Method for laying cable in bridge on overhead pipe network
By using cable slides and slide systems in the overhead tube network bridge, combined with the winch and fixing device, the problems of large manpower investment and high construction risk during the cable laying process are solved, and a more efficient construction process is achieved.
Patent Information
- Application Number
- CN202411812343.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-02-18
AI Technical Summary
In the prior art, the cable laying process of overhead pipe network bridges is very dangerous, with a lot of personnel investment and a cumbersome construction process.
By fixing the cable slide on the steel purlin of the overhead pipe network, multiple slides are placed on the outer peripheral wall of the cable, and using the hoist's traction rope to apply tension to the cable to slide along the cable slide; after the cable is laid in place, the cable is laid in place , use a fixing device to fix the cable to the sole end of the column foot of the overhead pipe network, and take out the cable and place it in the bridge tray to install the bridge cover.
It reduces manpower investment, avoids the danger of high-altitude operations, and improves construction efficiency.
Smart Images

Figure CN119482187A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cable laying, and in particular to a method for laying cables in a bridge frame of an overhead pipe network. Background Art
[0002] At present, the factory area is usually composed of multiple areas with different functions, such as production area, storage area, office area, living area, etc. The external network cable can connect the power system and communication system of these areas to realize the power distribution and signal interaction between the areas. Various production machines and equipment in the factory area, such as large machine tools, production lines, cranes, etc., require a stable power supply to operate normally. The external network cable is like an "electric artery", transmitting the power from the substation or the main distribution room to the distribution box or control cabinet near these equipment to provide power for production activities.
[0003] The laying of cables for the external network of the factory area is usually mainly done by laying cables in the bridge frame on the overhead pipe network, laying cables directly buried, and laying cables in the cable trench. Among these three laying methods, the construction organization and technical difficulty of laying cables in the bridge frame on the overhead pipe network are the most complicated.
[0004] At present, the common practice is to pull the cable to the overhead pipe network platform, and arrange enough personnel on the platform to place the cable section by section at the bottom of the bridge or the specified layered position. For the laying of multiple cables, they should be arranged in layers according to the design requirements. The disadvantage of this method is that it requires more manpower and the high-altitude operation is more dangerous. Another method is to use a manual auxiliary crane to put the cable into the bridge after the winch and pulley are laid on the ground in the straight section, and then fix it after arranging it. The disadvantage of this method is that it is greatly affected by the site environmental conditions. If the overhead pipe network is complex, it is difficult to implement. Summary of the invention
[0005] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a method for laying cables in a bridge frame on an overhead pipe network, which has the advantage of being able to solve the technical problems of high risk, large number of manpower input and complicated construction process during the process of laying cables in a bridge frame on an overhead pipe network.
[0006] The above-mentioned invention object of the present invention is achieved through the following technical scheme: A method for laying cables in a bridge frame on an overhead pipe network, comprising the following steps:
[0007] Fix the cable slideway on the steel purlin of the overhead pipe network according to the cable laying direction;
[0008] A plurality of sliders are sleeved on the outer peripheral wall of the cable to be laid, and the plurality of sliders slide along the cable slideway in the cable slideway as the pulling force applied by the traction rope of the hoist to the cable to be laid;
[0009] After the cable to be laid is laid in place, a fixing device is used to fix the cable to be laid to the bottom end of the column foot of the overhead pipe network;
[0010] Open the cable slide, take out the cables to be laid and place them in the bridge, and install the bridge cover.
[0011] Preferably, the present invention provides a method for laying cables in a bridge frame on an overhead pipe network, wherein the cable slide comprises a plurality of slide units, and the plurality of slide units are detachably connected in sequence along the cable laying direction; the slide unit comprises a shell, a cover plate, a fixing plate and a plurality of gears, the cover plate is arranged on the shell, the cover plate is rotatably connected to the shell, the shell is enclosed to form a cavity, the cavity is divided into a first cavity and a second cavity, the first cavity is communicated with the second cavity, the first cavity and the second cavity are arranged in sequence from top to bottom, a plurality of gears are arranged in the second cavity, a plurality of gears are arranged at intervals along the extension direction of the second cavity, and the plurality of gears can rotate relative to the shell; the fixing plate is arranged at the bottom end of the shell, and the fixing plate is fastened to the steel purlins of the overhead pipe network through a locking member.
[0012] Preferably, the cable laying method in the overhead pipe network bridge provided by the present invention, wherein the cable slide is fixed to the steel purlin of the overhead pipe network according to the cable laying direction, comprises:
[0013] Place the slideway units of each section on the steel purlins of the overhead pipe network according to the cable laying direction. When the overhead pipe network branches or turns, install a turning elbow according to the direction of the cable, and the turning elbow is located between two slideway units;
[0014] Connecting the connecting noses on the housings of two adjacent slideway units by bolts;
[0015] After the cable slide is leveled and straightened, the fixing plate is fastened to the steel purlin of the overhead pipe network through the locking piece.
[0016] Preferably, the method for laying cables in a bridge frame on an overhead pipe network provided by the present invention comprises: sleeved with a plurality of sliders on the outer peripheral wall of the cable to be laid, and the plurality of sliders slide along the cable slideway in the cable slideway as the pulling force applied by the traction rope of the hoist to the cable to be laid comprises:
[0017] Extend the traction rope of the hoist along the cable slideway, the end of the traction rope is connected to the starting end of the cable to be laid through the cable traction net sleeve, when the cable to be laid is pulled to the starting end of the cable slideway, a slider is sleeved on the outer peripheral wall of the cable to be laid, and the slider slides in the cable slideway under the pulling force of the traction rope;
[0018] Whenever the traction rope pulls the cable to be laid forward by a preset distance, a slider is sleeved on the outer peripheral wall of the cable to be laid at the starting end of the cable slideway;
[0019] The plurality of sliders slide along the cable slide in the cable slide as the pulling force applied by the traction rope of the hoist to the cable to be laid is applied.
[0020] Preferably, in the cable laying method in the overhead pipe network bridge frame provided by the present invention, the slider comprises a first block and a second block, the first block is provided with a first arcuate through groove, the second block is provided with a second arcuate through groove, a side of the second block provided with the second arcuate through groove is affixed to a side of the first block provided with the first arcuate through groove, the first block is rotatably connected to the second block via a hinge, the first arcuate through groove and the second arcuate through groove are correspondingly arranged, and the first arcuate through groove and the second arcuate through groove together constitute a rotating through cavity;
[0021] An anti-slip layer is adhered to the inner circumferential wall of the rotating cavity, the cable to be laid is passed through the rotating cavity, and the outer circumferential wall of the cable to be laid is in contact with the anti-slip layer;
[0022] The bottom ends of the first block and the second block are both provided with racks meshing with the gear.
[0023] Preferably, in the method for laying cables in a bridge frame on an overhead pipe network provided by the present invention, the fixing device includes a clamp and two steel ropes, pull rings are provided on the outer peripheral walls on opposite sides of the clamp, one end of the two steel ropes are respectively connected to the two pull rings, and the other ends of the two steel ropes are respectively connected to the bottom ends of two column feet; the clamp is fastened to the cable to be laid by tightening the bolts on the clamp to reduce the inner diameter of the clamp.
[0024] Preferably, the method for laying cables in a bridge frame on an overhead pipe network provided by the present invention, after the cables to be laid are laid in place, a fixing device is used to fix the cables to be laid to the bottom end of the column foot of the overhead pipe network, comprising:
[0025] After the cable to be laid is laid in place, the clamp is fastened to the outer peripheral wall of a section of the cable to be laid extending out of the cable slide rail;
[0026] One end of the steel wire rope is connected to the pull ring, and the other end of the steel wire rope is connected to the hanging ring at the bottom end of the column foot to fix the cable to be laid.
[0027] Preferably, the method for laying cables in a bridge frame on an overhead pipe network provided by the present invention includes: a plurality of sliders being sleeved on the outer peripheral wall of the cable to be laid, and the plurality of sliders sliding along the cable slideway in the cable slideway as the pulling force applied by the traction rope of the hoist to the cable to be laid is applied, and after the cable to be laid is laid in place, before the cable to be laid is fixed to the bottom end of the column foot of the overhead pipe network by a fixing device, the method further includes:
[0028] After the slider leaves the cable slide, the slider is no longer constrained by the cable slide. Under the action of gravity, the slider falls off the cable to be laid and is recovered in the net bag on the overhead pipe network. The recovered slider is taken to the starting end of the cable slide for continued use.
[0029] Preferably, the method for laying cables in a bridge frame on an overhead pipe network provided by the present invention comprises: opening the cable slide, taking out the cable to be laid and placing it in the bridge frame, and installing the bridge frame cover plate, comprising:
[0030] Opening the cover of the slide unit;
[0031] Starting from the terminal of the cable to be laid, the cable to be laid is taken out section by section and placed in the bridge. After the cable to be laid is placed in the bridge each time, the cable to be laid is tied and labeled according to the specification requirements;
[0032] After all the cables to be laid are transferred into the bridge, the bridge cover is installed.
[0033] Preferably, the present invention provides a method for laying cables in a bridge frame on an overhead pipe network, wherein the turning elbow includes an outer shell, an end cover, a mounting plate and a plurality of rotating gears, wherein the end cover is disposed on the upper end of the outer shell, and the end cover is rotatably connected to the outer shell, the outer shell is enclosed to form a accommodating cavity, the accommodating cavity is divided into a first chamber and a second chamber, the first chamber is connected to the second chamber, a plurality of the rotating gears are disposed in the second chamber, a plurality of the rotating gears are spaced apart along the extension direction of the second chamber, and the plurality of the rotating gears can all rotate relative to the outer shell; a plurality of rollers are disposed on the opposite inner side walls of the first chamber, and the plurality of rollers can all rotate relative to the outer shell; the mounting plate is disposed at the bottom end of the outer shell, and the mounting plate is fastened to the steel purlins of the overhead pipe network through fasteners.
[0034] To sum up, the beneficial technical effects of the present invention are as follows: the cable laying method in the bridge frame of the overhead pipeline network provided in the present application includes the following steps: fixing the cable slide on the steel purlin of the overhead pipeline network according to the cable laying direction; sleeved with multiple sliders on the outer peripheral wall of the cable to be laid, and the multiple sliders slide along the cable slide in the cable slide as the pulling force applied by the traction rope of the winch to the cable to be laid; after the cable to be laid is laid in place, the cable to be laid is fixed to the bottom end of the column foot of the overhead pipeline network by a fixing device; the cable slide is opened, the cable to be laid is taken out and placed in the bridge frame, and the bridge frame cover is installed; compared with the traditional construction method, the cable to be laid is fixed in the slider and moves along the cable slide along the traction force, thereby reducing the manpower input, avoiding too many people from being involved in high-altitude operations, reducing construction risks, and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a flow chart of a method for laying cables in a bridge frame on an overhead pipe network provided by an embodiment of the present invention.
[0036] Figure 2 It is a structural schematic diagram of the arrangement of a cable slide on an overhead pipe network in a cable laying method in a bridge frame on an overhead pipe network provided by an embodiment of the present invention.
[0037] Figure 3 The structure of the cable slide in the cable laying method in the bridge frame of the overhead pipe network provided by the embodiment of the present invention is schematically shown. Figure 1 .
[0038] Figure 4 The structure of the cable slide in the cable laying method in the bridge frame of the overhead pipe network provided by the embodiment of the present invention is schematically shown. Figure 2 .
[0039] Figure 5 It is a structural schematic diagram of a turning elbow in a cable laying method in a bridge frame on an overhead pipe network provided by an embodiment of the present invention.
[0040] Figure 6 It is a structural schematic diagram of a slider in a cable laying method in a bridge frame on an overhead pipe network provided by an embodiment of the present invention.
[0041] Figure 7 It is a structural schematic diagram of the connection between the cable slide and the steel purlin on the overhead pipe network in the cable laying method in the overhead pipe network bridge frame provided by an embodiment of the present invention.
[0042] Figure 8 It is a schematic diagram of the fixing structure of the head end of the cable after the cable is laid in place in the cable laying method in the bridge frame on the overhead pipe network provided by the embodiment of the present invention.
[0043] In the figure, 1, overhead pipe network; 10, steel purlin; 2, bridge; 3, cable slide; 31, slide unit; 311, shell; 312, cover plate; 313, fixing plate; 314, gear; 315, locking piece; 4, steering elbow; 41, roller shaft; 42, rotating gear; 43, mounting plate; 5, slider; 51, first block; 52, second block; 53, rack; 54, rotating cavity; 6, fixing device; 61, clamp; 62, wire rope; 7, winch; 8, cable to be laid. DETAILED DESCRIPTION
[0044] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0045] Reference Figure 1 and Figure 2 , a method for laying cables in a bridge frame on an overhead pipe network disclosed in the present invention comprises the following steps:
[0046] S101, fixing the cable slide 3 on the steel purlin 10 of the overhead pipe network 1 according to the cable laying direction.
[0047] S102 , multiple sliders 5 are sleeved on the outer peripheral wall of the cable 8 to be laid, and the multiple sliders 5 slide along the cable slide 3 in the cable slide 3 as the pulling force applied to the cable 8 to be laid by the traction rope of the winch 7.
[0048] S103 , after the cable 8 to be laid is laid in place, the fixing device 6 is used to fix the cable 8 to be laid to the bottom end of the column foot of the overhead pipe network 1 .
[0049] S104, open the cable slide 3, take out the cable 8 to be laid and place it in the bridge 2, and install the bridge cover.
[0050] Continue to refer to Figure 3 and Figure 4 In this embodiment, the cable slide 3 includes a plurality of slide units 31, and the plurality of slide units 31 are detachably connected in sequence along the cable laying direction; such a configuration increases the application scope of the cable slide 3.
[0051] Among them, the slide unit 31 includes a shell 311, a cover plate 312, a fixed plate 313 and a plurality of gears 314. The cover plate 312 is covered on the shell 311, and the cover plate 312 is rotatably connected to the shell 311. The shell 311 is enclosed to form a cavity, and the cavity is divided into a first cavity and a second cavity. The first cavity is connected to the second cavity, and the first cavity and the second cavity are arranged in sequence from top to bottom. A plurality of gears 314 are arranged in the second cavity, and the plurality of gears 314 are arranged at intervals along the extension direction of the second cavity, and the plurality of gears 314 can rotate relative to the shell 311; the fixed plate 313 is arranged at the bottom end of the shell 311, and the fixed plate 313 is fastened to the steel purlin 10 of the overhead pipe network 1 through a locking member 315.
[0052] Specifically, the cover plate 312 is rotatably connected to the housing 311 via a hinge. The first cavity is used to place the slider 5 wrapped on the outer peripheral wall of the cable 8 to be laid, and the slider 5 can slide along the first cavity.
[0053] When there is no branching or turning of the overhead pipe network 1, a plurality of first cavities are connected in sequence to form a slide cavity, and a plurality of second cavities are connected in sequence to form a gear cavity.
[0054] Continue to refer to Figure 6 In this embodiment, the slider 5 includes a first block 51 and a second block 52. The first block 51 is provided with a first arc-shaped through groove, and the second block 52 is provided with a second arc-shaped through groove. The side of the second block 52 provided with the second arc-shaped through groove is in contact with the side of the first block 51 provided with the first arc-shaped through groove. The first block 51 is rotatably connected to the second block 52 through a hinge. The first arc-shaped through groove and the second arc-shaped through groove are correspondingly arranged. The first arc-shaped through groove and the second arc-shaped through groove together constitute a rotating through cavity 54. An anti-slip layer is adhered to the inner circumferential wall of the rotating cavity, and the cable 8 to be laid is passed through the rotating through cavity 54. , the outer peripheral wall of the cable 8 to be laid is in contact with the anti-skid layer; the bottom ends of the first block 51 and the second block 52 are both provided with a rack 53 meshing with the gear 314; on the one hand, by providing the rack 53, the friction is reduced during the sliding process of the slider 5, and the energy loss can be reduced with a higher transmission efficiency, so as to achieve the purpose of fast and labor-saving laying of cables on the high-altitude pipe rack; on the other hand, by providing the anti-skid layer, the cable 8 to be laid can be firmly fixed to prevent slipping during the traction process of the cable 8 to be laid, and the outer skin of the cable 8 to be laid can be protected to prevent the slider 5 from damaging the outer skin of the cable 8 to be laid.
[0055] It should be noted that the structures of the first block 51 and the second block 52 may be the same or different. In this embodiment, the structures of the first block 51 and the second block 52 are substantially the same.
[0056] During use, the second block 52 is opened, the cable 8 to be laid is inserted into the first arc-shaped through groove, and then the second block 52 is covered so that the slider 5 is wrapped around the outer peripheral wall of the cable 8 to be laid. When the slider 5 is inside the slide cavity, the slider 5 is in close contact with the slide cavity wall so that the slider 5 remains in a closed state and moves forward with the pulling force of the traction rope. When the slider 5 leaves the slide cavity, the slider 5 falls off from the cable 8 to be laid due to gravity and falls at the exit of the slide cavity.
[0057] It should be noted that the rotating through cavity 54 can be manufactured in various specifications according to the outer diameter of common cables.
[0058] The housing 311 , the cover plate 312 , the fixing plate 313 and the slider 5 are all made of metal.
[0059] Continue to refer to Figure 1 , Figure 2 as well as Figure 7 In this embodiment, S101, the cable slide 3 is fixed on the steel purlin 10 of the overhead pipe network 1 according to the cable laying direction, including:
[0060] S1011. Place each section of the slideway unit 31 on the steel purlin 10 of the overhead pipe network 1 according to the cable laying direction. When the overhead pipe network 1 branches or turns, install the turning elbow 4 according to the cable direction. The turning elbow 4 is located between two slideway units 31.
[0061] It should be noted that, in order to prevent damage to the cable sheath and reduce friction, pulley devices are provided at the head and end portions of the cable slide 3 .
[0062] S1012, connecting the connecting noses on the shells 311 of two adjacent slideway units 31 with bolts.
[0063] When the overhead pipe network 1 branches or turns, it is necessary to connect the turning elbow 4 to the slideway unit 31 adjacent to it.
[0064] S1013, after leveling and straightening the cable slide 3, the fixing plate 313 is fastened to the steel purlin 10 of the overhead pipe network 1 through the locking member 315. This arrangement ensures that the cable slide 3 does not move during the traction process of the cable 8 to be laid. Continuing to refer to 5, in this embodiment, the steering elbow 4 includes an outer shell, an end cover, a mounting plate 43 and a plurality of rotating gears 42. The end cover is arranged on the upper end of the outer shell, and the end cover is rotatably connected to the outer shell. The outer shell is arranged to form a accommodating chamber, and the accommodating chamber is divided into a first chamber and a second chamber. The first chamber is connected to the second chamber, and a plurality of rotating gears 42 are arranged in the second chamber. The plurality of rotating gears 42 are arranged at intervals along the extension direction of the second chamber, and the plurality of rotating gears 42 can all rotate relative to the outer shell; a plurality of roller shafts 41 are arranged on the opposite inner side walls of the first chamber, and the plurality of roller shafts 41 can all rotate relative to the outer shell; the mounting plate 43 is arranged at the bottom end of the outer shell, and the mounting plate 43 is fastened to the steel purlin 10 of the overhead pipe network 1 through fasteners; by arranging the roller shafts 41, it is convenient for the slider 5 to turn.
[0065] Wherein, the end cover is rotatably connected to the outer shell through a hinge.
[0066] In order to prevent damage to the roller shafts 41 on both sides, each slider 5 should not be made too long, and the ends of the slider 5 should be chamfered.
[0067] It should be noted that both the locking member 315 and the fastening member are bolts.
[0068] When the overhead pipe network 1 branches or turns, a plurality of first cavities are connected with the first chamber to form a slide chamber, and a plurality of second cavities are connected with the second chamber to form a gear chamber.
[0069] Continue to refer to Figure 1 and Figure 2 In this embodiment, S102, a plurality of sliders 5 are sleeved on the outer peripheral wall of the cable 8 to be laid, and the plurality of sliders 5 slide along the cable slide 3 in the cable slide 3 as the pulling force applied by the traction rope of the hoist 7 to the cable 8 to be laid, including:
[0070] S1021. Extend the traction rope of the winch 7 along the cable slide 3. The end of the traction rope is connected to the starting end of the cable 8 to be laid through the cable traction mesh. When the cable 8 to be laid is pulled to the starting end of the cable slide 3, a slider 5 is mounted on the outer peripheral wall of the cable 8 to be laid. The slider 5 slides in the cable slide 3 under the pulling force of the traction rope.
[0071] S1022. Whenever the traction rope pulls the cable 8 to be laid forward a preset distance, a slider 5 is sleeved on the outer peripheral wall of the cable 8 to be laid at the starting end of the cable slide 3.
[0072] S1023. Multiple sliders 5 slide along the cable slide 3 in the cable slide 3 as the pulling force applied by the traction rope of the winch 7 to the cable 8 to be laid.
[0073] It should be noted that the speed of laying the cable should not be too fast, and the winch switch should be turned off in time when there is any abnormality.
[0074] Continue to refer to Figure 8 In this embodiment, the fixing device 6 includes a clamp 61 and two steel wire ropes 62. Pull rings are provided on the outer peripheral walls on opposite sides of the clamp 61. One end of the two steel wire ropes 62 is respectively connected to the two pull rings, and the other ends of the two steel wire ropes 62 are respectively connected to the bottom ends of the two column feet; the clamp 61 is fastened to the cable 8 to be laid by tightening the bolts on the clamp 61 to reduce the inner diameter of the clamp 61.
[0075] Further, in this embodiment, S103, after the cable 8 to be laid is laid in place, the fixing device 6 is used to fix the cable 8 to be laid to the bottom end of the column foot of the overhead pipe network 1, including:
[0076] S1031. After the cable 8 to be laid is laid in place, the clamp 61 is fastened to the outer peripheral wall of the section of the cable 8 to be laid extending out of the cable slide rail.
[0077] S1032, connecting one end of the steel wire rope 62 to the pull ring, and connecting the other end of the steel wire rope 62 to the hanging ring at the bottom end of the column foot to fix the cable 8 to be laid to prevent the cable 8 to be laid from falling back.
[0078] Furthermore, in the present embodiment, S102, a plurality of sliders 5 are sleeved on the outer peripheral wall of the cable 8 to be laid, and after the plurality of sliders 5 slide along the cable slide 3 in the cable slide 3 as the pulling force applied by the traction rope of the winch 7 to the cable 8 to be laid, S103, after the cable 8 to be laid is laid in place, before the fixing device 6 is used to fix the cable 8 to be laid to the bottom end of the column foot of the overhead pipe network 1, it also includes: after the slider 5 leaves the cable slide 3, the slider 5 is no longer constrained by the cable slide 3, and the slider 5 falls off from the cable 8 to be laid under the action of gravity into the net bag on the overhead pipe network 1 for recovery, and the recovered slider 5 is taken to the starting end of the cable slide 3 for continued use.
[0079] Specifically, after the slider 5 leaves the slide cavity, since the slider 5 is no longer constrained by the slide cavity, the slider 5 falls off the cable 8 to be laid under the action of gravity and falls at the exit of the slide cavity.
[0080] Continue to refer to Figure 1 and Figure 2 In this embodiment, S104, open the cable slide 3, take out the cable 8 to be laid and place it in the bridge 2, and install the bridge cover, including:
[0081] S1041 . Open the cover of the slide unit 31 .
[0082] S1042. Starting from the terminal of the cable 8 to be laid, the cable 8 to be laid is taken out section by section and placed in the bridge 2. After each time the cable 8 to be laid is placed in the bridge 2, the cable 8 to be laid is tied and labeled according to the specification requirements.
[0083] Specifically, the cables 8 to be laid are taken out section by section and placed in the bridge 2 manually or with the assistance of a crane (for cables with large cross-section). Each time the cables 8 to be laid are placed in the bridge 2, they are tied and labeled according to the specifications.
[0084] S1043. After all the cables 8 to be laid are transferred into the bridge 2, the bridge cover is installed.
[0085] The present application provides a method for laying cables in a bridge frame on an overhead pipe network, comprising the following steps: fixing a cable slide 3 on a steel purlin 10 of an overhead pipe network 1 in a cable laying direction; sleeved with a plurality of sliders 5 on the outer peripheral wall of a cable 8 to be laid, wherein the plurality of sliders 5 slide along the cable slide 3 in the cable slide 3 as the pulling force applied by a traction rope of a winch 7 to the cable 8 to be laid; after the cable 8 to be laid is laid in place, a fixing device 6 is used to fix the cable 8 to be laid to the bottom end of a column foot of the overhead pipe network 1; the cable slide 3 is opened, the cable 8 to be laid is taken out and placed in the bridge frame 2, and a bridge frame cover is installed; compared with the traditional construction method, the cable 8 to be laid is fixed in the slider 5 and moves along the cable slide 3 with the traction force, thereby reducing the input of manpower, avoiding too many people from being involved in high-altitude operations, reducing construction risks, and improving construction efficiency.
[0086] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0087] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A method for laying cables in a bridge frame on an overhead pipe network, characterized in that: The steps include: Fix the cable slideway on the steel purlin of the overhead pipe network according to the cable laying direction; A plurality of sliders are sleeved on the outer peripheral wall of the cable to be laid, and the plurality of sliders slide along the cable slideway in the cable slideway as the pulling force applied by the traction rope of the hoist to the cable to be laid; After the cable to be laid is laid in place, a fixing device is used to fix the cable to be laid to the bottom end of the column foot of the overhead pipe network; Open the cable slide, take out the cables to be laid and place them in the bridge, and install the bridge cover.
2. The method for laying cables in a bridge frame on an overhead pipe network according to claim 1, characterized in that: The cable slideway comprises a plurality of slideway units, and the plurality of slideway units are detachably connected in sequence along the cable laying direction; The slide unit includes a shell, a cover plate, a fixing plate, and a plurality of gears, wherein the cover plate is disposed on the shell, the cover plate is rotatably connected to the shell, the shell is surrounded by a cavity, the cavity is divided into a first cavity and a second cavity, the first cavity is communicated with the second cavity, the first cavity and the second cavity are sequentially arranged from top to bottom, a plurality of the gears are arranged in the second cavity, the plurality of the gears are spaced apart along the extension direction of the second cavity, and the plurality of the gears can rotate relative to the shell; The fixing plate is arranged at the bottom end of the shell, and the fixing plate is fastened to the steel purlins of the overhead pipe network through a locking piece.
3. The method for laying cables in a bridge frame on an overhead pipe network according to claim 2, characterized in that: The method of fixing the cable slideway on the steel purlin of the overhead pipe network according to the cable laying direction includes: Place the slideway units of each section on the steel purlins of the overhead pipe network according to the cable laying direction. When the overhead pipe network branches or turns, install a turning elbow according to the direction of the cable, and the turning elbow is located between two slideway units; Connecting the connecting noses on the housings of two adjacent slideway units by bolts; After the cable slide is leveled and straightened, the fixing plate is fastened to the steel purlin of the overhead pipe network through the locking piece.
4. The method for laying cables in a bridge frame on an overhead pipe network according to claim 2, characterized in that: The outer peripheral wall of the cable to be laid is provided with a plurality of sliders, and the plurality of sliders slide along the cable slideway in the cable slideway as the pulling force applied by the traction rope of the hoist to the cable to be laid, including: Extend the traction rope of the hoist along the cable slideway, the end of the traction rope is connected to the starting end of the cable to be laid through the cable traction net sleeve, when the cable to be laid is pulled to the starting end of the cable slideway, a slider is sleeved on the outer peripheral wall of the cable to be laid, and the slider slides in the cable slideway under the pulling force of the traction rope; Whenever the traction rope pulls the cable to be laid forward by a preset distance, a slider is sleeved on the outer peripheral wall of the cable to be laid at the starting end of the cable slideway; The plurality of sliders slide along the cable slide in the cable slide as the pulling force applied by the traction rope of the hoist to the cable to be laid is applied.
5. The method for laying cables in a bridge frame on an overhead pipe network according to claim 4, characterized in that: The slider includes a first block and a second block, the first block is provided with a first arcuate through groove, the second block is provided with a second arcuate through groove, a side of the second block provided with the second arcuate through groove is in contact with a side of the first block provided with the first arcuate through groove, the first block is rotatably connected to the second block via a hinge, the first arcuate through groove and the second arcuate through groove are correspondingly arranged, and the first arcuate through groove and the second arcuate through groove together constitute a rotating through cavity; An anti-slip layer is adhered to the inner circumferential wall of the rotating cavity, the cable to be laid is passed through the rotating cavity, and the outer circumferential wall of the cable to be laid is in contact with the anti-slip layer; The bottom ends of the first block and the second block are both provided with racks meshing with the gear.
6. The method for laying cables in a bridge frame on an overhead pipe network according to claim 1, characterized in that: The fixing device comprises a clamp and two steel wire ropes, and pull rings are arranged on the outer peripheral walls on opposite sides of the clamp, one end of the two steel wire ropes is respectively connected to the two pull rings, and the other ends of the two steel wire ropes are respectively connected to the bottom ends of the two column feet; The clamp is fastened to the cable to be laid by tightening the bolts on the clamp to reduce the inner diameter of the clamp.
7. The method for laying cables in a bridge frame on an overhead pipe network according to claim 6, characterized in that: After the cable to be laid is laid in place, a fixing device is used to fix the cable to be laid to the bottom end of the column foot of the overhead pipe network, including: After the cable to be laid is laid in place, the clamp is fastened to the outer peripheral wall of a section of the cable to be laid extending out of the cable slide rail; One end of the steel wire rope is connected to the pull ring, and the other end of the steel wire rope is connected to the hanging ring at the bottom end of the column foot to fix the cable to be laid.
8. The method for laying cables in a bridge frame on an overhead pipe network according to claim 1, characterized in that: The method further comprises: after a plurality of sliders are sleeved on the outer peripheral wall of the cable to be laid, and the plurality of sliders slide along the cable slideway in accordance with the pulling force applied by the traction rope of the hoist to the cable to be laid, after the cable to be laid is laid in place, before the fixing device is used to fix the cable to be laid to the bottom end of the column foot of the overhead pipe network, the method further comprises: After the slider leaves the cable slide, the slider is no longer constrained by the cable slide. Under the action of gravity, the slider falls off the cable to be laid and is recovered in the net bag on the overhead pipe network. The recovered slider is taken to the starting end of the cable slide for continued use.
9. The method for laying cables in a bridge frame on an overhead pipe network according to claim 2, characterized in that: The method of opening the cable slide, taking out the cable to be laid and placing it in the bridge, and installing the bridge cover plate comprises: Opening the cover of the slide unit; Starting from the terminal of the cable to be laid, the cable to be laid is taken out section by section and placed in the bridge. After the cable to be laid is placed in the bridge each time, the cable to be laid is tied and labeled according to the specification requirements; After all the cables to be laid are transferred into the bridge, the bridge cover is installed.
10. The method for laying cables in a bridge frame on an overhead pipe network according to claim 3, characterized in that: The steering elbow comprises a shell, an end cover, a mounting plate and a plurality of rotating gears, wherein the end cover is disposed on the upper end of the shell, the end cover is rotatably connected to the shell, the shell is surrounded by a receiving chamber, the receiving chamber is divided into a first chamber and a second chamber, the first chamber is communicated with the second chamber, a plurality of the rotating gears are disposed in the second chamber, the plurality of the rotating gears are spaced apart along the extension direction of the second chamber, and the plurality of the rotating gears can rotate relative to the shell; A plurality of rollers are disposed on two opposite inner side walls of the first chamber, and the plurality of rollers are capable of rotating relative to the housing; The mounting plate is arranged at the bottom end of the shell, and the mounting plate is fastened to the steel purlins of the overhead pipe network through fasteners.