middle column (4047). A vertical plate, a guide rod (40411) is symmetrically installed on one side of the vertical plate close to the inner plate (4043), the guide rod (40411) passes through a guide groove (40410), the guide groove (40410) is symmetrically opened on the inner plate (4043), a first spring (40412) is fixedly installed on one side of the vertical plate close to the inner plate (4043), one end of the first spring (40412) is fixedly connected to the inner plate (4043), and a fixed clamping unit (406) is installed on one end of the middle column rod (4047) close to the track body (201).

5. The hydraulic climbing formwork for high bridge piers according to claim 3 is characterized by: The side clamping unit (405) comprises a plate movable groove (4051) provided inside the crawling clamping unit (404); a rod movable groove (4052) is provided at one end of the plate movable groove (4051) away from the guide plate (403); the two rod movable grooves (4052) respectively penetrate to the sides of the two crawling clamping units (404) close to each other; a movable plate (4053) is movably installed inside the plate movable groove (4051); a clamping rod (4054) is movably installed inside the clamping rod (4054); a first connecting rod (4055) is hingedly installed on one side of the movable plate (4053) close to the clamping rod (4054); the first connecting rod The other end of (4055) is hinged to the clamping rod (4054). When the movable plate (4053) moves toward one side of the clamping rod (4054), the clamping rod (4054) is pushed by the first connecting rod (4055) to move toward the outside of the crawling clamping unit (404). A second spring (4056) is symmetrically installed on the other side of the movable plate (4053). One end of the second spring (4056) is fixedly connected to the inner wall of the end of the movable groove (4051) of the plate body. A pressure rod (4057) is installed on the side of the movable plate (4053) away from the clamping rod (4054). The end of the pressure rod (4057) passes through the side of the guide plate (403) close to the end plate (4048).

6. A hydraulic climbing formwork for high bridge piers according to claim 4, characterized in that: The fixed clamping unit (406) comprises a middle plug block (4061) arranged on the side of the middle column (4047) close to the rail body (201), a limiting inner groove (4062) is provided inside the middle plug block (4061), a limiting inner plate (4063) is movably installed inside the limiting inner groove (4062), a fixing rod (4064) is installed on the side of the limiting inner plate (4063) close to the guide plate (403), and the fixing rod (4064) is installed on the side of the limiting inner plate (4063) close to the guide plate (403). 64) penetrates to the outside of the middle plug block (4061), and one end of the fixing rod (4064) is fixedly connected to the middle column (4047), a third spring (4065) is symmetrically installed on one side of the limiting inner plate (4063) close to the middle column (4047), one end of the third spring (4065) is fixedly connected to the end of the limiting inner groove (4062), and an auxiliary fixing unit (407) is installed on the middle plug block (4061).

7. A hydraulic climbing formwork for high bridge piers according to claim 6, characterized in that: A middle through slot (4066) is provided at one end of the inner slot (4041) close to the track body (201), the middle through slot (4066) corresponds to the middle plug block (4061), plate slots (4067) are symmetrically provided at the top and bottom ends of the middle through slot (4066), a baffle (4068) is movably installed inside the plate slot (4067), a fourth spring (4069) is symmetrically installed at one end of the two baffles (4068) away from each other, an end of the fourth spring (4069) is fixedly connected to the inner wall of the plate slot (4067), the middle through slot (4066) is closed when the two baffles (4068) are in contact, a second magnetic block (40610) is installed on the baffle (4068), and a second electromagnet (40611) is installed on the inner wall of the two plate slots (4067) away from each other.

8. The hydraulic climbing formwork for high bridge piers according to claim 6 is characterized by: The auxiliary fixing unit (407) comprises a transverse displacement groove (4071) symmetrically arranged inside the middle plug block (4061), the two transverse displacement grooves (4071) are symmetrically arranged on both sides of the limiting inner groove (4062), the two transverse displacement grooves (4071) are each provided with a transverse groove (4072) on the side away from each other, two longitudinal displacement grooves (4075) are arranged between the two transverse displacement grooves (4071), the two longitudinal displacement grooves (4075) are symmetrically arranged on the upper and lower sides of the limiting inner groove (4062), and the two longitudinal displacement grooves (4075) are each provided with a longitudinal groove (4076) on the side away from each other.

9. A hydraulic climbing formwork for high bridge piers according to claim 8, characterized in that: A transverse plate (4073) is movably installed inside the transverse slot (4071), and a transverse block (4074) is installed on the side of the two transverse plates (4073) away from each other, and the transverse block (4074) is located inside the transverse slot (4072). A longitudinal plate (4077) is movably installed inside the longitudinal slot (4075), and a longitudinal block (4078) is installed on the side of the two longitudinal plates (4077) away from each other, and a conductive rod (4079) is installed on the upper longitudinal block (4078). Second connecting rods (40710) are hingedly installed at both ends of the longitudinal plate (4077), and the other end of the second connecting rod (40710) is hingedly installed on the transverse plate (4073). A fifth spring (40711) is symmetrically installed on one side of the transverse plate (4073) close to the limiting inner slot (4062).

10. A construction method for a high bridge pier hydraulic climbing formwork according to any one of claims 1 to 9, characterized in that: The construction method is as follows: S1, installing the track body (201) on the side wall of the high pier (1) by means of the mounting nails (3), interlacingly engaging the upper and lower crawling platforms (401) with the corresponding fixing blocks (2031), and driving the two crawling platforms (401) to crawl upwards in an interlaced manner by means of the hydraulic cylinder (402), thereby driving the climbing formwork frame (5) to move upwards; S2. When crawling, the baffle (4068) is in a state of closing the middle through slot (4066), and the first electromagnet (4045) drives the card plate (4044) to be inserted into the first slot (2032), so that the card rod (4054) is inserted into the first card slot (2034), the crawling platform (401) is connected, and the card plate (4044) and the first card slot (2034) are moved back to facilitate climbing; S3, when fixing, after the card plate (4044) is inserted into the first slot (2032) and the card rod (4054) is inserted into the first slot (2034), the middle through slot (4066) is opened, so that the middle plug block (4061) moves outward and is inserted into the second slot (2033), and then the middle column rod (4047) continues to move, so that the card rod (4054) is inserted into the transverse slot (4072), and the longitudinal moving block (4078) is pushed into the second slot (2035) through the second connecting rod (40710), and at the same time, the fan (2039) is powered on so that the suction cup (2038) and the card plate (4044) are fixed by negative pressure adsorption; S4. After the two crawling platforms (401) are connected and fixed to the fixing blocks (2031), the construction personnel construct the high pier (1) on the climbing formwork frame (5).