Prefabricated building primary and secondary beam connecting structure and construction technology

By designing positioning and locking mechanisms, using components such as rectangular frames and elastic parts, the problems of low installation efficiency and height drop of the existing primary and secondary beam connecting structures are solved, and convenient installation and high-firmity primary and secondary beam connecting structures of prefabricated buildings are realized. .

CN119288087AInactive Publication Date: 2025-01-10HENAN ZHENGCHUAN CONSTR ENG CO LTD

Patent Information

Application Number
CN202411847003.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing primary and secondary beam connection structures are inefficient during installation, require multiple welding and adjustments, and need to be polished during removal, resulting in inconvenient installation and height drop problems.

Method used

A prefabricated building primary and secondary beam connecting structure including positioning mechanism and locking mechanism is designed. Through components such as rectangular frames, rectangular frames, support plates, elastic parts and locking pins, the main and secondary beams are easily installed and disassembled, and the main and secondary beams are used. Elastic wedge blocks and curved plates improve connection firmness.

Benefits of technology

It improves the installation efficiency of primary and secondary beams, reduces manual adjustment and reaming, enhances the firmness of the connection, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119288087A_ABST
    Figure CN119288087A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to an assembly type building primary and secondary beam connecting structure and a construction technology. According to the technical scheme, the device comprises a main beam, a secondary beam is arranged on one side of the main beam, the device further comprises a positioning mechanism, the positioning mechanism comprises a rectangular frame, the outer wall of the main beam is fixedly connected with the rectangular frame, a rectangular frame is slidably connected into the rectangular frame, a bearing plate is slidably connected into the rectangular frame, and an elastic piece A is arranged between the bearing plate and the rectangular frame. According to the invention, through the design of the positioning mechanism, when two adjacent main beams are staggered, the secondary beam is more convenient to mount by moving the position of the rectangular frame, and through the design of the locking mechanism, when the two adjacent main beams have a height difference, the secondary beam is more convenient to mount by rotating the connecting plate C; and the lock pin A can be conveniently inserted into the through holes A of the fixing plate, the connecting plate A, the connecting plate B and the connecting plate C without reaming or other treatment on the insertion holes of the secondary beam, so that the working efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to a primary and secondary beam connection structure of an assembled building and a construction process. Background Art

[0002] The connection between main and secondary beams is a structural connection method for a building. The rigidity and stability of the beam are crucial to the safety and stability of the building. By connecting the main beam with the beam, the overall structure can be made more stable and meet the use requirements of the building.

[0003] When installing the existing main and secondary beam connection structure, it is necessary to transport a variety of prefabricated parts to the construction site, and then the workers connect the prefabricated parts to the main beam or secondary beam by welding or other means, and then connect the main beam to the secondary beam, which is time-consuming and labor-intensive. In addition, when the prefabricated parts need to be dismantled, they can only be dismantled by force. When they need to be used again, they must be processed again by grinding and polishing to ensure the connection performance of the prefabricated parts. The efficiency is low. There is a slight height difference between the main and secondary beams, which results in the need to use a crowbar to continuously pry the secondary beam to adjust the position when installing bolts, or to expand the bolt holes of the secondary beam, which is extremely inconvenient. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides a prefabricated building main and secondary beam connection structure.

[0005] The technical solution is: a prefabricated building main and secondary beam connection structure, including a main beam, a secondary beam is arranged on one side of the main beam, and also includes a positioning mechanism, the positioning mechanism includes a rectangular frame, the outer wall of the main beam is fixedly connected to the rectangular frame, a rectangular frame is slidably connected in the rectangular frame, a supporting plate is slidably connected in the rectangular frame, an elastic member A is arranged between the supporting plate and the rectangular frame, the supporting plate is used in conjunction with the secondary beam, a fixing plate is fixedly connected to the top of the rectangular frame, the fixing plate is slidably connected to the rectangular frame, and also includes a locking mechanism, the locking mechanism includes A connecting plate A, a guide groove is provided at the top of the rectangular frame, a sliding shaft is slidably connected in the guide groove, the bottom end of the sliding shaft is rotatably connected to the connecting plate A, a connecting plate B is symmetrically slidably connected in the rectangular frame, one side of the connecting plate A and the connecting plate B are hinged with a connecting plate C, and an elastic member B is respectively provided between the connecting plate C and the connecting plate A and the connecting plate B, two groups of locking pins A are provided in the rectangular frame, and through holes A used in conjunction with the locking pins A are symmetrically provided on the fixed plate, the connecting plate A, the connecting plate B and the connecting plate C.

[0006] As a further preferred scheme, the positioning mechanism also includes a locking pin B, a plurality of evenly distributed locking holes are provided at the bottom of the inner wall of the rectangular frame, the locking pin B used in conjunction with the plurality of locking holes is fixedly connected to the bottom of the supporting plate, a sliding frame is slidably connected to the bottom of the supporting plate, an elastic wedge block A is symmetrically slidably connected in the sliding frame, a special-shaped groove is symmetrically provided through the rectangular frame, a slider is slidably connected in the special-shaped groove, a card groove used in conjunction with the elastic wedge block A is provided on one side of the slider, an elastic member C is arranged between the slider and the special-shaped groove, one end of the vertical axis is fixedly connected to the top of the slider, the other end of the vertical axis slides through the rectangular frame and is fixedly connected to a sleeve, the bottom of the connecting plate A is fixedly connected to a guide column, the sleeve is sleeved on the outer wall of the guide column, the outer wall of the guide column is provided with a spiral groove, and the inner wall of the sleeve is fixedly connected to a guide block used in conjunction with the spiral groove.

[0007] As a further preferred embodiment, the locking mechanism also includes a connecting plate A, which is arranged on one side of the connecting plate B on the left side, and the connecting plate B is hinged to one side of the connecting plate A, and an elastic member D is arranged between the connecting plate A and the connecting plate B, a group of locking pins A on the rear side is fixedly connected to one side of the connecting plate A, and a group of locking pins A on the front side is rotatably connected to one side of the connecting plate B, and an elastic member E is arranged between the connecting plate A and the connecting plate B on the left side.

[0008] As a further preferred embodiment, the locking mechanism also includes a locking block A, which is fixedly connected to one side of the connecting plate A, and a locking pin C is slidably connected to one side of the left connecting plate B, and a through hole B for use with the locking pin C is opened on the top of the locking block A.

[0009] As a further preferred scheme, it also includes a reinforcement mechanism, which includes a sliding rod, and the sliding rod is slidably connected to one side of the right connecting plate B, an elastic member F is arranged between the sliding rod and the right connecting plate B, a locking block B is fixedly connected to one side of the sliding rod, and an installation box is fixedly connected to one side of the right connecting plate B, an elastic wedge block B used in conjunction with the locking block B is slidably connected in the installation box, one side of the elastic wedge block B is fixedly connected to a connecting shaft, a vertical groove is penetrated on one side of the installation box, one end of the connecting shaft slides through the vertical groove and is fixedly connected to a pressing block.

[0010] As a further preferred scheme, the reinforcement mechanism also includes an E-shaped frame, and the E-shaped frame is slidably connected to one side of the right connecting plate C, and two groups of inclined grooves are symmetrically provided on one side of the E-shaped frame, and two groups of arc blocks are symmetrically slidably connected to one side of the right connecting plate C, and a sliding shaft is fixedly connected to one side of the arc block, and the sliding shaft is inserted into the inclined groove and slides therein, and an annular groove is provided on the outer wall of a group of locking pins A on the front side for use with the arc block, and a locking pin D is inserted through one side of the E-shaped frame, and a limiting plate is fixedly connected to the other side of the right connecting plate C, and a through hole C is provided on the limiting plate for use with the locking pin D.

[0011] As a further preferred scheme, the reinforcement mechanism also includes a gear A, the gear A is fixedly connected to one side of the sliding rod, an L-shaped plate is symmetrically fixedly connected to one side of the right connecting plate C, a group of locking pins A on the front side are slidably connected to the L-shaped plate, one side of the L-shaped plate is rotatably connected to a gear B meshing with the gear A, the inner wall of the gear B is symmetrically fixed with a protrusion, and one end of the group of locking pins A on the front side is symmetrically provided with a rectangular groove used in conjunction with the protrusion.

[0012] As a further preferred embodiment, the reinforcement mechanism also includes a protruding block, one side of the arc block is fixedly connected to the protruding block, and the inner walls of the annular grooves of a group of the locking pins A on the front side are symmetrically fixedly connected to arc plates used in conjunction with the protruding block.

[0013] As a further preferred solution, a guide plate is also included, the bottom of the supporting plate is fixedly connected to the guide plate, a pull rod is slidably connected through the guide plate, the pull rod is fixedly connected to the sliding frame, and an elastic member G is provided between the sliding frame and the guide plate.

[0014] As a further preferred solution, a construction process of a prefabricated building primary and secondary beam connection structure includes the following steps: S1: The staff pushes the rectangular frame to slide in the rectangular frame, so that the fixed plate and the web of the secondary beam are on the same vertical plane, and the secondary beam is placed on the supporting plate, so that the connecting plate A drives the connecting plate C to rotate and fit with both sides of the fixed plate and both sides of the web of the secondary beam; S2: Push the connecting plate B through the handle on one side of the connecting plate B, and drive the connecting plate B to rotate, so that the other set of locking pins A are aligned with the two insertion holes of the secondary beam; S3: Slide the slide bar horizontally forward to make the gear A mesh with the gear B, and make the elastic wedge block B limit the lock block B so that the gear A remains meshed with the gear B, and push the E-shaped frame horizontally backward to make the two adjacent arc blocks snap into the annular grooves corresponding to the lock pin A; S4: When the secondary beam is slightly twisted, the arc-shaped plate is squeezed by the adjacent protruding block to improve the firmness between the main beam and the secondary beam.

[0015] The present invention has the following advantages: 1. The present invention, through the design of the positioning mechanism, can make the secondary beam easier to install by moving the position of the rectangular frame when two adjacent main beams are misaligned. Through the design of the locking mechanism, when there is a height difference between the two adjacent main beams, the locking pin A can be easily inserted into the through hole A of the fixing plate, the connecting plate A, the connecting plate B and the connecting plate C by rotating the connecting plate C. There is no need to expand the hole of the secondary beam or perform other processing, which effectively improves the work efficiency.

[0016] 2. The present invention, through the design of the elastic wedge block A and the slider, can drive the slider to move through the elastic wedge block A when installing the secondary beam, so that the two connecting plates A can be rotated close to each other and the secondary beam can be initially fixed without manual adjustment by the staff, thereby further improving the work efficiency. Through the design of the arc plate and the protruding block, when the height difference between two adjacent main beams increases, the firmness between the main beam and the secondary beam can be further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a structural schematic diagram of the positioning mechanism of the present invention; Figure 3 This is a schematic diagram of the installation of the lock pin B of the present invention; Figure 4 This is a schematic diagram of the installation of the elastic wedge block A of the present invention; Figure 5 It is a structural schematic diagram of the locking mechanism of the present invention; Figure 6 It is a structural schematic diagram of the reinforcement mechanism of the present invention; Figure 7 This is a schematic diagram of the installation of the elastic wedge block B of the present invention; Figure 8 This is a schematic diagram of the installation of the protruding block of the present invention; Fig. 9 It is a schematic diagram of the installation of the curved plate of the present invention; Fig.10 This is a schematic diagram of the installation of the gear B of the present invention; Fig.11 It is a schematic diagram of the installation of the pull rod of the present invention.

[0018] Among them: 1-main beam, 101-secondary beam, 201-rectangular frame, 202-rectangular frame, 203-supporting plate, 204-fixed plate, 205-connecting plate A, 206-connecting plate B, 207-connecting plate C, 208-locking pin A, 301-locking pin B, 302-sliding frame, 303-elastic wedge block A, 304-sliding block, 305-sleeve, 306-guide column, 401-connecting plate A, 402 -Connecting plate B, 501-locking block A, 502-locking pin C, 601-sliding rod, 602-locking block B, 603-installing box, 604-elastic wedge block B, 605-pressing block, 701-E-shaped frame, 702-arc block, 703-locking pin D, 704-gear A, 705-L-shaped plate, 706-gear B, 801-protruding block, 802-arc plate, 901-guide plate, 902-pull rod. DETAILED DESCRIPTION

[0019] The present invention is further described below in conjunction with specific embodiments. It should also be noted that, unless otherwise clearly specified and limited, terms such as: setting, installing, connecting, and connecting should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. Example 1

[0020] A prefabricated building main and secondary beam connection structure, such as Figure 1-Figure 3As shown, it includes a main beam 1, a secondary beam 101 is arranged on one side of the main beam 1, and also includes a positioning mechanism, the positioning mechanism includes a rectangular frame 201, the outer wall of the main beam 1 is fixedly connected to the rectangular frame 201, a rectangular frame 202 is horizontally slidably connected in the rectangular frame 201, a supporting plate 203 is vertically slidably connected in the rectangular frame 202, an elastic member A is arranged between the supporting plate 203 and the rectangular frame 202, the elastic member A is a compression spring, the supporting plate 203 is used in conjunction with the secondary beam 101, a fixing plate 204 is fixedly connected to the top of the rectangular frame 202, the fixing plate 204 is slidably connected to the rectangular frame 201, and also includes a locking mechanism, the locking mechanism includes a connecting plate A205, a guide groove is opened in the top of the rectangular frame 201, and the sliding plate 204 in the guide groove is connected to the connecting plate 205. A sliding shaft is movably connected, and a connecting plate A205 is rotatably connected to the bottom end of the sliding shaft. A connecting plate B206 is symmetrically and horizontally slidably connected in the rectangular frame 201. A connecting plate C207 is hinged on one side of the connecting plate A205 and the connecting plate B206. An elastic member B is provided between the connecting plate C207 and the connecting plate A205 and the connecting plate B206 respectively. The elastic member B is a torsion spring. Two groups of locking pins A208 are provided in the rectangular frame 201, and each group has two. Through holes A used in conjunction with the locking pins A208 are symmetrically opened on the fixed plate 204, the connecting plate A205, the connecting plate B206 and the connecting plate C207. A jack used in conjunction with the locking pins A208 is symmetrically opened on one side of the web of the secondary beam 101.

[0021] like Figure 3-Figure 4 As shown, the positioning mechanism also includes a locking pin B301. Five evenly distributed locking holes are opened at the bottom of the inner wall of the rectangular frame 201. The bottom of the supporting plate 203 is fixed with a locking pin B301 used in conjunction with the five locking holes. The locking pin B301 is inserted into the locking hole and can limit the rectangular frame 202 through the supporting plate 203. The bottom of the supporting plate 203 is horizontally slidably connected to the sliding frame 302. The sliding frame 302 is symmetrically slidably connected with an elastic wedge block A303. The rectangular frame 202 is symmetrically opened with special-shaped grooves, and the special-shaped grooves are slidably connected with a slider 304. A slot for use with an elastic wedge block A303 is provided on one side of the slider 304 close to the sliding frame 302, an elastic member C is provided between the slider 304 and the special-shaped slot, the elastic member C is a tension spring, one end of a vertical axis is fixedly connected to the top of the slider 304, the other end of the vertical axis slides through the rectangular frame 202, and is fixedly connected to a sleeve 305, a guide column 306 is fixedly connected to the bottom of the connecting plate A205, the sleeve 305 is sleeved on the outer wall of the guide column 306, a spiral groove is provided on the outer wall of the guide column 306, and a guide block for use with the spiral groove is fixedly connected to the inner wall of the sleeve 305.

[0022] like Figure 5As shown, the locking mechanism also includes a connecting plate A401, a connecting plate A401 is arranged on one side of the left connecting plate B206, a connecting plate B402 is hinged on the front side of the connecting plate A401, an elastic member D is arranged between the connecting plate A401 and the connecting plate B402, the elastic member D is a torsion spring, two locking pins A208 on the rear side are fixedly connected to the right side of the connecting plate A401, and two locking pins A208 on the front side are rotatably connected to the right side of the connecting plate B402, an elastic member E is arranged between the connecting plate A401 and the left connecting plate B206, and the elastic member E is a reset spring.

[0023] like Figure 5 As shown, the locking mechanism also includes a locking block A501, one side of the connecting plate A401 is fixedly connected with the locking block A501, one side of the left connecting plate B206 is vertically slidably connected with a locking pin C502, and the top of the locking block A501 is provided with a through hole B for use with the locking pin C502. The locking pin C502 is inserted into the through hole B of the locking block A501, so as to limit the connecting plate A401.

[0024] like Figure 6-Figure 7 As shown, a reinforcement mechanism is also included, which includes a slide bar 601. The right side of the right connecting plate B206 is horizontally slidably connected to the slide bar 601. An elastic member F is arranged between the slide bar 601 and the right connecting plate B206. The elastic member F is a tension spring. A locking block B602 is fixedly connected to the front bottom of the slide bar 601. The right side of the right connecting plate B206 is fixedly connected to an installation box 603. An elastic wedge block B604 used in conjunction with the locking block B602 is vertically slidably connected in the installation box 603. A connecting shaft is fixedly connected to the right side of the elastic wedge block B604. A vertical groove is penetrated on one side of the installation box 603. One end of the connecting shaft slides through the vertical groove and is fixedly connected to a pressing block 605.

[0025] like Figure 6 , Figure 8-Figure 10 As shown, the reinforcement mechanism also includes an E-shaped frame 701, the right side of the right connecting plate C207 is slidably connected to the E-shaped frame 701, the left side of the E-shaped frame 701 is symmetrically provided with two groups of inclined grooves, each group is two, the right side of the right connecting plate C207 is symmetrically provided with two groups of arc blocks 702, each group is two, and when the two arc blocks 702 are fitted together, a complete circular ring can be formed, a sliding shaft is fixedly connected to the right side of the arc block 702, the sliding shaft is inserted into the corresponding inclined groove and slides therein, the outer walls of the two locking pins A208 on the front side are provided with annular grooves for use with the arc blocks 702, the left side of the E-shaped frame 701 is through-inserted with a locking pin D703, the front side of the right connecting plate C207 is fixedly connected to a limiting plate, and the limiting plate is provided with a through hole C for use with the locking pin D703.

[0026] like Figure 6As shown, the reinforcement mechanism also includes a gear A704, a gear A704 is fixedly connected to the right side of the slide rod 601, an L-shaped plate 705 is symmetrically fixedly connected to the right side of the right connecting plate C207, two locking pins A208 on the front side are slidably connected with the corresponding L-shaped plates 705, and the right side of the L-shaped plate 705 is rotatably connected with a gear B706 meshing with the gear A704, and the inner wall of the gear B706 is symmetrically fixed with protrusions, and one end of the two locking pins A208 on the front side is symmetrically provided with rectangular grooves used in conjunction with the protrusions.

[0027] like Figure 8-Figure 10 As shown, the reinforcement mechanism also includes a protruding block 801, and the protruding block 801 is fixedly connected to the left side of the arc block 702. The inner walls of the annular grooves of the two front locking pins A208 are symmetrically fixed with arc plates 802 used in conjunction with the protruding block 801. The sides of the two adjacent protruding blocks 801 that are close to each other are gradually curved, and the radii of the arc surfaces of the protruding blocks 801 at both ends continuously increase toward the middle. The radius of the arc surface of the protruding block 801 in the middle is greater than the radius of the inner arc surface of the arc plate 802.

[0028] Initially, the elastic member A is in a released state, the rectangular frame 202 can slide horizontally in the rectangular frame 201, the elastic wedge block A303 is inserted into the slot of the corresponding slider 304, and the two connecting plates A205 are perpendicular to the fixed plate 204. The secondary beam 101 is first hoisted to the top of the two adjacent main beams 1 by the hoisting equipment in the prior art, and then the rectangular frame 202 is pushed by the staff to slide in the rectangular frame 201. The rectangular frame 202 drives the fixed plate 204 to slide in the rectangular frame 201, so that the fixed plate 204 and the web of the secondary beam 101 are in the same vertical plane, and then the secondary beam 101 is placed on the supporting plate 203. The supporting plate 203 slides down under the influence of the weight of the secondary beam 101, and the elastic member A is contracted by force. The supporting plate 203 drives the two elastic wedge blocks A303 to descend through the sliding frame 302, and drives the locking pin B301 to descend. The elastic wedge block A303 presses the adjacent sliders 304. The slot is squeezed, so that the slider 304 drives the corresponding sleeve 305 to drop through the vertical axis thereon, and the elastic member C is extended by force, and the sleeve 305 drives the guide block therein to squeeze the spiral groove of the adjacent guide column 306. The spiral groove is forced to drive the corresponding guide column 306 to rotate, and the guide column 306 drives the connecting plate A205 to rotate with the connection point of the corresponding sliding shaft as the center of the circle. At this time, the two connecting plates A205 rotate close to each other, and the connecting plate A205 drives the corresponding connecting plate C207 to rotate, and then the two connecting plates A205 are respectively fitted with the two sides of the fixed plate 204, and the two connecting plates C207 connected by the two connecting plates A205 are fitted with the two sides of the web of the secondary beam 101. After the locking pin B301 drops, it is inserted into the corresponding locking hole at the bottom of the inner wall of the rectangular frame 201, and the locking pin B301 limits the rectangular frame 202, so that the fixed plate 204 and the connecting plate A205 no longer move, thereby preventing the secondary beam 101 from displacement.

[0029] Initially, the elastic member D is in a released state, the top surfaces of the connecting plates A401 and B402 are in the same horizontal plane, the elastic member E is in a released state, and the two sets of locking pins A208 are respectively inserted into the through holes A of the left connecting plate B206 and the connecting plate C207. Due to the height difference between the two adjacent main beams 1, when installing the secondary beam 101, the secondary beam 101 will be slightly tilted due to the height difference between the two main beams 1, resulting in the two insertion holes of the secondary beam 101 being misaligned with the two locking pins A208 on the connecting plate B402. At this time, the staff will first push the two connecting plates B206 to make the two connecting plates B206 slide close to each other in the rectangular frame 201 until the two connecting plates B206 are respectively connected to the adjacent connecting plates. The side of connecting plate A205 is fitted, and then the staff pushes connecting plate B402 through the handle on one side of connecting plate B402. The connecting plate B402 is forced to drive connecting plate A401 to slide horizontally to the right, and the elastic member E is forced to shrink. Connecting plate A401 drives locking block A501 and the corresponding two locking pins A208 to move to the right, and connecting plate B402 drives the corresponding two locking pins A208 to move to the right, so that the two groups of locking pins A208 pass through the two through holes A of the connecting plate A205 and the connecting plate C207 on the left side of the fixed plate 204 respectively. Since the two sockets of the secondary beam 101 are misaligned with the two locking pins A208 on the connecting plate B402, the two locking pins A208 on the connecting plate B402 are in contact with the edges of the two sockets of the secondary beam 101 at this time, and the front side The two locking pins A208 are blocked and cannot move. At this time, the staff drives the connecting plate B402 to rotate upward or downward with the connection point of the connecting plate A401 as the center through the handle on one side of the connecting plate B402 according to the misaligned direction of the two insertion holes of the secondary beam 101. The elastic part D is forced to shrink, and the connecting plate B402 drives the corresponding two locking pins A208 to rotate. The through holes A of the two connecting plates C207 on the left are squeezed by the two locking pins A208, so that the two connecting plates C207 on the left are respectively rotated with the connection point of the corresponding connecting plate A205 and the connecting plate B206 as the center, and the elastic parts B corresponding to the two connecting plates C207 on the left are forced to shrink until the two locking pins A208 on the connecting plate B402 are aligned with the two insertion holes of the secondary beam 101, and the engagement is completed. The connecting plate A401 and the connecting plate B402 move again, and the connecting plate A401 drives the locking block A501 and the two locking pins A208 thereon to move, and the two locking pins A208 on the connecting plate B402 move, so that the two groups of locking pins A208 are respectively inserted into the two through holes A of the fixed plate 204 and the two plug holes of the secondary beam 101, and the staff rotates the two connecting plates C207 on the right side at the same time, and the two connecting plates C207 on the right side respectively rotate with the connection point of the corresponding connecting plate A205 and the connecting plate B206 as the center of the circle, and the elastic parts B corresponding to the two connecting plates C207 on the right side are contracted by force, so that the through hole A of the connecting plate C207 on the right side is aligned with the corresponding locking pin A208, so that the two groups of locking pins A208 can continue to move to the right,The two lock pins A208 corresponding to the connecting plate B402 pass through the through holes A of the corresponding connecting plate C207 respectively, and the protrusions in the two gears B706 are respectively inserted into the rectangular grooves of the corresponding lock pins A208. Then the staff inserts the lock pin C502 into the through hole B of the lock block A501. The lock pin C502 limits the connecting plate A401 through the lock block A501, so that the connecting plate A401 and the connecting plate B402 respectively drive the corresponding two lock pins A208 to remain stable.

[0030] Initially, there is a gap between the two adjacent arc blocks 702, and the locking pin D703 is not inserted into the through hole C of the upper limit plate of the right connecting plate C207. The staff first slides the sliding rod 601 horizontally to the front side, and the elastic member F is extended by force. The sliding rod 601 drives the locking block B602 and the gear A704 to move. After the gear A704 moves, it meshes with the two gears B706. After the locking block B602 moves, it squeezes the wedge surface of the elastic wedge block B604. The elastic wedge block B604 is forced to shrink until the locking block B602 passes over the wedge surface of the elastic wedge block B604. The elastic wedge block B604 releases and slides back, and contacts the vertical surface of the locking block B602, so that the sliding rod 601 is limited by the locking block B602, so that the elastic member F remains in the extended state, and the gear A704 remains meshed with the two gears B706. The E-shaped frame 701 is then pushed horizontally to the rear by the staff. The E-shaped frame 701 squeezes the sliding axes of the four arc blocks 702 through the two sets of inclined grooves therein, so that the two adjacent arc blocks 702 slide close to each other, and the arc blocks 702 drive the corresponding protruding blocks 801 to move. After sliding, the two adjacent arc blocks 702 are stuck in the annular grooves of the corresponding locking pins A208 and merged into a complete circular ring, so that the protruding blocks 801 contact the outer walls of the annular grooves of the corresponding locking pins A208, and the outer arc edge of the protruding block 801 is misaligned with the inner arc surfaces of the two adjacent arc plates 802. At this time, the locking pin D703 is aligned with the through hole C of the upper limit plate of the connecting plate C207. The staff inserts the locking pin D703 into the through hole C to limit the E-shaped frame 701, thereby completing the assembly of the connection structure of the main beam 1 and the secondary beam 101.

[0031] When the main beam 1 sinks due to natural or other factors, resulting in an increase in the height difference between two adjacent main beams 1, the secondary beam 101 will produce a slight twist, and the secondary beam 101 drives the corresponding two locking pins A208 to move through the two sockets therein, and the two locking pins A208 on the front side drive the four connecting plates C207 to rotate around the connection between the two connecting plates A205 and the two connecting plates B206 as the center of the circle, and the elastic member B is contracted or released under force, and the connecting plate C207 on the right side drives the two gears B706 to move through the two L-shaped plates 705. The two gears B706 move at the connection between the L-shaped plates 705 under the action of the gear A704. The locking pin A208 rotates around the connection point of the connecting plate B402 as the center of the circle, and squeezes the rectangular groove of the adjacent locking pin A208 through the protrusion inside it, so that the locking pin A208 rotates around the connection point of the connecting plate B402 as the center of the circle. At the same time, the locking pin A208 drives the two arc plates 802 inside it to rotate. After the arc plates 802 rotate, they contact and squeeze the adjacent protruding blocks 801. Due to the arc surface characteristics of the protruding blocks 801, the friction between the arc plates 802 and the protruding blocks 801 is increased through the squeezing of the arc plates 802 and the adjacent protruding blocks 801, thereby preventing the arc blocks 702 from being separated from the annular grooves of the corresponding locking pins A208, and further improving the firmness between the main beam 1 and the secondary beam 101. Example 2

[0032] like Fig.11 As shown, it also includes a guide plate 901, the bottom of the supporting plate 203 is fixedly connected with the guide plate 901, a pull rod 902 is slidably connected through the guide plate 901, the pull rod 902 is fixedly connected to the sliding frame 302, and an elastic member G is provided between the sliding frame 302 and the guide plate 901, and the elastic member G is a compression spring.

[0033] When the secondary beam 101 needs to be removed, the staff first pulls out the locking pin D703 from the through hole C of the upper limit plate of the right connecting plate C207 to enable the E-shaped frame 701 to move, and then pulls the E-shaped frame 701 to the front side. The E-shaped frame 701 squeezes the sliding shafts of the two sets of arc blocks 702 through the two sets of inclined grooves therein, so that the two adjacent arc blocks 702 slide away from each other and reset. The arc block 702 drives the protruding block 801 therein to move and reset, and then pushes the pressing block 605 downward. The pressing block 605 is subjected to force to drive the elastic wedge block B604 to shrink and slide through the connecting shaft. After sliding, the elastic wedge block B604 no longer contacts the locking block B602. After the locking block B602 is freed from the restriction, the sliding rod 601 can move, and the elastic member F shrinks and drives the sliding rod 601 slides to reset, the slide bar 601 drives the gear A704 away from the two gears B706, and then the staff lifts the lock pin C502 upward to disengage the lock pin C502 from the through hole B of the lock block A501. After the lock block A501 is freed from the restriction, the connecting plate A401 can move, and the elastic member E is released to drive the connecting plate A401 to move and reset, and the connecting plate A401 drives the connecting plate B402 to move and reset, and the connecting plate A401 and the connecting plate B402 respectively drive the corresponding two lock pins A208 to move and reset, so that the two groups of lock pins A208 are respectively disengaged from the through holes A of the fixed plate 204, the two connecting plates A205, the two connecting plates B206 and the four connecting plates C207, and are disengaged from the two sockets of the secondary beam 101, and then the staff The personnel push the two connecting plates B206 away from each other to reset them, so that the two connecting plates B206 are respectively away from the adjacent connecting plates A205, and then pull the pull rod 902 to the front side, and the pull rod 902 drives the sliding frame 302 to slide to the front side, and the elastic member G is forced to shrink, and the sliding frame 302 drives the two elastic wedge blocks A303 therein to move to the front side. After the elastic wedge blocks A303 move, they disengage from the corresponding slots of the sliders 304. After the sliders 304 are freed from the restrictions, the elastic member C shrinks and drives the sliders 304 to slide and reset. The sliders 304 drive the corresponding sleeves 305 to lift and reset upwards through the vertical axis. The sleeves 305 squeeze the spiral grooves of the guide posts 306 through the guide blocks therein. The guide posts 306 are forced to drive the corresponding connecting plates A205 to rotate and reset. The connecting plate A205 drives the corresponding connecting plate C207 to rotate and reset. After the connecting plate C207 rotates and resets, it no longer contacts the secondary beam 101. Then the pull rod 902 is loosened, and the elastic member G is released to drive the sliding frame 302 to slide and reset. The sliding frame 302 drives the pull rod 902 to move and reset. Then the secondary beam 101 is lifted by the lifting equipment, so that the secondary beam 101 can be separated from the main beam 1. After the secondary beam 101 is lifted, it no longer squeezes the supporting plate 203. The elastic member A is released to drive the supporting plate 203 to reset. The supporting plate 203 drives the locking pin B301 and the sliding frame 302 to lift and reset upward. In this process, the sliding frame 302 drives the two elastic wedge blocks A303 to lift. After the elastic wedge blocks A303 are lifted, they contact and squeeze the corresponding sliders 304.Since the elastic force of the elastic member A is greater than the elastic force of the elastic wedge block A303, the elastic wedge block A303 is forced to shrink and slide until the elastic wedge block A303 is aligned with the corresponding slot of the slider 304, and the elastic wedge block A303 is released and inserted into the slot of the slider 304, thereby completing the installation and reset of the overall connection structure.

[0034] A construction process for a prefabricated building main and secondary beam connection structure comprises the following steps: S1: The staff pushes the rectangular frame 202 to slide in the rectangular frame 201, so that the fixed plate 204 and the web of the secondary beam 101 are on the same vertical plane, and the secondary beam 101 is placed on the supporting plate 203, so that the connecting plate A205 drives the connecting plate C207 to rotate and fit with both sides of the fixed plate 204 and both sides of the web of the secondary beam 101; S2: Push the connecting plate B402 through the handle on one side of the connecting plate B402, and drive the connecting plate B402 to rotate, so that the other set of locking pins A208 are aligned with the two insertion holes of the secondary beam 101; S3: Slide the slide bar 601 horizontally to the front side, so that the gear A704 is meshed with the gear B706, and the elastic wedge block B604 limits the lock block B602, so that the gear A704 remains meshed with the gear B706, and the E-shaped frame 701 is pushed horizontally to the rear side, so that the two adjacent arc blocks 702 are stuck in the annular grooves of the corresponding lock pins A208; S4: When the secondary beam 101 is slightly twisted, the arc-shaped plate 802 is squeezed by the adjacent protruding block 801 to improve the firmness between the main beam 1 and the secondary beam 101.

[0035] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A prefabricated building main and secondary beam connection structure, comprising a main beam (1), a secondary beam (101) being arranged on one side of the main beam (1), characterized in that: The main beam (101) further comprises a positioning mechanism, the positioning mechanism comprising a rectangular frame (201), the outer wall of the main beam (1) being fixedly connected to the rectangular frame (201), a rectangular frame (202) being slidably connected inside the rectangular frame (201), a supporting plate (203) being slidably connected inside the rectangular frame (202), an elastic member A being arranged between the supporting plate (203) and the rectangular frame (202), the supporting plate (203) being used in conjunction with the secondary beam (101), a fixing plate (204) being fixedly connected to the top of the rectangular frame (202), the fixing plate (204) being slidably connected to the rectangular frame (201), and a locking mechanism comprising a connecting plate A (205), a guide groove being arranged at the top of the rectangular frame (201) A sliding shaft is slidably connected in the guide groove, and the bottom end of the sliding shaft is rotatably connected to the connecting plate A (205). A connecting plate B (206) is symmetrically slidably connected in the rectangular frame (201). A connecting plate C (207) is hinged on one side of the connecting plate A (205) and the connecting plate B (206). An elastic member B is respectively arranged between the connecting plate C (207) and the connecting plate A (205) and the connecting plate B (206). Two groups of locking pins A (208) are arranged in the rectangular frame (201). Through holes A for use with the locking pins A (208) are symmetrically opened on the fixing plate (204), the connecting plate A (205), the connecting plate B (206) and the connecting plate C (207).

2. The prefabricated building primary and secondary beam connection structure according to claim 1, characterized in that: The positioning mechanism further comprises a locking pin B (301), a plurality of evenly distributed locking holes are provided at the bottom of the inner wall of the rectangular frame (201), the locking pin B (301) used in conjunction with the plurality of locking holes is fixedly connected to the bottom of the supporting plate (203), a sliding frame (302) is slidably connected to the bottom of the supporting plate (203), an elastic wedge block A (303) is symmetrically slidably connected in the sliding frame (302), a special-shaped groove is symmetrically provided through the rectangular frame (201), a sliding block (304) is slidably connected in the special-shaped groove, and a sliding block (304) is provided on one side of the sliding block (304) The elastic wedge block A (303) is used in conjunction with a card slot, an elastic member C is provided between the slider (304) and the special-shaped slot, one end of a vertical axis is fixedly connected to the top of the slider (304), the other end of the vertical axis slides through the rectangular frame (202) and is fixedly connected to a sleeve (305), the bottom of the connecting plate A (205) is fixedly connected to a guide column (306), the sleeve (305) is sleeved on the outer wall of the guide column (306), the outer wall of the guide column (306) is provided with a spiral groove, and the inner wall of the sleeve (305) is fixedly connected to a guide block used in conjunction with the spiral groove.

3. The prefabricated building primary and secondary beam connection structure according to claim 2, characterized in that: The locking mechanism further comprises a connecting plate A (401), the connecting plate A (401) being arranged on one side of the connecting plate B (206) on the left side, the connecting plate B (402) being hingedly connected to one side of the connecting plate A (401), an elastic member D being arranged between the connecting plate A (401) and the connecting plate B (402), a group of the locking pins A (208) on the rear side being fixedly connected to one side of the connecting plate A (401), a group of the locking pins A (208) on the front side being rotatably connected to one side of the connecting plate B (402), and an elastic member E being arranged between the connecting plate A (401) and the connecting plate B (206) on the left side.

4. The prefabricated building primary and secondary beam connection structure according to claim 3, characterized in that: The locking mechanism further comprises a locking block A (501), one side of the connecting plate A (401) is fixedly connected to the locking block A (501), one side of the left connecting plate B (206) is slidably connected to a locking pin C (502), and a through hole B for use with the locking pin C (502) is formed at the top of the locking block A (501).

5. The prefabricated building primary and secondary beam connection structure according to claim 4, characterized in that: The invention also includes a reinforcing mechanism, which includes a sliding rod (601), one side of the right connecting plate B (206) is slidably connected to the sliding rod (601), an elastic member F is provided between the sliding rod (601) and the right connecting plate B (206), one side of the sliding rod (601) is fixedly connected to a locking block B (602), one side of the right connecting plate B (206) is fixedly connected to a mounting box (603), an elastic wedge block B (604) used in conjunction with the locking block B (602) is slidably connected in the mounting box (603), one side of the elastic wedge block B (604) is fixedly connected to a connecting shaft, one side of the mounting box (603) is provided with a vertical groove, one end of the connecting shaft slides through the vertical groove and is fixedly connected to a pressing block (605).

6. The prefabricated building primary and secondary beam connection structure according to claim 5, characterized in that: The reinforcement mechanism also includes an E-shaped frame (701), one side of the right connecting plate C (207) is slidably connected to the E-shaped frame (701), one side of the E-shaped frame (701) is symmetrically provided with two groups of inclined grooves, one side of the right connecting plate C (207) is symmetrically provided with two groups of arc blocks (702), one side of the arc blocks (702) is fixedly connected with a sliding shaft, the sliding shaft is inserted into the inclined groove and slides therein, an annular groove for use with the arc blocks (702) is provided on the outer wall of a group of locking pins A (208) on the front side, a locking pin D (703) is inserted through one side of the E-shaped frame (701), and the other side of the right connecting plate C (207) is fixedly connected to a limiting plate, and the limiting plate is provided with a through hole C for use with the locking pin D (703).

7. The prefabricated building primary and secondary beam connection structure according to claim 6, characterized in that: The reinforcement mechanism also includes a gear A (704), one side of the sliding rod (601) is fixedly connected to the gear A (704), one side of the right connecting plate C (207) is symmetrically fixedly connected to an L-shaped plate (705), a group of locking pins A (208) on the front side is slidably connected to the L-shaped plate (705), one side of the L-shaped plate (705) is rotatably connected to a gear B (706) meshing with the gear A (704), the inner wall of the gear B (706) is symmetrically fixedly connected to a protrusion, and one end of the group of locking pins A (208) on the front side is symmetrically provided with a rectangular groove used in conjunction with the protrusion.

8. The prefabricated building primary and secondary beam connection structure according to claim 7, characterized in that: The reinforcement mechanism also includes a protruding block (801), one side of the arc block (702) is fixedly connected to the protruding block (801), and the inner walls of the annular grooves of a group of the locking pins A (208) on the front side are symmetrically fixedly connected to arc plates (802) used in conjunction with the protruding block (801).

9. The prefabricated building primary and secondary beam connection structure according to claim 8, characterized in that: It also includes a guide plate (901), the bottom of the supporting plate (203) is fixedly connected to the guide plate (901), a pull rod (902) is slidably connected through the guide plate (901), the pull rod (902) is fixedly connected to the sliding frame (302), and an elastic member G is provided between the sliding frame (302) and the guide plate (901).

10. The construction process of the primary and secondary beam connection structure of an assembled building according to claim 9, characterized in that: The following steps are included: S1: A staff member pushes the rectangular frame (202) to slide in the rectangular frame (201) so that the fixing plate (204) and the web of the secondary beam (101) are on the same vertical plane, and the secondary beam (101) is placed on the supporting plate (203), so that the connecting plate A (205) drives the connecting plate C (207) to rotate and fit with the two sides of the fixing plate (204) and the two sides of the web of the secondary beam (101); S2: Pushing the connecting plate B (402) through a handle on one side of the connecting plate B (402), and driving the connecting plate B (402) to rotate, so that another set of the locking pins A (208) are aligned with the two insertion holes of the secondary beam (101); S3: Slide the slide bar (601) horizontally toward the front side so that the gear A (704) meshes with the gear B (706), and the elastic wedge block B (604) limits the locking block B (602) so that the gear A (704) remains meshed with the gear B (706), and push the E-shaped frame (701) horizontally toward the rear side so that the two adjacent arc blocks (702) are inserted into the annular grooves corresponding to the locking pin A (208); S4: When the secondary beam (101) generates a slight twist, the arc-shaped plate (802) is squeezed with the adjacent protruding block (801), thereby improving the firmness between the main beam (1) and the secondary beam (101).

Citation Information

Patent Citations

  • Primary and secondary beam connecting structure and primary and secondary beam connecting method

    CN118704614A

  • Steel structure bracket

    CN202012192U

  • Steel structure connecting device

    CN220768402U

  • Post structural steel, jig used for its connection and method of connecting structural steel

    JP1996326211A

  • Method for constructing building

    JP1999029989A

Cited By

  • Multilayer factory building frame connecting structure and construction technology

    CN120867421A