Prefabricated wall safety detection device and detection method based on constructional engineering
Through the prefabricated wall safety detection device based on construction projects, water vapor detection and rotary sealing cylinder simulate cutting or opening operation, the problem that the existing detection methods cannot accurately simulate the actual situation, and achieve efficient and accurate anti-seepage Water-based testing reminds users of waterproofing measures and improves wall production processes.
Patent Information
- Application Number
- CN202411488298.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2025-01-03
AI Technical Summary
The existing prefabricated wall inspection methods pass water spray and water pressure detection, and cannot accurately simulate the actual situation, resulting in inaccurate detection results and a long detection time.
A prefabricated wall safety detection device based on construction engineering, including sealing cylinder, intake pipe, air supply pipe, air bag, sealing rubber and driving components, detecting the water seepage of the wall through water vapor, and sealing cylinder by rotating and lifting Simulate cutting or opening operations, combine water spray rack and electronically controlled valves to clean dust to ensure accuracy of detection.
It realizes the accuracy and efficiency of anti-seepage water properties of prefabricated walls, can detect anti-seepage water properties of wall cutting or openings under actual simulation, remind users to take waterproof measures, and improve wall production technology to avoid the problem of Mold problems caused by water seepage.
Smart Images

Figure CN119246373A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wall waterproof detection equipment, and in particular to a prefabricated wall safety detection device and a detection method based on a construction project. Background Art
[0002] After the existing prefabricated walls are produced, they need to be tested for water seepage. The existing testing method applies a certain water pressure on one side of the prefabricated wall to observe whether there is water seepage on the other side, or uses a high-pressure spray gun or spray equipment to spray water on one side of the prefabricated wall for a certain period of time to observe whether there is water seepage on the other side. However, due to the poor permeability of water, the testing time is relatively long when using the above testing methods. In addition, when the south winds return, water vapor can easily penetrate the wall. However, water spraying and water pressure testing cannot simulate the actual situation, resulting in inaccurate test results. Summary of the invention
[0003] In order to overcome the shortcomings of over-spraying and water pressure detection, inability to simulate actual conditions, resulting in inaccurate detection results, and long detection time, the present invention provides a prefabricated wall safety detection device based on construction engineering.
[0004] The technical solution of the present invention is: a prefabricated wall safety detection device based on construction engineering, including a placement table; also including a sealing cylinder, an air intake pipe, an air supply pipe, an air bag, a sealing rubber, a sealing rubber ring and a driving component; the placement table is connected to the driving component; the driving component is connected to the sealing cylinder, and the sealing cylinder is driven to rise and fall and rotate through the driving component; the sealing cylinder is fixedly connected to the air intake pipe; the sealing cylinder is provided with an air collecting cavity; the air collecting cavity is connected to the air intake pipe; the sealing cylinder is provided with a plurality of jet holes; the jet holes are connected to the air collecting cavity; the sealing cylinder is penetrated by an air supply pipe; the sealing cylinder is fixedly connected to the air bag, and the air supply pipe is connected to the air bag; the sealing cylinder is fixedly connected to the sealing rubber; the air bag is in contact with the outer side of the sealing rubber, and a protrusion is provided on the upper part of the sealing cylinder; a sealing rubber ring is inserted on the upper part of the sealing cylinder.
[0005] As an improvement of the above scheme, it also includes a connecting frame, a water inlet pipe and a water spraying frame; the sealing tube is fixedly connected to the connecting frame; the connecting frame is connected to the water inlet pipe; the connecting frame is provided with a water collecting cavity, the water inlet pipe is connected to the water collecting cavity, and a one-way valve is provided in the water inlet pipe; the connecting frame is connected to the water spraying frame, and the water spraying frame is composed of a connecting rod, a straight plate and an annular plate; the upper sides of the connecting rod, the straight plate and the annular plate of the water spraying frame are all provided with water spraying cavities, and the water spraying cavity is connected to the water collecting cavity; a plurality of water spraying holes are provided on the annular plate of the water spraying frame; the water spraying holes are connected to the water spraying cavity.
[0006] As an improvement of the above solution, the air jet holes are inclined downward.
[0007] As an improvement of the above scheme, it also includes a convex block; a plurality of convex blocks are fixedly connected to the upper inner side of the sealing cylinder; and the convex blocks are located above the sealing rubber.
[0008] As an improvement on the above scheme, the driving assembly includes an electric push rod, a fixed frame, a motor, an electric guide rail, a moving block and a ring frame; the placing table is fixedly connected to two electric guide rails distributed front and back, the electric guide rails are connected to an external power supply, and each electric guide rail is slidably connected to two moving blocks; all the moving blocks are commonly fixedly connected to the ring frame; the ring frame is fixedly connected to four electric push rods; all the telescopic parts of the electric push rods are commonly fixedly connected to the fixed frame; the fixed frame is fixedly connected to the motor, and the electric guide rail and the motor are respectively connected to the external power supply; the motor output shaft is fixedly connected to the sealing cylinder; the sealing cylinder is rotatably connected to the fixed frame.
[0009] As an improvement of the above scheme, it also includes an electric control valve; the sealing cylinder is provided with a discharge hole; the electric control valve is fixedly connected to the discharge hole of the sealing cylinder; and the electric control valve is connected to an external power supply.
[0010] As an improvement of the above solution, the discharge hole is located at a low-lying area of the bottom wall of the sealing cylinder.
[0011] As an improvement of the above solution, a plurality of grooves are provided on the outer side of the annular plate of the water spray frame to facilitate the discharge of dirty water mixed with dust and water from the grooves to the inner bottom wall of the sealing tube.
[0012] As an improvement of the above scheme, it also includes a paddle; the paddle is fixedly connected to the connecting rod of the water spray frame; the paddle is provided with at least eight connecting holes; the connecting holes are connected to the water spray cavity; the connecting rod of the water spray frame is rotatably connected to the connecting frame.
[0013] A prefabricated wall safety detection method based on construction engineering, the specific steps are as follows: Step 1: Drill into the wall through the sealing tube, and then spray water vapor into the sealed space through the external air supply equipment and the air inlet pipe to conduct water seepage inspection; Step 2: Use external water supply equipment in conjunction with the connection frame, water inlet pipe and water spray frame to reduce dust and clean the sealed cylinder to prevent dust from affecting the detection; Step 3: When drilling the sealing cylinder, grind part of the wall through the convex block to enlarge the gap between the wall and the sealing cylinder, so that it is easier to spray water into the wall for cleaning; Step 4: When water enters the connecting frame, the water impacts the slurry sheet, causing the water spray frame to rotate, and then the water spray frame sprays in a rotating manner, which is conducive to speeding up the cleaning and dust reduction speed. Beneficial Effects
[0014] The present invention performs detection through water vapor. When it is detected that the wall has strong water-proof performance, it can be explained that during the return of the south wind, water vapor is not easy to enter the room through the gas. The strong water-proof performance of the wall can effectively avoid the problem of high water vapor content in the room and easy mold and rust of furniture.
[0015] The present invention can simulate the water vapor penetration during the cutting or hole opening operation of the prefabricated wall, thereby detecting the water seepage resistance of the prefabricated wall after the cutting or hole opening. When the water seepage resistance of the wall after the cutting or hole opening is poor, the residents can be reminded to take waterproof measures after grooving, or to improve the wall production process, thereby enhancing its water seepage resistance.
[0016] The distance that the sealing cylinder rotates and rises to punch holes in the wall can be controlled by the electric push rod, so the water seepage resistance of different cutting or opening depths can be tested. At the same time, when the water seepage resistance of prefabricated walls under the same process is tested, holes can also be made in the prefabricated walls, that is, the water seepage resistance of prefabricated walls under different thicknesses can be tested through the opening operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure disclosed by the prefabricated wall safety detection device based on construction engineering of the present invention; Figure 2 It is a schematic diagram of the combined structure of the sealing cylinder, the air inlet pipe and the sealing rubber ring disclosed in the prefabricated wall safety detection device based on the construction project of the present invention; Figure 3 It is a structural cross-sectional view of a sealing cylinder disclosed in the prefabricated wall safety detection device based on construction engineering of the present invention; Figure 4 It is a schematic diagram of the combined structure of the sealing cylinder, the air supply pipe, the air bag, the sealing rubber and the convex block disclosed in the prefabricated wall safety detection device based on the construction project of the present invention; Figure 5 It is a schematic diagram of the combined structure of the connection frame, water inlet pipe, water spray frame and slurry sheet disclosed in the prefabricated wall safety detection device based on construction engineering of the present invention; Figure 6 The present invention is a schematic diagram of the combined structure of a sealing cylinder, an air inlet pipe, a water spray rack and an electric control valve disclosed in the prefabricated wall safety detection device based on construction engineering.
[0018] Reference numerals in the figure: 1-placing table, 2-sealing cylinder, 3-air inlet pipe, 4-connecting frame, 5-water inlet pipe, 6-water spray frame, 7-air delivery pipe, 8-air bag, 9-sealing rubber, 10-sealing rubber ring, 101-electric push rod, 102-fixed frame, 103-motor, 104-electric guide rail, 105-moving block, 106-annular frame, 111-paddle, 112-bump, 201-electrically controlled valve, 2001-gas collecting cavity, 2002-jet hole, 2003-discharging hole, 2004-protrusion, 4001-water collecting cavity, 6001-water spray cavity, 6002-water spray hole, 6003-groove, 11101-connecting hole. DETAILED DESCRIPTION
[0019] The above scheme is further described below in conjunction with specific examples. It should be understood that these examples are used to illustrate the present application and are not limited to the scope of the present application. The implementation conditions adopted in the examples can be further adjusted according to the conditions of the specific manufacturer, and the unspecified implementation conditions are usually the conditions in conventional experiments. Example 1
[0020] A prefabricated wall safety detection device based on construction engineering, such as Figure 1-Figure 6 As shown, it includes a placement table 1; It also includes a sealing cylinder 2, an air intake pipe 3, an air supply pipe 7, an air bag 8, a sealing rubber 9, a sealing rubber ring 10 and a driving component; the placement table 1 is connected to the driving component; the driving component is connected to the sealing cylinder 2, and the sealing cylinder 2 is driven to rise and fall and rotate through the driving component; the sealing cylinder 2 is fixedly connected to the air intake pipe 3; the sealing cylinder 2 is provided with a gas collecting cavity 2001; the gas collecting cavity 2001 is communicated with the air intake pipe 3; the sealing cylinder 2 is provided with a plurality of injection holes 2002; the injection holes 2002 are communicated with the gas collecting cavity 2001; the sealing cylinder 2 is penetrated by the air supply pipe 7; the sealing cylinder 2 is fixedly connected to the air bag 8, and the air supply pipe 7 is communicated with the air bag 8; the sealing cylinder 2 is fixedly connected to the sealing rubber 9; the air bag 8 is in contact with the outer side of the sealing rubber 9, and a protrusion 2004 is provided on the upper part of the sealing cylinder 2; and a sealing rubber ring 10 is inserted on the upper part of the sealing cylinder 2.
[0021] It also includes a connecting frame 4, a water inlet pipe 5 and a water spraying frame 6; the sealing tube 2 is fixedly connected to the connecting frame 4; the connecting frame 4 is connected to the water inlet pipe 5; the connecting frame 4 is provided with a water collecting cavity 4001, the water inlet pipe 5 is connected to the water collecting cavity 4001, and a one-way valve is provided in the water inlet pipe 5 to prevent gas from leaking through the water inlet pipe 5; the connecting frame 4 is connected to the water spraying frame 6, and the water spraying frame 6 is composed of a connecting rod, a straight plate and an annular plate; the upper sides of the connecting rod, the straight plate and the annular plate of the water spraying frame 6 are all provided with a water spraying cavity 6001, and the water spraying cavity 6001 is connected to the water collecting cavity 4001; a plurality of water spraying holes 6002 are provided on the annular plate of the water spraying frame 6; the water spraying holes 6002 are connected to the water spraying cavity 6001.
[0022] The air jet hole 2002 is inclined downward to prevent dirty water flowing down the inner wall of the sealing tube 2 from flowing into the air collecting cavity 2001 through the air jet hole 2002 .
[0023] It also includes a protrusion 112; a plurality of protrusions 112 are fixedly connected to the upper inner side of the sealing cylinder 2; the protrusion 112 is located above the sealing rubber 9.
[0024] The driving assembly includes an electric push rod 101, a fixed frame 102, a motor 103, an electric guide rail 104, a moving block 105 and a ring frame 106; the placement table 1 is fixedly connected to two electric guide rails 104 distributed front and back, the electric guide rails 104 are connected to an external power supply, and each electric guide rail 104 is slidably connected to two moving blocks 105; all the moving blocks 105 are commonly fixedly connected to the ring frame 106; the ring frame 106 is fixedly connected to four electric push rods 101; the telescopic parts of all the electric push rods 101 are commonly fixedly connected to the fixed frame 102; the fixed frame 102 is fixedly connected to the motor 103, and the electric guide rails 104 and the motor 103 are respectively connected to the external power supply; the output shaft of the motor 103 is fixedly connected to the sealing cylinder 2; the sealing cylinder 2 is rotationally connected to the fixed frame 102.
[0025] It also includes an electric control valve 201; the sealing cylinder 2 is provided with a discharge hole 2003; the electric control valve 201 is fixedly connected to the discharge hole 2003 of the sealing cylinder 2; and the electric control valve 201 is connected to an external power supply.
[0026] The discharge hole 2003 is located at a low-lying area of the inner bottom wall of the sealing cylinder 2, so that dirty water can be discharged to the discharge hole 2003 easily.
[0027] A plurality of grooves 6003 are provided on the outer side of the annular plate of the water spray frame 6 to facilitate the discharge of dirty water mixed with dust and water from the grooves 6003 to the inner bottom wall of the sealing tube 2 .
[0028] The specific working steps are: When it is necessary to inspect the produced prefabricated wall, firstly, the wall is lifted to the top of the placement table 1 by an external crane, and then the rectangular wall is driven down and placed flat on the placement table 1. After the wall is placed, the lower side of the wall will squeeze the upper side of the sealing rubber ring 10, so that the wall and the sealing rubber ring 10 are in close contact. At this time, the sealing tube 2, the sealing rubber ring 10 and the wall will form a sealed space, and then the external device manually connects the air supply pipe of the external air supply device with the air intake pipe 3, and then the external air supply device transports water vapor to the air intake pipe 3, and the water vapor will enter the gas collecting cavity 2001, and then be ejected from the air jet hole 2002. At this time, the ejected water vapor will be sprayed into the sealed space. As the water vapor in the sealed space increases, the air pressure in the sealed space will also increase. At this time, the high-pressure gas will drive the water vapor to move to the holes or gaps in the wall, thereby diffusing upward in the wall. When the water vapor in the wall gradually increases, the water vapor will be discharged upward from the wall. At this time, a humidity sensor can be placed on the upper part of the wall. When the humidity is detected to be rising, it means that the wall is prone to water seepage, which in turn affects the safety of the house, thereby detecting the safety of the wall. If the humidity does not change after a long period of detection, it means that the wall has strong water-proof properties and is also safe. Moreover, since the detection is carried out through water vapor, when it is detected that the wall has strong water-proof properties, it can be said that when the south wind returns, water vapor is not easy to enter the room through the gas. The strong water-proof properties of the wall can effectively avoid the problem of high water vapor content in the room and mold and rust of furniture.
[0029] Considering that during house construction, the prefabricated wall will be cut or opened, and after the prefabricated wall is cut or opened, the cut or opened part of the prefabricated wall becomes thinner than other parts. At this time, the water seepage resistance of the cut or opened part of the prefabricated wall cannot be ensured. Therefore, the electric push rod 101 is first controlled to drive the fixed frame 102, the motor 103 and the sealing cylinder 2 to descend, so that the sealing cylinder 2 is away from the wall, and then the sealing rubber ring 10 is pulled out to separate the sealing rubber ring 10 from the sealing cylinder 2, and then the electric guide rail 104 is controlled to drive the moving block 105 to drive the annular frame 106, the electric push rod 101, the fixed frame 102, the motor 103 and the sealing cylinder 2 to move to the right. It should be noted that Figure 1The side where the number of the placement table 1 is located is the right side. Then the electric push rod 101 drives the motor 103, the sealing cylinder 2, the air inlet pipe 3, the connecting frame 4, the water inlet pipe 5 and the water spray frame 6 to rise through the fixing frame 102. While rising, the motor 103 is controlled to drive the sealing cylinder 2 to rotate counterclockwise from a top-down perspective. At this time, the sealing cylinder 2 will rotate and rise to punch holes in the wall to simulate the cutting or opening operation of the prefabricated wall during house construction. It should be noted that the distance that the sealing cylinder 2 will rotate and rise to punch holes in the wall can be controlled by the electric push rod 101, so that the sealing cylinder 2 can be easily cut and opened. The sealing tube 2 is inserted into the wall, and then the electric push rod 101 and the motor 103 stop driving the sealing tube 2 to rise and rotate respectively. It should be noted that the maximum distance that the electric push rod 101 pushes the sealing tube 2 to rise is when the lower side of the wall is close to the water spray frame 6, that is, the lower side of the wall will not block the water spray hole 6002, and then the air supply pipe of the external air supply equipment is plugged into the air supply pipe 7, and then the external air supply equipment delivers gas to the air supply pipe 7, so that the gas enters the airbag 8. At this time, the airbag 8 will expand and squeeze the sealing rubber 9 to deform it, and the deformed sealing rubber 9 will be in close contact with the wall, thereby making the sealing tube 2 and the sealing The sealing rubber 9 and the gas form a sealed space, and then the external air supply equipment is used to transport water vapor to the air inlet pipe 3, and the water vapor will enter the gas collecting cavity 2001, and then be ejected from the air jet hole 2002. Since the contact area between the sealing rubber 9 and the wall is at the upper part of the cutting groove of the prefabricated wall, the gas will rise along the gap between the wall and the sealing cylinder 2 until it rises to the lower part of the sealing rubber 9, and then penetrate into the wall. At this time, the water vapor will penetrate upward at the middle position of the wall, thereby simulating the water vapor penetration when the prefabricated wall is cut or opened, so as to detect the cutting or opening of the prefabricated wall. The water-proof property after thinning is poor after the wall is cut or opened. The residents can be reminded to take waterproof measures after grooving, or to improve the wall production process to enhance its water-proof property. It should be noted that since the sealing cylinder 2 will rotate and rise to drill holes in the wall, the distance can be controlled by the electric push rod 101, so the water-proof property of different cutting or drilling depths can be tested. At the same time, when the water-proof property of prefabricated walls is tested under the same process, holes can also be drilled in the prefabricated walls, that is, the water-proof property of prefabricated walls under different thicknesses can be tested through the drilling operation.
[0030] Considering that after the sealing cylinder 2 is drilled, debris particles will be attached to the wall and the side of the sealing rubber 9 facing the center of the sealing cylinder 2, which will cause a gap between the sealing rubber 9 and the wall. At this time, water vapor will be discharged from the gap, resulting in air leakage, and dust will also adhere to the sealing cylinder 2. When water vapor enters the sealing cylinder 2, the dust attached to the inside of the sealing cylinder 2 will absorb the moisture in the water vapor, thereby causing scaling. After the inspection, the sealing cylinder 2 needs to be cleaned, which increases the workload of the workers. Therefore, before sending in steam, the water supply pipe of the external water supply equipment is manually connected to the water inlet pipe 5, and then the external water supply equipment sends water to the water inlet pipe 5, and the sent water will pass through the The water inlet pipe 5, the water collecting cavity 4001 and the water spraying cavity 6001 are finally sprayed out from the water spraying hole 6002, and the water will be sprayed into the gap between the sealing tube 2 and the wall. At this time, the sprayed water will clean the wall, the sealing tube 2 and the sealing rubber 9. When cleaning the attached dust, open the electric control valve 201. Since the discharge hole 2003 and the electric control valve 201 are located in the low-lying area of the inner bottom wall of the sealing tube 2, the dirty water formed by cleaning flows to the discharge hole 2003. At this time, the discharged dirty water can be collected by an external collection device, thereby preventing dust from affecting the seal and causing air leakage. It can also avoid the dirt formed by dust, which requires subsequent cleaning work and increases the burden on staff.
[0031] It should be noted that the above-mentioned method of using water to clean dust is adopted instead of using vacuum to extract the dust because the vacuum cannot completely suck away the dust, and some dust will still adhere to the inner wall of the sealing tube 2, and the dust attached to the wall and the sealing rubber 9 is more difficult to be sucked away. Therefore, there are unavoidable disadvantages in using vacuum to suck away the dust.
[0032] When drilling, the sealing cylinder 2 will be in close contact with the wall. The gap after drilling is small, and water is not easy to spray into the gap. A long cleaning time is required to flush water into the gap. In addition, when drilling, it is easy for the sealing rubber 9 to contact with the wall, which will cause wear and tear, affecting the service life. Therefore, when drilling, the protrusion 112 will also contact the wall and grind a part of the wall to increase the gap between the sealing cylinder 2 and the wall, making it easier to spray water into the deep gap, facilitate dust cleaning, and speed up the cleaning speed. After the distance between the sealing cylinder 2 and the wall becomes larger, the sealing rubber 9 can also be prevented from being worn, thereby preventing the service life of the sealing rubber 9 from being affected. Example 2
[0033] On the basis of Example 1, Figure 5As shown, it also includes a paddle 111; the paddle 111 is fixedly connected to the connecting rod of the water spray frame 6; the paddle 111 is provided with eight connecting holes 11101; the connecting holes 11101 are connected to the water spray cavity 6001; the connecting rod of the water spray frame 6 is rotatably connected to the connecting frame 4.
[0034] A prefabricated wall safety detection method based on construction engineering, the specific steps are as follows: Step 1: Drill into the wall through the sealing tube 2, and then spray water vapor into the sealed space through the external air supply equipment and the air inlet pipe 3 to perform water seepage inspection; Step 2: Use the external water supply equipment in conjunction with the connecting frame 4, the water inlet pipe 5 and the water spraying frame 6 to perform dust reduction and cleaning work in the sealing cylinder 2 to prevent dust from affecting the detection; Step 3: When the sealing cylinder 2 is drilling, the protrusion 112 grinds part of the wall, so that the gap between the wall and the sealing cylinder 2 becomes larger, thereby facilitating water spraying into the wall for cleaning; Step 4: When water enters the connecting frame 4, the water impacts the slurry blades 111, causing the water spray frame 6 to rotate, and then the water spray frame 6 sprays in a rotating manner, which is beneficial to speed up the cleaning and dust reduction speed.
[0035] The specific working steps are: When water is sprayed out from the water inlet pipe 5 and enters the water collecting cavity 4001, the sprayed water will impact the paddle 111, so that the paddle 111 drives the water spray frame 6 to rotate clockwise when viewed from a top-down angle, so that the water sprayed from the water spray hole 6002 of the water spray frame 6 is in a rotating state, which is conducive to speeding up the cleaning and dust reduction speed and avoiding affecting the detection efficiency; it should be noted that the water in the water collecting cavity 4001 will enter the water spray cavity 6001 through the connecting hole 11101.
[0036] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A prefabricated wall safety detection device based on construction engineering, comprising a placement table (1); characterized in that: The invention also comprises a sealing cylinder (2), an air intake pipe (3), an air delivery pipe (7), an air bag (8), a sealing rubber (9), a sealing rubber ring (10) and a driving assembly; the placement table (1) is connected to the driving assembly; the driving assembly is connected to the sealing cylinder (2), and the sealing cylinder (2) is driven to rise and fall and rotate by the driving assembly; the sealing cylinder (2) is fixedly connected to the air intake pipe (3); the sealing cylinder (2) is provided with an air collecting cavity (2001); the air collecting cavity (2001) is communicated with the air intake pipe (3); the sealing cylinder ( 2) is provided with a plurality of air injection holes (2002); the air injection holes (2002) are communicated with the air collecting cavity (2001); an air supply pipe (7) is passed through the sealing cylinder (2); an air bag (8) is fixedly connected to the sealing cylinder (2), and the air supply pipe (7) is communicated with the air bag (8); a sealing rubber (9) is fixedly connected to the sealing cylinder (2); the air bag (8) is in contact with the outer side of the sealing rubber (9), and a protrusion (2004) is provided on the upper part of the sealing cylinder (2); and a sealing rubber ring (10) is inserted into the upper part of the sealing cylinder (2).
2. A prefabricated wall safety detection device based on construction engineering according to claim 1, characterized in that: The invention also comprises a connecting frame (4), a water inlet pipe (5) and a water spraying frame (6); the sealing cylinder (2) is fixedly connected to the connecting frame (4); the connecting frame (4) is connected to the water inlet pipe (5); the connecting frame (4) is provided with a water collecting cavity (4001), the water inlet pipe (5) is connected to the water collecting cavity (4001), and a one-way valve is provided in the water inlet pipe (5); the connecting frame (4) is connected to the water spraying frame (6), and the water spraying frame (6) is composed of a connecting rod, a straight plate and an annular plate; the upper sides of the connecting rod, the straight plate and the annular plate of the water spraying frame (6) are all provided with a water spraying cavity (6001), and the water spraying cavity (6001) is connected to the water collecting cavity (4001); the annular plate of the water spraying frame (6) is provided with a plurality of water spraying holes (6002); the water spraying holes (6002) are connected to the water spraying cavity (6001).
3. The prefabricated wall safety detection device based on construction engineering according to claim 1 is characterized in that: The fumarole (2002) is tilted downward.
4. The prefabricated wall safety detection device based on construction engineering according to claim 1 is characterized in that: It also includes a protrusion (112); a plurality of protrusions (112) are fixedly connected to the upper inner portion of the sealing cylinder (2); and the protrusions (112) are located above the sealing rubber (9).
5. The prefabricated wall safety detection device based on construction engineering according to claim 1 is characterized in that: The driving assembly comprises an electric push rod (101), a fixed frame (102), a motor (103), an electric guide rail (104), a moving block (105) and an annular frame (106); the placement table (1) is fixedly connected to two electric guide rails (104) distributed front and back, the electric guide rails (104) are connected to an external power supply, and each electric guide rail (104) is slidably connected to two moving blocks (105); all the moving blocks (105) are commonly fixedly connected to the annular frame (106); the annular frame (106) is fixedly connected to four electric push rods (101); the telescopic parts of all the electric push rods (101) are commonly fixedly connected to the fixed frame (102); the fixed frame (102) is fixedly connected to the motor (103), and the electric guide rail (104) and the motor (103) are respectively connected to the external power supply; the output shaft of the motor (103) is fixedly connected to the sealing cylinder (2); and the sealing cylinder (2) is rotatably connected to the fixed frame (102).
6. The prefabricated wall safety detection device based on construction engineering according to claim 4 is characterized in that: It also includes an electric control valve (201); the sealing cylinder (2) is provided with a discharge hole (2003); the electric control valve (201) is fixedly connected to the discharge hole (2003) of the sealing cylinder (2); and the electric control valve (201) is connected to an external power supply.
7. A prefabricated wall safety detection device based on construction engineering according to claim 6, characterized in that: The discharge hole (2003) is located at a low-lying area of the inner bottom wall of the sealing cylinder (2).
8. The prefabricated wall safety detection device based on construction engineering according to claim 2 is characterized in that: A plurality of grooves (6003) are provided on the outer side of the annular plate of the water spray frame (6), so that dirty water mixed with dust and water can be discharged from the grooves (6003) to the inner bottom wall of the sealing cylinder (2).
9. A prefabricated wall safety detection device based on construction engineering according to claim 8, characterized in that: It also comprises a paddle (111); the paddle (111) is fixedly connected to the connecting rod of the water spray frame (6); the paddle (111) is provided with at least eight communication holes (11101); the communication holes (11101) are connected to the water spray cavity (6001); and the connecting rod of the water spray frame (6) is rotatably connected to the connecting frame (4).
10. A method for detecting the safety of prefabricated walls based on construction engineering, characterized in that: According to a prefabricated wall safety detection device based on construction engineering according to any one of claims 1 to 9, the specific steps are as follows: Step 1: Drill into the wall through the sealing tube (2), and then spray water vapor into the sealed space through the cooperation of the external air supply device and the air inlet pipe (3), so as to perform water seepage inspection; Step 2: by using an external water supply device in cooperation with the connecting frame (4), the water inlet pipe (5) and the water spray frame (6), dust reduction and cleaning work is performed in the sealing cylinder (2) to prevent dust from affecting the detection; Step 3: When drilling the sealing cylinder (2), a portion of the wall is polished by the protrusion (112) so that the gap between the wall and the sealing cylinder (2) becomes larger, thereby facilitating water spraying into the wall for cleaning; Step 4: When water enters the connecting frame (4), the water impacts the slurry sheet (111), causing the water spray frame (6) to rotate, thereby causing the water spray frame (6) to spray in a rotating manner, which is beneficial to speeding up the cleaning and dust reduction speed.
Citation Information