Green building curtain wall structure and construction method thereof

Through the green building curtain wall structure and construction methods, the rapid connection mechanism and intelligent light adjustment technology are used to solve the problems of high energy consumption and waste treatment of building curtain walls, and efficient and environmentally friendly curtain wall installation and energy efficiency optimization are achieved.

CN119266429AInactive Publication Date: 2025-01-07SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411804698.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing building curtain walls have high energy consumption, serious resource consumption, difficulty in disposing of waste during demolition or replacement, and lack effective recycling technology, resulting in waste of resources and environmental pollution.

Method used

Adopt green building curtain wall structure and construction methods, including supporting columns, connecting beams, electric blinds and glass protective covers, rapid installation and deformation absorption through quick plug-in connecting plates, installation chutes and telescopic installation troughs, and equipped with smart sensors and LED lights Group, automatically adjust natural light and artificial lighting.

Benefits of technology

It realizes rapid and safe installation and stable structure, optimizes natural light utilization, reduces energy consumption, reduces noise and deformation, improves the environmental performance and service life of the building, and reduces waste disposal problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266429A_ABST
    Figure CN119266429A_ABST
Patent Text Reader

Abstract

The invention relates to a green building curtain wall structure and a construction method thereof, and relates to the technical field of building curtain walls, the green building curtain wall structure comprises a civil engineering structure, multiple sets of supporting stand columns are connected to one side of the civil engineering structure, and connecting cross beams are arranged on the two sides of the supporting stand columns; a mounting frame structure is formed between every two adjacent supporting stand columns and every two adjacent connecting cross beams, curtain walls are connected between the supporting stand columns and the connecting cross beams, each curtain wall comprises a connecting frame, a glass protective cover and an electric louver, and each electric louver comprises a plurality of curtain wall panels; the components are connected through the quick connecting mechanisms, it is ensured that field installation is simple and quick, heat expansion and cold contraction of an absorbing material and force possibly caused by the outside are reserved through the installing and connecting mechanisms, and therefore the structure of the curtain wall is safer and more stable, indoor temperature and humidity changes and outdoor illumination intensity and angle can be monitored, and the practicability is high. And the opening and closing angle of the curtain wall is automatically adjusted to optimize natural illumination conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building curtain walls, and in particular to a green building curtain wall structure and a construction method thereof. Background Art

[0002] At present, with the development of social economy and the improvement of environmental awareness, green building materials are attracting more and more attention. Traditional building curtain walls are usually composed of aluminum alloy frames and glass, which improve the aesthetics and thermal insulation performance of buildings to a certain extent, but there are problems of high energy consumption and serious resource consumption. In order to achieve sustainable development, more and more research is devoted to the development of new green and environmentally friendly materials and structural designs, aiming to reduce energy consumption and environmental burden.

[0003] Several common improvement measures currently on the market include but are not limited to increasing the thickness of the insulation layer, using low-emissivity coated glass, and introducing a natural ventilation system. However, although these solutions can improve thermal insulation performance, they also face problems such as increased costs and increased construction difficulty. In addition, the disposal of waste generated during the removal or replacement of traditional curtain walls is also an issue that needs to be addressed.

[0004] In summary, although the existing building curtain walls have improved energy efficiency through various means, they still cannot fundamentally overcome the core contradictions such as resource waste and environmental pollution. Especially in terms of recycling, the lack of effective technical and mechanism support has led to a large number of building materials being treated as waste, causing great economic losses and lack of social responsibility.

[0005] Therefore, in view of the above-mentioned related technical problems, a green building curtain wall structure and a construction method thereof are proposed. Summary of the invention

[0006] In order to improve the above problems, the present application provides a green building curtain wall structure and a construction method thereof.

[0007] The present application provides a green building curtain wall structure and a construction method thereof, which adopts the following technical solutions: A green building curtain wall structure, comprising a civil structure, wherein one side of the civil structure is connected to a plurality of groups of supporting columns, both sides of the supporting columns are provided with connecting beams, and an installation frame structure is formed between two adjacent groups of the supporting columns and two groups of connecting beams, and a curtain wall is connected between the supporting columns and the connecting beams; Among them, the curtain wall includes a connecting frame, a glass protective cover and electric blinds, and the electric blinds include multiple groups of curtain wall panels. The glass protective cover and the electric blinds are all connected in the connecting frame, and the electric blinds are arranged on the side of the glass protective cover close to the civil structure, and quick-plug connecting plates are arranged on both sides of the connecting frame; the supporting columns are installed and connected to the civil structure of the green building, and play a major supporting and connecting role, the connecting beams are connected to the supporting columns, and are spliced ​​on the outside of the civil structure through multiple groups of supporting columns and connecting beams to form an installation frame structure, and the curtain wall is connected to each installation frame through the quick-plug connecting plates on both sides of the connecting frame to form a protective structure for the building, and the curtain wall protects the building through the glass protective cover and plays a light-transmitting role, and the opening and closing of the curtain wall light transmission and the degree of light transmission are controlled by the curtain wall panels on the electric blinds.

[0008] Preferably, a column mounting plate is provided on one side of the civil engineering structure close to the supporting column, and a mounting groove is provided on the column mounting plate, and a column mounting angle code is connected between the supporting column and the mounting groove by bolts, a mounting assembly is provided between the supporting column and the connecting beam, and a fixed mounting plate is connected to the bottom of the supporting column close to the civil engineering structure.

[0009] By adopting the above technical solution, the supporting column is installed and connected to the civil structure through the column mounting angle code and the column mounting plate, and the mounting groove on the column mounting plate can make the supporting column faster and more convenient to install and connect, and the mounting groove can absorb a certain amount of thermal expansion and contraction and deformation caused by sliding on the X-axis during the application process, so as to avoid falling off or deformation.

[0010] Preferably, a column noise-proof isolation plate is arranged between the column mounting angle code and the mounting slide groove, a No. 1 telescopic mounting groove is arranged on the side of the column mounting angle code close to the column noise-proof isolation plate, and two groups of No. 2 telescopic mounting grooves are arranged on the side of the column mounting angle code close to the supporting column.

[0011] By adopting the above technical solution, the column mounting angle code is fixedly connected to the mounting groove on the column mounting plate through bolts passing through the column noise-proof isolation plate, and the column noise-proof isolation plate can absorb the noise generated when the supporting column shakes, and the No. 1 telescopic mounting groove and the No. 2 telescopic mounting groove on the column mounting angle code are more convenient for the installation and connection of the bolts, and the No. 1 telescopic mounting groove can absorb the force generated by the deformation on the Z axis, and the No. 2 telescopic mounting groove can absorb the force generated by the deformation on the Y axis.

[0012] Preferably, the installation assembly includes a crossbeam noise-proof isolation plate and a crossbeam mounting angle code, and the two sides of the crossbeam noise-proof isolation plate are respectively fitted with the supporting columns and the crossbeam mounting angle code, and the supporting columns, the connecting crossbeams and the installation assembly are fixedly connected by connecting bolts.

[0013] By adopting the above technical solution, the crossbeam noise-proof isolation plate can generate noise when the crossbeam shakes, and the supporting column is fixedly connected to the supporting column by bolts passing through the crossbeam noise-proof isolation plate and the crossbeam installation angle code.

[0014] Preferably, a connecting slot is provided on the inner side of the supporting column, and a connecting block is inserted between the supporting column and the supporting columns on its upper and lower sides, two groups of mutually symmetrical positioning slide blocks are provided on the inner side of the connecting slot, and two groups of positioning grooves that are interlocked with the positioning slide blocks are provided on the inner side of the connecting block.

[0015] By adopting the above technical solution, two groups of adjacent supporting columns are connected by connecting blocks, and the connecting blocks are fixedly connected to the supporting columns through adjacent beam mounting angle codes and column mounting angle codes and the bolts connected thereto, and the two ends of the connecting blocks are respectively inserted into the connecting slots of the two groups of adjacent supporting columns, and the positioning slider and the positioning groove are used to locate the installation sliding position, thereby facilitating a faster connection.

[0016] Preferably, a mounting sliding groove is provided on the side of the support column away from the civil engineering structure, and two adjacent groups of the quick-plug connecting plates are plugged into the same group of mounting sliding grooves, and the two groups of the quick-plug connecting plates are fixed to the mounting sliding grooves by means of insert block extrusion buckles.

[0017] By adopting the above technical solution, two adjacent groups of curtain walls on the left and right are connected to the same group of curtain walls, and the connecting frame of the curtain wall is inserted into the installation sliding groove of the supporting column through the quick-insertion connecting plates on both sides thereof, and is fixed by the embedded block extrusion buckle after sliding and installing to the specified position.

[0018] Preferably, an LED smart light group is arranged on the side of the curtain wall panel close to the civil engineering structure, a smart sensor is connected to one side of the LED smart light group, and a light sensor is connected to the side of the connecting frame away from the smart sensor.

[0019] By adopting the above technical solution, the intelligent sensor monitors the changes in indoor temperature and humidity, and the electric blinds system automatically adjusts the opening and closing angles of the curtain wall panels based on the monitored data to optimize the natural lighting conditions. The light sensor can detect sufficient light intensity and transmit the signal to the central processor, which then starts the electric blinds to adjust the inclination of the curtain wall panels to allow them to receive as much direct sunlight as possible in order to make full use of solar energy resources. At night or in rainy weather, the system switches to artificial lighting mode. At this time, the motor runs in reverse to completely close the curtain wall and isolate it from the interference of harsh external climate. At the same time, the LED smart light group of the curtain wall panel is used to create a warm and comfortable indoor atmosphere.

[0020] Preferably, the supporting columns, connecting beams and the main body of the curtain wall are all composed of an alloy frame, a thermal insulation filling layer and a self-cleaning coating, and the self-cleaning coating is coated on the outside of the alloy frame, and the thermal insulation filling layer is filled in the alloy frame.

[0021] By adopting the above technical solution, the supporting columns, connecting beams and curtain walls are made of the same material to ensure strength consistency. The alloy frame can be made of -T type aluminum alloy, which has excellent corrosion resistance and mechanical properties. The self-cleaning coating and the internal thermal insulation filling layer are used in combination to achieve the best insulation effect. The cleaning coating can automatically decompose attachments and keep the wall clean.

[0022] Preferably, a construction method of a green building curtain wall structure comprises the following steps: Step 1: First, accurately measure the length of each component according to the pre-set drawing size, mark it, and use professional cutting equipment to cut the raw materials such as supporting columns, connecting beams, and curtain wall connecting frames until they meet the standard specifications; Step 2: Then, install and connect multiple sets of column mounting plates to the civil engineering structure according to the dimensions on the drawing, and install and connect the column mounting angle codes and column noise-proof isolation sheets to the column mounting plates through studs, and then install and connect the supporting columns between the two sets of column mounting angle codes, and fix the supporting columns at the bottom with expansion bolts through their fixed mounting plates; Step 3: Then, connect multiple groups of support columns in sequence through connecting plugs according to the drawing dimensions, and after the frame of the support column is fixed, install the installation assembly on the support column through bolts, and connect the connecting beam to the support column through connecting bolts, beam noise isolation sheets and beam installation angle codes; Step 4: Finally, complete the splicing of the curtain wall according to the drawing dimensions, and arrange the lines required for the curtain wall. Then connect the curtain wall to the frame spliced ​​by the supporting columns and connecting beams through the connecting frame.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Compared with the prior art, the green building curtain wall structure and the construction method thereof are connected by a quick connection mechanism between the components, ensuring that the on-site installation is simple and fast. The supporting columns are installed and connected to the civil structure through the column installation angle code and the column installation plate, and the installation slide groove on the column installation plate enables the supporting columns to be installed and connected faster and more conveniently. The column installation angle code is fixedly connected to the installation slide groove on the column installation plate through bolts passing through the column noise-proof isolation plate, and the No. 1 telescopic installation groove and the No. 2 telescopic installation groove on the column installation angle code are more convenient for the installation and connection of the bolts. The supporting columns are fixedly connected to the crossbeam noise-proof isolation plate and the crossbeam installation angle code through bolts. The two adjacent groups of supporting columns are connected by connecting blocks, and the connecting blocks are fixedly connected to the supporting columns through adjacent beam mounting angle codes and column mounting angle codes and the bolts connected thereto, and the two ends of the connecting blocks are respectively inserted into the connecting slots of the two adjacent groups of supporting columns, and the positioning slider and the positioning slide groove are used to locate the installation sliding position, and facilitate faster connection. The two adjacent groups of curtain walls on the left and right are connected to the same group of curtain walls, and the connecting frame of the curtain wall is inserted into the installation sliding groove of the supporting column through the quick-insertion connecting plates on both sides thereof, and is fixed by the embedded block extrusion buckle after sliding and installing to the specified position.

[0024] 2. Compared with the prior art, the green building curtain wall structure and the construction method thereof, through the installation and connection mechanism, have the ability to absorb the thermal expansion and contraction of the material and the forces that may be caused by the outside, thereby making the curtain wall structure safer and more stable. The installation slide groove can absorb certain thermal expansion and contraction and deformation caused by sliding on the X-axis during the application process to avoid falling off or deformation. The No. 1 telescopic installation groove can absorb the force caused by the deformation on the Z-axis, and the No. 2 telescopic installation groove can absorb the force caused by the deformation on the Y-axis.

[0025] 3. Compared with the prior art, the green building curtain wall structure and its construction method can monitor the changes in indoor temperature and humidity, as well as the outdoor light intensity and angle, and automatically adjust the opening and closing angle of the curtain wall to optimize the natural light conditions. The intelligent sensor monitors the changes in indoor temperature and humidity, and the electric blinds system automatically adjusts the opening and closing angle of the curtain wall panel based on the monitored data to optimize the natural light conditions. The light sensor can detect sufficient light intensity and transmit the signal to the central processor, which then starts the electric blinds to adjust the inclination of the curtain wall panel so that it can receive as much direct sunlight as possible to make full use of solar energy resources. At night or in rainy weather, the system switches to artificial lighting mode. At this time, the motor runs in reverse to completely close the curtain wall and isolate it from the interference of harsh external climate. At the same time, the LED smart light group of the curtain wall panel is used to create a warm and comfortable indoor atmosphere. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural diagram of the main side of this application; Figure 2 A schematic diagram of the structure of the front side of the main body of this application; Figure 3 This is a schematic diagram of the structure of the corner bracket for installing the column of this application; Figure 4 This is a schematic diagram of the structure of the installation components of this application; Figure 5 This is a schematic diagram of the structure of the connection plug of the present application; Figure 6 This is a schematic diagram of the structure of the front side of the curtain wall of this application; Figure 7 This is a schematic diagram of the structure on the back of the curtain wall of this application; Figure 8 This is a schematic diagram of the structure of the curtain wall side of this application; Fig. 9 This is a structural diagram of the quick-plug connection plate of the present application; Fig.10 This is a schematic diagram of the structure of the curtain wall panel of this application; Fig.11 This is a schematic structural diagram of the cross section of the support column of the present application; Fig.12 This is a schematic structural diagram of a cross section of a curtain wall panel of the present application.

[0027] The accompanying drawings are marked as follows: 1. Civil structure; 11. Column mounting plate; 111. Mounting slide; 2. Support column; 21. Column mounting angle code; 211. Telescopic mounting slot No. 1; 212. Telescopic mounting slot No. 2; 22. Mounting assembly; 221. Crossbeam noise isolation plate; 222. Crossbeam mounting angle code; 23. Connecting plug block; 231. Positioning slide; 24. Fixed mounting plate; 25. Mounting slide slot; 26. Connecting slot; 261. Positioning slider; 27. Self-cleaning coating; 28. Alloy frame; 29. ​​Insulation filling layer; 3. Connecting beam; 4. Curtain wall; 41. Connecting frame; 411. Quick-plug connecting plate; 42. Glass protective cover; 43. Light sensor; 44. Smart sensor; 45. Electric blinds; 451. Curtain wall panel; 452. LED smart light group. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0029] Example 1 The following is combined with Figure 1-Figure 12 , further details of this application are given.

[0030] A green building curtain wall structure, referring to Figure 1 and Figure 7 as well as Figure 8 , comprising a civil structure 1, a plurality of groups of supporting columns 2 are connected to one side of the civil structure 1, connecting beams 3 are arranged on both sides of the supporting columns 2, and an installation frame structure is formed between two adjacent groups of supporting columns 2 and two groups of connecting beams 3, and a curtain wall 4 is connected between the supporting columns 2 and the connecting beams 3; Among them, the curtain wall 4 includes a connecting frame 41, a glass protective cover 42 and an electric blind 45, and the electric blind 45 includes a plurality of curtain wall panels 451, the glass protective cover 42 and the electric blind 45 are both connected in the connecting frame 41, and the electric blind 45 is arranged on the side of the glass protective cover 42 close to the civil structure 1, and quick-plug connecting plates 411 are arranged on both sides of the connecting frame 41; the supporting columns 2 are installed and connected to the civil structure 1 of the green building, and play a major supporting and connecting role, the connecting beams 3 are connected to the supporting columns 2, and are spliced ​​on the outside of the civil structure 1 through a plurality of groups of supporting columns 2 and connecting beams 3 to form an installation frame structure, and the curtain wall 4 is connected to each installation frame through the quick-plug connecting plates 411 on both sides of the connecting frame 41 to form a protective structure for the building, and the curtain wall 4 protects the building through the glass protective cover 42 and plays a light-transmitting role, and the opening and closing of the light-transmitting curtain wall 4 and the degree of light-transmitting are controlled by the curtain wall panels 451 on the electric blind 45.

[0031] Reference Figure 1 and Figure 2 A column mounting plate 11 is provided on one side of the civil engineering structure 1 close to the supporting column 2, and a mounting groove 111 is provided on the column mounting plate 11, and a column mounting angle code 21 is connected between the supporting column 2 and the mounting groove 111 by bolts, a mounting assembly 22 is provided between the supporting column 2 and the connecting beam 3, and a fixed mounting plate 24 is connected to the bottom of the side of the supporting column 2 close to the civil engineering structure 1; the supporting column 2 is installed and connected to the civil engineering structure 1 through the column mounting angle code 21 and the column mounting plate 11, and the mounting groove 111 on the column mounting plate 11 can make the supporting column 2 be installed and connected faster and more conveniently, and the mounting groove 111 can absorb a certain amount of thermal expansion and contraction and deformation caused by sliding on the X-axis during use to avoid falling off or deformation.

[0032] Reference Figure 3A column noise-proofing isolation plate 12 is arranged between the column mounting angle code 21 and the mounting groove 111, a No. 1 telescopic mounting groove 211 is arranged on the side of the column mounting angle code 21 close to the column noise-proofing isolation plate 12, and two groups of No. 2 telescopic mounting grooves 212 are arranged on the side of the column mounting angle code 21 close to the supporting column 2; the column mounting angle code 21 is fixedly connected with the mounting groove 111 on the column mounting plate 11 by bolts passing through the column noise-proofing isolation plate 12, and the column noise-proofing isolation plate 12 can absorb the noise generated when the supporting column 2 shakes, and the No. 1 telescopic mounting groove 211 and the No. 2 telescopic mounting groove 212 on the column mounting angle code 21 are more convenient for the installation and connection of the bolts, and the No. 1 telescopic mounting groove 211 can absorb the force generated by the deformation on the Z axis, and the No. 2 telescopic mounting groove 212 can absorb the force generated by the deformation on the Y axis.

[0033] Reference Figure 4 The installation component 22 includes a crossbeam noise-proof isolation piece 221 and a crossbeam installation angle code 222, and the two sides of the crossbeam noise-proof isolation piece 221 are respectively fitted with the supporting column 2 and the crossbeam installation angle code 222, and the supporting column 2 and the connecting crossbeam 3 and the installation component 22 are fixedly connected by connecting bolts; the crossbeam noise-proof isolation piece 221 can absorb the noise generated when the connecting crossbeam 3 shakes, and the column noise-proof isolation piece 12 and the crossbeam noise-proof isolation piece 221 are both metal sound insulation boards made of iron, aluminum or steel and other materials, which have the characteristics of high strength, high toughness and long life, and can reduce the vibration transmission at the connection, thereby reducing the propagation of noise, and the supporting column 2 is fixedly connected to the supporting column 2 by bolts passing through the crossbeam noise-proof isolation piece 221 and the crossbeam installation angle code 222.

[0034] Reference Figure 5 A connecting slot 26 is provided on the inner side of the supporting column 2, and a connecting block 23 is inserted between the supporting column 2 and the supporting columns 2 on its upper and lower sides. Two groups of mutually symmetrical positioning sliders 261 are provided on the inner side of the connecting slot 26, and two groups of positioning grooves 231 that are mutually engaged with the positioning sliders 261 are provided on the inner side of the connecting block 23; two groups of adjacent supporting columns 2 are plugged and connected through the connecting block 23, and the connecting block 23 is fixedly connected to the supporting column 2 through the adjacent crossbeam mounting angle code 222 and the column mounting angle code 21 and the bolts connected thereto, and the two ends of the connecting block 23 are respectively inserted into the connecting slots 26 of the two groups of adjacent supporting columns 2, and the positioning slider 261 and the positioning groove 231 are used to locate the installation sliding position, and facilitate faster connection.

[0035] Reference Fig. 9A mounting sliding groove 25 is provided on the side of the supporting column 2 away from the civil structure 1, and the two adjacent groups of quick-plug connecting plates 411 are plugged into the same group of mounting sliding grooves 25, and the two groups of quick-plug connecting plates 411 are fixed to the mounting sliding grooves 25 by means of embedded blocks, extrusion buckles; the two adjacent groups of curtain walls 4 on the left and right are connected to the same group of supporting columns 2, and the connecting frames 41 of the curtain walls 4 are plugged into the mounting sliding grooves 25 of the supporting columns 2 through the quick-plug connecting plates 411 on both sides thereof, and are fixed by means of embedded blocks, extrusion buckles after sliding and installing to the designated position.

[0036] Reference Figure 6 and Figure 7 A LED smart light group 452 is arranged on the side of the curtain wall panel 451 close to the civil structure 1, a smart sensor 44 is connected to one side of the LED smart light group 452, and a light sensor 43 is connected to the side of the connecting frame 41 away from the smart sensor 44; the smart sensor 44 monitors the changes in indoor temperature and humidity, and the system of the electric blinds 45 automatically adjusts the opening and closing angle of the curtain wall panel 451 through the monitored data to optimize the natural lighting conditions, and the light sensor 43 can detect sufficient light intensity and transmit the signal to the central processor, which then starts the electric blinds 45 to adjust the inclination of the curtain wall panel 451 so that it receives as much direct sunlight as possible to make full use of solar energy resources. At night or in rainy weather, the system switches to artificial lighting mode. At this time, the motor runs in reverse to completely close the curtain wall and isolate it from the interference of bad weather outside. At the same time, a warm and comfortable indoor atmosphere is created with the help of the LED smart light group 452 of the curtain wall panel 451.

[0037] Reference Fig.11 and Fig.12 The main bodies of the supporting columns 2, the connecting beams 3 and the curtain wall 4 are all composed of an alloy frame 28, a thermal insulation filling layer 29 and a self-cleaning coating 27. The self-cleaning coating 27 adopts fluorocarbon nano-coatings, and the self-cleaning coating 27 is coated on the outside of the alloy frame 28, and the thermal insulation filling layer 29 is filled in the alloy frame 28; the thermal insulation filling layer 29 is made of polyurethane foam material, which has good thermal insulation and sound insulation properties. The supporting columns 2, the connecting beams 3 and the curtain wall 4 are made of the same material to ensure strength consistency. The alloy frame 28 can be made of 6063-T5 aluminum alloy, which has excellent corrosion resistance and mechanical properties. The self-cleaning coating 27 and the internal thermal insulation filling layer 29 are used in combination to achieve the best insulation effect. The self-cleaning coating 27 can automatically decompose attachments and keep the wall clean.

[0038] As a preferred embodiment, a construction method of a green building curtain wall structure comprises the following steps: Step 1: First, accurately measure the length of each component according to the pre-set drawing size, mark it, and use professional cutting equipment to cut the raw materials such as the supporting columns 2, connecting beams 3, and connecting frames 41 of the curtain wall 4 until they meet the standard specifications; Step 2: Then, multiple sets of column mounting plates 11 are installed and connected to the civil engineering structure 1 according to the dimensions of the drawing, and the column mounting angle codes 21 and the column noise isolation plates 12 are installed and connected to the column mounting plates 11 through studs, and then the supporting columns 2 are installed and connected between the two sets of column mounting angle codes 21, and the supporting columns 2 at the bottom are fixed and connected through their fixed mounting plates 24 with expansion bolts; Step 3: Then, multiple groups of support columns 2 are connected in sequence through the connecting plugs 23 according to the drawing dimensions, and after the frame of the support column 2 is fixed, the installation assembly 22 is installed and connected to the support column 2 by bolts, and the connecting beam 3 is connected to the support column 2 by connecting bolts and the beam anti-noise isolation sheet 221 and the beam installation angle code 222; Step 4: Finally, the curtain wall 4 is spliced ​​according to the drawing dimensions, and the lines required for the curtain wall 4 are arranged. Then, the curtain wall 4 is connected to the frame spliced ​​by the supporting columns 2 and the connecting beams 3 through the connecting frame 41.

[0039] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A green building curtain wall structure, comprising a civil engineering structure (1), characterized in that: A plurality of groups of supporting columns (2) are connected to one side of the civil engineering structure (1), connecting beams (3) are arranged on both sides of the supporting columns (2), and an installation frame structure is formed between two adjacent groups of supporting columns (2) and two groups of connecting beams (3), and a curtain wall (4) is connected between the supporting columns (2) and the connecting beams (3); The curtain wall (4) comprises a connection frame (41), a glass protection cover (42) and an electric blind (45), and the electric blind (45) comprises a plurality of sets of curtain wall panels (451). The glass protection cover (42) and the electric blind (45) are both connected in the connection frame (41), and the electric blind (45) is arranged on a side of the glass protection cover (42) close to the civil structure (1), and quick-connection plates (411) are arranged on both sides of the connection frame (41).

2. A green building curtain wall structure according to claim 1, characterized in that: A column mounting plate (11) is provided on a side of the civil engineering structure (1) close to the supporting column (2), and a mounting slot (111) is provided on the column mounting plate (11), and a column mounting angle code (21) is connected between the supporting column (2) and the mounting slot (111) by bolts, a mounting assembly (22) is provided between the supporting column (2) and the connecting crossbeam (3), and a fixed mounting plate (24) is connected to the bottom of the side of the supporting column (2) close to the civil engineering structure (1).

3. A green building curtain wall structure according to claim 2, characterized in that: A column noise-proof isolation plate (12) is arranged between the column installation angle code (21) and the installation slide groove (111); a first telescopic installation groove (211) is arranged on a side of the column installation angle code (21) close to the column noise-proof isolation plate (12); and two groups of second telescopic installation grooves (212) are arranged on a side of the column installation angle code (21) close to the supporting column (2).

4. A green building curtain wall structure according to claim 2, characterized in that: The mounting assembly (22) comprises a crossbeam noise-proof isolation sheet (221) and a crossbeam mounting angle code (222), and two sides of the crossbeam noise-proof isolation sheet (221) are respectively fitted with the supporting column (2) and the crossbeam mounting angle code (222), and the supporting column (2) and the connecting crossbeam (3) as well as the mounting assembly (22) are fixedly connected by connecting bolts.

5. The green building curtain wall structure according to claim 1, characterized in that: A connecting slot (26) is provided on the inner side of the supporting column (2), and a connecting plug block (23) is inserted between the supporting column (2) and the supporting columns (2) on the upper and lower sides thereof, two groups of mutually symmetrical positioning slide blocks (261) are provided on the inner side of the connecting slot (26), and two groups of positioning slide grooves (231) that are mutually engaged with the positioning slide blocks (261) are provided on the inner side of the connecting plug block (23).

6. A green building curtain wall structure according to claim 1, characterized in that: A mounting sliding groove (25) is provided on a side of the support column (2) away from the civil engineering structure (1), and two adjacent groups of quick-plug connection plates (411) are plugged into the same group of mounting sliding grooves (25), and the two groups of quick-plug connection plates (411) are fixed to the mounting sliding grooves (25) by means of an insert block extrusion buckle.

7. A green building curtain wall structure according to claim 1, characterized in that: An LED smart light group (452) is provided on a side of the curtain wall panel (451) close to the civil structure (1), a smart sensor (44) is connected to one side of the LED smart light group (452), and a light sensor (43) is connected to a side of the connection frame (41) away from the smart sensor (44).

8. The green building curtain wall structure according to claim 1, characterized in that: The main bodies of the supporting columns (2), the connecting beams (3) and the curtain wall (4) are all composed of an alloy frame (28), a thermal insulation filling layer (29) and a self-cleaning coating (27), wherein the self-cleaning coating (27) is coated on the outside of the alloy frame (28) and the thermal insulation filling layer (29) is filled inside the alloy frame (28).

9. A construction method of a green building curtain wall structure, using a green building curtain wall structure according to any one of claims 1 to 8, characterized in that: The construction method comprises the following steps: Step 1: First, accurately measure the length of each component according to the pre-set drawing size, mark it, and use professional cutting equipment to cut the raw materials such as the supporting columns (2) and connecting beams (3) and the connecting frame (41) of the curtain wall (4) until they meet the standard specifications; Step 2: Then, multiple sets of column mounting plates (11) are installed and connected to the civil engineering structure (1) according to the dimensions on the drawing, and column mounting angle brackets (21) and column noise isolation plates (12) are installed and connected to the column mounting plates (11) through studs, and then the supporting columns (2) are installed and connected between the two sets of column mounting angle brackets (21), and the supporting columns (2) at the bottom are fixed and connected through their fixed mounting plates (24) with expansion bolts; Step 3: Then, multiple groups of support columns (2) are connected in sequence through connecting plugs (23) according to the dimensions on the drawing, and after the frame of the support column (2) is fixed, the installation assembly (22) is installed and connected to the support column (2) through bolts, and the connecting beam (3) is connected to the support column (2) through connecting bolts and beam anti-noise isolation sheets (221) and beam installation angle brackets (222); Step 4: Finally, the curtain wall (4) is assembled according to the dimensions on the drawing, and the lines required for the curtain wall (4) are arranged. Then, the curtain wall (4) is connected to the frame assembled by the supporting columns (2) and the connecting beams (3) through the connecting frame (41).

Citation Information

Patent Citations

  • Quickly-assembled wallboard for operating room

    CN208815833U

  • Curtain wall capable of automatically adjusting light change

    CN210767420U

  • Welding-free curtain wall post-burying switching system

    CN219175487U

  • Stone curtain wall mounting and connecting device

    CN220058462U

  • Panel connecting member and panel connecting structure using it

    JP2001317139A