Earthwork standard room and manufacturing process thereof
By using the design of combining the movable layer formed by the split joints in the geogrid chamber and the node connection fastener, the problem of unsatisfactory connection stability of the traditional geogrid chamber is solved, and higher stability and flexibility are achieved.
Patent Information
- Application Number
- CN202411957551.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-02-28
AI Technical Summary
The connection mode of traditional geochases is not ideal, it is prone to separation damage caused by external forces, and cannot be separated as needed, and it is not flexible.
The design of combining the movable layer formed by the split joint and the node connecting fastener is formed through the connection between the pressing block and the pressing groove and the articulation shaft, a stable connection node is formed to ensure the stability of the connection and flexibility.
It improves the overall stability and connection stability of the geotextile chamber, and is flexible, and can be disassembled and separated as needed for easy use.
Smart Images

Figure CN119531332A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of geocells, and in particular relates to a geocell and a manufacturing process thereof. Background Art
[0002] A geocell is a geosynthetic material used in soil and civil engineering. It is usually made of polymers and has a grid-like structure that can expand and form a three-dimensional cell that can effectively support and reinforce the soil;
[0003] The sheets of traditional geocells are usually connected by fusion, bonding, suturing, etc. to form nodes, and then form geocells for use. However, the traditional connection method has poor connection stability and is easily separated and damaged due to large external forces. After the nodes are formed, they cannot be separated as needed, and the flexibility is not ideal. Summary of the invention
[0004] The object of the present invention is to provide a geocell and a manufacturing process thereof, so as to solve the problem that the traditional connection method has poor connection stability and is easily separated and damaged due to large external forces.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A geocell comprises at least two sheets and connecting nodes;
[0007] The sheet is divided into a plurality of active layers by a dividing seam;
[0008] The connection node comprises two node connection fasteners that engage with each other, a plurality of pressing blocks are arranged on the node connection fasteners, pressing grooves are arranged between adjacent pressing blocks, the pressing blocks are adapted to the pressing grooves, and the two node connection fasteners are connected by a hinge shaft;
[0009] The plurality of movable layers are staggered and divided into two groups, and the two groups of movable layers are respectively located in the pressing grooves of the two node connection fasteners.
[0010] Preferably, a cover plate is provided at the front end of the node connection fastener.
[0011] Preferably, the cover plate and the pressing block are both provided with through holes inside, and the hinge shaft is located in the through holes.
[0012] Preferably, an anti-dropping piece is provided at the front end of the articulated shaft, and a plurality of conical rings are provided on the outer surface of the articulated shaft.
[0013] Preferably, the two node connection fasteners are arranged upside down.
[0014] Preferably, both side surfaces of the sheet are provided with embossing, and the side walls of the node connection fasteners are provided with threads.
[0015] A geocell manufacturing process, comprising:
[0016] S1, providing a plurality of horizontal dividing seams on the sheet material to form an active layer located above and below the dividing seams;
[0017] S2, staggering a plurality of the active layers into two groups, and pulling the two groups of active layers toward two sides of the sheet respectively;
[0018] S3, turning the two node connection fasteners upside down, and then pushing the two groups of active layers into the pressing grooves of the two node connection fasteners respectively;
[0019] S4, engaging the pressing blocks and pressing grooves of the two node connection fasteners with each other, so that the active layer is squeezed between the pressing blocks and the pressing grooves;
[0020] S5. Insert the hinge shaft into the through hole to connect the two node connection fasteners to form a connection node, and form a mesh geocell by arranging the connection nodes equidistantly in the longitudinal and transverse directions.
[0021] Preferably, in step S1, the plurality of dividing seams are aligned vertically.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The present invention presses and fixes the movable layer in the pressing groove through the pressing block to ensure the stability of the connection node. The connection node can be prevented from being separated from the sheet from the top or bottom by staggering the two groups of movable layers up and down, and the connection node can be prevented from being separated from the dividing seam area, thereby ensuring the relative position stability of the connection node and the sheet, and firmly hinges the adjacent sheets together, thereby improving the overall stability of the geocell. The operation is simple, the connection is stable, and it can be disassembled and separated at any time, which is convenient for personnel to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 It is a schematic diagram of the connection node structure of the present invention;
[0027] Figure 3 It is a schematic diagram of the connection node and the connection point of the sheet material of the present invention;
[0028] Figure 4 It is a schematic diagram of the connection node structure of the present invention;
[0029] Figure 5 A schematic diagram of a sheet structure according to an embodiment of the present invention;
[0030] Figure 6 A schematic diagram of a sheet structure of another embodiment of the present invention;
[0031] Figure 7 The figure is a flowchart of the method steps of the present invention.
[0032] In the figure: 1, sheet; 101, dividing seam; 102, movable layer; 2, connection node; 2011, cover plate; 2012, pressing block; 2013, through hole; 2014, pressing groove; 201, node connection fastener; 202, hinge shaft; 2021, tapered ring; 2022, anti-slip piece. DETAILED DESCRIPTION
[0033] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0034] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0035] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0036] As attached Figure 1 , 2 , 3 and attached Figure 4 As shown:
[0037] Embodiment 1: This embodiment provides a geocell, comprising at least two sheets 1 and connection nodes 2; the sheet 1 is divided into a plurality of active layers 102 by a dividing seam 101; the connection node 2 comprises two mutually engaged node connection fasteners 201, a plurality of pressing blocks 2012 are arranged on the node connection fastener 201, a pressing groove 2014 is arranged between adjacent pressing blocks 2012, the pressing blocks 2012 are adapted to the pressing groove 2014, and the two node connection fasteners 201 are connected by a hinge shaft 202; the plurality of active layers 102 are staggered into two groups, and the two groups of active layers 102 are respectively located in the pressing grooves 2014 of the two node connection fasteners 201.
[0038] The sheet 1 is divided into a plurality of movable layers 102 by a dividing seam 101, and the movable layers 102 are staggered up and down to be divided into two groups, that is, from top to bottom, the first layer is the first group, the second layer is the second group, the third layer is the first group, and the fourth layer is the second group, and so on and so forth. Then, the two groups of movable layers 102 are respectively pushed into the pressing grooves 2014 of the two node connecting fasteners 201, and then the two node connecting fasteners 201 are engaged with each other, and the movable layers 102 can be pressed and fixed in the pressing grooves 2014 by the pressing blocks 2012 to ensure the stability of the connecting nodes 2. By staggering the two groups of movable layers 102 up and down, it is possible to prevent the connecting nodes 2 from being separated from the sheet 1 from the top or bottom, and at the same time prevent the connecting nodes 2 from being separated from the dividing seam 101 area, thereby ensuring the relative position stability of the connecting nodes 2 and the sheet 1, and firmly hinge the adjacent sheets 1 together to improve the overall stability of the geocell.
[0039] A hollow area is formed between the movable layers 102 on both sides in the pressing grooves 2014 of the two node connection fasteners 201 for filling the pressing blocks 2012 for pressing and fixing. The hollow area includes but is not limited to arc or diamond shapes.
[0040] Specifically, a cover plate 2011 is provided at the front end of the node connection fastener 201 . The cover plate 2011 can prevent the active layer 102 located at the uppermost layer or the lowermost layer from being separated from the node connection fastener 201 .
[0041] Specifically, the cover plate 2011 and the pressing block 2012 are both provided with through holes 2013, and the hinge shaft 202 is located in the through hole 2013. After the two node connecting fasteners 201 are snapped together, the through holes 2013 thereon will also be aligned. At this time, the hinge shaft 202 is inserted into the through hole 2013 to connect the two node connecting fasteners 201 into an integral structure to form a connecting node 2.
[0042] Specifically, the front end of the hinge shaft 202 is provided with an anti-slip component 2022, and the outer surface of the hinge shaft 202 is provided with a plurality of conical rings 2021. The anti-slip component 2022 prevents the hinge shaft 202 from directly passing through the through hole 2013 and falling off when being inserted into the through hole 2013, resulting in separation from the node connecting fastener 201. The conical ring 2021 is a structure that is wide at the top and narrow at the bottom. In the process of inserting the hinge shaft 202 into the through hole 2013 from top to bottom, the clamping force will be increased by the conical ring 2021, so that the hinge shaft 202 will automatically engage and be fixed in the through hole 2013, thereby increasing the clamping force and preventing it from falling off.
[0043] Specifically, the two node connecting fasteners 201 are arranged upside down. Through the node connecting fasteners 201 arranged upside down, the pressure block 2012 and the pressure groove 2014 thereon will be exactly aligned, which is convenient for personnel to perform the locking operation and form a complete cylindrical shape after locking, thereby improving the overall stability. At the same time, when a node connecting fastener 201 is damaged, it can also be easily replaced, thereby reducing the production and use costs.
[0044] Specifically, both sides of the sheet 1 are provided with embossing, and the side wall of the node connection fastener 201 is provided with threads, as shown in the attached Figure 5 As shown, the embossing is a stripe pattern, which increases the friction and bonding force between the sheet and the filler at a later stage. The thread will increase the rigidity and strength of the node and the friction between the sheet and the filler when the filler is filled in later.
[0045] Embodiment 2: This embodiment is basically the same as the previous embodiment, except that Figure 6 As shown, the embossing is a wave pattern, which increases the friction and bonding force between the sheet and the filler in the later stage.
[0046] As attached Figure 7 As shown:
[0047] Embodiment 3: This embodiment is basically the same as the previous embodiment, except that a manufacturing process of a geocell includes:
[0048] S1, a plurality of horizontal split seams 101 are provided on the sheet 1 to form an active layer 102 located above and below the split seams 101;
[0049] S2, dividing a plurality of active layers 102 into two groups in an interlaced manner, and pulling the two groups of active layers 102 toward two sides of the sheet 1 respectively;
[0050] S3, turning the two node connection fasteners 201 upside down, and then pushing the two groups of active layers 102 into the pressing grooves 2014 of the two node connection fasteners 201 respectively;
[0051] S4, engaging the pressing blocks 2012 and the pressing grooves 2014 of the two node connection fasteners 201 with each other, so that the active layer 102 is squeezed between the pressing blocks 2012 and the pressing grooves 2014;
[0052] S5. Insert the hinge shaft 202 into the through hole 2013 to connect the two node connection fasteners 201 to form a connection node 2, and form a mesh geocell by arranging the connection nodes 2 equidistantly in the longitudinal and transverse directions.
[0053] Specifically, in step S1 , a plurality of dividing seams 101 are aligned vertically.
[0054] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values (e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to numerous modifications still falling within the scope of the appended claims.
[0055] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0056] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0057] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A geocell, characterized in that: It comprises at least two sheets (1) and a connecting node (2); The sheet material (1) is divided into a plurality of active layers (102) by a dividing seam (101); The connection node (2) comprises two mutually engaged node connection fasteners (201), a plurality of pressing blocks (2012) are arranged on the node connection fastener (201), pressing grooves (2014) are arranged between adjacent pressing blocks (2012), the pressing blocks (2012) are adapted to the pressing grooves (2014), and the two node connection fasteners (201) are connected via a hinge shaft (202); The plurality of movable layers (102) are staggered and divided into two groups, and the two groups of movable layers (102) are respectively located in the pressing grooves (2014) of the two node connection fasteners (201).
2. A geocell according to claim 1, characterized in that: A cover plate (2011) is provided at the front end of the node connection fastener (201).
3. A geocell according to claim 2, characterized in that: The cover plate (2011) and the pressing block (2012) are both provided with through holes (2013) inside, and the hinge shaft (202) is located inside the through hole (2013).
4. A geocell according to claim 1, characterized in that: The front end of the hinge shaft (202) is provided with an anti-slip component (2022), and the outer surface of the hinge shaft (202) is provided with a plurality of conical rings (2021).
5. The geocell according to claim 1, characterized in that: The two node connection fasteners (201) are arranged upside down.
6. The geocell according to claim 1, characterized in that: Both side surfaces of the sheet (1) are provided with embossing, and the side walls of the node connection fasteners (201) are provided with threads.
7. A process for producing a geocell, characterized in that: include: S1, providing a plurality of horizontal dividing slits (101) on the sheet (1) to form an active layer (102) located above and below the dividing slits (101); S2, dividing a plurality of the active layers (102) into two groups in an interlaced manner, and pulling the two groups of active layers (102) toward two sides of the sheet (1) respectively; S3, turning the two node connection fasteners (201) upside down, and then pushing the two groups of movable layers (102) into the pressing grooves (2014) of the two node connection fasteners (201) respectively; S4, engaging the pressing blocks (2012) and the pressing grooves (2014) of the two node connection fasteners (201) with each other, so that the active layer (102) is squeezed between the pressing blocks (2012) and the pressing grooves (2014); S5. Insert the hinge shaft (202) into the through hole (2013) to connect the two node connection fasteners (201) to form a connection node (2), and form a mesh geocell by arranging the connection nodes (2) equidistantly in the longitudinal and transverse directions.
8. The process for making a geocell according to claim 7, characterized in that: In the step S1, a plurality of the dividing seams (101) are aligned vertically.