Electric power construction site safety supervision and management alarm device
By using a safety supervision and management alarm device combining dust reduction, monitoring and detection at the power construction site, the conductivity risks and false alarm problems of water spray dust reduction methods are solved, and a safe construction environment is achieved.
Patent Information
- Application Number
- CN202411385807.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2025-01-10
AI Technical Summary
At the power construction site, the existing technology of water spray dust reduction methods have conductive risks and false alarms, which cannot effectively ensure construction safety.
A safety supervision and management alarm device for power construction site including dust reduction components, cameras, electric shock detectors and short-circuit detectors is designed. By combining vacuuming, monitoring and detection components, the dust concentration is reduced and alarms are issued in a timely manner.
It effectively reduces the dust concentration in the work space, reduces the risk of electric shock, reduces false alarms, and ensures the safety of the construction site.
Smart Images

Figure CN119296253A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric power construction safety management, and in particular to an electric power construction site safety supervision management alarm device. Background Art
[0002] At present, in the process of power construction, the construction site often involves the wiring and installation of weak wires. When unexpected safety situations occur, timely supervision and discovery are required, and early warning signals are issued to remind on-site construction personnel to disconnect the power supply in time and take emergency shelter.
[0003] For example, the application number is CN202022118661.8, and the application name is: A safety supervision and management alarm device for electric power construction sites, including a device body, a hydraulic pump, and a battery. The battery is installed at the bottom of the device body, and the top of the battery is connected to the hydraulic pump. The hydraulic pump is connected to the working platform through a hydraulic rod. The top of the working platform is fixedly connected with an equipment component, and the bottom of the equipment component is electrically connected to a circuit board. The circuit board is arranged inside the hydraulic rod; support rods are arranged at the four corners of the working platform, and an equipment cover is arranged on the support rod. A signal device is also arranged on the working platform, and the bottom of the signal device is electrically connected to the circuit board. This application document is a prior art relative to this application. In this application document, water in the water tank is sprayed into the air through a nozzle to reduce dust in the air, but water is conductive. When water is sprayed to the circuit wiring, it is easy to cause abnormal current phenomena, and may even cause electric shock hazards, which poses a greater safety hazard. In addition, only alarms are made through camera monitoring, which is prone to false alarms, which is not conducive to ensuring safe construction at the construction site. For this reason, we have designed a safety supervision and management alarm device for electric power construction sites to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to solve the problems existing in the prior art, and to propose a safety supervision management alarm device for power construction sites, which can reduce the dust concentration in the working space by absorbing dust, and can supervise the construction personnel through the cooperation of cameras, electric shock detectors and short circuit detectors. When a circuit fails or a construction worker is electrocuted, the alarm can sound an alarm so that other construction personnel can disconnect the circuit in time, thereby fully ensuring the safety of power construction.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A safety supervision and management alarm device for an electric power construction site comprises a base, a plurality of locking universal wheels are installed at the bottom of the base, a chassis driven to rotate by a first drive motor is installed at the upper end of the base, a dust reduction component for adsorbing and removing dust in a working environment is provided at the upper end of the chassis, a mounting plate is connected to the upper end of the base via a plurality of brackets, a movable plate is provided above the mounting plate, the mounting plate and the movable plate are connected via an adjusting component so that the movable plate can move up and down to adjust the height, a camera and an alarm are installed on the movable plate, a short circuit detector is installed at the upper end of the base, a winding component for winding the connecting wires of the short circuit detector is provided on the base, and an electric shock detection component is installed at the upper end of the base.
[0007] Preferably, the dust reduction assembly includes a dust reduction box installed on the upper end of the chassis, a suction fan blade driven to rotate by a second drive motor is installed at the bottom of the dust reduction box, a bracket is installed in the dust reduction box, a plurality of filters are installed through the bracket, a drop-off port is provided on the bracket through a partition, a cleaning brush is rotatably connected to the bracket and rotates coaxially with the suction fan blade, the cleaning brush is against the filter, a dust suction pipe located above the bracket is installed through the front side wall of the dust reduction box, and a ventilation port located below the bracket is provided through the side wall of the dust reduction box.
[0008] Preferably, the side wall of the dust reduction box is pull-through-connected with a dust storage box, a pull block is fixed to the side wall of the dust storage box, and the side wall of the dust reduction box is rotatably connected with a baffle that abuts against the side wall of the dust storage box.
[0009] Preferably, a rectangular block is fixedly connected to the upper end of the suction fan blade, a rectangular groove is formed at the bottom of the cleaning brush, and the rectangular block extends into the rectangular groove.
[0010] Preferably, the adjustment component includes an adjustment slot opened on the upper end of the mounting plate, two adjustment sliders matched with the adjustment slot are slidably connected in the adjustment slot, a double-headed screw is rotatably connected in the adjustment slot, the double-headed screw thread passes through the two adjustment sliders, the double-headed screw is driven to rotate by a servo motor installed on the side wall of the mounting plate, a connecting block is fixedly connected to the bottom of the movable plate, and a connecting rod is hinged between the connecting block and the two adjustment sliders.
[0011] Preferably, a plurality of telescopic rods are connected between the mounting plate and the movable plate.
[0012] Preferably, the winding assembly includes a first winding rod fixedly connected to the upper end of the base, and the connecting wire of the short-circuit detector is spirally wound on the first winding rod. The upper end of the first winding rod is slidably connected to a U-shaped block that abuts against the connecting wire.
[0013] Preferably, the electric shock detection component includes a third driving motor installed on the upper end of the base, a second winding rod is installed at the end of the output shaft of the third driving motor, and the electric shock detector is installed on the second winding rod. The connecting wire of the electric shock detector is wound on the second winding rod. The upper end of the base is fixedly connected to a limiting plate, and a through opening is opened on the limiting plate. The connecting wire of the electric shock detector passes through the through opening and is connected with a strap, and the inner side wall of the strap is provided with multiple detection contacts.
[0014] Preferably, one side of the strap is provided with a fleece-surface Velcro, and the other side of the strap is provided with a hook-surface Velcro.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. This power construction site safety supervision and management alarm device has a suction fan blade that rotates to suck the dust in the working space into the dust suppression box through the suction pipe. The cleaning brush can rotate synchronously with the suction fan blade to clean the filter to prevent dust from adhering to the filter and causing clogging. The cleaned dust can fall into the dust storage box through the drop opening formed between the partition and the bracket for collection, thereby reducing the dust concentration in the working space.
[0017] 2. This power construction site safety supervision and management alarm device can monitor construction personnel through the cooperation of cameras, electric shock detectors, and short-circuit detectors. When a circuit fails or a construction worker is electrocuted, the alarm can sound an alarm so that other construction personnel can disconnect the circuit in time, fully ensuring the safety of power construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of the first-view stereoscopic structure of a power construction site safety supervision and management alarm device proposed by the present invention;
[0019] Figure 2 A schematic diagram of the third perspective structure of a safety supervision and management alarm device for electric power construction sites proposed by the present invention;
[0020] Figure 3 This is a schematic diagram of the main plan structure of a power construction site safety supervision and management alarm device proposed by the present invention;
[0021] Figure 4 This is a schematic diagram of the connection between the mounting plate, the adjusting slide, and the double-headed screw;
[0022] Figure 5 for Figure 3 Schematic diagram of the cross-sectional structure at AA in the middle;
[0023] Figure 6This is a schematic diagram of the connections between the dust suppression box, suction fan blades, bracket, cleaning brush, dust storage box, and baffle.
[0024] In the figure: 1. base; 2. locking universal wheel; 3. chassis; 4. second drive motor; 5. dust suppression box; 6. suction fan blades; 7. bracket; 8. cleaning brush; 9. partition; 10. dust storage box; 11. dust suction pipe; 12. vent; 13. support leg; 14. mounting plate; 15. adjustment slide; 16. adjustment slider; 17. double-headed screw; 18. servo motor; 19. moving plate; 20. connecting rod; 21. camera; 22. alarm; 23. short circuit detector; 24. first winding rod; 25. connecting wire; 26. U-shaped block; 27. second winding rod; 28. connecting wire; 29. limit plate; 30. strap; 31. baffle; 32. telescopic rod; 33. third drive motor. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0026] Reference Figure 1-Figure 6 , a safety supervision and management alarm device for electric power construction site, comprising a base 1, a battery for power supply is installed on the base 1, a plurality of locking universal wheels 2 are installed at the bottom of the base 1, the arrangement of the locking universal wheels 2 can move the device, and the device is convenient for use at different positions, a chassis 3 driven to rotate by a first drive motor 4 is installed at the upper end of the base 1, the first drive motor 4 is installed at the bottom of the base 1, and can drive the chassis 3 to rotate, and then can make the dust reduction box 5 rotate, so as to absorb dust in different directions and reduce dust in the working space;
[0027] A dust reduction component for adsorbing and removing dust from the working environment is provided at the upper end of the chassis 3. The dust reduction component includes a dust reduction box 5 installed at the upper end of the chassis 3. A suction fan blade 6 driven to rotate by a second drive motor is installed at the bottom of the dust reduction box 5. A bracket 7 is installed in the dust reduction box 5. A plurality of filter screens are installed through the bracket 7. The bracket 7 is located above the suction fan blade 6. The filter screen can filter the dust entering the dust reduction box 5 to reduce the dust adhering to the suction fan blade 6. A drop opening is provided on the bracket 7 through a partition 9. The drop opening is an opening formed by the partition 9 and the inner side wall of the bracket 7. A cleaning brush 8 coaxially rotating with the suction fan blade 6 is rotatably connected to the bracket 7. A rectangular block is fixedly connected to the upper end of the suction fan blade 6. A rectangular block is provided at the bottom of the cleaning brush 8. The rectangular block extends into the rectangular groove, so that the cleaning brush 8 can rotate synchronously with the suction fan blade 6, and the cleaning brush 8 is against the filter screen. The cleaning brush 8 can clean the filter screen during its rotation to prevent dust from adhering to the filter screen and causing clogging. The cleaned dust can fall through the drop opening formed between the partition plate 9 and the bracket 7. The front side wall of the dust reduction box 5 is penetrated by a dust suction pipe 11 located above the bracket 7. The feeding end of the dust suction pipe 11 is trumpet-shaped and can suck dust into the dust reduction box 5. The side wall of the dust reduction box 5 is penetrated by a vent 12 located below the bracket 7. The vent 12 enables the suction fan blade 6 to adsorb dust normally, and a dustproof net can be installed on the vent 12 to reduce dust adhesion to the suction fan blade 6.
[0028] The side wall of the dust reduction box 5 is connected to a dust storage box 10 through a pull-out, and the dust storage box 10 is located directly below the drop-out opening, so that the dust cleaned off the filter net can fall into the dust storage box 10 through the drop-out opening and be collected. A pull block is fixed to the side wall of the dust storage box 10, which is convenient for pulling out the dust storage box 10 for cleaning. The side wall of the dust reduction box 5 is rotatably connected to a baffle 31 that abuts against the side wall of the dust storage box 10. The setting of the baffle 31 enables the dust storage box 10 to be stably fixed in the dust reduction box 5 in a natural state and will not move outside the dust reduction box 5. Clean water can be placed in the dust storage box 10 to absorb dust.
[0029] The upper end of the base 1 is connected to a mounting plate 14 through a plurality of supporting legs 13, a movable plate 19 is provided above the mounting plate 14, a plurality of telescopic rods 32 are connected between the mounting plate 14 and the movable plate 19, so that the movable plate 19 can only move up and down, and the mounting plate 14 and the movable plate 19 are connected by an adjustment component, so that the movable plate 19 can move up and down to adjust the height, and the adjustment component includes an adjustment slot 15 provided at the upper end of the mounting plate 14, and two adjustment sliders 16 adapted thereto are slidably connected in the adjustment slot 15, and a double-headed screw 17 is rotatably connected in the adjustment slot 15, and the double-headed screw 17 threads penetrate the two adjustment sliders 16, and the double-headed screw 17 is installed on the mounting plate 1 The servo motor 18 on the side wall drives the rotation, and the servo motor 18 drives the double-headed screw 17 to rotate, so that the two adjusting sliders 16 can be moved closer to or farther away from each other under the action of the thread engagement. The bottom of the movable plate 19 is fixedly connected with a connecting block, and a connecting rod 20 is hinged between the connecting block and the two adjusting sliders 16. The two ends of the connecting rod 20 are respectively rotatably connected with the adjusting slider 16 and the connecting block. When the two adjusting sliders 16 are close to each other, the two connecting rods 20 can be rotated, and the movable plate 19 can be driven to move upward through the connecting block. When the two adjusting sliders 16 are away from each other, the two connecting rods 20 can be rotated, and the movable plate 19 can be driven to move downward through the connecting block.
[0030] A camera 21 and an alarm 22 are installed on the movable plate 19. Both the camera 21 and the alarm 22 are prior art. The camera 21 can monitor the safety of personnel in the construction site. The alarm 22 can sound an alarm when a circuit fails. The alarm 22 is electrically connected to the camera 21 and sounds an alarm when the camera 21 detects a potential safety hazard. A short-circuit detector 23 is installed on the upper end of the base 1. A winding assembly for winding a connecting wire 25 of the short-circuit detector 23 is provided on the base 1. The winding assembly includes a first winding rod 24 fixedly connected to the upper end of the base 1. The free end of the connecting wire 25 of the short-circuit detector 23 is spirally wound. The U-shaped clamp 26 is connected to the upper end of the first winding rod 24 and slides up and down to abut against the connecting wire 25. The U-shaped clamp 26 is a gravity block. The inner wall of the U-shaped clamp 26 is provided with a rubber pad. The U-shaped clamp 26 moves downward to fix the connecting wire 25 to avoid loose winding when it is not in use. The connecting wire 25 is connected to the wire on the construction site, and the power-on state can be detected by the short-circuit detector 23. The short-circuit detector 23 is connected to the alarm 22 by electrical signals. If a short circuit occurs, the alarm 22 can sound an alarm.
[0031] An electric shock detection component is installed at the upper end of the base 1, and the electric shock detection component includes a third drive motor 33 installed at the upper end of the base 1, a second winding rod 27 is installed at the end of the output shaft of the third drive motor 33, and an annular groove is provided at the bottom of the second winding rod 27, and a support rod extending into the annular groove and slidably connected thereto is provided at the upper end of the base 1, so that the second winding rod 27 can rotate stably, and an electric shock detector is installed on the second winding rod 27, and the contact detector is connected to the third drive motor 33 and the alarm 22 by electrical signals, and the connecting line 28 of the electric shock detector is wound on the second winding rod 27, and the upper end of the base 1 is fixedly connected to a limiting plate 29, and a through hole is provided on the limiting plate 29. The connecting wire 28 of the detector passes through the through opening and is connected to a strap 30. The connecting wire 28 passing through the through opening can restrict its free end to reduce the looseness when it is not in use. The inner wall of the strap 30 is provided with a plurality of detection contacts, one side of the strap 30 is provided with a furry Velcro, and the other side of the strap 30 is provided with a hook Velcro. The strap 30 can be tied to the construction worker by combining the furry Velcro and the hook Velcro. When the detection contact detects that the construction worker is electrocuted, the third drive motor 33 can be controlled to rotate to wind and store the connecting wire 28, so that the connecting wire 28 can pull the construction worker to move away from the electric shock point. At the same time, the alarm 22 sounds an alarm to ensure the safety of power construction.
[0032] The present invention can be explained by the following operation mode:
[0033] In the present invention, when the electric power construction site safety supervision and management alarm device is in use, the locking universal wheel 2 can move the device to the supervision point, the third drive motor 33 drives the second winding rod 27 to rotate to unwind the connecting wire 28, and the binding belt 30 is tied to the construction personnel through the combination of the fleece surface Velcro and the hook surface Velcro. The connecting wire 28 is in a loose state, which enables the construction personnel to perform construction at different positions. The U-shaped block 26 is pulled upward to unwind the connecting wire 25, so that the connecting wire 25 can be connected to the circuit at the construction site;
[0034] The camera 21 can monitor the safety of personnel in the construction site. The servo motor 18 is started to drive the double-headed screw 17 to rotate, and the two adjustment sliders 16 can be moved closer to or away from each other under the action of the thread engagement, and then the movable plate 19 can be moved up and down under the connection of the two connecting rods 20, so as to adjust the height of the camera 21 to meet different usage requirements;
[0035] The second driving motor is started to drive the suction fan blades 6 to rotate, so that the dust in the working space can be sucked into the dust reduction box 5 through the dust suction pipe 11. The cleaning brush 8 can rotate synchronously with the suction fan blades 6 to clean the filter screen to prevent dust from adhering to the filter screen and clogging it. The cleaned dust can fall into the dust storage box 10 through the drop opening formed between the partition plate 9 and the bracket 7 for collection;
[0036] If the camera 21 detects that the construction worker is abnormal, the alarm 22 can sound an alarm, and other construction workers can be reminded to go and check. If the detection contact detects that the construction worker is electrocuted, the third drive motor 33 can be controlled to rotate to wind and store the connecting wire 28, so that the connecting wire 28 can pull the construction worker to move away from the electric shock point. At the same time, the alarm 22 sounds an alarm, which is conducive to other construction workers to disconnect the circuit in time; if the connecting wire 25 and the short-circuit detector 23 detect a short circuit in the circuit, the alarm 22 can sound an alarm, so that other construction workers can disconnect the circuit in time, and then the camera 21, the contact detector and the short-circuit detector 23 cooperate to ensure the safety of power construction, and the alarm 22 can be set to issue different alarms, which is conducive to distinguishing the alarms issued by the camera 21, the contact detector and the short-circuit detector 23;
[0037] The baffle 31 is rotated so that it no longer blocks the dust storage box 10, and the dust storage box 10 can be pulled out for cleaning.
[0038] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A power construction site safety supervision and management alarm device, comprising a base (1), characterized in that: A plurality of locking universal wheels (2) are installed at the bottom of the base (1); a chassis (3) driven to rotate by a first drive motor (4) is installed at the upper end of the base (1); a dust reduction component for adsorbing and removing dust in the working environment is provided at the upper end of the chassis (3); a mounting plate (14) is connected to the upper end of the base (1) via a plurality of supporting legs (13); a movable plate (19) is provided above the mounting plate (14); the mounting plate (14) and the movable plate (19) are connected via an adjustment component so that the movable plate (19) can be moved up and down to adjust the height; a camera (21) and an alarm (22) are installed on the movable plate (19); a short circuit detector (23) is installed at the upper end of the base (1); a winding component for winding a connecting wire (25) of the short circuit detector (23) is provided on the base (1); and an electric shock detection component is installed at the upper end of the base (1).
2. The electric power construction site safety supervision and management alarm device according to claim 1 is characterized in that: The dust reduction assembly comprises a dust reduction box (5) mounted on the upper end of the chassis (3); a suction fan blade (6) driven to rotate by a second drive motor is mounted at the bottom of the dust reduction box (5); a bracket (7) is mounted inside the dust reduction box (5); a plurality of filter screens are mounted through the bracket (7); a drop-off opening is provided on the bracket (7) through a partition (9); a cleaning brush (8) is mounted through the bracket (7) and is rotatably connected to the bracket (7) and is coaxially rotatable with the suction fan blade (6); the cleaning brush (8) abuts against the filter screen; a dust suction pipe (11) located above the bracket (7) is mounted through the front side wall of the dust reduction box (5); and a ventilation opening (12) located below the bracket (7) is opened through the side wall of the dust reduction box (5).
3. The electric power construction site safety supervision and management alarm device according to claim 2 is characterized in that: The side wall of the dust reduction box (5) is extended and connected to a dust storage box (10), a pull block is fixed to the side wall of the dust storage box (10), and the side wall of the dust reduction box (5) is rotatably connected to a baffle (31) that abuts against the side wall of the dust storage box (10).
4. The electric power construction site safety supervision and management alarm device according to claim 3 is characterized in that: A rectangular block is fixedly connected to the upper end of the suction fan blade (6), a rectangular groove is provided at the bottom of the cleaning brush (8), and the rectangular block extends into the rectangular groove.
5. The electric power construction site safety supervision and management alarm device according to claim 1 is characterized in that: The adjustment component comprises an adjustment slot (15) provided at the upper end of the mounting plate (14), wherein two adjustment sliders (16) adapted thereto are slidably connected in the adjustment slot (15), a double-headed screw (17) is rotatably connected in the adjustment slot (15), wherein the double-headed screw (17) is threadedly passed through the two adjustment sliders (16), and the double-headed screw (17) is driven to rotate by a servo motor (18) mounted on the side wall of the mounting plate (14), and a connecting block is fixedly connected to the bottom of the movable plate (19), and a connecting rod (20) is hingedly connected between the connecting block and the two adjustment sliders (16).
6. The electric power construction site safety supervision and management alarm device according to claim 5 is characterized in that: A plurality of telescopic rods (32) are connected between the mounting plate (14) and the movable plate (19).
7. The electric power construction site safety supervision and management alarm device according to claim 1 is characterized in that: The winding assembly comprises a first winding rod (24) fixedly connected to the upper end of the base (1), a connecting wire (25) of the short-circuit detector (23) is spirally wound on the first winding rod (24), and the upper end of the first winding rod (24) is slidably connected to a U-shaped clamping block (26) that abuts against the connecting wire (25).
8. The electric power construction site safety supervision and management alarm device according to claim 1 is characterized in that: The electric shock detection component comprises a third drive motor (33) mounted on the upper end of the base (1); a second winding rod (27) is mounted on the end of the output shaft of the third drive motor (33); an electric shock detector is mounted on the second winding rod (27); a connecting wire (28) of the electric shock detector is wound on the second winding rod (27); a limiting plate (29) is fixedly connected to the upper end of the base (1); a through hole is formed through the limiting plate (29); the connecting wire (28) of the electric shock detector passes through the through hole and is connected to a binding belt (30); and a plurality of detection contacts are provided on the inner side wall of the binding belt (30).
9. The electric power construction site safety supervision and management alarm device according to claim 8 is characterized in that: One side of the binding strap (30) is provided with a fleece-surface Velcro, and the other side of the binding strap (30) is provided with a hook-surface Velcro.