Power station gate opening degree monitoring method and system applied to hydropower dispatching operation

By constructing a gate risk opening database and performing risk quantification calculations and visualization, the problem of failing to consider dynamic changing factors in existing technologies has been solved, realizing intelligent monitoring of gate opening and improving the safety and efficiency of hydropower stations.

CN119475836AActive Publication Date: 2025-02-18GUIZHOU QIANYUAN POWER CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510076922.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-02-18
Estimated Expiration
2045-01-17

AI Technical Summary

Technical Problem

Existing methods for monitoring the opening of power station gates fail to fully consider dynamic factors that change during actual operation, such as water level variation range, power generation workload, and gate lifespan. This leads to misjudgments in monitoring results and affects the safety and efficiency of hydropower stations.

Method used

By collecting gate design standards and lifespan information, combined with water level variation ranges and power generation tasks, a gate risk opening database is constructed. Risk quantification calculations and visualization are performed, and monitoring parameters are dynamically adjusted to achieve intelligent monitoring of gate opening.

Benefits of technology

This improves the accuracy and efficiency of monitoring, enabling timely detection of potential safety hazards, rational scheduling of power generation tasks, extension of gate service life, and enhancement of the safety and stability of hydropower stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119475836A_ABST
    Figure CN119475836A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hydropower station operation and maintenance management, in particular to a power station gate opening degree monitoring method and system applied to hydropower dispatching operation, and the safety, stability and efficiency of hydropower station operation are improved. The method comprises the steps of collecting design standard information and life state information of each gate of a hydropower station; acquiring a water level change interval in a set time and a power generation task load of the hydropower station; based on the power generation task load and the design standard information of each gate, the predicted operation opening degree of each gate in the set time is determined; for each gate, positioning in a pre-established gate risk opening degree database by taking the gate life state information and the water level change interval as double-limit positioning conditions to obtain a gate risk opening degree interval; and risk quantification calculation is carried out on the predicted operation opening degree and the gate risk opening degree interval corresponding to the same gate, and the risk abnormity degree corresponding to the gate is obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydropower station operation and maintenance management, and in particular to a method and system for monitoring the opening of a power station gate applied to hydropower dispatching operations. Background Art

[0002] During the operation of a hydropower station, gate opening control is one of the key links to ensure safe and stable operation of the power station. The gate opening not only affects the power generation efficiency of the hydropower station, but is also directly related to the safety of the power station and the service life of the equipment.

[0003] The existing monitoring methods for the gate opening of power stations often use the design standards at the beginning of the gate construction as the monitoring threshold. For example, when the water level is at a certain height, if the gate opening is monitored to be higher than the fixed monitoring threshold, an excessive opening alarm will be issued. Therefore, the existing monitoring methods fail to fully consider the dynamic changing factors of the gate in actual operation, such as the water level change range, power generation task volume, and the life status of the gate, etc., making it difficult to fully reflect the operating status of the gate, which can easily lead to misjudgment of the monitoring results. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a method and system for monitoring the gate opening of a power station applied to hydropower dispatching operations, which improves the safety, stability and efficiency of the operation of the hydropower station.

[0005] In a first aspect, the present invention provides a method for monitoring the gate opening of a power station applied to hydropower dispatching operations, the method comprising: Collect design standard information and life status information of each gate of the hydropower station; Obtain the water level change range within the set time and the power generation task of the hydropower station; Based on the power generation task and the design standard information of each gate, determining the expected operating opening of each gate within the set time; For each gate, the gate life status information and the water level change range are used as dual-limit positioning conditions, and the gate risk opening range is obtained by positioning in a pre-built gate risk opening database; Perform risk quantification calculation on the predicted operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; Conduct statistical analysis on the risk anomaly levels corresponding to multiple gates in a hydropower station to obtain the risk monitoring results of the hydropower station gates; The risk monitoring results of the hydropower station gates and the abnormal risk level of each gate are visualized.

[0006] Furthermore, the calculation for statistical analysis of the risk anomaly degree corresponding to multiple gates in the hydropower station is: Among them, K represents the risk monitoring result of the hydropower station gate, n represents the number of gates in the hydropower station, represents the expected operating opening of the i-th gate, represents the lower limit of the gate risk opening interval of the i-th gate, Represents the upper limit of the gate risk opening range of the i-th gate.

[0007] Furthermore, the method for obtaining the estimated operating opening includes: Decompose the power generation task within the set time according to the time granularity to obtain the power generation task at each time point; Allocate the total power generation task to each generator set according to the operation strategy and equipment status of the hydropower station; Calculate the required flow rate according to the power generation task assigned to each generator set; Determine the expected operating opening of each gate based on the calculated flow demand and the gate design standard information.

[0008] Furthermore, the method for constructing a gate risk opening database includes: Collect basic design information of each gate of the hydropower station, gate life status information, historical water level change data of the hydropower station and power generation task data; Design database structure, including gate information table, water level change table, power generation task table and risk opening table; Enter the collected data into the database and integrate it; Calculate the risk opening range under different water level change ranges and gate life conditions; As the operation time of the hydropower station increases and the gate status changes, the data in the database is updated regularly and a database backup mechanism is established.

[0009] Furthermore, the method for obtaining the abnormal risk level includes: Calculate the deviation between the estimated operating opening and the upper limit of the gate risk opening interval; subtract the upper limit of the gate risk opening interval from the estimated operating opening to obtain the upper limit of the deviation; Calculate the deviation between the expected operating opening and the lower limit of the gate risk opening interval; subtract the expected operating opening from the lower limit of the gate risk opening interval to obtain the lower limit of the deviation; The larger of the two deviations is chosen as the maximum deviation; Normalize the maximum deviation; According to the normalized deviation value, the risks are divided into different levels; The degree of risk abnormality is calculated based on the normalized deviation value and risk level.

[0010] Furthermore, the contents of the visualization include: Display the risk monitoring results of all gates in the entire hydropower station to intuitively reflect the overall risk level of the power station; Display the risk anomaly distribution of each gate to help operation and maintenance personnel identify high-risk and low-risk gates; Display the changing trend of gate risk abnormality over time to help operation and maintenance personnel predict the development of risks and take measures in advance; The correlation between the risk abnormality degree and the gate design standard, life status, water level change range and power generation task volume is displayed to help operation and maintenance personnel find the root cause of the risk.

[0011] Furthermore, the implementation steps of the visual display include: Convert the format of the hydropower station gate risk monitoring results and the risk abnormality degree data of each gate; Design chart types and styles based on the actual needs of the hydropower station and the preferences of operation and maintenance personnel; Import the format-converted data into the visualization software, configure and adjust it according to the designed chart, and display the data through the chart; Test the generated charts to check the accuracy of data and the display effect of the charts; The generated charts are deployed to the control room of the hydropower station.

[0012] On the other hand, the present application also provides a power station gate opening monitoring system applied to hydropower dispatching operations, the system comprising: Information collection module, which collects design standard information and life status information of each gate of the hydropower station; Environmental parameter acquisition module, which obtains the water level change range within the set time and the power generation task of the hydropower station; An operation opening prediction module determines the estimated operation opening of each gate within the set time based on the power generation task and the design standard information of each gate; The risk opening interval determination module locates each gate in a pre-built gate risk opening database using the gate life status information and the water level change interval as dual-limit positioning conditions, and obtains the gate risk opening interval; determines the upper limit of the gate risk opening interval according to the upper limit of the water level change interval and the gate life status information; determines the lower limit of the gate risk opening interval according to the lower limit of the water level change interval and the gate life status information; A risk quantification calculation module performs risk quantification calculation on the expected operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; The comprehensive risk assessment module conducts statistical analysis on the risk anomaly levels of multiple gates in the hydropower station and obtains the risk monitoring results of the hydropower station gates; The visualization module visualizes the risk monitoring results of the hydropower station gates and the abnormal risk level of each gate.

[0013] In a third aspect, the present application provides an electronic device, comprising a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the transceiver, the memory, and the processor are connected via the bus, and the computer program, when executed by the processor, implements the steps of any one of the above methods.

[0014] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps in any one of the above-mentioned methods when executed by a processor.

[0015] Compared with the prior art, the invention has the following beneficial effects: the method not only takes into account the design standard information of the gate, but also incorporates multiple dynamic factors such as the gate life status, water level change range and power generation task volume, so that the monitoring is closer to the actual operation status of the gate and the accuracy of the monitoring is improved; at the same time, the monitoring parameters are dynamically adjusted so that the system can adapt to the changes in the operating conditions of the hydropower station in real time; Through the pre-built gate risk opening database, the risk opening range of each gate can be determined, and the risk quantification calculation of the expected operating opening and the risk opening range can be performed, so that the operation and maintenance personnel can more intuitively understand the operating status of the gate and promptly discover and deal with potential safety hazards; This method realizes intelligent monitoring of gate opening by collecting, processing and analyzing a large amount of data. The entire monitoring process is highly automated, reducing manual intervention and improving monitoring efficiency and accuracy. At the same time, the visual display function enables operation and maintenance personnel to view and analyze monitoring results more conveniently. Since this method can more accurately reflect the operating status of the gate, it helps the hydropower station to arrange power generation tasks more reasonably and improve power generation efficiency. At the same time, it can significantly improve the safety of the hydropower station by timely warning and handling of potential safety hazards. By comprehensively considering the life status of the gate, this method can more scientifically control the gate opening and avoid equipment damage caused by excessive use or improper operation; this helps to extend the service life of the gate and reduce operation and maintenance costs; In summary, the above method shows many advantages such as comprehensiveness, dynamism, intelligence, efficiency, safety and scalability when solving the problem of gate opening monitoring in hydropower stations; it improves the safety, stability and efficiency of hydropower station operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a flow chart of the present invention; Figure 2 It is a flow chart that visually displays the implementation steps; Figure 3 It is a structural diagram of a power station gate opening monitoring system used in hydropower dispatching operations. DETAILED DESCRIPTION

[0017] In the description of this application, those skilled in the art should know that this application can be implemented as a method, an apparatus, an electronic device, and a computer-readable storage medium. Therefore, this application can be specifically implemented in the following forms: complete hardware, complete software (including firmware, resident software, microcode, etc.), a combination of hardware and software. In addition, in some embodiments, this application can also be implemented in the form of a computer program product in one or more computer-readable storage media, and the computer-readable storage medium contains computer program code.

[0018] The above-mentioned computer-readable storage medium may adopt any combination of one or more computer-readable storage media. Computer-readable storage media include: electrical, magnetic, optical, electromagnetic, infrared or semiconductor systems, devices or devices, or any combination of the above. More specific examples of computer-readable storage media include: portable computer disks, hard disks, random access memories, read-only memories, erasable programmable read-only memories, flash memories, optical fibers, optical disc read-only memories, optical storage devices, magnetic storage devices, or any combination of the above. In the present application, computer-readable storage media can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, device, or device.

[0019] The acquisition, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of national laws.

[0020] The present application describes the provided methods, devices, and electronic devices through flowcharts and / or block diagrams.

[0021] It should be understood that each box in the flowchart and / or block diagram and the combination of boxes in the flowchart and / or block diagram can be implemented by computer-readable program instructions. These computer-readable program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine, and these computer-readable program instructions are executed by a computer or other programmable data processing device to produce a device that implements the functions / operations specified by the boxes in the flowchart and / or block diagram.

[0022] These computer-readable program instructions may also be stored in a computer-readable storage medium that enables a computer or other programmable data processing device to work in a specific manner. In this way, the instructions stored in the computer-readable storage medium produce an instruction device product including functions / operations specified in the blocks in the flowchart and / or block diagram.

[0023] Computer-readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device, so that a series of operational steps are performed on the computer, other programmable data processing apparatus, or other device to produce a computer-implemented process, thereby enabling the instructions executed on the computer or other programmable data processing apparatus to provide a process for implementing the functions / operations specified in the blocks in the flowchart and / or block diagram.

[0024] The present application is described below in conjunction with the drawings in the present application.

[0025] Embodiment 1: Figure 1 to Figure 2 As shown, the power station gate opening monitoring method applied to hydropower dispatching operation of the present invention specifically includes the following steps: S1. Collect the design standard information and life status information of each gate of the hydropower station; The collection method of design standard information and life status information includes: Extract the specific design parameters of each gate from the design documents of the hydropower station, including the gate size, material, maximum allowable opening, minimum allowable opening and design head; Collect the design performance indicators of each gate from the technical data provided by the manufacturer, including opening and closing speed, opening and closing force and pressure resistance level; Collect the technical parameters and debugging records of the gate during installation, and understand the actual installation position of the gate, installation errors and adjustment parameters during debugging; Record the date of manufacture and installation of each gate; Collect information on the time, content and parts replaced of previous maintenance; Organize all fault records that occur during gate operation, including fault type, occurrence time, treatment measures and their effects; Regularly collect gate operation data, including the number of times the gate is opened, the opening time, and the maximum water pressure it withstands; All collected information is stored in a unified manner in the database to ensure data integrity and traceability.

[0026] In this step, by collecting information from multiple sources, it is possible to ensure that detailed data on the entire life cycle of gate design, manufacturing, installation, operation and maintenance are obtained; this provides a solid foundation for subsequent monitoring, analysis and decision-making; accurate design standard information and life status information are the key to evaluating the operating status of the gate and formulating maintenance plans; through the collected information, the actual operating status of the gate can be determined more accurately, reducing the risk of misjudgment and missed judgment, thereby improving the accuracy of monitoring; based on the collected information, a more accurate assessment of the maintenance needs of the gate can be made; by analyzing the operating data and fault records of the gate, potential failure risks can be predicted, maintenance plans can be formulated in advance, the occurrence of failures can be avoided or reduced, and the service life of the gate can be extended; through real-time monitoring and analysis of the gate The operating status of the gate can be used to adjust the power generation strategy in time and optimize the operating efficiency of the power station; when the gate fails or its performance deteriorates, timely measures can be taken to repair or replace it to ensure the stable operation and efficient power generation of the power station; as an important safety facility of the hydropower station, the operating status of the gate is directly related to the safety of the power station; the information collected through step S1 can be used to timely discover and deal with potential safety hazards to ensure the safe operation of the power station; the various collected information is stored in a unified database, which not only facilitates data query and analysis, but also ensures the integrity and traceability of the data; step S1 can not only provide comprehensive data support, improve monitoring accuracy, optimize maintenance strategies, and improve power station operating efficiency, but also enhance the safety of the power station and facilitate data management and traceability.

[0027] S2, obtaining the water level change range within the set time and the power generation task of the hydropower station; The method for obtaining the water level variation interval comprises: Use water level sensors to monitor the water levels upstream and downstream of the hydropower station in real time and record the water level data at each time point; install water level sensors at key locations such as dams, diversion channels, and spillways of reservoirs to provide high-precision water level measurement data; Combine historical hydrological data to analyze water level trends within a specific time period; Refer to the weather forecast and rainfall forecast provided by the meteorological department, combined with the topographic and hydrological characteristics of the reservoir confluence area, to predict future water level changes; this helps to prepare response measures in advance to avoid a sharp rise in water levels caused by sudden floods; Determine the water level variation range within a set time based on real-time monitoring data, historical data analysis and weather forecasts; the water level variation range includes the highest and lowest water level values; The method for obtaining the power generation task amount of the hydropower station comprises: Obtain the dispatch plan of the hydropower station, including the daily, weekly and monthly power generation task volume; the dispatch plan is formulated by the power grid dispatch center to meet the needs of the power grid and optimize the operation of the power station; Combine historical electricity consumption data and seasonal electricity consumption patterns to predict electricity demand in the future; help adjust the power generation task to ensure the stability and economy of power supply; Consider the status of other power generation equipment in the hydropower station to ensure that the allocation of power generation tasks is reasonable and feasible; if some equipment is under maintenance or faulty, the power generation tasks need to be adjusted accordingly; Comply with national and local environmental protection policies and ensure that power generation tasks meet environmental protection requirements.

[0028] In this step, by real-time monitoring of the water levels upstream and downstream of the hydropower station, combined with historical hydrological data and weather forecasts, the water level change range within the set time can be accurately determined, including the highest and lowest water levels; this helps the hydropower station to formulate response measures in advance to avoid safety risks caused by a sharp rise or fall in water levels, and also provides a scientific basis for the water resources management and scheduling of the hydropower station; based on the hydropower station's scheduling plan, historical electricity consumption data and seasonal electricity consumption patterns, it is possible to predict electricity demand in the future, thereby reasonably adjusting the power generation task volume; this demand-based power generation task allocation method not only ensures the stability and economy of power supply, but also helps to improve the operating efficiency and energy utilization of the hydropower station. ; When allocating power generation tasks, consider the status of other power generation equipment in the hydropower station to ensure that the allocation of power generation tasks is reasonable and feasible; help improve equipment utilization, reduce power supply interruptions caused by equipment failures, and also enhance the overall safety of the hydropower station; when determining the power generation task, comply with national and local environmental protection policies to ensure that the power generation task meets environmental protection requirements; help the hydropower station achieve sustainable development, reduce the impact on the environment, and improve social recognition; this step improves the operating efficiency and energy utilization of the hydropower station by accurately grasping water level changes and optimizing the allocation of power generation tasks, while also enhancing the safety and environmental protection of the hydropower station, providing strong support for the sustainable development of the hydropower station.

[0029] S3, based on the power generation task and the design standard information of each gate, determining the expected operating opening of each gate within the set time; Methods for obtaining the estimated operating opening include: Decompose the power generation task within the set time according to the time granularity to obtain the power generation task at each time point; According to the operation strategy and equipment status of the hydropower station, the total power generation task is allocated to each generator set; factors to be considered in this step include: Capacity and efficiency of generator sets: Different generator sets have different power generation capacity and efficiency. When allocating tasks, high-efficiency units should be given priority; Equipment status: Consider the maintenance status and availability of generator sets to avoid assigning tasks to units that are under maintenance or have faults; Environmental conditions: Consider factors such as water temperature and water flow rate to select the most suitable generator set; Calculate the required flow rate according to the power generation task assigned to each generator set; Determine the expected operating opening of each gate based on the calculated flow demand and the gate design standard information; Verify the expected operating opening to ensure that the calculated gate opening is within the design range of the gate, that is, it does not exceed the maximum allowable opening and the minimum allowable opening; if the calculated opening exceeds the design range, it needs to be adjusted; according to the real-time monitored water level and flow data, dynamically adjust the gate opening to ensure that the actual operating status is consistent with the expected operating status.

[0030] In this step, by decomposing the power generation task within the set time according to the time granularity, the specific power generation demand at each time point or time period can be accurately determined, thereby more accurately guiding the prediction and setting of the gate opening; comprehensively considering the capacity, efficiency, equipment status and environmental conditions of the generator set, the total power generation task is reasonably allocated to each generator set, ensuring the optimal allocation and efficient utilization of resources; the expected operating opening is strictly checked to ensure that it is within the design range of the gate, that is, it does not exceed the maximum allowable opening and the minimum allowable opening, effectively avoiding equipment damage or safety risks caused by excessive or too small opening; the gate opening is dynamically adjusted according to the real-time monitored water level and flow data to ensure the consistency between the actual operating status and the expected operating status, further enhancing the safety and stability of the hydropower station operation; Through this step, the expected operating opening of each gate within the set time can be planned in advance, providing clear work guidance and plans for the hydropower station operation and maintenance personnel, reducing the blindness and arbitrariness in the operation and maintenance process; when the calculated gate opening exceeds the design range or there is a deviation between the actual operating status and the expected status, an early warning can be issued in time to remind the operation and maintenance personnel to take corresponding measures to adjust and correct, thereby avoiding potential operating risks and failures; by reasonably allocating power generation tasks and accurately controlling the gate opening, the power generation efficiency and energy utilization rate of the hydropower station can be maximized, unnecessary energy waste and emissions can be reduced, and the goal of energy conservation and emission reduction can be achieved; the implementation of this step can also help hydropower stations better plan and arrange operation and maintenance work, and reduce economic losses and cost expenditures caused by equipment failures or downtime for maintenance.

[0031] S4. For each gate, use the gate life status information and the water level change interval as dual-limit positioning conditions, locate it in the pre-built gate risk opening database, and obtain the gate risk opening interval; determine the upper limit of the gate risk opening interval according to the upper limit of the water level change interval and the gate life status information; determine the lower limit of the gate risk opening interval according to the lower limit of the water level change interval and the gate life status information; The method for constructing a gate risk opening database includes: Collect basic design information of each gate of the hydropower station, gate life status information, historical water level change data of the hydropower station and power generation task data; Design the database structure, including gate information table, water level change table, power generation task table and risk opening table; these tables can store the above collected data and model calculation results; Enter the collected data into the database and integrate it to ensure the consistency and integrity of the data; Calculate the risk opening ranges under different water level change intervals and gate life states; these intervals will be used as key information in the database for subsequent positioning and risk assessment; As the operation time of the hydropower station increases and the gate status changes, the data in the database needs to be updated regularly; Establish a database backup mechanism to ensure data security and recoverability; Determine the specific water level conditions currently faced by the gate based on the water level change range; Determine the current gate life status according to the gate life status information; In the gate risk opening database, query according to the current gate water level change range and life status information to find matching records; According to the upper limit of the water level change range and the gate life status information, the upper limit of the corresponding gate risk opening range is obtained from the database; According to the lower limit of the water level change range and the gate life status information, the lower limit of the corresponding gate risk opening range is obtained from the database.

[0032] In this step, by using the gate life status information and the water level change range as the dual-limit positioning conditions, the records matching the current gate status can be accurately found in the gate risk opening database, so as to more accurately determine the gate risk opening range; compared with the traditional method of using the design standard as the monitoring threshold, it can better reflect the dynamic change factors of the gate in actual operation and improve the accuracy of risk assessment; using database technology, real-time monitoring and dynamic updating of the gate risk opening are realized; as the operating time of the hydropower station increases and the gate status changes, the data in the database will be updated accordingly, thereby ensuring the risk assessment The timeliness and accuracy of the results; the obtained gate risk opening range can provide strong decision-making support for the operation and maintenance management of the hydropower station; the operation and maintenance personnel can formulate reasonable gate opening control strategies and maintenance plans based on the risk assessment results, so as to ensure the safe and stable operation of the hydropower station; at the same time, this also helps to extend the service life of the gate and reduce the operation and maintenance costs; step S4 introduces the gate risk opening database to achieve accurate assessment and dynamic monitoring of gate opening risks, improve the accuracy of risk assessment, enhance the real-time and dynamic nature of monitoring, optimize operation and maintenance management decisions, and improve data management and security.

[0033] S5. Perform risk quantification calculation on the predicted operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; Methods for obtaining the abnormal risk level include: Calculate the deviation between the estimated operating opening and the upper limit of the gate risk opening interval: subtract the upper limit of the gate risk opening interval from the estimated operating opening to obtain the upper limit of the deviation; Calculate the deviation between the expected operating opening and the lower limit of the gate risk opening interval; subtract the expected operating opening from the lower limit of the gate risk opening interval to obtain the lower limit of the deviation; The larger of the two deviations is chosen as the maximum deviation; Normalize the maximum deviation to facilitate subsequent risk assessment; According to the normalized deviation value, the risks are divided into different levels; The degree of risk abnormality is calculated based on the normalized deviation value and risk level.

[0034] In this step, by calculating the deviation between the expected operating opening and the gate risk opening range, the operating risk of the gate can be accurately quantified, avoiding the misjudgment caused by the traditional fixed threshold method; the method takes into account dynamic factors such as the water level change range and the gate life status, which can more comprehensively reflect the actual operating status of the gate and improve the accuracy and reliability of risk assessment; the risks are divided into different levels, which is convenient for managers to take corresponding countermeasures according to the risk level, thereby improving the safety and stability of power station operation; through normalization processing, the risk anomaly degree is standardized to a value between 0 and 1, which is convenient for statistical analysis and visual display, and improves the operability and interpretability of the data; timely discovery and quantification of the gate operation risk is helpful to take preventive maintenance measures in advance, extend the service life of the gate, and reduce downtime and economic losses caused by equipment failure; based on the assessment results of the risk anomaly degree, the dispatching strategy of the hydropower station can be optimized, the power generation efficiency can be improved, and the safe and stable operation of the power station can be ensured.

[0035] S6. Statistically analyze the risk anomaly levels corresponding to multiple gates in the hydropower station to obtain the risk monitoring results of the hydropower station gates; The method for obtaining the risk monitoring results of the hydropower station gate includes: Collect the risk anomaly data of all gates in the hydropower station. After collecting the data, it is necessary to organize the data to ensure its accuracy and completeness; Calculate the average of all gate risk abnormalities to understand the overall risk level; Calculate the median of risk abnormality to reflect the risk status of most gates; Calculate the standard deviation of risk anomalies and assess the degree of risk dispersion; Find the maximum and minimum values ​​of risk abnormality and identify the gates with the highest and lowest risks; Divide the risk anomaly degree into different intervals and calculate the number of gates in each interval to understand the distribution of risk anomaly degree; Analyze the correlation between the risk abnormality degree and factors such as gate design standards, life status, water level change range, power generation task volume, etc., to identify the key factors affecting the risk; Based on the results of statistical analysis, interpret the risk status of the hydropower station gates and obtain the risk monitoring results of the hydropower station gates; The calculation for statistical analysis of the risk anomaly degree corresponding to multiple gates in the hydropower station is: Among them, K represents the risk monitoring result of the hydropower station gate, n represents the number of gates in the hydropower station, represents the expected operating opening of the i-th gate, represents the lower limit of the gate risk opening interval of the i-th gate, Represents the upper limit of the gate risk opening range of the i-th gate.

[0036] In this step, by collecting the risk anomaly degree data of all gates in the hydropower station, and organizing and analyzing them, the risk status of the gates of the entire hydropower station can be fully and objectively understood; it is helpful for operation and maintenance managers to grasp the safe operation status of the hydropower station as a whole; by calculating the mean, median, standard deviation, maximum and minimum values ​​of the risk anomaly degree, the risk level of the hydropower station gate can be accurately quantified; it not only reflects the overall risk status, but also reveals the discrete degree and extreme conditions of the risk, providing strong support for risk management and decision-making; dividing the risk anomaly degree into different intervals and calculating the number of gates in each interval can intuitively display the distribution of the risk anomaly degree; it is helpful for operation and maintenance managers to identify high-risk areas and low-risk areas, so as to take targeted risk management measures; by analyzing the risk anomaly degree The correlation between the degree of normality and factors such as gate design standards, life status, water level change range, and power generation tasks can identify the key factors affecting the risk; it helps operation and maintenance managers to have a deep understanding of the root causes of risks and thus formulate more effective risk management strategies; based on the results of statistical analysis, operation and maintenance managers can interpret the risk status of hydropower station gates more scientifically and formulate risk response measures accordingly; this not only improves the pertinence and effectiveness of risk management, but also provides a strong guarantee for the stable operation of hydropower stations; step S6 provides scientific and effective support for the risk management of hydropower station gates through comprehensive data collection, precise statistical analysis, visual display of risk distribution, and identification of key factors; it not only helps to improve the safe operation level of hydropower stations, but also provides a strong basis for the decision-making of operation and maintenance managers.

[0037] S7. Visualize the risk monitoring results of the hydropower station gates and the risk abnormality degree of each gate; The visual display includes: Display the risk monitoring results of all gates in the entire hydropower station, usually in the form of dashboards or progress bars, to intuitively reflect the overall risk level of the power station; Use bar charts, pie charts, or scatter plots to display the risk anomaly distribution of each gate, helping operation and maintenance personnel identify high-risk and low-risk gates; Through line graphs or time series graphs, the trend of gate risk abnormality over time is displayed to help operation and maintenance personnel predict the development of risks and take measures in advance; Use radar charts or heat maps to show the correlation between the risk abnormality level and gate design standards, life status, water level change range and power generation task volume, helping operation and maintenance personnel find the root cause of the risk; The implementation steps of visual display include: Organize the risk monitoring results of hydropower station gates and the risk abnormality data of each gate into a format that can be recognized by visualization software; Design chart types and styles based on the actual needs of the hydropower station and the preferences of operation and maintenance personnel to ensure that the charts can intuitively and accurately display risk information; Import the prepared data into the visualization software, configure and adjust it according to the chart design to ensure that the chart can display the data correctly; Test the generated charts to check the accuracy of the data and the display effect of the charts; optimize and adjust according to the test results to ensure that the charts can meet the needs of operation and maintenance personnel; The generated charts are deployed to the hydropower station’s control room to ensure that operation and maintenance personnel can view and monitor risk information in real time.

[0038] In this step, through dashboards, progress bars, bar charts, pie charts, scatter plots and other visualization forms, operation and maintenance personnel can quickly and intuitively grasp the risk monitoring results of all gates of the hydropower station and the risk abnormality level of each gate; it helps operation and maintenance personnel to quickly identify high-risk and low-risk gates, so as to take targeted operation and maintenance measures; the visualization not only provides static risk data, but also shows the changing trend of risk abnormality level over time through line charts, time series charts, etc.; it helps operation and maintenance personnel to predict the development of risks and take measures in advance to avoid power station operation failures or safety accidents caused by risk deterioration; at the same time, radar charts and heat maps show the correlation between risks and multiple factors, providing operation and maintenance personnel with a more comprehensive decision-making basis; through visualization, operation and maintenance personnel can deeply understand Understanding the risk status of each gate will help operation and maintenance personnel implement more refined risk management and formulate personalized operation and maintenance strategies based on the risk characteristics of different gates; visual display not only facilitates internal communication among operation and maintenance personnel, but can also serve as an important tool for communication with external partners, regulatory agencies, etc.; through intuitive chart display, the risk status and management measures of the hydropower station can be more effectively conveyed, and the confidence of all parties in the safe operation of the power station can be enhanced; during the implementation of visual display, operation and maintenance personnel can continuously optimize the type and style of charts according to actual needs and feedback, to ensure that the charts can more accurately reflect risk information; at the same time, through regular updating and monitoring of charts, operation and maintenance personnel can promptly discover new risk points and take measures to improve them, providing strong guarantees for the continued safe operation of the hydropower station.

[0039] Embodiment 2: Figure 3 As shown, the power station gate opening monitoring system applied to hydropower dispatching operations of the present invention specifically includes the following modules: Information collection module, which collects design standard information and life status information of each gate of the hydropower station; Environmental parameter acquisition module, which obtains the water level change range within the set time and the power generation task of the hydropower station; An operation opening prediction module determines the estimated operation opening of each gate within the set time based on the power generation task and the design standard information of each gate; The risk opening interval determination module locates each gate in a pre-built gate risk opening database using the gate life status information and the water level change interval as dual-limit positioning conditions, and obtains the gate risk opening interval; determines the upper limit of the gate risk opening interval according to the upper limit of the water level change interval and the gate life status information; determines the lower limit of the gate risk opening interval according to the lower limit of the water level change interval and the gate life status information; A risk quantification calculation module performs risk quantification calculation on the expected operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; The comprehensive risk assessment module conducts statistical analysis on the risk anomaly levels of multiple gates in the hydropower station and obtains the risk monitoring results of the hydropower station gates; The visualization module visualizes the risk monitoring results of the hydropower station gates and the abnormal risk level of each gate.

[0040] The system can dynamically predict the expected operating opening of the gate according to the actual operating conditions of the hydropower station, rather than relying solely on the design standards at the beginning of the gate construction, so that the monitoring system can more accurately reflect the actual operating status of the gate; in addition to considering the water level and power generation task volume, the system also incorporates the life status information of the gate as an important monitoring parameter; so that the monitoring system can more comprehensively evaluate the operating risks of the gate and reduce misjudgments caused by a single factor; Through the risk quantification calculation module, the system can make a quantitative comparison between the expected operating opening and the risk opening range of each gate, and derive the degree of risk abnormality, making the monitoring results more objective and accurate, and helping operation and maintenance personnel to make more informed decisions; the entire monitoring system is highly intelligent and automated, and can collect information, make predictions and evaluations in real time, and visualize the results; this greatly reduces the workload of operation and maintenance personnel and improves monitoring efficiency and accuracy; The system can timely detect and warn of potential risks in gate operation, helping operation and maintenance personnel to take preventive measures in advance, thereby avoiding or reducing the occurrence of accidents and ensuring the safe and stable operation of the hydropower station; In summary, the power station gate opening monitoring system integrates multi-source information and adopts advanced algorithms and technical means to realize intelligent and precise monitoring of the gate opening of the hydropower station, thereby improving the safety management level of the hydropower station.

[0041] The various variations and specific embodiments of the power station gate opening monitoring method applied to hydropower dispatching operations in the aforementioned embodiment 1 are also applicable to the power station gate opening monitoring system applied to hydropower dispatching operations in this embodiment. Through the aforementioned detailed description of the power station gate opening monitoring method applied to hydropower dispatching operations, those skilled in the art can clearly know the implementation method of the power station gate opening monitoring system applied to hydropower dispatching operations in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here.

[0042] In addition, the present application also provides an electronic device, including a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor. The transceiver, the memory, and the processor are respectively connected via a bus. When the computer program is executed by the processor, each process of the above-mentioned method for controlling output data is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.

[0043] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for monitoring the gate opening of a power station used in hydropower dispatching operations, characterized in that: The method comprises: Collect design standard information and life status information of each gate of the hydropower station; Obtain the water level change range within the set time and the power generation task of the hydropower station; Based on the power generation task and the design standard information of each gate, determining the expected operating opening of each gate within the set time; For each gate, the gate life status information and the water level change range are used as dual-limit positioning conditions, and the gate risk opening range is obtained by positioning in a pre-built gate risk opening database; Perform risk quantification calculation on the predicted operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; Conduct statistical analysis on the risk anomaly levels corresponding to multiple gates in a hydropower station to obtain the risk monitoring results of the hydropower station gates; The risk monitoring results of the hydropower station gates and the abnormal risk level of each gate are visualized.

2. The method for monitoring the gate opening of a power station applied to hydropower dispatching operations according to claim 1, characterized in that: The calculation for statistical analysis of the risk anomaly degree corresponding to multiple gates in the hydropower station is: Among them, K represents the risk monitoring result of the hydropower station gate, n represents the number of gates in the hydropower station, represents the expected operating opening of the i-th gate, represents the lower limit of the gate risk opening interval of the i-th gate, Represents the upper limit of the gate risk opening range of the i-th gate.

3. The method for monitoring the gate opening of a power station applied to hydropower dispatching operations according to claim 1, characterized in that: Methods for obtaining the estimated operating opening include: Decompose the power generation task within the set time according to the time granularity to obtain the power generation task at each time point; Allocate the total power generation task to each generator set according to the operation strategy and equipment status of the hydropower station; Calculate the required flow rate according to the power generation task assigned to each generator set; Determine the expected operating opening of each gate based on the calculated flow demand and the gate design standard information.

4. The method for monitoring the gate opening of a power station applied to hydropower dispatching operations according to claim 1, characterized in that: The method for constructing a gate risk opening database includes: Collect basic design information of each gate of the hydropower station, gate life status information, historical water level change data of the hydropower station and power generation task data; Design database structure, including gate information table, water level change table, power generation task table and risk opening table; Enter the collected data into the database and integrate it; Calculate the risk opening range under different water level change ranges and gate life conditions; As the operation time of the hydropower station increases and the gate status changes, the data in the database is updated regularly and a database backup mechanism is established.

5. The method for monitoring the gate opening of a power station applied to hydropower dispatching operations according to claim 1, characterized in that: Methods for obtaining the abnormal risk level include: Calculate the deviation between the estimated operating opening and the upper limit of the gate risk opening interval; subtract the upper limit of the gate risk opening interval from the estimated operating opening to obtain the upper limit of the deviation; Calculate the deviation between the expected operating opening and the lower limit of the gate risk opening interval; subtract the expected operating opening from the lower limit of the gate risk opening interval to obtain the lower limit of the deviation; The larger of the two deviations is chosen as the maximum deviation; Normalize the maximum deviation; According to the normalized deviation value, the risks are divided into different levels; The degree of risk abnormality is calculated based on the normalized deviation value and risk level.

6. The method for monitoring the gate opening of a power station applied to hydropower dispatching operations according to claim 1, characterized in that: The visual display includes: Display the risk monitoring results of all gates in the entire hydropower station to intuitively reflect the overall risk level of the power station; Display the risk anomaly distribution of each gate to help operation and maintenance personnel identify high-risk and low-risk gates; Display the changing trend of gate risk abnormality over time to help operation and maintenance personnel predict the development of risks and take measures in advance; The correlation between the risk abnormality degree and the gate design standard, life status, water level change range and power generation task volume is displayed to help operation and maintenance personnel find the root cause of the risk.

7. The method for monitoring the gate opening of a power station used in hydropower dispatching operations according to claim 6, characterized in that: The implementation steps of visual display include: Convert the format of the hydropower station gate risk monitoring results and the risk abnormality degree data of each gate; Design chart types and styles based on the actual needs of the hydropower station and the preferences of operation and maintenance personnel; Import the format-converted data into the visualization software, configure and adjust it according to the designed chart, and display the data through the chart; Test the generated charts to check the accuracy of data and the display effect of the charts; The generated charts are deployed to the control room of the hydropower station.

8. A power station gate opening monitoring system used in hydropower dispatching operations, characterized in that: The system comprises: Information collection module, which collects design standard information and life status information of each gate of the hydropower station; Environmental parameter acquisition module, which obtains the water level change range within the set time and the power generation task of the hydropower station; An operation opening prediction module determines the estimated operation opening of each gate within the set time based on the power generation task and the design standard information of each gate; The risk opening interval determination module locates each gate in a pre-built gate risk opening database using the gate life status information and the water level change interval as dual-limit positioning conditions, and obtains the gate risk opening interval; determines the upper limit of the gate risk opening interval according to the upper limit of the water level change interval and the gate life status information; determines the lower limit of the gate risk opening interval according to the lower limit of the water level change interval and the gate life status information; A risk quantification calculation module performs risk quantification calculation on the expected operating opening and the gate risk opening interval corresponding to the same gate to obtain the risk abnormality degree corresponding to the gate; The comprehensive risk assessment module conducts statistical analysis on the risk anomaly levels of multiple gates in the hydropower station and obtains the risk monitoring results of the hydropower station gates; The visualization module visualizes the risk monitoring results of the hydropower station gates and the abnormal risk level of each gate.

9. An electronic device, comprising a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the transceiver, the memory, and the processor are connected via the bus, wherein: When the computer program is executed by the processor, the steps in the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps in the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Method and system for real-time automatic distribution of gate opening of cascade hydropower station

    CN109272245A

  • Flood discharge gate operation state monitoring method and system, electronic equipment and storage medium

    CN117252383A

  • Fixed winch type hoist detection system and device

    CN117868059A

  • Washing machine and its Electric braking method

    KR1020030088824A

  • Omitted

    KR1020180114472A