Building material informatization management method, electronic equipment and storage medium

By splitting the building site into the target building site and building building model and mapping relationship, the complexity of information management and data inconsistency caused by frequent scanning in the existing technology is solved, and real-time use of building materials on construction sites is achieved. The real-time and effectiveness of updates and information management.

CN119444105AInactive Publication Date: 2025-02-14徐宇龙
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411384700.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2025-02-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing information management methods for building materials need to frequently scan the barcodes on real building materials during the management process, which leads to an increase in the complexity of information management and control, and may lead to inconsistent data in the building materials information model with the real building materials status, weakening information. Timeliness and effectiveness of control.

Method used

By splitting the building site to be managed into multiple target building sites according to the construction level, building models corresponding to the target building site, and establishing a mapping relationship between real building materials and building structures, the data in building data blocks are updated in real time in real time structure so that it is consistent with the construction process.

Benefits of technology

Real-time update of the use of building materials at construction sites has been achieved, real-time and effectiveness of information management and control at construction sites has been improved, the complexity of information management and control has been reduced, and the synchronization of building materials information model and real building materials status has been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119444105A_ABST
    Figure CN119444105A_ABST
Patent Text Reader

Abstract

The invention provides a building material informatization management method, electronic equipment and a storage medium, and the method comprises the steps: dividing a to-be-managed building site into a plurality of target building sites according to the construction level, and constructing building models corresponding to the target building sites through a preset informatization model, the target building site comprises at least one target storage area and at least one real building material located in the target storage area, and the building model comprises a building data block corresponding to the target storage area and at least one building structure located in the building data block; establishing a mapping relationship between each real building material and each building structure through a preset informatization model, wherein the mapping relationship is used for representing a corresponding relationship between each building structure and each real building material; and in response to the identified building material change of the target building site, updating the change information to the corresponding building data block through the informatization model, so that the data structure in the building data block is consistent with the construction process of the target building site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of construction information technology, and in particular to a building material information management method, electronic equipment and a computer-readable storage medium. Background Art

[0002] With the continuous advancement and widespread deployment of information technology, it has become crucial to use information technology to implement information-based monitoring of the construction process. This practice has significantly accelerated the construction progress, greatly reduced the demand for human resources, and improved the overall efficiency of the construction project. Among the many related technologies, a management and control method based on the building materials information model is particularly prominent. This method involves the following steps: First, the integrated design model is split into components to form a detailed building information model. Using this model, simulations can be performed to reproduce the conditions of the actual construction site. Then, the information in the model is converted into production data of the components in order to manage the production links of the actual building materials. In addition, by scanning the barcodes on the real building materials, location information can be obtained, which is transmitted back to the building information model to manage the transportation process of the building materials.

[0003] However, in the management process, this method emphasizes the use of building information models to control building materials throughout their life cycle. During this control cycle, the barcodes on real building materials need to be scanned frequently. This process is relatively complicated and may increase the difficulty of information-based control. More importantly, this repeated scanning may cause inconsistencies between the data in the building materials information model and the actual status of the real building materials at the construction site, which may weaken the timeliness and effectiveness of information-based control of building materials. The barcodes of real building materials need to be scanned multiple times, which not only increases the complexity of information-based control, but also poses a risk that the information in the building materials information model may be out of sync with the status of the real building materials on site. This disconnect may damage the real-time nature of information-based control. Summary of the invention

[0004] The purpose of this application is to provide an electronic device and a computer-readable storage medium for a construction material information management method, which can update the use of construction materials on a construction site in real time and improve the real-time performance of information management and control of the construction site.

[0005] In a first aspect, an embodiment of the present invention provides a method for information management of building materials, the method comprising:

[0006] The building site to be managed is divided into a plurality of target building sites according to the construction level, and a building model corresponding to the target building site is constructed by a preset information model, wherein the target building site includes at least one target storage area and at least one real building material in the target storage area, and the building model includes a building data block corresponding to the target storage area and at least one building structure in the building data block;

[0007] Establishing a mapping relationship between each of the real building materials and each of the building structures through the preset information model, wherein the mapping relationship is used to characterize the corresponding relationship between each of the building structures and each of the real building materials;

[0008] In response to identifying changes in building materials at the target building site, the change information is updated to the corresponding building data block through the information model, so that the data structure in the building data block is consistent with the construction progress of the target building site.

[0009] In one implementation, the step of dividing the construction site to be managed into a plurality of target construction sites according to the construction level includes:

[0010] Conducting monitoring and classification of the construction site to be managed, each monitoring level including at least one construction material storage area;

[0011] The construction area having a building material storage area and satisfying the preset splitting conditions is divided to obtain the corresponding target construction site.

[0012] In one embodiment, the step of constructing a building model corresponding to the target building site by using a preset information model includes:

[0013] In response to a first preset operation instruction, inputting a parameter set corresponding to the target building site into the preset information model;

[0014] After the parameter set is input into the preset information model, a second preset operation instruction is received, and in response to the second preset operation instruction, the building model is planned in the preset information model according to the parameter set.

[0015] In one embodiment, the establishing of a mapping relationship between each of the real building materials and each of the building structures through the preset information model includes:

[0016] Assigning a first version number to the real building material, and assigning a second version number corresponding to the first version number to the building structure in the building data block;

[0017] When the state of the real building material changes, a corresponding second version number is obtained based on the first version number of the real building material, and the state of the building structure corresponding to the second version number is updated in the building data block.

[0018] In one embodiment, the acquiring the corresponding second version number based on the first version number of the real building material, and updating the state of the building structure corresponding to the second version number in the building data block, includes:

[0019] Determine the building data block where the building structure corresponding to the second version number is located as the target building data block;

[0020] The building structure in the target building data block is updated according to the change of the real building material.

[0021] In one embodiment, the preset information model stores a communication program that associates the real building material with the building structure; and dynamically updating the building structure in the preset information model according to the mapping relationship includes:

[0022] Starting the communication program, and packaging the mapping relationship between the building structure and the real building material through the communication program to obtain a corresponding construction information query request message;

[0023] The construction information query request message is parsed and processed to obtain a corresponding first update information set, wherein the first update information set is used to reflect the status of each of the real building materials being presented at the real construction site and being promoted in the real construction process.

[0024] In one embodiment, after parsing the construction information query request message to obtain the corresponding first update information set, the method further includes:

[0025] According to the first update information set, in the preset information model, the building structure associated with the building material information is dynamically deduced according to the virtual construction process to obtain a second update information set; the second update information set is used to reflect the state of the building structure in the virtual construction process of the building model;

[0026] The building structure is replanned in the preset information model according to the second update information set.

[0027] In one implementation, packaging the mapping relationship between the building structure and the real building material through the communication program includes:

[0028] The building material information association results are stored in a preset storage space in order respectively;

[0029] According to the order in which the building material information association results are stored in the preset storage space, transferring the building material information association results from the preset storage space to the communication program respectively;

[0030] When the building material information association results exist in the communication program, the building material information association results are packaged in the instant messaging program according to a preset network communication protocol.

[0031] In a second aspect, the present invention provides an electronic device comprising: a processor; a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement the building materials information management method as described in any one of the first aspects.

[0032] In a third aspect, the present invention provides a computer-readable storage medium. When instructions in the computer-readable storage medium are executed by a processor, the method for information management of building materials described in any one of the first aspects is implemented.

[0033] The construction material information management method, device, electronic device and computer-readable storage medium provided by the present invention obtain multiple target construction sites by splitting the construction site, construct a building model corresponding to the target construction site through the information model, and establish a mapping relationship between the target construction site and the building materials in the corresponding building model, and simulate the use status of the building materials at the target construction site through the building model based on the mapping relationship. In this way, the use status of the building materials at the construction site can be updated in real time, and the real-time performance of the information management and control of the construction site can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0035] Figure 1 A schematic diagram of a process flow of a building materials information management method provided by an embodiment of the present invention;

[0036] Figure 2 A schematic diagram of modules of a building materials information management system provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0037] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0038] It should be noted that, in this article, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element. In addition, components, features, and elements with the same name in different embodiments of the present application may have the same meaning or different meanings, and their specific meanings need to be determined by their explanation in the specific embodiment or further combined with the context of the specific embodiment.

[0039] It should be understood that, although the terms first, second, third, etc. may be used to describe various information in this article, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this article, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein can be interpreted as "at the time of..." or "when..." or "in response to determination". Furthermore, as used in this article, the singular forms "one", "one" and "the" are intended to also include plural forms, unless there is an opposite indication in the context. It should be further understood that the terms "comprising", "including" indicate that there are described features, steps, operations, elements, components, projects, kinds, and / or groups, but do not exclude the existence, occurrence or addition of one or more other features, steps, operations, elements, components, projects, kinds, and / or groups. The terms "or" and "and / or" used herein are interpreted as inclusive, or mean any one or any combination. Thus, “A, B, or C” or “A, B and / or C” means “any of the following: A; B; C; A and B; A and C; B and C; A, B, and C.” An exception to this definition will occur only when a combination of elements, functions, steps, or operations are inherently mutually exclusive in some manner.

[0040] It should be understood that, although the various steps in the flowchart in the embodiment of the present application are displayed in sequence according to the indication of the arrows, these steps are not necessarily performed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and it can be performed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and their execution order is not necessarily performed in sequence, but can be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.

[0041] It should be noted that in this article, step codes such as S1 and S2 are used for the purpose of expressing the corresponding content more clearly and concisely, and do not constitute a substantial limitation on the order. When implementing the step, those skilled in the art may execute S2 first and then S1, etc., but these should all be within the scope of protection of this application.

[0042] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0043] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present application, and have no specific meanings. Therefore, "module", "component" or "unit" can be used in a mixed manner.

[0044] See also Figure 1 , is a flow chart of a method for information management of building materials provided in an embodiment of the present application. The method for information management of building materials can be executed by a method for information management of building materials provided in an embodiment of the present application. The system can be implemented in software and / or hardware, such as electronic devices such as servers, computers, and processors. In this embodiment, the execution subject of the method for information management of building materials is a processor of a vehicle-mounted terminal as an example. The method for information management of building materials provided in this embodiment includes:

[0045] Step S1, splitting the construction site to be managed into multiple target construction sites according to the construction level, and constructing a building model corresponding to the target construction site through a preset information model, wherein the target construction site includes at least one target storage area and at least one real building material located in the target storage area, and the building model includes a building data block corresponding to the target storage area and at least one building structure located in the building data block.

[0046] Understandably, by splitting the construction site, the complex entire construction site can be divided into smaller, more manageable parts. And ensuring that each target construction site is equipped with at least one storage area can more effectively manage materials and resources, ensuring that materials can be delivered directly to the use site according to the construction progress and needs, reducing unnecessary transportation and handling, and improving the efficiency of material circulation.

[0047] In this embodiment, the building model can be understood as a virtual construction site, which is used to simulate the real construction site. Similarly, the building data block is used to simulate the storage area in the target construction site, and the building structure is used to simulate the real building materials at the construction site. In this way, the construction site is expressed in the form of data, and the material changes at the construction site are simulated through the changes in data, so that the construction situation of the construction site can be efficiently grasped.

[0048] It should be noted that when the building planning at the construction site changes, it can also be displayed in the form of data. For example, if a temporary office area is built on the construction site, a temporary foundation pit is excavated, and machinery and equipment are brought in, the same principle can be used to represent it in data.

[0049] In one embodiment, constructing a building model corresponding to a target building site through a preset information model includes: in response to a first preset operation instruction, inputting a parameter set corresponding to the target building site into the preset information model; after the parameter set is input into the preset information model, receiving a second preset operation instruction, and in response to the second preset operation instruction, planning the building model in the preset information model according to the parameter set.

[0050] It can be understood that during the operation of the preset information model, the first preset operation instruction can be identified by the operation identifier, and the first preset operation instruction can include characters, single clicks, double clicks, and other operations of the mouse, and the second preset operation instruction is similar to the first preset operation instruction. By setting the first preset operation instruction and the second preset operation instruction, the building model is established step by step, which can ensure the reliability of the building model.

[0051] In one embodiment, the construction site to be managed is split into multiple target construction sites according to the construction level, including: monitoring the construction site to be managed in a graded manner, each monitoring level including at least one building material storage area; dividing the construction area having a building material storage area and satisfying preset splitting conditions to obtain corresponding target construction sites.

[0052] In this embodiment, the building model is made to correspond to the target construction site, and the storage area of ​​the building model corresponds to the storage area of ​​the target construction site. The material flow situation of the storage area of ​​the target construction site can be determined by the material flow situation of the building material storage area of ​​the virtual site, so that the material entry and exit of the construction site can be controlled in time.

[0053] Step S2: establishing a mapping relationship between each of the real building materials and each of the building structures through the preset information model, wherein the mapping relationship is used to characterize the corresponding relationship between each of the building structures and each of the real building materials.

[0054] By establishing a mapping relationship, the building structure and the actual building materials are made to correspond to each other, so that the changes in data information can be used to represent the flow status of the actual building materials in the target construction site, thereby realizing real-time management and control of building materials.

[0055] In one embodiment, the mapping relationship between each of the real building materials and each of the building structures is established through the preset information model, including: assigning a first version number to the real building material, and assigning a second version number corresponding to the first version number to the building structure in the building data block; when the status of the real building material changes, obtaining the corresponding second version number based on the first version number of the real building material, and updating the status of the building structure corresponding to the second version number in the building data block.

[0056] Here, by assigning a first version number to each building material and a corresponding second version number to the building structure, a one-to-one correspondence between real building materials and building structures can be ensured, facilitating accurate tracking and management. After the mapping relationship is established, the material status of the real construction site can be reflected in the building model, realizing synchronous update of information. This improves the efficiency and accuracy of construction project management.

[0057] Furthermore, the method of obtaining a corresponding second version number based on the first version number of the real building material and updating the status of the building structure corresponding to the second version number in the building data block includes: determining the building data block where the building structure corresponding to the second version number is located as the target building data block; and updating the building structure in the target building data block according to the change of the real building material.

[0058] It can be understood that by using the data changes in the building data block to represent the changes in the building materials in the storage area of ​​the construction site, the data changes in the building data block can also be inferred by using the changes in the building materials in the corresponding storage area. Therefore, the building structure in the target building data block is updated according to the changes in the real building materials, so that the building structure in the building data block always maintains a corresponding relationship with the building materials.

[0059] It should be noted that the building data block and the building structure are associated through the version number and the building data block number, and each type of building structure has a specific version number. When a new building structure is added to the building model, the corresponding building data block can be matched according to the version number of the building structure. After the match is successful, the building structure is stored in the building data block, and the building structure is filled based on the building data block, so that the building structure corresponds to the building materials at the construction site.

[0060] In addition, when a newly added building structure has not established a mapping relationship with the corresponding building material, when the second version number of the newly added building structure is the same as the second version number of the established building structure, the corresponding building material is automatically matched for the newly added building structure based on the second version number of the established building structure and the first version number of the building material with which the mapping relationship is established.

[0061] Step S3, in response to identifying changes in building materials at the target building site, updating the change information into the corresponding building data block through the information model, so that the data structure in the building data block is consistent with the construction progress of the target building site.

[0062] Specifically, the preset information model stores a communication program that associates the real building materials with the building structure; the dynamic updating of the building structure in the preset information model according to the mapping relationship includes: starting the communication program, packaging the mapping relationship between the building structure and the real building materials through the communication program to obtain a corresponding construction information query request message; parsing the construction information query request message to obtain a corresponding first update information set, wherein the first update information set is used to reflect the status of each of the real building materials being presented at the real construction site and being promoted in the real construction process.

[0063] It can be understood that, since the mapping relationship between real building materials and building structures has been established in the previous text, the data changes in the first update information set can directly correspond to the state changes of real building materials. Specifically, the data in the first update information set can come from various sensors, barcode scanning or other data collection methods on site, which can accurately track the state of materials. By analyzing the first update information set, information such as the speed of material consumption and construction progress can be understood, thereby evaluating the health of the real construction process.

[0064] Furthermore, after parsing the construction information query request message to obtain the corresponding first update information set, the method also includes: based on the first update information set, in the preset information model, dynamically deducing the virtual construction process for the building structure associated with the building material information to obtain a second update information set; the second update information set is used to reflect the state of the building structure in the virtual construction process of the building model; and re-planning the building structure in the preset information model based on the second update information set.

[0065] In this embodiment, by dynamically deducing the virtual construction process, the construction progress and material requirements can be accurately predicted, and the material usage status can be accurately reflected, which helps project managers optimize resource allocation and improve resource utilization. At the same time, potential problems and risks can be discovered and prevented in advance, reducing uncertainty in the construction process.

[0066] Furthermore, the mapping relationship between the building structure and the real building material is packaged and processed through the communication program, including: storing each of the building material information association results in a preset storage space in order; transferring each of the building material information association results from the preset storage space to the communication program in the order in which each of the building material information association results is stored in the preset storage space; when each of the building material information association results exists in the communication program, packaging each of the building material information association results in the instant messaging program according to the preset network communication protocol.

[0067] Preferably, the storage space in this embodiment may be a database, a file system or other data storage medium, etc. Orderly storing the building material information and the associated results can ensure the orderliness and traceability of the building material information.

[0068] The construction material information management method provided by the present invention obtains multiple target construction sites by splitting the construction site, constructs a construction model corresponding to the target construction site through the information model, and establishes a mapping relationship between the target construction site and the construction materials in the corresponding construction model, and simulates the use status of the construction materials at the target construction site through the construction model based on the mapping relationship. In this way, the use status of the construction materials at the construction site can be updated in real time, and the real-time performance of the information management and control of the construction site can be improved.

[0069] Based on the same inventive concept as the aforementioned embodiments, the present invention also provides an electronic device, comprising: a processor; a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement a method for information management of building materials as described in any one of the aforementioned embodiments.

[0070] Based on the same concept of the aforementioned embodiments, the present invention also provides a computer-readable storage medium, characterized in that when the instructions in the computer-readable storage medium are executed by a processor, the building materials information management method as described in any one of the aforementioned embodiments is implemented.

[0071] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0072] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. A method for information management of building materials, characterized in that: include: The building site to be managed is divided into a plurality of target building sites according to the construction level, and a building model corresponding to the target building site is constructed by a preset information model, wherein the target building site includes at least one target storage area and at least one real building material in the target storage area, and the building model includes a building data block corresponding to the target storage area and at least one building structure in the building data block; Establishing a mapping relationship between each of the real building materials and each of the building structures through the preset information model, wherein the mapping relationship is used to characterize the corresponding relationship between each of the building structures and each of the real building materials; In response to identifying changes in building materials at the target building site, the change information is updated to the corresponding building data block through the information model, so that the data structure in the building data block is consistent with the construction progress of the target building site.

2. The method according to claim 1, characterized in that The construction site to be managed is divided into multiple target construction sites according to the construction level, including: Conducting monitoring and classification of the construction site to be managed, each monitoring level including at least one construction material storage area; The construction area having a building material storage area and satisfying the preset splitting conditions is divided to obtain the corresponding target construction site.

3. The method according to claim 1, characterized in that The method of constructing a virtual construction site corresponding to the target construction site by using a preset information model includes: In response to a first preset operation instruction, inputting a parameter set corresponding to the target building site into the preset information model; After the parameter set is input into the preset information model, a second preset operation instruction is received, and in response to the second preset operation instruction, the building model is planned in the preset information model according to the parameter set.

4. The method according to claim 1, characterized in that: The establishing of a mapping relationship between each of the real building materials and each of the building structures through the preset information model includes: Assigning a first version number to the real building material, and assigning a second version number corresponding to the first version number to the building structure in the building data block; When the state of the real building material changes, a corresponding second version number is obtained based on the first version number of the real building material, and the state of the building structure corresponding to the second version number is updated in the building data block.

5. The method according to claim 4, characterized in that The acquiring the corresponding second version number based on the first version number of the real building material, and updating the state of the building structure corresponding to the second version number in the building data block, includes: Determine the building data block where the building structure corresponding to the second version number is located as the target building data block; The building structure in the target building data block is updated according to the change of the real building material.

6. The method according to claim 4 or 5, characterized in that: The preset information model stores a communication program that relates the real building material to the building structure; The dynamically updating the building structure in the preset information model according to the mapping relationship includes: Starting the communication program, and packaging the mapping relationship between the building structure and the real building material through the communication program to obtain a corresponding construction information query request message; The construction information query request message is parsed and processed to obtain a corresponding first update information set, wherein the first update information set is used to reflect the status of each of the real building materials being presented at the real construction site and being promoted in the real construction process.

7. The method according to claim 6, characterized in that After parsing the construction information query request message to obtain the corresponding first update information set, the method further includes: According to the first update information set, in the preset information model, the building structure associated with the building material information is dynamically deduced according to the virtual construction process to obtain a second update information set; the second update information set is used to reflect the state of the building structure in the virtual construction process of the building model; The building structure is replanned in the preset information model according to the second update information set.

8. The method according to claim 7, characterized in that The mapping relationship between the building structure and the real building material is packaged and processed by the communication program, including: The building material information association results are stored in a preset storage space in order respectively; According to the order in which the building material information association results are stored in the preset storage space, transferring the building material information association results from the preset storage space to the communication program respectively; When the building material information association results exist in the communication program, the building material information association results are packaged in the instant messaging program according to a preset network communication protocol.

9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; Wherein, the processor is configured to execute the instructions to implement the building materials information management method as described in any one of claims 1-8.

10. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by a processor, the building material information management method according to any one of claims 1 to 8 is implemented.