Wind power construction project management method and related device thereof
By constructing wind power construction project management methods, including dividing wind power generation units and building management organizational structure models, the problem of difficulty in progress control in onshore wind power engineering construction is solved, and efficient construction progress management is achieved.
Patent Information
- Application Number
- CN202411756254.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The construction cycle of onshore wind power projects is long, the environment is arduous, the conditions are harsh, and the lack of an information management system has led to low project management efficiency and difficult progress control.
The wind power construction project management method is adopted, and the project is divided into groups by determining the first-level structure of wind power generation units, and a management organizational structure model and progress management model are constructed to achieve comprehensive control of construction progress.
Effectively standardize the project management of onshore wind farm construction, and improve construction efficiency and progress control capabilities.
Smart Images

Figure CN119250756A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of information management technology, and in particular to a wind power construction project management method and related devices. Background Art
[0002] As an industry with high investment and high technology, onshore wind power project management has strict requirements on the technical ability and mechanical equipment level of managers, and lacks sufficient experience in project progress management and risk management. The construction period of onshore wind power projects is long, the environment is harsh, the conditions are bad, the effective operation time is short; the technology is complex, the engineering difficulty is high; there are many operating areas, and the safety management tasks are heavy. At the same time, at present, onshore wind power projects have not yet used a real information management system to assist management during the construction process. Paper media and manual processing are still the main ways of information transmission and analysis, and the level of information management is low.
[0003] Therefore, for wind power construction projects, how to efficiently and batch-control the project progress has become an important issue in project management. Summary of the invention
[0004] In order to solve or partially solve the problems existing in the relevant technologies, the present application provides a wind power construction project management method and related devices, which can effectively standardize the project management of onshore wind farm engineering construction, and is conducive to efficient and batch comprehensive control of construction progress information, thereby improving construction efficiency.
[0005] The first aspect of the present application provides a wind power construction project management method, comprising determining a first-level structure of wind power generation units corresponding to a plurality of wind power construction projects respectively; dividing the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each of the wind power construction project groups including one or more wind power construction projects for wind power generation units with the same first-level structure; for any one of the wind power construction project groups, obtaining text information of a management organization structure of the wind power construction project group, performing semantic analysis on the text information of the management organization structure, and obtaining semantics corresponding to each management organization in the management organization structure; constructing a management organization structure model of the wind power construction project group according to the semantics of each management organization, the management organization structure model The type is a tree structure, and the management organization structure model includes a project management node, a group management node, and a master control node from bottom to top. The project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group; according to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each of the progress control nodes corresponds to the construction progress of a component of the wind power generation unit; based on the management organization structure model and the progress management model, the construction progress of the wind power construction project group is managed.
[0006] In combination with the first aspect, in a possible implementation of the first aspect, determining the first-level structure of the wind power generation units corresponding to the multiple wind power construction projects respectively includes: obtaining the second-level structure of the wind power generation units corresponding to the multiple wind power construction projects respectively, the second-level structure including multiple components; aggregating the multiple components included in the second-level structure of the wind power generation unit of each of the wind power construction projects to obtain a first-level structure, each component included in the first-level structure is composed of one or more components in the second-level structure.
[0007] In combination with the first aspect, in a possible implementation method of the first aspect, the construction progress of the wind power generation unit is divided into multiple progress control nodes according to the multiple components included in the first-level structure, including: obtaining the management and control mode of the wind power construction project group; dividing the construction progress of the wind power generation unit into multiple progress control nodes according to the management and control mode and the multiple components included in the first-level structure.
[0008] In combination with the first aspect, in a possible implementation method of the first aspect, the construction progress of the wind power generation unit is divided into multiple progress control nodes according to the management and control mode and the multiple components included in the first-level structure, including: dividing the construction progress of the wind power generation unit into multiple progress control nodes according to the multiple components included in the first-level structure; extracting the number of wind power construction projects included in the wind power construction project group and the expected construction time of the wind power construction project group from the management and control mode; and further splitting or merging each of the progress control nodes according to the number of wind power construction projects and the expected construction time.
[0009] In combination with the first aspect, in a possible implementation method of the first aspect, constructing a progress management model based on the multiple progress control nodes includes: obtaining a preset construction sequence of each component included in the first-level structure; constructing a progress management model based on the preset construction sequence and the multiple progress control nodes, the progress management model being used to indicate the construction progress of the components, and the order of the progress control nodes in the progress management model being consistent with the preset construction sequence.
[0010] In combination with the first aspect, in a possible implementation method of the first aspect, the construction progress of the wind power construction project group is managed based on the management organization structure model and the progress management model, including: constructing a progress management data table for the wind power construction project group according to the progress management model, the progress management data table being used to store the construction progress data of each component of each wind power generation unit in the wind power construction project group; updating the progress management data table according to the construction progress of the wind power construction project group; reading the construction progress data of each component of each wind power construction project from the progress management data table; and aggregating the construction progress data in the progress management data table of the wind power construction project group according to the bottom-up hierarchical structure of the management organization structure model to obtain the aggregated construction progress data of the management organizations at each layer in the management organization structure model.
[0011] In combination with the first aspect, in a possible implementation method of the first aspect, before updating the progress management data table according to the construction progress of the wind power construction project group, it also includes: constructing a component arrival model of the wind power construction project group according to the multiple components included in the first-level structure, the component arrival model is used to indicate the arrival information of the multiple components included in the first-level structure, and the arrival information includes: the arrival quantity and cumulative arrival quantity within the current statistical period; updating the arrival quantity and cumulative arrival quantity in the component arrival model in real time; and controlling the construction progress of the wind power construction project group based on the component arrival model.
[0012] The second aspect of the present application provides a wind power construction project management device, including a determination module, which is used to determine the first-level structure of the wind power generation unit corresponding to multiple wind power construction projects respectively; an allocation module, which is used to divide the multiple wind power construction projects into one or more wind power construction project groups according to the first-level structure, and each of the wind power construction project groups includes one or more wind power construction projects for wind power generation units with the same first-level structure; an analysis module, which is used to obtain text information of the management organization structure of any one of the wind power construction project groups, so as to perform semantic analysis on the text information of the management organization structure and obtain the semantics corresponding to each management organization in the management organization structure; a construction module, which is used to construct a management organization structure model of the wind power construction project group according to the semantics of each management organization, The management organization structure model is a tree structure, which includes a project management node, a group management node, and a master control node from bottom to top. The project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group; a processing module is used to divide the construction progress of the wind power generation unit into multiple progress control nodes according to the multiple components included in the first-level structure, and to construct a progress management model according to the multiple progress control nodes, each of the progress control nodes corresponds to the construction progress of a component of the wind power generation unit; a management module is used to manage the construction progress of the wind power construction project group based on the management organization structure model and the progress management model.
[0013] In combination with the second aspect, in a possible implementation of the second aspect, the determination module is also used to obtain the second-level structures of wind power generation units corresponding to multiple wind power construction projects, respectively, and the second-level structure includes multiple components; the multiple components included in the second-level structure of the wind power generation unit of each of the wind power construction projects are aggregated to obtain a first-level structure, and each component included in the first-level structure is composed of one or more components in the second-level structure.
[0014] In combination with the second aspect, in a possible implementation of the second aspect, the allocation module is used to obtain the management and control mode of the wind power construction project group; according to the management and control mode and the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes.
[0015] In combination with the second aspect, in a possible implementation of the second aspect, the allocation module is also used to divide the construction progress of the wind power generation unit into multiple progress control nodes according to the multiple components included in the first-level structure; extract the number of wind power construction projects included in the wind power construction project group and the expected construction time of the wind power construction project group from the management and control mode; and further split or merge each of the progress control nodes according to the number of wind power construction projects and the expected construction time.
[0016] In combination with the second aspect, in a possible implementation of the second aspect, the processing model is also used to obtain a preset construction sequence of the various components included in the first-level structure; based on the preset construction sequence and the multiple progress control nodes, a progress management model is constructed, and the progress management model is used to indicate the construction progress of the various components, and the order of the progress control nodes in the progress management model is consistent with the preset construction sequence.
[0017] In combination with the second aspect, in a possible implementation method of the second aspect, the management module is also used to construct a progress management data table for the wind power construction project group based on the progress management model, and the progress management data table is used to store the construction progress data of each component of each wind power generation unit in the wind power construction project group; update the progress management data table according to the construction progress of the wind power construction project group; read the construction progress data of each component of each wind power construction project from the progress management data table; aggregate the construction progress data in the progress management data table of the wind power construction project group according to the bottom-up hierarchical structure of the management organizational structure model to obtain the aggregated construction progress data of the management organizations at each level in the management organizational structure model.
[0018] In combination with the second aspect, in a possible implementation of the second aspect, the management module is also used to construct a component arrival model for the wind power construction project group based on the multiple components included in the first-level structure, and the component arrival model is used to indicate the arrival information of the multiple components included in the first-level structure, and the arrival information includes: the arrival quantity and cumulative arrival quantity within the current statistical period; real-time updating of the arrival quantity and cumulative arrival quantity in the component arrival model; and controlling the construction progress of the wind power construction project group based on the component arrival model.
[0019] A third aspect of the present application provides an electronic device, including:
[0020] Processor; and
[0021] The memory stores executable codes thereon, and when the executable codes are executed by the processor, the processor is caused to execute the method as described above.
[0022] A fourth aspect of the present application provides a computer-readable storage medium having executable code stored thereon. When the executable code is executed by a processor of an electronic device, the processor is caused to execute the method as described above.
[0023] The technical solution provided by this application may have the following beneficial effects:
[0024] The wind power construction project management method of the present application includes determining the first-level structures of wind power generation units corresponding to a plurality of wind power construction projects respectively; dividing the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structures, each wind power construction project group including one or more wind power construction projects for wind power generation units with the same first-level structures; For any wind power construction project group, the text information of the management organization structure of the wind power construction project group is obtained to perform semantic analysis on the text information of the management organization structure to obtain the semantics corresponding to each management organization in the management organization structure; the management organization structure model of the wind power construction project group is constructed according to the semantics of each management organization, the management organization structure model is a tree structure, and the management organization structure model includes project management nodes, group management nodes, and general control nodes from bottom to top, the project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the general control node corresponds to the management organization of the wind power construction project group; according to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each progress control node corresponds to the construction progress of a component of the wind power generation unit; based on the management organization structure model and the progress management model, the construction progress of the wind power construction project group is managed, which can effectively standardize the project management of the onshore wind farm engineering construction, and is conducive to efficient and batch comprehensive control of construction progress information, thereby improving construction efficiency.
[0025] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The above and other objects, features and advantages of the present application will become more apparent by describing in more detail exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.
[0027] Figure 1 It is a flow chart of a wind power construction project management method shown in an embodiment of the present application;
[0028] Figure 2 It is a structural schematic diagram of a wind power construction project device shown in an embodiment of the present application;
[0029] Figure 3 is a schematic diagram of the structure of an electronic device shown in an embodiment of the present application;
[0030] Figure 4 It is a schematic diagram of a management organizational structure model of a wind power construction project management method shown in an embodiment of the present application;
[0031] Figure 5 It is a structural schematic diagram of a wind power generation unit of a wind power construction project management method shown in an embodiment of the present application.
[0032] Reference numerals: 1. base; 2. tower; 3. blade; 4. main engine; 5. box-type transformer. DETAILED DESCRIPTION
[0033] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.
[0034] The terms used in this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The singular forms of "a", "a", "an" and "the" used in this application and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used in this article refers to and includes any or all possible combinations of one or more associated listed items.
[0035] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0036] In related technologies, through the integrated management of batch engineering projects, the overall progress of most projects can be effectively controlled, and the quality and safety of engineering projects can be managed in an integrated manner, which is conducive to reducing corporate investment costs and increasing project returns. The current mainstream engineering project management model is a refined management model for a certain project, which cannot be well applied to multiple different projects of the same type.
[0037] In response to the above problems, the embodiments of the present application provide a wind power construction project management method and related devices, which can effectively standardize the project management of onshore wind farm construction projects, facilitate comprehensive control of construction progress information in an efficient and batch manner, and improve construction efficiency.
[0038] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.
[0039] Figure 1 It is a flow chart of a wind power construction project management method shown in an embodiment of the present application.
[0040] See also Figure 1 , a wind power construction project management method, comprising:
[0041] S110: Determine the first-level structures of wind power generation units corresponding to the plurality of wind power construction projects.
[0042] Specifically, the wind power construction project includes installing wind power generation units at the construction site, and each wind power generation unit includes multiple first-level structures. The first-level structures may include a base, a tower, a main engine, blades and a box-type transformer. The multiple first-level structures included in each wind power generation unit are the same, that is, each wind power generation unit includes a base, a tower, a main engine, blades and a box-type transformer. By using the same first-level structure for each wind power generation unit, it is beneficial to use the same management progress model to manage the wind power construction project group.
[0043] See also Figure 5 Specifically, the base 1 is a bearing member for supporting objects such as the tower; the tower 2 is the trunk and skeleton of the wind power generation unit, which supports the wind turbine and also carries functions such as line layout; the main engine 4 is the soul of the wind power generation unit and is the direct part for converting kinetic energy into electrical energy; the blade 3 is the power source of the power generation unit and is the direct part for generating kinetic energy; the box-type transformer 5 is referred to as the box transformer for short, which has the advantages of small space occupation, low noise loss, flexible combination mode, safe operation, etc.
[0044] In a possible implementation, the second-level structures of wind power generation units corresponding to a plurality of wind power construction projects are obtained, the second-level structures including a plurality of components; the plurality of components included in the second-level structure of the wind power generation unit of each wind power construction project are aggregated to obtain a first-level structure, each component included in the first-level structure is composed of one or more components in the second-level structure.
[0045] Specifically, each wind power construction project includes multiple second-level structures, and the second-level structures may include multiple components. The first-level structure may be obtained by assembling and aggregating the second-level structures. For example, the first-level structure is a tower, and the second-level structure is a tower platform, a ladder, a cable ladder, etc. Multiple second-level structures are aggregated to form the first-level structure. The tower platform includes multiple components, such as screws, nuts and other parts; for the first-level structure being a base, the second-level structure may include foundation rings, anchor rods, cable ducts, drainage systems, monitoring equipment and other devices, and the second-level structures together constitute the first-level structure base; for the second-level structures, the first-level structure may be a base, an anchor rod, a cable duct, a drainage system, a monitoring device and other devices, and the second-level structures may be assembled together to form the first-level structure base; The primary structure is the main engine, which can convert wind energy into electrical energy. The second-level structure may include equipment such as the nacelle, bearings, cooling system, lubrication system, cables, safety protection devices, etc., and multiple second-level structures together constitute the main engine; for the first-level structure is the blade, which can convert wind energy into mechanical energy, the second-level structure may include the outer shell, beam cap, web, blade root and other structures, and multiple second-level structures together constitute the blade; for the first-level structure is a box-type transformer, the second-level structure may include an oil tank, an iron core, a high-voltage side winding, a low-voltage side winding, a shell, a pipeline and other devices, and multiple second-level structures together constitute the box-type transformer.
[0046] S120: Divide the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each wind power construction project group including one or more wind power construction projects for wind power generation units with the same first-level structure.
[0047] Specifically, each wind power construction project may construct different first-level structures of wind power generating units respectively. For example, wind power construction project A constructs the base of the wind power generating unit, and wind power construction project B constructs the tower of the wind power generating unit. The wind power construction projects that need to be constructed with the same first-level structure are statistically integrated to obtain multiple wind power construction project groups, and the wind power construction projects in each wind power construction project group all construct the same first-level structure.
[0048] S130: For any wind power construction project group, obtain text information of the management organization structure of the wind power construction project group, perform semantic analysis on the text information of the management organization structure, and obtain semantics corresponding to each management organization in the management organization structure.
[0049] Specifically, after a wind power construction project group is established, the text information of the management structure of each wind power construction project group can be obtained. Semantic analysis of the text information can obtain the semantics corresponding to each management organization. The semantics can be information such as the responsibilities and names of the management organizations. The semantics can be used to determine the hierarchical relationship between management organizations.
[0050] S140: Construct a management organization structure model of the wind power construction project group according to the semantics of each management organization. The management organization structure model is a tree structure. The management organization structure model includes project management nodes, group management nodes, and master control nodes from bottom to top. The project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group.
[0051] See also Figure 4 Specifically, a management organization structure model is constructed according to the semantics of each management organization. The management organization structure model can be a tree structure. The management organization structure model can be divided into three layers. The top layer is the master control node, which can manage all wind power construction projects. The master control node and the group management nodes in the middle layer have a management and subordinate relationship. The middle layer is the group management node, such as the management organization of each region. The group management node in the middle layer can manage all wind power construction projects in a certain region. The group management node and the project management node in its group have a management and subordinate relationship. The bottom layer can be the project management node. The project management node corresponds to the management organization of each wind power construction project. Each wind power construction project group can have a corresponding management organization structure model. The management progress data of each wind power construction project can be aggregated through the management organization structure model. For example, the group management node can obtain all project data of the lower-level project management node corresponding to the group management node, and perform data aggregation, which is conducive to better overall control of the wind power construction project group and improve management efficiency.
[0052] S150: According to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each progress control node corresponds to the construction progress of a component of the wind power generation unit.
[0053] Specifically, each progress control node can be used to indicate the construction progress of a first-level structure of a wind power generation unit. A wind power generation unit may include multiple progress control nodes, such as a base progress control node, used to indicate the construction progress of the base; a tower progress control node, used to indicate the construction progress of the tower, etc. There is no restriction here. A progress management model can be constructed based on multiple progress control nodes, and the progress management model can be used to display the construction progress of the corresponding wind power generation unit.
[0054] Referring to Table 1, specifically, the progress control nodes may include the completion time of foundation casting, the completion time of wind turbine hoisting, the grid-connected time of the power generation unit, and the commissioning time of the power generation unit. Through the four different progress control nodes, a progress management model can be constructed, and the construction progress of the wind power generation unit can be visually known.
[0055]
[0056] In a possible implementation, a management and control mode of a wind power construction project group is obtained; and the construction progress of the wind power generation unit is divided into a plurality of progress control nodes according to the management and control mode and a plurality of components included in the first-level structure.
[0057] Specifically, the management and control mode of a wind power construction project group may include information such as project scale, project construction duration, and engineering difficulty. The progress management model can be adjusted according to the management and control modes of different wind power construction project groups. For example, the elements and time of the progress control nodes in the progress management model may be changed.
[0058] In a possible implementation, the construction progress of the wind power generation unit is divided into multiple progress control nodes according to the multiple components included in the first-level structure; the number of wind power construction projects included in the wind power construction project group and the expected construction time of the wind power construction project group are extracted from the management and control mode; and each progress control node is further split or merged according to the number of wind power construction projects and the expected construction time.
[0059] Specifically, each wind power construction project may include different wind power construction projects, the expected construction time of the expected wind power construction project or the expected construction time of the wind power construction project group. The progress control nodes in the progress management model are regulated according to the number of wind power construction projects and the expected construction time of the wind power construction project group, and each progress control node can be further split or merged.
[0060] In one possible implementation, a preset construction sequence of each component included in the first-level structure is obtained; a progress management model is constructed based on the preset construction sequence and multiple progress control nodes, and the progress management model is used to indicate the construction progress of each component. The order of the progress control nodes in the progress management model is consistent with the preset construction sequence.
[0061] Specifically, for wind power generation units, it is generally necessary to start construction from the base, or the blades can be assembled first. According to the preset construction sequence of each component of the first-level structure, the corresponding progress control nodes can be obtained and a progress management model can be constructed.
[0062] S160: Manage the construction progress of the wind power construction project group based on the management organization structure model and the progress management model.
[0063] Specifically, by managing the organizational structure model and the progress management model, the construction progress of each wind power construction project in the wind power construction project group can be monitored in real time, which is conducive to improving construction efficiency.
[0064] In one possible implementation, a progress management data table for a wind power construction project group is constructed based on a progress management model, and the progress management data table is used to store construction progress data of each component of each wind power generation unit in the wind power construction project group; the progress management data table is updated according to the construction progress of the wind power construction project group; the construction progress data of each component of each wind power construction project is read from the progress management data table; and the construction progress data in the progress management data table of the wind power construction project group is aggregated according to the bottom-up hierarchical structure of the management organization structure model to obtain the aggregated construction progress data of the management organizations at each level in the management organization structure model.
[0065] Specifically, the progress management data table may include the construction progress of each component of each wind power generation unit in the wind power construction project group. According to the construction progress of each component of each wind power generation unit, the progress management data table may be updated, and the construction progress of each component of each wind power generation unit may be collected daily, and the updated progress management data table may be integrated daily to obtain the aggregated construction progress of the management organizations at each level in the management organizational structure model, which may help each level in the management organizational structure model to know the construction progress of the wind power construction project group or wind power generation unit in the corresponding monitoring area in real time.
[0066] In a possible implementation, a component arrival model for a wind power construction project group is constructed based on multiple components included in the first-level structure. The component arrival model is used to indicate arrival information of multiple components included in the first-level structure, and the arrival information includes: arrival quantity and cumulative arrival quantity within the current statistical period; real-time updating of arrival quantity and cumulative arrival quantity in the component arrival model; and controlling the construction progress of the wind power construction project group based on the component arrival model.
[0067] Refer to Table 2. Specifically, it may also include the arrival of equipment on site of the wind power construction project group. The component arrival model may include multiple arrival information in the first-level structure. The arrival information may include the arrival of the day and the cumulative arrival. In the wind power construction project, new components will arrive every day. The daily arrival quantity and the component arrival model can be updated in real time. According to the data of the progress management model, when a required component arrives, the component can be constructed. Through the arrival of the site equipment, the progress management model can be further optimized to control the construction progress of the wind power construction project group.
[0068]
[0069] In summary, this application can be applied to the centralized management of multiple wind power construction projects, can be well applied to the unified centralized management of multi-level grouping organizational structures, can greatly improve the efficiency and level of engineering progress information management based on traditional forms, and secondly, can be well applied to the site construction progress structure decomposition of the vast majority of engineering projects of this type of onshore wind power, and can be used as the parent structure of further subdivided structures to improve construction efficiency, shorten construction time, and reduce manpower and material resources.
[0070] The wind power construction project management method of the present application includes determining the first-level structures of wind power generation units corresponding to a plurality of wind power construction projects respectively; dividing the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structures, each wind power construction project group including one or more wind power construction projects for wind power generation units with the same first-level structures; For any wind power construction project group, the text information of the management organization structure of the wind power construction project group is obtained to perform semantic analysis on the text information of the management organization structure to obtain the semantics corresponding to each management organization in the management organization structure; the management organization structure model of the wind power construction project group is constructed according to the semantics of each management organization, the management organization structure model is a tree structure, and the management organization structure model includes project management nodes, group management nodes, and general control nodes from bottom to top, the project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the general control node corresponds to the management organization of the wind power construction project group; according to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each progress control node corresponds to the construction progress of a component of the wind power generation unit; based on the management organization structure model and the progress management model, the construction progress of the wind power construction project group is managed, which can effectively standardize the project management of the onshore wind farm engineering construction, and is conducive to efficient and batch comprehensive control of construction progress information, thereby improving construction efficiency.
[0071] Corresponding to the aforementioned application function realization method embodiment, the present application also provides a wind power construction project management device, electronic equipment and corresponding embodiments.
[0072] Figure 2 It is a structural schematic diagram of a wind power construction project management device shown in an embodiment of the present application.
[0073] See also Figure 2 A wind power construction project management device 200 includes a determination module 210, an allocation module 220, an analysis module 230, a construction module 240, a processing module 250, and a management module 260.
[0074] The determination module 210 is used to determine the first-level structures of the wind power generation units corresponding to the plurality of wind power construction projects.
[0075] Specifically, the base is a bearing component used to support objects such as the tower; the tower is the trunk and skeleton of the wind power generation unit, which supports the wind turbine and also carries functions such as line layout; the main engine is the soul of the wind power generation unit and is the direct part where kinetic energy is converted into electrical energy; the blades are the power source of the power generation unit and are the direct part that generates kinetic energy; the box-type transformer is referred to as a box transformer, which has the advantages of small space occupation, low noise loss, flexible combination method, and safe operation.
[0076] The determination module 210 is also used to obtain the second-level structure of the wind power generation units corresponding to multiple wind power construction projects, the second-level structure including multiple components; the multiple components included in the second-level structure of the wind power generation unit of each wind power construction project are aggregated to obtain the first-level structure, and each component included in the first-level structure is composed of one or more components in the second-level structure.
[0077] Specifically, each wind power construction project may construct different first-level structures of wind power generating units respectively. For example, wind power construction project A constructs the base of the wind power generating unit, and wind power construction project B constructs the tower of the wind power generating unit. The wind power construction projects that need to be constructed with the same first-level structure are statistically integrated to obtain multiple wind power construction project groups, and the wind power construction projects in each wind power construction project group all construct the same first-level structure.
[0078] The allocation module 220 is used to divide the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each wind power construction project group including one or more wind power construction projects for wind power generation units with the same first-level structure.
[0079] Specifically, each wind power construction project may construct different first-level structures of wind power generating units respectively. For example, wind power construction project A constructs the base of the wind power generating unit, and wind power construction project B constructs the tower of the wind power generating unit. The wind power construction projects that need to be constructed with the same first-level structure are statistically integrated to obtain multiple wind power construction project groups, and the wind power construction projects in each wind power construction project group all construct the same first-level structure.
[0080] The allocation module 220 is used to obtain the control mode of the wind power construction project group; according to the control mode and the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes.
[0081] The allocation module 220 is also used to divide the construction progress of the wind power generation unit into multiple progress control nodes according to the multiple components included in the first-level structure; extract the number of wind power construction projects included in the wind power construction project group and the expected construction time of the wind power construction project group from the management and control mode; and further split or merge each progress control node according to the number of wind power construction projects and the expected construction time.
[0082] The analysis module 230 is used to obtain the text information of the management organization structure of any wind power construction project group, so as to perform semantic analysis on the text information of the management organization structure and obtain the semantics corresponding to each management organization in the management organization structure.
[0083] Specifically, after a wind power construction project group is established, the text information of the management structure of each wind power construction project group can be obtained. Semantic analysis of the text information can obtain the semantics corresponding to each management organization. The semantics can be information such as the responsibilities and names of the management organizations. The semantics can be used to determine the hierarchical relationship between management organizations.
[0084] Construction module 240 is used to construct a management organization structure model of a wind power construction project group according to the semantics of each management organization. The management organization structure model is a tree structure. The management organization structure model includes project management nodes, group management nodes, and master control nodes from bottom to top. The project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group.
[0085] Specifically, a management organization structure model is constructed according to the semantics of each management organization. The management organization structure model can be a tree structure. The management organization structure model can be divided into three layers. The top layer is the master control node, which can manage all wind power construction projects. The master control node and the group management nodes in the middle layer have a management and subordinate relationship. The middle layer is the group management node, such as the management organization of each region. The group management node in the middle layer can manage all wind power construction projects in a certain region. The group management node and the project management node in its group have a management and subordinate relationship. The bottom layer can be the project management node. The project management node corresponds to the management organization of each wind power construction project. Each wind power construction project group can have a corresponding management organization structure model. The management progress data of each wind power construction project can be aggregated through the management organization structure model. For example, the group management node can obtain all project data of the lower-level project management node corresponding to the group management node, and perform data aggregation, which is conducive to better overall control of the wind power construction project group and improve management efficiency.
[0086] The processing module 250 is used to divide the construction progress of the wind power generation unit into multiple progress control nodes according to the multiple components included in the first-level structure, and construct a progress management model according to the multiple progress control nodes, each progress control node corresponding to the construction progress of a component of the wind power generation unit.
[0087] Specifically, each progress control node can be used to indicate the construction progress of a first-level structure of a wind power generation unit. A wind power generation unit may include multiple progress control nodes, such as a base progress control node, used to indicate the construction progress of the base; a tower progress control node, used to indicate the construction progress of the tower, etc. There is no restriction here. A progress management model can be constructed based on multiple progress control nodes, and the progress management model can be used to display the construction progress of the corresponding wind power generation unit.
[0088] The processing module 250 is also used to obtain the preset construction sequence of each component included in the first-level structure; based on the preset construction sequence and multiple progress control nodes, a progress management model is constructed, and the progress management model is used to indicate the construction progress of each component. The order of the progress control nodes in the progress management model is consistent with the preset construction sequence.
[0089] The management module 260 is used to manage the construction progress of the wind power construction project group based on the management organization structure model and the progress management model.
[0090] Specifically, by managing the organizational structure model and the progress management model, the construction progress of each wind power construction project in the wind power construction project group can be monitored in real time, which is conducive to improving construction efficiency.
[0091] The management module 260 is also used to construct a progress management data table for the wind power construction project group according to the progress management model, the progress management data table is used to store the construction progress data of each component of each wind power generation unit in the wind power construction project group; update the progress management data table according to the construction progress of the wind power construction project group; read the construction progress data of each component of each wind power construction project from the progress management data table; according to the bottom-up hierarchical structure of the management organization structure model, aggregate the construction progress data in the progress management data table of the wind power construction project group to obtain the aggregated construction progress data of the management organizations at each level in the management organization structure model.
[0092] The management module 260 is also used to construct a component arrival model for the wind power construction project group based on the multiple components included in the first-level structure. The component arrival model is used to indicate the arrival information of the multiple components included in the first-level structure. The arrival information includes: the arrival quantity and cumulative arrival quantity within the current statistical period; real-time updating of the arrival quantity and cumulative arrival quantity in the component arrival model; and controlling the construction progress of the wind power construction project group based on the component arrival model.
[0093] The wind power construction project management device of the present application includes determining a first-level structure of wind power generation units corresponding to a plurality of wind power construction projects respectively; dividing the plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each wind power construction project group including one or more wind power construction projects for wind power generation units with the same first-level structure; For any wind power construction project group, the text information of the management organization structure of the wind power construction project group is obtained to perform semantic analysis on the text information of the management organization structure to obtain the semantics corresponding to each management organization in the management organization structure; the management organization structure model of the wind power construction project group is constructed according to the semantics of each management organization, the management organization structure model is a tree structure, and the management organization structure model includes project management nodes, group management nodes, and general control nodes from bottom to top, the project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the general control node corresponds to the management organization of the wind power construction project group; according to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each progress control node corresponds to the construction progress of a component of the wind power generation unit; based on the management organization structure model and the progress management model, the construction progress of the wind power construction project group is managed, which can effectively standardize the project management of the onshore wind farm engineering construction, and is conducive to efficient and batch comprehensive control of construction progress information, thereby improving construction efficiency.
[0094] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated again here.
[0095] Figure 3 It is a schematic diagram of the structure of an electronic device shown in an embodiment of the present application.
[0096] See also Figure 3 , the electronic device 300 includes a memory 310 and a processor 320.
[0097] The processor 320 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.
[0098] The memory 310 may include various types of storage units, such as system memory, read-only memory (ROM), and permanent storage. Among them, ROM can store static data or instructions required by the processor 320 or other modules of the computer. The permanent storage device may be a readable and writable storage device. The permanent storage device may be a non-volatile storage device that does not lose the stored instructions and data even after the computer is powered off. In some embodiments, the permanent storage device uses a large-capacity storage device (such as a magnetic or optical disk, flash memory) as a permanent storage device. In some other embodiments, the permanent storage device may be a removable storage device (such as a floppy disk, optical drive). The system memory may be a readable and writable storage device or a volatile readable and writable storage device, such as a dynamic random access memory. The system memory may store some or all instructions and data required by the processor at run time. In addition, the memory 310 may include any combination of computer-readable storage media, including various types of semiconductor storage chips (such as DRAM, SRAM, SDRAM, flash memory, programmable read-only memory), and disks and / or optical disks may also be used. In some embodiments, the memory 310 may include a readable and / or writable removable storage device, such as a laser disc (CD), a read-only digital versatile disc (such as a DVD-ROM, a double-layer DVD-ROM), a read-only Blu-ray disc, an ultra-density optical disc, a flash memory card (such as an SD card, a mini SD card, a Micro-SD card, etc.), a magnetic floppy disk, etc. Computer-readable storage media do not include carrier waves and transient electronic signals transmitted wirelessly or wired.
[0099] The memory 310 stores executable codes, and when the executable codes are processed by the processor 320 , the processor 320 can execute part or all of the methods described above.
[0100] In addition, the method according to the present application may also be implemented as a computer program or a computer program product, which includes computer program code instructions for executing some or all of the steps in the above method of the present application.
[0101] Alternatively, the present application can also be implemented as a computer-readable storage medium (or non-transitory machine-readable storage medium or machine-readable storage medium) on which executable code (or computer program or computer instruction code) is stored. When the executable code (or computer program or computer instruction code) is executed by a processor of an electronic device (or server, etc.), the processor executes part or all of the steps of the above-mentioned method according to the present application.
[0102] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A wind power construction project management method, characterized in that: include: Determine the first-level structures of wind power generation units corresponding to the multiple wind power construction projects respectively; Dividing a plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each of the wind power construction project groups including one or more wind power construction projects for wind power generation units with the same first-level structure; For any one of the wind power construction project groups, obtaining text information of the management organization structure of the wind power construction project group, performing semantic analysis on the text information of the management organization structure, and obtaining semantics corresponding to each management organization in the management organization structure; A management organization structure model of the wind power construction project group is constructed according to the semantics of each management organization. The management organization structure model is a tree structure. The management organization structure model includes a project management node, a group management node, and a master control node from bottom to top. The project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group. According to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, and a progress management model is constructed according to the multiple progress control nodes, each of which corresponds to the construction progress of a component of the wind power generation unit; Based on the management organizational structure model and the progress management model, the construction progress of the wind power construction project group is managed.
2. The method according to claim 1, characterized in that The first-level structure of determining wind power generation units corresponding to a plurality of wind power construction projects respectively comprises: Acquire the second-level structures of wind power generation units respectively corresponding to the plurality of wind power construction projects, wherein the second-level structures include a plurality of components; The plurality of components included in the second-level structure of the wind power generation unit of each wind power construction project are aggregated to obtain a first-level structure, wherein each component included in the first-level structure is composed of one or more components in the second-level structure.
3. The method according to claim 1, characterized in that According to the multiple components included in the first level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes, including: Obtaining a management and control model for the wind power construction project group; According to the management and control mode and the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes.
4. The method according to claim 3, characterized in that The construction progress of the wind power generation unit is divided into a plurality of progress control nodes according to the control mode and the plurality of components included in the first level structure, including: According to the multiple components included in the first-level structure, the construction progress of the wind power generation unit is divided into multiple progress control nodes; Extracting the number of wind power construction projects included in the wind power construction project group and the expected construction time of the wind power construction project group from the management and control model; The progress control nodes are further split or merged according to the number of wind power construction projects and the expected construction time.
5. The method according to claim 1, characterized in that The constructing a progress management model according to the plurality of progress control nodes comprises: Obtaining a preset construction sequence of each component included in the first-level structure; A progress management model is constructed according to the preset construction sequence and the multiple progress control nodes. The progress management model is used to indicate the construction progress of each component. The order of the progress control nodes in the progress management model is consistent with the preset construction sequence.
6. The method according to claim 1, characterized in that The managing the construction progress of the wind power construction project group based on the management organization structure model and the progress management model includes: Constructing a progress management data table of the wind power construction project group according to the progress management model, wherein the progress management data table is used to store construction progress data of each component of each wind power generation unit in the wind power construction project group; Updating the progress management data table according to the construction progress of the wind power construction project group; Reading the construction progress data of each component of each wind power construction project from the progress management data table; According to the bottom-up hierarchical structure of the management organization structure model, the construction progress data in the progress management data table of the wind power construction project group is aggregated to obtain the aggregated construction progress data of the management organizations at each level in the management organization structure model.
7. The method according to claim 6, characterized in that Before updating the progress management data table according to the construction progress of the wind power construction project group, the method further includes: According to the multiple components included in the first level structure, a component arrival model of the wind power construction project group is constructed, wherein the component arrival model is used to indicate the arrival information of the multiple components included in the first level structure, and the arrival information includes: the arrival quantity and the cumulative arrival quantity in the current statistical period; updating the arrival quantity and cumulative arrival quantity in the component arrival model in real time; The construction progress of the wind power construction project group is controlled based on the component arrival model.
8. A wind power construction project management device, characterized in that: include: A determination module, used to determine the first-level structures of wind power generation units corresponding to a plurality of wind power construction projects; an allocation module, configured to divide a plurality of wind power construction projects into one or more wind power construction project groups according to the first-level structure, each of the wind power construction project groups including one or more wind power construction projects for wind power generation units having the same first-level structure; An analysis module, for obtaining text information of a management organization structure of any one of the wind power construction project groups, so as to perform semantic analysis on the text information of the management organization structure and obtain semantics corresponding to each management organization in the management organization structure; A construction module, used to construct a management organization structure model of the wind power construction project group according to the semantics of each management organization, wherein the management organization structure model is a tree structure, and the management organization structure model includes a project management node, a group management node, and a master control node from bottom to top, wherein the project management node corresponds to the management organization of each wind power construction project, the group management node corresponds to the management organization of a wind power construction project group, and the master control node corresponds to the management organization of the wind power construction project group; A processing module, configured to divide the construction progress of the wind power generation unit into a plurality of progress control nodes according to the plurality of components included in the first-level structure, and construct a progress management model according to the plurality of progress control nodes, each of the progress control nodes corresponding to the construction progress of a component of the wind power generation unit; A management module is used to manage the construction progress of the wind power construction project group based on the management organization structure model and the progress management model.
9. An electronic device, characterized in that: include: processor; as well as A memory having executable codes stored thereon, which, when executed by the processor, causes the processor to execute the method according to any one of claims 1 to 6.
10. A computer-readable storage medium, characterized in that: An executable code is stored thereon, and when the executable code is executed by a processor of an electronic device, the processor is caused to execute the method as claimed in any one of claims 1 to 6.
Citation Information
Patent Citations
Engineering project performance supervision system, electronic equipment and storage medium
CN113869654A
Construction project management method and device of wind power plant centralized control center based on ontology
CN114819885A
Minimum unit division method for fine management of multi-industry complex engineering
CN117575167A
Engineering project management method and system, electronic equipment and storage medium