Temperature testing method of refrigeration house system

Through multi-stage testing and multi-point layout methods, the problems of inconsistency and error of temperature tests in the cold storage are solved, and more accurate and efficient cold storage performance evaluation is achieved, improving the uniformity and representativeness of the test.

CN119245280APending Publication Date: 2025-01-03SHANGHAI INSTALLATION ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411418055.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

The internal temperature testing of cold storage in the existing technology lacks a standardized process, resulting in inconsistent test results and errors in the temperature measurement of a single measurement point, making it impossible to comprehensively evaluate the performance of the cold storage.

Method used

Using multi-stage testing methods, including cooling stage, balance stage and insulation and isolation stage, the air in the cold storage is calculated by laying multiple temperature detection and measurement points on the top, bottom and storage rack of the cold storage, combining infrared temperature initial measurement and temperature and humidity card data. Average the temperature and generate a graph to evaluate the function and insulation effect of the refrigeration equipment.

Benefits of technology

It improves the uniformity and representativeness of temperature tests, shortens the test cycle, ensures that the temperature data of each test point is fully considered at different moments, more accurately reflects the performance of the cold storage system, and reduces the testing cost and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119245280A_ABST
    Figure CN119245280A_ABST
Patent Text Reader

Abstract

The invention discloses a temperature testing method for a refrigeration house system, and belongs to the technical field of refrigeration house management. In order to solve the problem that errors exist in the result of a single measuring point due to the fact that a standardized process is lacked and temperature differences exist in all areas in the refrigeration house, the measuring points are arranged at the top and the bottom of the refrigeration house and on a storage rack, it is ensured that a temperature field can be effectively measured at all important positions of the refrigeration house, the uniformity and representativeness of testing are improved, and the measurement accuracy is improved. Therefore, the testing efficiency is improved, and the average temperature of air in the refrigeration house at a certain moment in the stage testing process is calculated based on data collected by air temperature field detection measuring points in different refrigeration houses at the same temperature detection moment. In this way, it can be ensured that the temperature data of each measuring point at different moments are fully considered, and the integrity of the test data is improved. By calculating the average temperature of the air in the refrigeration house at each temperature detection moment, the performance of the refrigeration house system in different time periods can be reflected more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cold storage management, and in particular to a temperature testing method for a cold storage system. Background Art

[0002] As the core facility of modern logistics and food processing, the construction and use of cold storage has gradually become the focus of attention from all walks of life. As a key link in the construction of cold storage, cold storage commissioning is not only crucial to ensure the normal operation of the cold storage, but also directly affects the safety and freshness of the food on the entire ship.

[0003] Under the existing technology, when testing the internal temperature of a cold storage, there is often a lack of standardized processes, resulting in inconsistent and incomparable test results. At the same time, when testing the temperature inside a cold storage, the temperature is often measured at a single measuring point. However, there may be temperature differences in various areas inside the cold storage, which leads to errors in the results of a single measuring point, incomplete testing, and inability to fully evaluate performance. Summary of the invention

[0004] The object of the present invention is to provide a temperature testing method for a cold storage system to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a temperature testing method for a cold storage system, comprising the following steps: Arrangement of measuring points: perform preliminary infrared temperature measurement on the cold storage, and arrange the distribution of measuring points for air temperature field detection in the cold storage according to the preliminary measurement results; Stage test: the cold storage is tested in three stages and the test temperature data is collected. The three stages are cooling stage, balance stage and thermal insulation stage. Data processing, obtaining the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times, and calculating the average air temperature in the cold storage at a specific time during the stage test; The test results are based on the average air temperature data in the cold storage at different times during the stage test calculated during data processing, and a curve chart is generated. Based on the curve chart, the function of the refrigeration equipment of the cold storage system, the continuous working status of the unit, and the insulation effect of the cold storage are judged.

[0006] Furthermore, the measuring point arrangement includes the following steps: Arrange temperature field detection points on the top of the cold storage, the distance between the top point and the loading line is 50mm-100mm, arrange temperature field detection points on the bottom of the cold storage, the distance between the bottom point and the cold storage floor is 50mm-100mm, arrange horizontal and vertical end points in the cold storage, the horizontal and vertical end points are set on the shelves in the cold storage, the distance between the horizontal and vertical end points and the cold storage wall is 50mm-100mm; Among them, the number of measuring points on each horizontal measurement line is set to be no less than 3 points, and the number of measuring points on each vertical measurement line is set to be no less than 3 points.

[0007] Furthermore, the measurement point arrangement further includes the following steps: Conduct an initial infrared temperature measurement inside the cold storage, and use infrared equipment to measure the temperature of the set temperature field detection points; Among them, if the temperature difference between each temperature field detection measuring point is greater than 2°C, it is determined that the temperature field distribution in the warehouse is uneven, and the existing number of temperature field detection measuring points in the cold storage is maintained; if the temperature difference between each temperature field detection measuring point is less than or equal to 2°C, it is determined that the temperature field distribution in the warehouse is uniform, and the existing number of temperature field detection measuring points in the cold storage is reduced. The number of reduced measuring points is set to no less than 3 points on the same horizontal and vertical measurement lines.

[0008] Furthermore, when conducting the temperature test, the test is carried out in the order of cooling stage, balancing stage, and thermal insulation stage. There is no time limit for the cooling stage test, the balancing stage test time is 10 hours, and the thermal insulation stage test time is 12 hours. Among them, the balance stage test is divided into the main unit stage test and the standby unit stage test. The main unit stage test duration is 6 hours, and the standby unit stage test duration is 4 hours.

[0009] Furthermore, in the stage test, the cooling stage test also includes the following steps: Close the cold storage door and keep it closed during the cooling phase test; According to the requirements of the contract and technical specifications, set the target temperature of the cold storage, record the ambient temperature at the beginning of the test, start the refrigeration equipment of the cold storage and adjust it to automatic mode. During the test, regularly check and record the temperature changes in the cold storage, observe whether the refrigeration equipment is operating normally and whether there is any abnormal noise or vibration; When the temperature in the cold storage reaches the set value, keep the refrigeration equipment running for a period of time and record the refrigeration time. After the test, record the ambient temperature in the cold storage at the end of the test.

[0010] Furthermore, in the stage test, the balance stage test also includes the following steps: After the cold storage completes the cooling stage test and the ambient temperature in the cold storage reaches the design temperature, keep the cold storage door tightly closed; Start the host unit and keep it running for 6 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time, and observe the operating status of the refrigeration unit; After the main unit has been running for 6 hours, stop running the main unit and start the standby unit. Keep the standby unit running continuously for 4 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. At the same time, observe the running status of the standby unit. After the test is completed, stop running the standby unit.

[0011] Furthermore, in the stage test, the thermal insulation stage test also includes the following steps: After the cold storage has completed the balance phase test and the refrigeration unit has stopped running, keep the cold storage door tightly closed; Keep the cold storage in a closed isolation state for 12 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. After the 12-hour insulation isolation test, record the last temperature data and turn off the temperature monitoring equipment.

[0012] Furthermore, the data processing comprises the following steps: Select a stage test with a total duration of no less than 36 hours as the test data, obtain the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times in the test data, take the continuous 24-hour data with the closest beginning and end temperatures, and calculate the average air temperature in the cold storage at a specific time during the stage test based on the data collected by the air temperature field detection points in different cold storages at the same temperature detection time.

[0013] Furthermore, the following formula is used to calculate the average air temperature in the cold storage at a certain moment during the stage test: In the above formula, T represents the temperature detection time, n represents the total number of air temperature field detection points arranged in the cold storage, represents the average air temperature in the cold storage at time T, and t represents the temperature of the nth test point in the cold storage at time T.

[0014] Furthermore, the air temperature field detection point in the warehouse uses a temperature and humidity card to record measurement data. The temperature and humidity card is communicated with the repeater, the receiver, and the tablet. The measurement data measured by the temperature and humidity card is sent to the repeater via a wireless communication signal.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention ensures that the temperature field can be effectively measured at each important position of the cold storage by arranging measuring points on the top, bottom and racks of the cold storage, which can more comprehensively reflect the temperature distribution inside the cold storage, improve the uniformity and representativeness of the test, and reduce unnecessary measurement work by reasonably arranging the number and position of measuring points, thereby improving the test efficiency. At the same time, due to the reasonable layout of the measuring points, effective temperature data can be collected more quickly, shortening the test cycle.

[0016] 2. The present invention calculates the average air temperature in the cold storage at a specific time during the stage test based on the data collected by the air temperature field detection points in different cold storages at the same temperature detection time. This ensures that the temperature data of each measurement point at different times are fully considered, thereby improving the integrity of the test data. By calculating the average air temperature in the cold storage at each temperature detection time, the performance of the cold storage system in different time periods can be more accurately reflected. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic flow chart of a temperature testing method for a cold storage system of the present invention; Figure 2 It is a schematic diagram of the test time nodes of the cold storage stage of the present invention. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] In order to solve the problem that there is often a lack of standardized processes when testing the temperature inside the cold storage, resulting in inconsistent and incomparable test results, and that the temperature inside the cold storage is often measured at a single measuring point, but there may be temperature differences in various areas inside the cold storage, resulting in errors in the results of a single measuring point, incomplete testing, and inability to fully evaluate performance, please refer to Figure 1 , the present invention provides the following technical solutions: A temperature testing method for a cold storage system comprises the following steps: Arrangement of measuring points: perform preliminary infrared temperature measurement on the cold storage, and arrange the distribution of air temperature field detection measuring points in the cold storage according to the preliminary measurement results. The air temperature field detection measuring points in the cold storage use temperature and humidity cards to record the measurement data. The temperature and humidity cards are connected with the repeater, receiver, and tablet. The measurement data measured by the temperature and humidity cards are sent to the repeater via wireless communication signals. Stage test: the cold storage is tested in three stages and the test temperature data is collected. The three stages are cooling stage, balance stage and thermal insulation stage. Data processing, obtaining the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times, and calculating the average air temperature in the cold storage at a specific time during the stage test; The test results are based on the average air temperature data in the cold storage at different times during the stage test calculated during data processing, and a curve chart is generated. Based on the curve chart, the function of the refrigeration equipment of the cold storage system, the continuous working status of the unit, and the insulation effect of the cold storage are judged.

[0020] Specifically, through the initial infrared temperature measurement, the measurement points can be arranged more accurately, and through phased testing, the operating status of the cold storage system can be more fully understood. Each stage has its specific test purpose, so that the performance of the cold storage system can be more accurately evaluated.

[0021] Specifically, through stage tests, a large amount of temperature data can be obtained and processed, the average air temperature in the cold storage at different times can be calculated, and the test results can be presented in the form of a curve chart, making the results more intuitive, easy to understand and analyze. At the same time, the trend and pattern of temperature changes can be more easily discovered through the curve chart, which helps to judge the performance of the cold storage system. Based on the test results, the function of the refrigeration equipment of the cold storage system, the continuous working condition of the unit and the insulation effect of the cold storage can be evaluated.

[0022] The measurement point arrangement includes the following steps: Arrange temperature field detection points on the top of the cold storage, the distance between the top point and the loading line is 50mm-100mm, arrange temperature field detection points on the bottom of the cold storage, the distance between the bottom point and the cold storage floor is 50mm-100mm, arrange horizontal and vertical end points in the cold storage, the horizontal and vertical end points are set on the shelves in the cold storage, the distance between the horizontal and vertical end points and the cold storage wall is 50mm-100mm; Among them, the number of measuring points on each horizontal measurement line is set to be no less than 3 points, and the number of measuring points on each vertical measurement line is set to be no less than 3 points.

[0023] Specifically, by arranging measuring points on the top, bottom and shelves of the cold storage, it is ensured that the temperature field can be effectively measured at all important locations of the cold storage, which can more comprehensively reflect the temperature distribution inside the cold storage and improve the uniformity and representativeness of the test. The distance between the measuring point and the loading line, the cold storage floor and the cold storage wall is controlled within the range of 50mm-100mm. This detail ensures the accuracy of the measuring point position and avoids test errors caused by improper measuring point position.

[0024] Specifically, by properly arranging the number and location of measuring points, unnecessary measurement work can be reduced, thereby improving test efficiency. At the same time, due to the reasonable layout of measuring points, effective temperature data can be collected more quickly, shortening the test cycle.

[0025] The measurement point arrangement also includes the following steps: Conduct an initial infrared temperature measurement inside the cold storage, and use infrared equipment to measure the temperature of the set temperature field detection points; Among them, if the temperature difference between each temperature field detection measuring point is greater than 2°C, it is determined that the temperature field distribution in the warehouse is uneven, and the existing number of temperature field detection measuring points in the cold storage is maintained; if the temperature difference between each temperature field detection measuring point is less than or equal to 2°C, it is determined that the temperature field distribution in the warehouse is uniform, and the existing number of temperature field detection measuring points in the cold storage is reduced. The number of reduced measuring points is set to no less than 3 points on the same horizontal and vertical measurement lines.

[0026] Specifically, by using infrared equipment to conduct an initial test inside the cold storage, we can more accurately understand the distribution of the temperature field inside the cold storage. When the temperature field inside the cold storage is relatively uniform, we can appropriately reduce the number of measuring points, which can reduce the test cost and ensure the accuracy of the test. By dynamically adjusting the number of measuring points, we can reduce unnecessary measurement point settings while ensuring the test accuracy, thereby shortening the test time and improving the test efficiency. It can reduce the manpower, material resources and time costs required for the test, and can also reduce the use of related equipment such as temperature and humidity cards and repeaters, further reducing the test cost.

[0027] See also Figure 2 In the figure, the x-axis is the temperature axis, the y-axis is the time axis, the A stage is the cooling stage, the B stage is the balance stage, the C stage is the thermal insulation stage, the a stage is the main unit stage, and the b stage is the standby unit stage. When performing the temperature test, the test is carried out in the order of the cooling stage, the balance stage, and the thermal insulation stage. In addition, there is no time limit for the cooling stage test, the balance stage test time is 10 hours, and the thermal insulation stage test time is 12 hours; Among them, the balance stage test is divided into the main unit stage test and the standby unit stage test. The main unit stage test duration is 6 hours, and the standby unit stage test duration is 4 hours.

[0028] The cooling phase test also includes the following steps: Close the cold storage door and keep it closed during the cooling phase test; According to the requirements of the contract and technical specifications, set the target temperature of the cold storage, record the ambient temperature at the beginning of the test, start the refrigeration equipment of the cold storage and adjust it to automatic mode. During the test, regularly check and record the temperature changes in the cold storage, observe whether the refrigeration equipment is operating normally and whether there is any abnormal noise or vibration; When the temperature in the cold storage reaches the set value, keep the refrigeration equipment running for a period of time and record the refrigeration time. After the test, record the ambient temperature in the cold storage at the end of the test.

[0029] Specifically, by closing the cold storage door and keeping it closed throughout the test, the closed and stable test environment is ensured. After the temperature in the cold storage reaches the set value, the refrigeration equipment is kept running for a period of time and the refrigeration time is recorded, which helps to understand the operating efficiency and energy consumption of the refrigeration equipment after reaching the target temperature. After the test, the ambient temperature in the cold storage at the end of the test is recorded, which can be compared with the temperature at the beginning of the test to analyze the temperature change trend and refrigeration effect during the test.

[0030] The equilibration phase test also includes the following steps: After the cold storage completes the cooling stage test and the ambient temperature in the cold storage reaches the design temperature, keep the cold storage door tightly closed; Start the host unit and keep it running for 6 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time, and observe the operating status of the refrigeration unit; After the main unit has been running for 6 hours, stop running the main unit and start the standby unit. Keep the standby unit running continuously for 4 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. At the same time, observe the running status of the standby unit. After the test is completed, stop running the standby unit.

[0031] Specifically, by testing the main unit and the standby unit separately, the overall performance and reliability of the cold storage system can be fully evaluated. This complete testing process helps to discover potential performance problems or failure risks and provide guidance for subsequent improvements and maintenance. By analyzing the temperature and operating status data of the main unit and the standby unit at different operating stages, the operating strategy of the cold storage system can be optimized, energy efficiency can be improved, and operating costs can be reduced.

[0032] The thermal insulation stage test also includes the following steps: After the cold storage has completed the balance phase test and the refrigeration unit has stopped running, keep the cold storage door tightly closed; Keep the cold storage in a closed isolation state for 12 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. After the 12-hour insulation isolation test, record the last temperature data and turn off the temperature monitoring equipment.

[0033] Specifically, by keeping the cold storage door tightly closed and continuously monitoring the temperature for 12 hours after the refrigeration unit stops operating, it is possible to accurately understand the temperature maintenance capability of the cold storage after it loses its active refrigeration capacity.

[0034] Specifically, during the thermal insulation test, regularly recording temperature data can help detect any abnormal temperature changes. By identifying these changes, potential heat leaks can be discovered and repaired in a timely manner, thereby improving the thermal insulation effect of the cold storage. By analyzing the thermal insulation test data, the temperature changes of the cold storage in different time periods can be understood, thereby optimizing the maintenance strategy.

[0035] Data processing includes the following steps: Select a stage test with a total duration of no less than 36 hours as the test data, obtain the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times in the test data, take the continuous 24-hour data with the closest beginning and end temperatures, and calculate the average air temperature in the cold storage at a specific time during the stage test based on the data collected by the air temperature field detection points in different cold storages at the same temperature detection time.

[0036] Among them, the following formula is used to calculate the average air temperature in the cold storage at a certain moment during the stage test: In the above formula, T represents the temperature detection time, n represents the total number of air temperature field detection points arranged in the cold storage, represents the average air temperature in the cold storage at time T, and t represents the temperature of the nth test point in the cold storage at time T.

[0037] Specifically, we select stage tests with a total duration of no less than 36 hours as test data to ensure that temperature data is collected over a long enough period of time, so as to more accurately reflect the actual operating status of the cold storage system. At the same time, we take 24 hours of continuous data with the closest temperature at the beginning and end to eliminate the temperature fluctuations that may exist at the beginning and end of the test, and improve the representativeness of the data.

[0038] Specifically, based on the data collected by the air temperature field detection points in different cold storages at the same temperature detection time, the average air temperature in the cold storage at a specific time during the stage test is calculated. This ensures that the temperature data of each measurement point at different times are fully considered, improving the integrity of the test data. By calculating the average air temperature in the cold storage at each temperature detection time, the performance of the cold storage system in different time periods can be more accurately reflected.

[0039] Specifically, this data processing method is applicable to different types of cold storage systems. Whether it is a large or small cold storage, the test requirements can be met by adjusting the number and location of measuring points. It has strong versatility and applicability.

[0040] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A temperature testing method for a cold storage system, characterized in that: The following steps are involved: Arrangement of measuring points: perform preliminary infrared temperature measurement on the cold storage, and arrange the distribution of measuring points for air temperature field detection in the cold storage according to the preliminary measurement results; Stage test: the cold storage is tested in three stages and the test temperature data is collected. The three stages are cooling stage, balance stage and thermal insulation stage. Data processing, obtaining the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times, and calculating the average air temperature in the cold storage at a specific time during the stage test; The test results are based on the average air temperature data in the cold storage at different times during the stage test calculated during data processing, and a curve chart is generated. Based on the curve chart, the function of the refrigeration equipment of the cold storage system, the continuous working status of the unit, and the insulation effect of the cold storage are judged.

2. A temperature testing method for a cold storage system according to claim 1, characterized in that: The measuring point arrangement comprises the following steps: Arrange temperature field detection points on the top of the cold storage, the distance between the top point and the loading line is 50mm-100mm, arrange temperature field detection points on the bottom of the cold storage, the distance between the bottom point and the cold storage floor is 50mm-100mm, arrange horizontal and vertical end points in the cold storage, the horizontal and vertical end points are set on the shelves in the cold storage, the distance between the horizontal and vertical end points and the cold storage wall is 50mm-100mm; Among them, the number of measuring points on each horizontal measurement line is set to be no less than 3 points, and the number of measuring points on each vertical measurement line is set to be no less than 3 points.

3. A temperature testing method for a cold storage system as claimed in claim 2, characterized in that: The measuring point arrangement further comprises the following steps: Conduct an initial infrared temperature measurement inside the cold storage, and use infrared equipment to measure the temperature of the set temperature field detection points; Among them, if the temperature difference between each temperature field detection measuring point is greater than 2°C, it is determined that the temperature field distribution in the warehouse is uneven, and the existing number of temperature field detection measuring points in the cold storage is maintained; if the temperature difference between each temperature field detection measuring point is less than or equal to 2°C, it is determined that the temperature field distribution in the warehouse is uniform, and the existing number of temperature field detection measuring points in the cold storage is reduced. The number of reduced measuring points is set to no less than 3 points on the same horizontal and vertical measurement lines.

4. A temperature testing method for a cold storage system as claimed in claim 1, characterized in that: When conducting temperature tests, the tests are carried out in the order of cooling stage, balancing stage, and thermal insulation stage. There is no time limit for the cooling stage test, the balancing stage test duration is 10 hours, and the thermal insulation stage test duration is 12 hours; Among them, the balance stage test is divided into the main unit stage test and the standby unit stage test. The main unit stage test duration is 6 hours, and the standby unit stage test duration is 4 hours.

5. A temperature testing method for a cold storage system as claimed in claim 4, characterized in that: In the stage test, the cooling stage test also includes the following steps: Close the cold storage door and keep it closed during the cooling phase test; According to the requirements of the contract and technical specifications, set the target temperature of the cold storage, record the ambient temperature at the beginning of the test, start the refrigeration equipment of the cold storage and adjust it to automatic mode. During the test, regularly check and record the temperature changes in the cold storage, observe whether the refrigeration equipment is operating normally and whether there is any abnormal noise or vibration; When the temperature in the cold storage reaches the set value, keep the refrigeration equipment running for a period of time and record the refrigeration time. After the test, record the ambient temperature in the cold storage at the end of the test.

6. A temperature testing method for a cold storage system as claimed in claim 4, characterized in that: In the stage test, the balance stage test also includes the following steps: After the cold storage completes the cooling stage test and the ambient temperature in the cold storage reaches the design temperature, keep the cold storage door tightly closed; Start the host unit and keep it running for 6 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time, and observe the operating status of the refrigeration unit; After the main unit has been running for 6 hours, stop running the main unit and start the standby unit. Keep the standby unit running continuously for 4 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. At the same time, observe the running status of the standby unit. After the test is completed, stop running the standby unit.

7. A temperature testing method for a cold storage system as claimed in claim 4, characterized in that: In the stage test, the thermal insulation stage test also includes the following steps: After the cold storage has completed the balance phase test and the refrigeration unit has stopped running, keep the cold storage door tightly closed; Keep the cold storage in a closed isolation state for 12 hours. During the test, set a temperature detection time every 1 hour and record the temperature data inside the cold storage at the current time. After the 12-hour insulation isolation test, record the last temperature data and turn off the temperature monitoring equipment.

8. A temperature testing method for a cold storage system as claimed in claim 1, characterized in that: The data processing comprises the following steps: Select a stage test with a total duration of no less than 36 hours as the test data, obtain the temperature data detected by the air temperature field detection points in the cold storage at different temperature detection times in the test data, take the continuous 24-hour data with the closest beginning and end temperatures, and calculate the average air temperature in the cold storage at a specific time during the stage test based on the data collected by the air temperature field detection points in different cold storages at the same temperature detection time.

9. A temperature testing method for a cold storage system as claimed in claim 8, characterized in that: The following formula is used to calculate the average air temperature in the cold storage at a certain moment during the stage test: , In the above formula, T represents the temperature detection time, n represents the total number of air temperature field detection points arranged in the cold storage, represents the average air temperature in the cold storage at time T, and t represents the temperature of the nth test point in the cold storage at time T.

10. A temperature testing method for a cold storage system according to claim 1, characterized in that: The air temperature field detection measuring point in the warehouse uses a temperature and humidity card to record the measurement data. The temperature and humidity card is communicated with the repeater, the receiver, and the tablet. The measurement data measured by the temperature and humidity card is sent to the repeater via a wireless communication signal.