Highway bridge pile foundation construction method

By using a hydraulic cylinder to drive the dust collection box and drilling assembly to closely contact the pile foundation surface to remove dust, and by using a rotating assembly to automatically flip the pile foundation, the problems of dust dispersion and construction applicability during drilling are solved, achieving efficient dust control and drilling adaptability.

CN119305025APending Publication Date: 2025-01-14NUCLEAR IND EAST CHINA CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411499504.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

In the construction of existing highway bridge pile foundations, severe dust dispersion during drilling deteriorates the working environment and makes it inconvenient to drill on the other side of the pile foundation, reducing the applicability of the construction.

Method used

A method for constructing highway bridge pile foundations is adopted, in which a dust collection box and a drilling assembly are driven by a hydraulic cylinder to make close contact with the pile foundation surface. Dust is sucked in by a dust pump, and the pile foundation is automatically flipped by a rotating assembly to achieve drilling on other surfaces of the pile foundation.

Benefits of technology

It effectively removes dust generated during drilling, preventing it from scattering, reducing manual cleaning steps, and improving the adaptability and efficiency of drilling operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119305025A_ABST
    Figure CN119305025A_ABST
Patent Text Reader

Abstract

The invention discloses a highway bridge pile foundation construction method, and relates to the field of highway bridge construction.The highway bridge pile foundation construction method comprises the following steps that firstly, a pile foundation is placed and fixed, specifically, the highway bridge pile foundation is horizontally placed in a supporting block on a workbench, so that the lower surfaces of the two ends of the pile foundation make contact with arc-shaped grooves, and then a rotating handle is manually rotated; the upper top arc plate moves downwards to be in contact with the upper surface of the pile foundation and is matched with the arc-shaped groove to clamp and fix the pile foundation; secondly, drilling construction is conducted, then an electric sliding rail is started to drive a drilling assembly to move to the position above the portion, needing to be drilled, of the pile foundation through a sliding seat, then a driving motor in a square pipe rotates, and a hydraulic cylinder works, thirdly, the drilling face is adjusted, and when other faces of the pile foundation need to be drilled, a fixed motor in a rotating assembly is started, and the drilling face is adjusted; when pile foundation drilling construction is carried out, the drilling part can be covered, generated dust is sucked, the dust is prevented from being scattered to the periphery, and the manual cleaning step is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention mainly relates to the technical field of highway bridge construction, and specifically to a highway bridge pile foundation construction method. Background Art

[0002] In construction and infrastructure projects, including highway bridge pile foundations, foundation design, geological exploration and drilling are usually required to determine the most suitable foundation type to ensure the safety and stability of the structure. When splicing the pile foundation, it is necessary to drill holes to install embedded parts or bolts.

[0003] A splash-proof drilling device for highway bridge pile foundation construction described in the prior art includes a base plate, a first moving mechanism, a second moving mechanism, a first screw, a cross plate, a first motor, a first slider, a second screw, a second motor, a second slider, a first limit rod, a second limit rod, a third slider, a third motor, a protective cover, a barrel, a drill bit, a first fixing bolt, a collecting trough and a fixing mechanism.

[0004] Although the above technology can prevent debris from splashing and injuring operators during drilling and improve the portability of drilling, during drilling, lighter dust is easily dispersed into the air and falls to the surroundings, causing the working environment to deteriorate. Manual cleaning is required after the operation is completed. At the same time, it is not convenient to perform drilling operations on the other side of the pile foundation, which reduces its applicability. Summary of the invention

[0005] Based on this, the purpose of the present invention is to provide a highway bridge pile foundation construction method to solve the technical problems raised in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions: A highway bridge pile foundation construction method comprises the following steps: Step 1: Place and fix the pile foundation. Place the pile foundation of the highway bridge horizontally in the support block on the workbench so that the lower surfaces of both ends of the pile foundation are in contact with the arc grooves. Then manually rotate the handle so that the upper arc plate moves down and contacts the upper surface of the pile foundation, and the pile foundation is clamped and fixed in cooperation with the arc groove. Step 2: Drilling construction. Then start the electric slide rail to drive the drilling assembly to move above the part of the pile foundation where a hole needs to be drilled through the sliding seat. Then the driving motor in the square tube rotates and the hydraulic cylinder works. The telescopic end of the hydraulic cylinder pushes the dust box and the drilling assembly downward, so that the arc-shaped pipe mouth of the drilling assembly is in close contact with the upper surface of the pile foundation. Under the continuous push of the hydraulic cylinder, the rotating drill rod drills the upper surface of the pile foundation. At the same time, the dust suction pump works to suck the dust generated by the drilling into the dust box through the arc-shaped pipe mouth, the telescopic tube and the square tube. Step 3: Adjust the drilling surface. When it is necessary to drill holes on other surfaces of the pile foundation, start the fixed motor in the rotating assembly. Driven by the transmission sprocket, worm gear and worm, the transmission shaft can drive the rolling cylinder to rotate. The two rolling cylinders can drive the pile foundation to rotate through friction with the surface of the pile foundation and cooperation with the balls on the arc surface of the top arc plate. Then adjust the horizontal position of the drilling assembly to drill holes on other surfaces of the pile foundation.

[0007] The technical solution is specific, vertical plates are welded on both sides of the long sides of the upper surface of the workbench, top plates are installed with bolts on the tops of the two vertical plates, an electric slide rail is fixedly installed at the center of the lower surface of the top plate, support blocks are welded on both sides of the short sides of the upper surface of the workbench, arc grooves are opened on the tops of the two support blocks, rolling drums are embedded in the grooves of the two arc grooves, the pile foundation is horizontally placed in the two arc grooves, the upper surfaces of the two rolling drums are in contact with the lower surface of the pile foundation, a driving shell is provided between the two support blocks, and a rotating assembly is provided in the driving shell for controlling the rotation of the two rolling drums; Sliding seats are slidably installed on the electric slide rails, hydraulic cylinders are symmetrically fixed on the lower surfaces of the sliding seats, dust boxes are fixedly installed on the telescopic ends of the two hydraulic cylinders, a drilling assembly is provided below the dust box, the drilling assembly consists of a dust suction mechanism and a drilling mechanism for absorbing dust generated when drilling holes in the pile foundation, the lower surface of the dust box is connected with the dust suction mechanism, the upper surface of the dust box is located between the two hydraulic cylinders and a dust suction pump is installed by bolts, and the suction port of the dust suction pump is connected with the interior of the dust box.

[0008] The technical solution is specific, the drilling assembly includes a square tube, the top of the square tube is connected to the lower surface of the dust box, a truncated cone-shaped fixing block is provided at the center of the square tube, both sides of the fixing block are fixedly connected to the tube wall of the square tube through connecting rods, a telescopic tube is fixed to the bottom end of the square tube, an arc-shaped pipe mouth is fixed to the bottom end of the telescopic tube, a driving motor is embedded in the fixing block, the output end of the driving motor is connected to a drill rod, and the bottom end of the drill rod is located in the arc-shaped pipe mouth.

[0009] Specifically, the inner top of the dust box is provided with a dust collecting bag, the top of the square tube is located at the outer wall of the fixed block and a valve is provided, and the lower surface of the arc-shaped tube mouth is provided with a toothed surface and connected with the surface of the pile foundation.

[0010] The technical solution is specific that side panels are welded to both side walls of the arc-shaped pipe mouth, and telescopic rods are installed on both sides of the lower surface of the dust collection box located on the square tube by bolts, and the telescopic ends of the two telescopic rods are fixedly connected to the upper surfaces of the side panels, and the outsides of the telescopic ends of the two telescopic rods are provided with support springs, and both ends of the two support springs are fixedly connected to the upper surfaces of the side panels and the ends of the telescopic rods.

[0011] Specifically, the outer walls of the two hydraulic cylinders and the dust suction pump are sleeved with mounting plates, the outer walls on both sides of the mounting plates are welded with limiting plates, the tops of the inner walls of the two vertical plates are opened with limiting grooves, and the ends of the two limiting plates are located in the limiting grooves and are slidably connected thereto.

[0012] The technical solution is specific in that a horizontal plate is welded between the two vertical plates and located above the support block, and an upper arc plate is provided at the center below the two horizontal plates, and the arc surfaces of the two upper arc plates are connected to the upper surface of the pile foundation, and a plurality of balls are embedded in the arc surfaces of the two upper arc plates, and a threaded rod is rotatably installed at the center of the upper surface of the two upper arc plates, and the top end of the threaded rod passes through the horizontal plate and is fixed with a rotating handle, and guide rods are passed through the two sides of the threaded rod on the horizontal plate, and the bottom ends of the two guide rods are fixedly connected to the two ends of the upper surface of the upper arc plate.

[0013] The technical solution is specific, the rotating assembly includes a transmission shaft, the transmission shaft passes through the driving shell and is fixedly connected with rolling cylinders at both ends, a worm wheel is symmetrically fixed on the transmission shaft inside the driving shell, a worm is meshingly connected below the two worm wheels, both ends of the two worms are rotatably connected to the inner wall of the driving shell through an axle rod, a rotating shaft is provided at the inner center line of the driving shell below the transmission shaft, a driving sprocket is fixedly mounted on the rotating shaft, driven sprockets are provided on both sides of the driving sprocket, the two driven sprockets are fixedly mounted on the axle rod, the driving sprocket and the two driven sprockets are connected by a transmission chain, one end of the rotating shaft is fixedly connected to a fixed motor, and the fixed motor is fixedly connected to the inner wall of the driving shell by bolts.

[0014] Specifically, the rotating shaft and the transmission shaft are arranged in a cross shape, the diameter of the driving sprocket is larger than the diameter of the two driven sprockets, the end of the rotating shaft away from the fixed motor is rotatably connected to the inside of the drive shell, and the upper surface of the drive shell is embedded with a plurality of balls in contact with the surface of the pile foundation.

[0015] Specifically, a transparent window is provided on one of the vertical plates and a control panel is installed below the vertical plate. The control panel is electrically connected to the electric slide rail, the vacuum pump, the drilling assembly and the rotating assembly.

[0016] In summary, the present invention mainly has the following beneficial effects: the present invention can cover the drilling site and absorb the generated dust during the pile foundation drilling construction to prevent it from scattering to the surroundings, thereby reducing the steps of manual cleaning, and can automatically flip the pile foundation to improve the adaptability of the drilling construction; First, place the pile foundation horizontally in the arc grooves of the two support blocks so that the rolling cylinder contacts the surface of the pile foundation. Then manually turn the rotary handle to push the upper arc plate downward through the threaded rod and the guide rod so that the arc surface of the upper arc plate contacts the upper surface of the pile foundation. The pile foundation is clamped and fixed with the arc groove. Then start the electric slide rail to control the sliding seat to move horizontally. The sliding seat drives the drilling assembly to move. When it moves to the specified position, start the dust suction pump, drive motor, and hydraulic cylinder. The dust suction pump works to make the dust in the dust box Negative pressure is generated, and suction is generated at the arc-shaped pipe mouth through the square tube and the telescopic tube. At this time, the telescopic end of the hydraulic cylinder pushes the dust box downward, so that the dust box drives the square tube, the telescopic tube and the arc-shaped pipe mouth downward, so that the tooth surface of the arc-shaped pipe mouth contacts the upper surface of the pile foundation. At this time, the driving motor drives the drill rod to rotate. As the hydraulic cylinder continues to work, the direction tube squeezes the telescopic tube, and the rotating drill rod drills the pile foundation. The generated dust is sucked into the dust collecting bag attached to the dust box by the suction force, and the drilling of the pile foundation is completed; When it is necessary to drill holes on other surfaces of the pile foundation, start the fixed motor of the rotating assembly, and under the action of the transmission sprocket and the worm gear, the two rolling cylinders rotate, and the friction between the two rolling cylinders and the pile foundation drives it to rotate, so that the other surfaces rotate to the upper part and are located below the drilling assembly, and then repeat the above drilling operation to carry out drilling construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a diagram of the method steps of the present invention; Figure 2 It is a schematic diagram of the device of the present invention; Figure 3 It is a front cross-sectional structural diagram of the present invention; Figure 4 It is a cross-sectional structural diagram of the drilling assembly of the present invention; Figure 5 It is a schematic diagram of a drilling assembly of the present invention; Figure 6 It is an enlarged view of point A of the present invention; Figure 7 It is a top view of the structure of the rotating assembly of the present invention.

[0018] Description of the drawings: 1. Workbench; 101. Support block; 1011. Arc groove; 1012. Rolling drum; 102. Vertical plate; 1021. Transparent window; 1022. Limiting groove; 103. Top plate; 1031. Electric slide rail; 104. Drive shell; 105. Control panel; 2. Pile foundation; 3. Horizontal plate; 301. Upper arc plate; 302. Threaded rod; 303. Guide rod; 304. Rotary handle; 4. Sliding seat; 401. Dust box; 402. Hydraulic cylinder; 403. Dust pump; 5. Drilling assembly; 501. Square tube ; 5011, telescopic tube; 5012, arc-shaped pipe mouth; 502, fixed block; 5021, driving motor; 5022, drill rod; 503, connecting rod; 504, valve; 6, side plate; 601, telescopic rod; 602, supporting spring; 7, mounting plate; 701, limiting plate; 8, rotating assembly; 801, transmission shaft; 802, worm gear; 803, worm; 804, shaft; 805, driven sprocket; 806, fixed motor; 807, rotating shaft; 808, driving sprocket; 809, transmission chain; 9, dust collecting bag. DETAILED DESCRIPTION

[0019] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0020] The following describes an embodiment of the present invention based on its overall structure. Example

[0021] See also Figure 1-7 As shown, a highway bridge pile foundation construction method comprises the following steps: Step 1: Place and fix the pile foundation. Place the pile foundation 2 of the highway bridge horizontally in the support block 101 on the workbench 1, so that the lower surfaces of both ends of the pile foundation 2 are in contact with the arc groove 1011. Then manually rotate the handle 304 to move the upper arc plate 301 downward to contact the upper surface of the pile foundation 2, and cooperate with the arc groove 1011 to clamp and fix the pile foundation 2. Step 2, drilling construction, then start the electric slide rail 1031 to drive the drilling assembly 5 to move to the part of the pile foundation 2 where a hole needs to be drilled through the sliding seat 4, then the driving motor 5021 in the square tube 501 rotates and the hydraulic cylinder 402 works, the telescopic end of the hydraulic cylinder 402 pushes the dust box 401 and the drilling assembly 5 downward, so that the arc-shaped pipe mouth 5012 of the drilling assembly 5 is in close contact with the upper surface of the pile foundation 2, under the continuous push of the hydraulic cylinder 402, the rotating drill rod 5022 performs a drilling operation on the upper surface of the pile foundation 2, and at the same time, the dust suction pump 403 works to suck the dust generated by the drilling into the dust box 401 through the arc-shaped pipe mouth 5012, the telescopic tube 5011 and the square tube 501; Step 3, adjust the drilling surface. When it is necessary to drill holes on other surfaces of the pile foundation 2, by starting the fixed motor 806 in the rotating assembly 8, the driving of the transmission sprocket, the worm wheel 802 and the worm 803, the transmission shaft 801 can drive the rolling cylinder 1012 to rotate. The two rolling cylinders 1012 can drive the pile foundation 2 to rotate through friction with the surface of the pile foundation 2 and cooperation with the balls on the arc surface of the top arc plate 301. Then adjust the horizontal position of the drilling assembly 5 to drill holes on other surfaces of the pile foundation 2.

[0022] A control program is input into the control panel 105 in the present application for controlling all electrical components, wherein the valve 504 is arranged to prevent dust from falling from the square tube 501 when the dust pump 403 stops after the dust is sucked into the dust box 401 .

[0023] See also Figure 2-6 As shown, vertical plates 102 are welded on both sides of the long sides of the upper surface of the workbench 1, and top plates 103 are installed on the tops of the two vertical plates 102 by bolts. An electric slide rail 1031 is fixedly installed at the center of the lower surface of the top plate 103, and support blocks 101 are welded on both sides of the short sides of the upper surface of the workbench 1. Arc grooves 1011 are opened on the tops of the two support blocks 101, and rolling cylinders 1012 are embedded in the grooves of the two arc grooves 1011. The pile foundation 2 is horizontally placed in the two arc grooves 1011, and the upper surfaces of the two rolling cylinders 1012 are in contact with the lower surface of the pile foundation 2. A driving shell 104 is provided between the two support blocks 101, and a rotating assembly 8 is provided in the driving shell 104 for controlling the rotation of the two rolling cylinders 1012. A transparent window 1021 is provided on one vertical plate 102 and a control panel 105 is installed below. The electric slide rails 1031 are all slidably mounted with a sliding seat 4, and a hydraulic cylinder 402 is symmetrically fixed on the lower surface of the sliding seat 4. The telescopic ends of the two hydraulic cylinders 402 are fixedly mounted with a dust box 401. A drilling assembly 5 is provided below the dust box 401. The drilling assembly 5 consists of a dust suction mechanism and a drilling mechanism and is used to absorb dust generated when drilling holes in the pile foundation 2. The lower surface of the dust box 401 is connected to the dust suction mechanism. The upper surface of the dust box 401 is located between the two hydraulic cylinders 402 and is equipped with a dust suction pump 4 through bolts. 03, the suction port of the dust suction pump 403 is connected with the interior of the dust box 401, the outer walls of the two hydraulic cylinders 402 and the dust suction pump 403 are sleeved with a mounting plate 7, the outer walls of both sides of the mounting plate 7 are welded with limiting plates 701, the inner wall tops of the two vertical plates 102 are provided with limiting grooves 1022, the ends of the two limiting plates 701 are located in the limiting grooves 1022 and are slidably connected thereto, and the control panel 105 is electrically connected with the electric slide rail 1031, the dust suction pump 403, the drilling assembly 5 and the rotating assembly 8; A horizontal plate 3 is welded between the two vertical plates 102 and located above the support block 101. An upper arc plate 301 is provided at the center below the two horizontal plates 3. The arc surfaces of the two upper arc plates 301 are connected to the upper surface of the pile foundation 2. A plurality of balls are embedded in the arc surfaces of the two upper arc plates 301. A threaded rod 302 is rotatably installed at the center of the upper surface of the two upper arc plates 301. The top end of the threaded rod 302 passes through the horizontal plate 3 and is fixed with a rotating handle 304. Guide rods 303 are penetrated on both sides of the threaded rod 302 on the horizontal plate 3. The bottom ends of the two guide rods 303 are fixedly connected to the two ends of the upper surface of the upper arc plate 301.

[0024] When splicing the pile foundation 2 of the highway bridge, it is necessary to drill holes in the splicing part for installing the embedded parts or bolts thereon. At this time, the staff first places the pile foundation 2 horizontally and moves it laterally, so that the pile foundation 2 is located in the arc groove 1011 on the two support blocks 101, and the rolling cylinder 1012 contacts the surface of the pile foundation 2. Then the staff manually turns the rotary handle 304, and the rotary handle 304 drives the threaded rod 302 to rotate. The threaded rod 302 moves downward along the cross plate 3 through the bolts, so that the upper arc plate 301 moves following the rotation of the threaded rod 302 under the restriction of the guide rod 303, and the guide rod 303 slides along the cross plate 3 until the arc surface of the upper arc plate 301 contacts the surface of the pile foundation 2, and cooperates with the arc groove 1011 to achieve the function of clamping and fixing, wherein the ball of the upper arc plate 301 contacts the surface of the pile foundation 2; Then the staff starts the electric slide rail 1031 through the control panel 105, and observes the movement of the sliding seat 4 in real time through the transparent window 1021. The sliding seat 4 drives the drilling assembly 5 to move above the drilling position of the pile foundation 2 through the two hydraulic cylinders 402. When the two hydraulic cylinders 402 move, the mounting plate 7 and the limiting plate 701 will move. The two limiting plates 701 will slide along the limiting groove 1022, and the two limiting plates 701 can start the suspended support of the entire drilling assembly 5. Then, the dust suction pump 403, the two hydraulic cylinders 402 and the drilling assembly 5 are started through the control panel 105. The driving part of the drilling mechanism in the hole assembly 5, the dust suction pump 403 works to generate negative pressure in the dust box 401, and acts on the actuator of the dust suction mechanism in the drilling assembly 5. At this time, the telescopic ends of the two hydraulic cylinders 402 push the dust box 401 to move downward, so that the dust box 401 drives the drilling assembly 5 to move downward, and the actuator end of the dust suction mechanism contacts the upper surface of the pile foundation 2. Under the continuous operation of the hydraulic cylinder 402, the dust suction mechanism shrinks, and the drilling mechanism performs drilling construction on the surface of the pile foundation 2. The generated dust is sucked into the dust box 401 by suction and attached to the dust collecting bag 9, completing the drilling of the pile foundation 2; When it is necessary to drill holes on other surfaces of the pile foundation 2, the staff starts the actuator of the rotating assembly 8 through the control panel 105, which can control the two rolling cylinders 1012 to rotate. The rotation of the two rolling cylinders 1012 drives the pile foundation 2 to rotate through friction with the surface of the pile foundation 2, wherein the surface of the rolling cylinder 1012 can be provided with a friction layer to increase friction, and at the same time, the upper arc plate 301 and the plurality of balls on the driving shell 104 can cooperate with the rolling cylinder 1012 to rotate the pile foundation 2, so that the other surfaces of the pile foundation 2 rotate to the upper side and below the drilling assembly 5, and then repeat the above-mentioned drilling operation to perform drilling construction; Therefore, the present application can cover the drilling site and absorb the generated dust when drilling the pile foundation 2 to prevent it from scattering to the surroundings, reducing the steps of manual cleaning, and can automatically flip the pile foundation 2 to improve the adaptability of the drilling construction.

[0025] See also Figure 3-5 As shown, the drilling assembly 5 includes a square tube 501, the top of the square tube 501 is connected to the lower surface of the dust box 401, a truncated cone-shaped fixed block 502 is provided at the center of the square tube 501, both sides of the fixed block 502 are fixedly connected to the tube wall of the square tube 501 through connecting rods 503, a telescopic tube 5011 is fixed to the bottom end of the square tube 501, an arc-shaped pipe mouth 5012 is fixed to the bottom end of the telescopic tube 5011, a driving motor 5021 is embedded in the fixed block 502, the output end of the driving motor 5021 is connected to a drill rod 5022, the bottom end of the drill rod 5022 is located in the arc-shaped pipe mouth 5012, a dust collecting bag 9 is provided at the inner top of the dust box 401, a valve 504 is provided at the top of the square tube 501 located at the outer wall of the fixed block 502, and a tooth surface is provided on the lower surface of the arc-shaped pipe mouth 5012 and is connected to the surface of the pile foundation 2; Side panels 6 are welded to both side walls of the arc-shaped pipe mouth 5012, and telescopic rods 601 are installed on both sides of the lower surface of the dust box 401 located on the square tube 501 by bolts, and the telescopic ends of the two telescopic rods 601 are fixedly connected to the upper surface of the side panel 6, and the telescopic ends of the two telescopic rods 601 are sleeved with support springs 602 on the outside, and both ends of the two support springs 602 are fixedly connected to the upper surface of the side panel 6 and the end of the telescopic rod 601, wherein a sealing door is provided on one end face of the dust box 401, which can centrally process the dust collected inside.

[0026] The driving motor 5021 of the drilling assembly 5 works together with the dust suction pump 403 and the two hydraulic cylinders 402. The output end of the driving motor 5021 drives the connected drill rod 5022 to rotate. When the telescopic ends of the two hydraulic cylinders 402 push the dust box 401 downward, the dust box 401 drives the dust suction pump 403, the square tube 501, the telescopic tube 5011 and the arc-shaped pipe mouth 5012 to move downward until the tooth surface of the arc-shaped pipe mouth 5012 contacts the surface of the pile foundation 2. The setting of the tooth surface can avoid the arc-shaped pipe mouth 5012 from contacting the surface of the pile foundation 2. The dust collecting box 401 is sealed to facilitate the suction to absorb the dust. At this time, as the hydraulic cylinder 402 continues to work, the dust collecting box 401 will drive the square tube 501 to continue to move downward. The downwardly moving square tube 501 will squeeze the telescopic tube 5011, causing the telescopic tube 5011 to shrink, and will also shrink the two telescopic rods 601 and squeeze the supporting spring 602. At this time, the fixed block 502 will move with the square tube 501, so that the rotating drill rod 5022 will contact the surface of the pile foundation 2 through the arc-shaped pipe mouth 5012 and perform drilling construction. The dust generated by drilling enters the telescopic tube 5011 and the square tube 501 through the suction at the arc-shaped pipe mouth 5012, enters the dust box 401 from both sides of the fixed block 502 through the valve 504 opened upward due to the suction, and adheres to the dust collecting bag 9. After long-term use, the dust collected inside is centrally processed by opening the sealed door.

[0027] See also Figure 3 and Figure 7 As shown, the rotating assembly 8 includes a transmission shaft 801, which passes through the drive housing 104 and is fixedly connected to the rolling cylinder 1012 at both ends. Worm wheels 802 are symmetrically fixed on the transmission shaft 801 and located in the drive housing 104. Worm screws 803 are meshed and connected below the two worm wheels 802. Both ends of the two worm screws 803 are rotatably connected to the inner wall of the drive housing 104 through shafts 804. A rotating shaft 807 is provided at the inner center line of the drive housing 104 and located below the transmission shaft 801. A driving sprocket 808 is fixedly installed on the rotating shaft 807. A driven sprocket 805 is provided on both sides of the driving sprocket 808. The driven sprockets 805 are fixedly mounted on the shaft 804, the driving sprocket 808 and the two driven sprockets 805 are connected to each other through a transmission chain 809, one end of the rotating shaft 807 is fixedly connected to the fixed motor 806, the fixed motor 806 is fixedly connected to the inner wall of the driving shell 104 through bolts, the rotating shaft 807 and the transmission shaft 801 are arranged in a cross shape, the diameter of the driving sprocket 808 is larger than the diameter of the two driven sprockets 805, the end of the rotating shaft 807 away from the fixed motor 806 is rotatably connected to the inside of the driving shell 104, and a plurality of balls in contact with the surface of the pile foundation 2 are embedded in the upper surface of the driving shell 104.

[0028] The fixed motor 806 in the rotating assembly 8 is working, and the output end of the fixed motor 806 drives the rotating shaft 807 to rotate, and the rotating shaft 807 drives the driving sprocket 808 to rotate, and the driving sprocket 808 drives the driven sprockets 805 on both sides to rotate through the transmission chain 809, and the two driven sprockets 805 drive the inserted shaft 804 to rotate, and the connected worm 803 is driven to rotate through the rotating shaft 804, and the two worms 803 drive the meshing worm wheels 802 to rotate, so that the two worm wheels 802 drive the inserted transmission shaft 801 to rotate, and the rotating transmission shaft 801 transmits the rotational force to the rolling cylinders 1012 at both ends, so that the rolling cylinders 1012 rotate and drive the pile foundation 2 to rotate through friction, wherein according to the worm wheel 802 and the worm 803, the worm wheel 802 cannot drive the worm 803 to rotate, and the rolling cylinder 1012 can be locked, and the clamping and fixing effect is achieved in cooperation with the top arc plate 301.

[0029] The working principle of the present invention is: When splicing the pile foundation 2 of the highway bridge, it is necessary to drill holes in the splicing part for installing the embedded parts or bolts thereon. At this time, the staff first places the pile foundation 2 horizontally and moves it laterally, so that the pile foundation 2 is located in the arc groove 1011 on the two support blocks 101, and the rolling cylinder 1012 contacts the surface of the pile foundation 2. Then the staff manually turns the rotary handle 304, and the rotary handle 304 drives the threaded rod 302 to rotate. The threaded rod 302 moves downward along the cross plate 3 through the bolts, so that the upper arc plate 301 moves following the rotation of the threaded rod 302 under the restriction of the guide rod 303, and the guide rod 303 slides along the cross plate 3 until the arc surface of the upper arc plate 301 contacts the surface of the pile foundation 2, and cooperates with the arc groove 1011 to achieve the function of clamping and fixing, wherein the ball of the upper arc plate 301 contacts the surface of the pile foundation 2; Then the staff starts the electric slide rail 1031 through the control panel 105, and observes the movement of the sliding seat 4 in real time through the transparent window 1021. The sliding seat 4 drives the drilling assembly 5 to move above the drilling position of the pile foundation 2 through the two hydraulic cylinders 402. When the two hydraulic cylinders 402 move, the mounting plate 7 and the limiting plate 701 are driven to move. The two limiting plates 701 slide along the limiting groove 1022. Then the dust suction pump 403, the two hydraulic cylinders 402 and the driving motor 5021 are started through the control panel 105. The operation of the dust suction pump 403 generates negative pressure in the dust box 401, and suction is generated at the arc-shaped pipe mouth 5012 through the square tube 501 and the telescopic tube 5011. The output end of the driving motor 5021 drives the connected drill rod 5022 to rotate When the telescopic ends of the two hydraulic cylinders 402 push the dust box 401 downward, the dust box 401 will drive the dust suction pump 403 and the square tube 501, the telescopic tube 5011 and the arc-shaped pipe mouth 5012 to move downward until the tooth surface of the arc-shaped pipe mouth 5012 contacts the surface of the pile foundation 2. At this time, as the hydraulic cylinder 402 continues to work, the dust box 401 will drive the square tube 501 to continue to move downward, and the downward moving square tube 501 will squeeze the telescopic tube 5011, causing the telescopic tube 5011 to shrink, and will also shrink the two telescopic rods 601 and squeeze the support spring 602. At this time, the fixed block 502 will move with the square tube 501, so that the rotating drill rod 5022 contacts the surface of the pile foundation 2 through the arc-shaped pipe mouth 5012 and performs drilling construction; The dust generated by drilling enters the telescopic tube 5011 and the square tube 501 through the suction force at the arc-shaped tube opening 5012, and enters the dust box 401 from both sides of the fixed block 502 through the valves 504 opened upward due to the suction force, and adheres to the dust collecting bag 9; When it is necessary to drill holes on other surfaces of the pile foundation 2, the staff starts the fixed motor 806 of the rotating assembly 8 through the control panel 105, and the output end of the fixed motor 806 drives the rotating shaft 807 to rotate, and the rotating shaft 807 drives the driving sprocket 808 to rotate, and the driving sprocket 808 drives the driven sprockets 805 on both sides to rotate through the transmission chain 809, and the two driven sprockets 805 drive the shaft rod 804 to rotate, and the connected worm 803 is driven to rotate through the rotating shaft rod 804, and the two worm 803 drives the meshing The worm gear 802 rotates, so that the two worm gears 802 drive the transmission shaft 801 to rotate. The rotating transmission shaft 801 transmits the rotational force to the rolling cylinders 1012 at both ends, so that the rolling cylinders 1012 rotate and drive the pile foundation 2 to rotate through friction. At the same time, the upper arc plate 301 and several balls on the drive shell 104 can cooperate with the rolling cylinders 1012 to rotate the pile foundation 2, so that the other surfaces of the pile foundation 2 rotate to the upper side and below the drilling assembly 5, and then repeat the above drilling operation to carry out drilling construction.

[0030] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A highway bridge pile foundation construction method, characterized in that , including the following steps: Step 1: The pile foundation is placed and fixed. The pile foundation (2) of the highway bridge is placed horizontally on the support block (101) on the workbench (1), so that the lower surfaces of both ends of the pile foundation (2) are in contact with the arc grooves (1011), and then the rotary handle (304) is manually rotated to make the upper arc plate (301) move downward to contact with the upper surface of the pile foundation (2), and the pile foundation (2) is clamped and fixed in cooperation with the arc grooves (1011); Step 2, drilling construction, then start the electric slide rail (1031) to drive the drilling assembly (5) to move to the position above the pile foundation (2) where a hole needs to be drilled through the sliding seat (4), then the driving motor (5021) in the square tube (501) rotates and the hydraulic cylinder (402) works, the telescopic end of the hydraulic cylinder (402) pushes the dust box (401) and the drilling assembly (5) downward, so that the arc-shaped pipe mouth (5012) of the drilling assembly (5) is in close contact with the upper surface of the pile foundation (2), and under the continuous push of the hydraulic cylinder (402), the rotating drill rod (5022) performs a drilling operation on the upper surface of the pile foundation (2), and at the same time, the dust suction pump (403) works to suck the dust generated by the drilling into the dust box (401) through the arc-shaped pipe mouth (5012), the telescopic tube (5011) and the square tube (501); Step 3: Adjust the drilling surface. When it is necessary to drill holes on other surfaces of the pile foundation (2), the fixed motor (806) in the rotating assembly (8) is started. Under the drive of the transmission sprocket, the worm wheel (802) and the worm (803), the rolling cylinder (1012) can be driven to rotate through the transmission shaft (801). The two rolling cylinders (1012) can drive the pile foundation (2) to rotate through friction with the surface of the pile foundation (2) and the balls on the arc surface of the top arc plate (301). Then, the horizontal position of the drilling assembly (5) is adjusted to drill holes on other surfaces of the pile foundation (2).

2. A highway bridge pile foundation construction method according to claim 1, characterized in that: Vertical plates (102) are welded on both sides of the long sides of the upper surface of the workbench (1), and top plates (103) are installed on the tops of the two vertical plates (102) by bolts. An electric slide rail (1031) is fixedly installed at the center of the lower surface of the top plate (103). Support blocks (101) are welded on both sides of the short sides of the upper surface of the workbench (1), and arc grooves (1011) are opened on the tops of the two support blocks (101). Rolling cylinders (1012) are embedded in the grooves of the two arc grooves (1011). The pile foundation (2) is horizontally placed in the two arc grooves (1011), and the upper surfaces of the two rolling cylinders (1012) are in contact with the lower surface of the pile foundation (2). A driving shell (104) is provided between the two support blocks (101), and a rotating assembly (8) is provided in the driving shell (104) for controlling the rotation of the two rolling cylinders (1012); A sliding seat (4) is slidably mounted on each of the electric slide rails (1031); a hydraulic cylinder (402) is symmetrically fixed on the lower surface of the sliding seat (4); a dust box (401) is fixedly mounted on the telescopic ends of the two hydraulic cylinders (402); a drilling assembly (5) is provided below the dust box (401); the drilling assembly (5) is composed of a dust suction mechanism and a drilling mechanism and is used to absorb dust generated when drilling holes in the pile foundation (2); the lower surface of the dust box (401) is connected to the dust suction mechanism; a dust suction pump (403) is bolted to the upper surface of the dust box (401) located between the two hydraulic cylinders (402); and a suction port of the dust suction pump (403) is connected to the interior of the dust box (401).

3. A highway bridge pile foundation construction method according to claim 2, characterized in that: The drilling assembly (5) comprises a square tube (501), the top end of the square tube (501) being connected to the lower surface of the dust box (401), a truncated cone-shaped fixing block (502) being provided at the center of the square tube (501), both sides of the fixing block (502) being fixedly connected to the tube wall of the square tube (501) via connecting rods (503), a telescopic tube (5011) being fixed to the bottom end of the square tube (501), an arc-shaped tube opening (5012) being fixed to the bottom end of the telescopic tube (5011), a driving motor (5021) being embedded in the fixing block (502), an output end of the driving motor (5021) being connected to a drilling rod (5022), and the bottom end of the drilling rod (5022) being located in the arc-shaped tube opening (5012).

4. A highway bridge pile foundation construction method according to claim 3, characterized in that: A dust collecting bag (9) is provided at the inner top of the dust box (401), a valve (504) is provided at the top of the square tube (501) located at the outer wall of the fixed block (502), and a toothed surface is provided on the lower surface of the arc-shaped tube opening (5012) and is connected to the surface of the pile foundation (2).

5. A highway bridge pile foundation construction method according to claim 3, characterized in that: Side panels (6) are welded to both side walls of the arc-shaped pipe opening (5012); telescopic rods (601) are installed on both sides of the lower surface of the dust collection box (401) located on the square tube (501) by bolts; the telescopic ends of the two telescopic rods (601) are fixedly connected to the upper surface of the side panels (6); the telescopic ends of the two telescopic rods (601) are sleeved with support springs (602) on the outside; and both ends of the two support springs (602) are fixedly connected to the upper surface of the side panels (6) and the ends of the telescopic rods (601).

6. A highway bridge pile foundation construction method according to claim 2, characterized in that: The outer walls of the two hydraulic cylinders (402) and the dust suction pump (403) are sleeved with a mounting plate (7), and the outer walls on both sides of the mounting plate (7) are welded with limiting plates (701), and the tops of the inner walls of the two vertical plates (102) are provided with limiting grooves (1022), and the ends of the two limiting plates (701) are located in the limiting grooves (1022) and are slidably connected thereto.

7. A highway bridge pile foundation construction method according to claim 2, characterized in that: A horizontal plate (3) is welded between the two vertical plates (102) and located above the support block (101). An upper arc plate (301) is provided at the center below the two horizontal plates (3). The arc surfaces of the two upper arc plates (301) are in contact with the upper surface of the pile foundation (2). A plurality of balls are embedded in the arc surfaces of the two upper arc plates (301). A threaded rod (302) is rotatably mounted at the center of the upper surface of the two upper arc plates (301). The top end of the threaded rod (302) passes through the horizontal plate (3) and is fixed with a rotary handle (304). Guide rods (303) are provided on both sides of the threaded rod (302) on the horizontal plate (3). The bottom ends of the two guide rods (303) are fixedly connected to the two ends of the upper surface of the upper arc plate (301).

8. A highway bridge pile foundation construction method according to claim 2, characterized in that: The rotating assembly (8) comprises a transmission shaft (801), the transmission shaft (801) passes through the drive housing (104) and is fixedly connected to the rollers (1012) at both ends, worm wheels (802) are symmetrically fixed on the transmission shaft (801) and located inside the drive housing (104), worms (803) are meshingly connected below the two worm wheels (802), both ends of the two worms (803) are rotatably connected to the inner wall of the drive housing (104) through the shaft (804), and the inner center line of the drive housing (104) is located at the transmission shaft (801). A rotating shaft (807) is provided at the bottom, a driving sprocket (808) is fixedly mounted on the rotating shaft (807), driven sprockets (805) are provided on both sides of the driving sprocket (808), the two driven sprockets (805) are fixedly mounted on the shaft (804), the driving sprocket (808) and the two driven sprockets (805) are connected to each other via a transmission chain (809), one end of the rotating shaft (807) is fixedly connected to a fixed motor (806), and the fixed motor (806) is fixedly connected to the inner wall of the drive housing (104) via bolts.

9. A highway bridge pile foundation construction method according to claim 8, characterized in that: The rotating shaft (807) and the transmission shaft (801) are arranged in a cross shape, the diameter of the driving sprocket (808) is larger than the diameters of the two driven sprockets (805), and one end of the rotating shaft (807) away from the fixed motor (806) is rotatably connected to the inside of the driving housing (104), and a plurality of balls in contact with the surface of the pile foundation (2) are embedded in the upper surface of the driving housing (104).

10. A highway bridge pile foundation construction method according to claim 2, characterized in that: A transparent window (1021) is provided on one of the vertical plates (102) and a control panel (105) is installed below the vertical plate; the control panel (105) is electrically connected to the electric slide rail (1031), the vacuum pump (403), the drilling assembly (5) and the rotating assembly (8).