Charging pile cluster control device and method capable of meeting urgent charging requirement

By introducing load monitoring and user qualification review mechanisms into the charging pile cluster and reasonably adjusting the charging sequence, the problem of expedited charging users queueing under the limit on electricity load in the charging pile cluster is solved, and a fair and efficient charging service is achieved.

CN119261635AActive Publication Date: 2025-01-07CHINESE PEOPLES LIBERATION ARMY UNIT 96657
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411295032.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-15
Publication Date
2025-01-07
Estimated Expiration
2044-09-15

AI Technical Summary

Technical Problem

In the charging pile cluster, due to the limitation of electricity load, the charging needs of all users cannot be met at the same time, resulting in the urgent charging users need to wait in line, which disrupts fair order and may induce bad behavior.

Method used

A charging pile cluster control device is designed, including a load monitoring module, a user interface, an audit module and a charging pile switching module. By monitoring the power load in real time, setting up an accelerated charging interface and a normal charging interface, and power outage provided by the user The duration and the expedited charging time should be adjusted reasonably to ensure that the expedited charging user can only use the expedited charging service after the expedited charging user is qualified, and the charging piles with priority to the power outage will provide users with the longest power outage time.

Benefits of technology

It effectively avoids deliberate plugging, meets the needs of users who are expedited charging, and maintains fairness in charging order, reduces the losses of users who are powered off, and forms a good user mutual aid atmosphere.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119261635A_ABST
    Figure CN119261635A_ABST
Patent Text Reader

Abstract

The invention discloses a charging pile cluster control device and method capable of meeting the urgent charging requirement, belongs to the technical field of electric vehicle charging, and particularly relates to a device and method for controlling a charging pile cluster. The device comprises a load monitoring module (1), a user interface (2), an acceptance auditing module (3), a user file module (4) and a charging pile switching module (5). The method is applied to the charging pile cluster of which the total power utilization load is insufficient to supply power to all the charging piles, the requirements of urgent charging users are met, and the fair charging order is kept.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric vehicle charging, and in particular relates to a device and method for controlling a charging pile cluster. Background Art

[0002] In some charging pile clusters including N charging piles, due to the limitation of the total power load of the cluster, only M (M < N) charging piles can be powered at the same time, while the other (NM) charging piles are temporarily powered off and cannot provide charging services. At this time, if the number of charging users is more than M, the later users can only wait in line. This will not meet the needs of some users who are particularly in urgent need of charging. Although it is technically possible to take a simple approach of cutting off the power of a charging pile that is charging to protect the users who need to charge urgently, this approach actually destroys the fair order of "first come, first served" queuing for charging, and is likely to induce deliberate "jamming" bad behavior, so it is not feasible in reality. However, objectively, the urgency of charging for each charging user is usually different, so there is still a possibility of reasonably adjusting the charging queue order based on the principle of "first urgent and then slow" with the permission of the charging user, so as to meet the needs of urgent charging without harming the interests of other charging users. Summary of the invention

[0003] The purpose of the present invention is to provide a charging pile cluster control device and method that conforms to the principle of fairness and can meet the needs of users who need expedited charging.

[0004] The technical solution of the present invention is: A charging pile cluster control device, characterized in that it includes a load monitoring module, a user interface, an acceptance and review module, a user profile module, and a charging pile switching module; The load monitoring module monitors the total power load of the charging pile cluster in real time, and sends the monitoring data to the user interface and the charging pile switching module; The user interface is set at each charging pile in the charging pile cluster, and provides different input interfaces to the user according to the monitoring data provided by the load monitoring module: when the current total power load is lower than the set upper limit, only the normal charging interface is enabled; when the current total power load reaches the set upper limit, only the expedited charging interface is enabled, and the expedited charging request input by the user, including the identity information and the duration of the expedited charging request, is received, and the information is transmitted to the acceptance and review module; The acceptance and review module calls the file of the expedited charging user stored in the user file module to determine whether the expedited charging user meets the preset conditions, and if so, sends a switching instruction to the charging pile switching module; if not, sends information rejecting the expedited charging request to the user interface; After receiving the switching instruction from the acceptance and review module, the charging pile switching module calls the files of all users who are charging in the current charging pile cluster in the user file module, and selects to cut off the power to one of the charging piles according to the preset power-off rule, and starts the power supply to the charging pile where the urgent charging user is located within the urgent charging time required by the urgent charging user; when the urgent charging time is reached, the current urgent charging is ended, and the power supply to the previously powered-off charging pile is restored; and the data of the current urgent charging time of the urgent charging user is transmitted to the user file module; during the urgent charging period, when the current total power load is lower than the set upper limit value, the charging pile switching module gives priority to restoring the power supply to the previously powered-off charging pile.

[0005] The user profile module records and accumulates the allowed power-off duration submitted by each user from the user interface, and records and accumulates the expedited charging duration of each expedited charging user from the charging pile switching module.

[0006] A charging pile cluster control method, which uses the charging pile cluster control device as claimed in claim 1, and comprises the following steps: When the user interface displays the normal charging interface, the charging user can enter identity information and voluntarily choose to enter the power-off duration allowed during this charging process. This information is transmitted to the user profile module and controls the start of the normal charging process of the charging pile; When the user interface displays the expedited charging interface, the expedited charging user can enter an expedited charging request, including his / her identity information and the duration of the requested expedited charging, and this information is transmitted to the acceptance and review module. B. The acceptance and review module calls the file of the expedited charging user stored in the user file module, and calculates the difference between the cumulative allowed power-off time provided by the user and the cumulative expedited charging time used. If it is greater than 0, it is determined that the expedited charging user meets the preset conditions, otherwise it is determined that the expedited charging user does not meet the preset conditions; C. The preset power-off rule executed by the charging pile switching module is: calling the power-off duration data voluntarily selected by each user who is charging during this charging process from the user profile module, selecting the one with the largest value, and powering off the charging pile where the user is located; D. When the power-off time of the powered-off charging pile reaches the allowable power-off time during the current charging process and does not reach the expedited charging time required by the expedited charging user, the charging pile switching module repeats step C, selects another charging pile to power off, and restores power to the previously powered-off charging pile.

[0007] The beneficial effects of the present invention are as follows: since the qualification conditions are set for the users who require expedited charging, that is, they are required to provide the opportunity for themselves to be disconnected from the power supply in advance to ensure the expedited charging of others, so that they can obtain the right to request expedited charging, thereby avoiding the deliberate "cutting in" behavior; since the users who voluntarily provide the longest power-off time (whose charging needs are relatively unurgent) are preferentially disconnected, the loss caused to the users whose power is disconnected is minimized or even no actual loss is caused. Thus, the needs of users who require expedited charging are met, the fairness of the charging order is maintained, and a good atmosphere of mutual assistance among charging users is formed. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Attached Figure 1 The structure and signal flow diagram of the charging pile cluster control device in the present invention. DETAILED DESCRIPTION

[0009] Embodiment 1: A charging pile cluster control device, characterized in that it comprises a load monitoring module 1, a user interface 2, an acceptance and review module 3, a user profile module 4, and a charging pile switching module 5; The load monitoring module 1 monitors the total power load of the charging pile cluster in real time, and sends the monitoring data to the user interface 2 and the charging pile switching module 5; The user interface 2 is arranged at each charging pile in the charging pile cluster, and provides different input interfaces to the user according to the monitoring data provided by the load monitoring module 1: when the current total power load is lower than the set upper limit, only the normal charging interface is enabled; when the current total power load reaches the set upper limit, only the expedited charging interface is enabled, and the expedited charging request input by the user, including the identity information and the duration of the expedited charging request, is received, and the information is transmitted to the acceptance and review module 3; The acceptance and review module 3 calls the file of the expedited charging user stored in the user file module 4 to determine whether the expedited charging user meets the preset conditions. If so, a switching instruction is sent to the charging pile switching module 5. If not, a message rejecting the expedited charging request is sent to the user interface 2. After receiving the switching instruction from the acceptance and review module 3, the charging pile switching module 5 calls the files of all users who are charging in the current charging pile cluster in the user file module 4, and selects to cut off the power to one of the charging piles according to the preset power-off rule, and starts the power supply to the charging pile where the urgent charging user is located within the urgent charging time required by the urgent charging user; when the urgent charging time is reached, the current urgent charging is ended, and the power supply to the previously powered-off charging pile is restored; and the data of the current urgent charging time of the urgent charging user is transmitted to the user file module 4; during the urgent charging period, when the current total power load is lower than the set upper limit value, the charging pile switching module 5 gives priority to restoring the power supply to the previously powered-off charging pile.

[0010] The user profile module 4 records and accumulates the allowed power-off duration submitted by each user from the user interface 2 , and records and accumulates the expedited charging duration of each expedited charging user from the charging pile switching module 5 .

[0011] Embodiment 2: A charging pile cluster control method, which uses the charging pile cluster control device as described in Embodiment 1, and includes the following steps: A. When the user interface 2 displays the normal charging interface, the charging user can enter identity information and voluntarily choose to enter the allowed power-off duration during this charging process (the charging user can select any value greater than 0 according to the urgency of the charging, so as to allow himself to be powered off to ensure that others can charge quickly; when the allowed power-off duration is selected as 0, it means that during this charging process, it is not allowed to be interrupted by others' urgent charging requests). This information is transmitted to the user profile module 4, and the normal charging process of the charging pile is controlled to be started; When the user interface 2 displays the expedited charging interface, the expedited charging user can input an expedited charging request, including his / her identity information and the duration of the requested expedited charging, and this information is transmitted to the acceptance and review module 3. B. The acceptance and review module 3 calls the file of the expedited charging user stored in the user file module 4, and calculates the difference between the cumulative allowed power-off time provided by the user and the cumulative expedited charging time used. If it is greater than 0, it is determined that the expedited charging user meets the preset conditions, otherwise it is determined that the expedited charging user does not meet the preset conditions; C. The preset power-off rule executed by the charging pile switching module 5 is: calling the power-off duration data voluntarily selected by each user in the charging process from the user profile module 4, selecting the one with the largest value, and powering off the charging pile where the user is located; D. When the power-off time of the disconnected charging pile reaches the allowable power-off time during the current charging process and does not reach the expedited charging time required by the expedited charging user, the charging pile switching module 5 repeats step C, selects another charging pile to disconnect the power, and restores the power supply to the previously disconnected charging pile.

[0012] Embodiment 3: A charging pile cluster control method as described in Embodiment 2, wherein step C further includes: C1. When there are multiple equal maximum values ​​of the allowed power-off duration, the charging pile closest to full charge is selected for powering off.

[0013] Embodiment 4: A charging pile cluster control method as described in Embodiment 2 or 3, wherein step A further comprises: A1. In the expedited charging interface, the expedited charging user is required to pay an additional fee proportional to the required expedited charging time. After the expedited charging user pays the full amount, it is recorded in the user profile module 4 and used to compensate the user whose power was cut off.

[0014] Embodiment 4: A charging pile cluster control method as described in Embodiment 2, 3 or 4, wherein step A further comprises: A2. The user interface 2 calls the user profile module 4 to display the cumulative allowed power outage duration data and the cumulative expedited charging duration data provided by the user.

Claims

1. A charging pile cluster control device, characterized by: It includes a load monitoring module (1), a user interface (2), an acceptance and review module (3), a user profile module (4), and a charging pile switching module (5); The load monitoring module (1) monitors the total power load of the charging pile cluster in real time, and sends the monitoring data to the user interface (2) and the charging pile switching module (5); The user interface (2) is arranged at each charging pile in the charging pile cluster, and provides different input interfaces to the user according to the monitoring data provided by the load monitoring module (1): when the current total power load is lower than the set upper limit value, only the normal charging interface is enabled; When the current total power load reaches the set upper limit, only the expedited charging interface is enabled to receive the expedited charging request input by the user, including the user's identity information and the duration of the requested expedited charging, and transmit this information to the acceptance and review module (3); The acceptance and review module (3) calls the file of the expedited charging user stored in the user file module (4) to determine whether the expedited charging user meets the preset conditions, and if so, sends a switching instruction to the charging pile switching module (5); if not, sends a message rejecting the expedited charging request to the user interface (2); After receiving the switching instruction from the acceptance and review module (3), the charging pile switching module (5) calls the files of all users who are charging in the charging pile cluster in the user file module (4), and selects to cut off the power to one of the charging piles according to the preset power-off rule, and starts to supply power to the charging pile where the urgent charging user is located within the urgent charging time required by the urgent charging user; when the urgent charging time is reached, the current urgent charging is terminated and the power supply to the previously powered-off charging pile is restored; and the data of the current urgent charging time of the urgent charging user is transmitted to the user file module (4); during the urgent charging period, when the current total power load is lower than the set upper limit value, the charging pile switching module (5) gives priority to restoring the power supply to the previously powered-off charging pile.

2. The user profile module (4) records and accumulates the allowed power-off duration submitted by each user from the user interface (2), and records and accumulates the accelerated charging duration of each accelerated charging user from the charging pile switching module (5).

3. A charging pile cluster control method, which uses the charging pile cluster control device as claimed in claim 1 and comprises the following steps: A. When the user interface (2) displays the normal charging interface, the charging user can input identity information and can voluntarily choose to input the power-off duration allowed during the current charging process. This information is transmitted to the user profile module (4) and controls the start of the normal charging process of the charging pile; When the user interface (2) displays the expedited charging interface, the expedited charging user can input an expedited charging request, including his / her identity information and the duration data of the requested expedited charging, and this information is transmitted to the acceptance and review module (3). B. The acceptance and review module (3) calls the file of the expedited charging user stored in the user file module (4) to calculate the difference between the cumulative allowed power-off time provided by the user and the cumulative expedited charging time used. If the difference is greater than 0, it is determined that the expedited charging user meets the preset conditions; otherwise, it is determined that the expedited charging user does not meet the preset conditions; C. The preset power-off rule executed by the charging pile switching module (5) is: calling the data of the power-off duration allowed during the current charging process voluntarily selected by each user who is charging from the user profile module (4), selecting the one with the largest value, and powering off the charging pile where the user is located; D. When the power-off time of the disconnected charging pile reaches the allowable power-off time during the current charging process and does not reach the expedited charging time required by the expedited charging user, the charging pile switching module (5) repeats step C, selects another charging pile to disconnect the power, and restores the power supply to the previously disconnected charging pile.

4. The charging pile cluster control method according to claim 2, wherein step C further comprises: C1. When there are multiple equal maximum values ​​of the allowed power-off duration, the charging pile closest to full charge is selected for powering off.

5. The charging pile cluster control method according to claim 2 or 3, wherein step A further comprises: A1. In the expedited charging interface, the expedited charging user is required to pay an additional fee proportional to the required expedited charging time. After the expedited charging user pays the full amount, it is recorded in the user profile module (4) and used as compensation for the user whose power was cut off.

6. A charging pile cluster control method as claimed in claim 2, 3 or 4, wherein step A further comprises: A2. The user interface (2) calls the user profile module (4) to display the cumulative allowed power outage duration data and the cumulative used expedited charging duration data provided by the user.

Citation Information

Patent Citations

  • Power distribution method and system of electric vehicle charging post

    CN106685034A

  • Charging pile power-on and power-off automatic control system and method

    CN111959335A

  • Charging pile power-on and power-off control system and method

    CN112248869A

  • Electric vehicle charging centralized control system and control method thereof

    CN112356725A

  • Charging pile wireless starting method and system

    CN118219906A