Roadbed sheet-pile wall construction device
By designing the roadbed pile wall construction device, using components such as mobile frame, lateral positioning groove, front-end positioning groove, steel sheet pile clamping and clamping drag plate, the problems of low efficiency and high labor cost of steel sheet pile driving are solved, and the precise insertion and buckle of steel sheet piles are achieved, reducing costs and improving construction efficiency.
Patent Information
- Application Number
- CN202411961193.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-02-28
AI Technical Summary
During the construction of roadbed pile panel walls, the pile driving operation efficiency of steel sheet piles is low and labor costs are high. There is a lack of effective guidance, calibration and positioning tools, resulting in at least two or more personnel participating in cooperation.
A roadbed pile wall construction device is designed, including a mobile frame, lateral positioning groove, front-end positioning groove, steel sheet pile clamping and clamping drag plate. Through the synergy of these components, the precise insertion and buckle of steel sheet piles is achieved, reducing manual intervention.
This device can realize accurate insertion and hooking of steel sheet piles without manual support, reduce pile driving operation costs, improve construction efficiency, and ensure construction quality.
Smart Images

Figure CN119531358A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of roadbed pile-sheet wall construction; in particular, the invention relates to a roadbed pile-sheet wall construction device. Background Art
[0002] The roadbed pile-sheet wall refers to a roadbed structure composed of reinforced concrete piles and prefabricated retaining plates (or concrete panels, steel sheet piles) on a weak or unstable foundation. This structure compensates for the lack of foundation strength by the depth of the piles, thereby improving the stability and bearing capacity of the road surface.
[0003] During the construction of roadbed pile-sheet walls, the pile driver operator needs to manually support the bottom end of the steel sheet pile, insert it into the gap between the steel guide beams, and connect it with the end of the previous steel sheet pile with the cooperation of the ground personnel before carrying out the piling operation.
[0004] During this process, due to the high precision requirements for steel sheet pile driving operations and the current lack of effective guidance, calibration and positioning tools, at least two people are required to cooperate, which results in low efficiency and high labor costs for the steel sheet pile driving operation.
[0005] In view of this, the present application provides a roadbed pile-sheet wall construction device. Summary of the invention
[0006] In view of this, the present invention provides a roadbed pile-sheet wall construction device, thereby solving or at least alleviating the above-mentioned problems existing in the prior art.
[0007] In order to achieve the above-mentioned object, the present invention provides a roadbed pile-sheet wall construction device, comprising:
[0008] A mobile frame is used for displacement on the steel guide beam, wherein a steel sheet pile entrance is provided at the rear end of the mobile frame, lateral positioning grooves are provided on both sides of the front end of the mobile frame, and a front end positioning groove is provided between the front ends of the two lateral positioning grooves;
[0009] A steel sheet pile clamp is used to be sleeved on the top of the outer side of the steel sheet pile that has been piled. The steel sheet pile clamp is slidably arranged on both sides of the mobile frame. The steel sheet pile clamp includes a first clamping plate, a second clamping plate rotatably arranged at the rear end of the first clamping plate, and a third clamping plate fixedly arranged at the front end of the first clamping plate.
[0010] A clamp lock plate is rotatably provided on both sides of the rear end of the mobile frame, and is used to block the rear end surface of the second clamp plate on the same side thereof, so as to prevent the second clamp plate from rotating backward and separating from the steel sheet pile;
[0011] An outer top block is provided on the outer side walls of the two lateral positioning grooves, and is used to drive the clamp lock plate on the same side to rotate outward and disengage from the second clamp plate when being squeezed outward by the steel guide beam;
[0012] The fixture carriage is rotatably provided at the front end of each of the two lateral positioning grooves, and the fixture carriage is located laterally of the front positioning groove. The front end of the third clamping plate is connected to the fixture carriage, and when the steel guide beam is placed in the lateral positioning groove, the outer end of the fixture carriage rotates forward and drags the corresponding side steel sheet pile fixture forward to align with the steel guide beam.
[0013] In a subgrade pile - slab wall construction device as described above, optionally, the moving frame has a "C" - shaped structure with an open end facing backward. Walking wheels for walking in the outer cavity of the steel guide beam are provided on both sides of the bottom of the moving frame. Longitudinal guide rollers are provided on both side walls of the steel sheet pile inlet, and the center line of the steel sheet pile inlet coincides with that of the front positioning groove.
[0014] In a subgrade pile - slab wall construction device as described above, optionally, a first sliding groove is formed in the inner side wall of the moving frame, the first clamping plate is slidably arranged in the first sliding groove, a second sliding groove is formed in the side wall of the moving frame, the second clamping plate is slidably arranged in the second sliding groove, and a slope is provided at the front end of the inner side wall of the second sliding groove. The top of the slope is flush with the inner side wall of the moving frame. When the second clamping plate moves forward to the top of the slope, it is in a state of closely adhering to the rear inclined surface of the outer wall of the steel sheet pile.
[0015] In a subgrade pile - slab wall construction device as described above, optionally, the fixture locking plate has an inverted "L" - shaped structure. A connecting rod is fixedly connected to the top end of the front side surface of the fixture locking plate. The front end of the connecting rod is fixedly connected to a rotating sleeve. The top end of the rotating sleeve is rotatably connected to the outer wall surface of the moving frame. Longitudinal strip grooves are formed on both the front and rear sides of the rotating sleeve. A transverse sliding rod is slidably connected between the two longitudinal strip grooves. One side surface of the transverse sliding rod facing the moving frame is connected with an elastic telescopic rod, and the elastic telescopic rod is fixedly installed on the moving frame.
[0016] In a subgrade pile - slab wall construction device as described above, optionally, the outer top block is located within the range of the rotating sleeve in the height direction, and the top block rotates the fixture locking plate outward through the outer top rotating sleeve to disengage from the second clamping plate.
[0017] In a subgrade pile - slab wall construction device as described above, optionally, a transverse strip groove is formed on the fixture carriage, a longitudinal sliding rod is fixedly connected to the front end of the third clamping plate, and the longitudinal sliding rod is slidably arranged in the transverse strip groove.
[0018] In a roadbed pile-board wall construction device as described above, optionally, a mounting shaft is fixedly connected to the top of the inner end of the clamping carriage, and the mounting shaft is rotatably mounted on a movable frame, and a first push block and a second push block are fixedly provided on the outer side surface of the mounting shaft, and the first push block and the second push block are symmetrically distributed, and the first push block is parallel to the clamping carriage.
[0019] In a roadbed pile-sheet wall construction device as described above, optionally, the side surface of the first push block facing the center of the movable frame is an arc-shaped surface, and when the steel sheet pile clamp is located at the rear end of the movable frame, the distance between the rear end of the first push block and the rear inner wall surface of the lateral positioning groove is greater than the width of the outer wall of the steel sheet pile.
[0020] In the roadbed pile-sheet wall construction device as described above, optionally, the movable frame is provided with a receiving cavity on the front side of the lateral positioning groove, and the receiving cavity connects the lateral positioning groove with the front positioning groove, wherein:
[0021] When the steel sheet pile fixture is located at the rear end of the mobile frame, the fixture drag plate is in a state where the rear end is tilted outward, the end of the first push block away from the installation axis is located in the inner cavity of the lateral positioning groove, and the end of the second push block away from the installation axis is located in the accommodating cavity;
[0022] When the steel sheet pile clamp is located at the front end of the moving frame, the clamp drag plate is perpendicular to the moving frame, the end of the first push block away from the installation axis is located in the accommodating cavity, and the end of the second push block away from the installation axis is located in the front end positioning groove.
[0023] In the above-mentioned roadbed pile-sheet wall construction device, optionally, a baffle is provided at the bottom of the steel sheet pile entrance, the height of the baffle is greater than the height of the fixture drag plate, and the height of the baffle is less than the height of the outer top block.
[0024] The invention discloses a roadbed pile sheet wall construction device, which adopts a movable frame, a lateral positioning groove, a front end positioning groove, a steel sheet pile clamp and a clamp drag plate, and can realize the insertion of the steel sheet piles into the steel guide beam and the buckling of the steel sheet piles without manual support during the piling operation of the steel sheet piles. The position of the steel sheet piles can be directly controlled by the pile driver to calibrate and position the steel sheet piles one by one, thereby reducing the piling operation cost of the steel sheet piles in the roadbed pile sheet wall construction, improving the construction efficiency and ensuring the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The disclosure of the present invention will become more apparent with reference to the accompanying drawings. It should be understood that these drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In the drawings:
[0026] Figure 1 This is a state diagram of the roadbed pile-sheet wall construction device of the present invention when the second steel sheet pile is being driven.
[0027] Figure 2 For the present invention Figure 1 Enlarged view of part A in the middle.
[0028] Figure 3 For the present invention Figure 1 Schematic diagram of the pile-sheet wall construction device for the middle roadbed.
[0029] Figure 4 For the present invention Figure 3 Schematic diagram of the left part of the middle mobile rack after it is cut open.
[0030] Figure 5 For the present invention Figure 3 Schematic diagram of the right side of the middle movable rack after cutting.
[0031] Figure 6 It is a schematic diagram of the mobile rack of the present invention.
[0032] Figure 7 It is a schematic diagram of the steel sheet pile clamp and the clamp drag plate located at the front end of the mobile frame of the present invention.
[0033] Figure 8 It is a schematic diagram of the locking plate and sleeve plate of the clamp of the present invention.
[0034] Figure numerals: 1. Mobile frame; 2. Steel sheet pile entrance; 3. Lateral positioning groove; 4. Front end positioning groove; 5. Steel sheet pile clamp; 5-1. First clamp; 5-2. Second clamp; 5-3. Third clamp; 6. Clamp lock plate; 7. External top block; 8. Clamp drag plate; 9. Traveling wheel; 10. Longitudinal guide roller; 11. First slide groove; 12. Second slide groove; 13. Slope; 14. Connecting rod; 15. Rotating sleeve; 16. Longitudinal strip groove; 17. Transverse slide rod; 18. Elastic telescopic rod; 19. Transverse strip groove; 20. Longitudinal slide rod; 21. Mounting shaft; 22. First push block; 23. Second push block; 24. Baffle. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] like Figure 1-Figure 8 As shown, a roadbed pile sheet wall construction device provided by the present invention is applied to the piling operation of steel sheet piles, provides a position calibration function for the piling operation of steel sheet piles, enables the steel sheet piles to be accurately inserted into the gaps between the steel guide beams, and enables two adjacent steel sheet piles to be effectively buckled, which includes:
[0037] A mobile frame 1 is used for displacement on the steel guide beam. A steel sheet pile entrance 2 is provided at the rear end of the mobile frame 1. Side positioning grooves 3 are provided on both sides of the front end of the mobile frame 1. A front positioning groove 4 is provided between the front ends of the two side positioning grooves 3.
[0038] In this embodiment, the mobile frame 1 is used to walk on the steel guide beam and is adjusted according to the piling position of the steel sheet pile to assist the piling operation of each steel sheet pile. The steel sheet pile lifted by the pile driver directly enters the mobile frame 1 from the steel sheet pile entrance 2, and then is moved to the corresponding lateral positioning groove 3. At this time, the lifted steel sheet pile is docked with the steel sheet pile that has been driven, and the front end of the lifted steel sheet pile is located in the front positioning groove 4. After that, it is only necessary to use the pile driver to move the lifted steel sheet pile downward, and use the guiding effect of the lateral positioning groove 3 and the front positioning groove 4 to make the rear end of the lifted steel sheet pile buckle with the front end of the steel sheet pile that has been driven and then continue to move downward to achieve the piling operation. There are two lateral positioning grooves 3, which are respectively used for the piling operation of two steel sheet piles facing opposite directions.
[0039] The steel sheet pile fixture 5 is used to be sleeved on the top of the outer side of the steel sheet pile that has been piled. The steel sheet pile fixture 5 is slidably arranged on both sides of the mobile frame 1. The steel sheet pile fixture 5 includes a first clamping plate 5-1, a second clamping plate 5-2 rotatably arranged at the rear end of the first clamping plate 5-1, and a third clamping plate 5-3 fixedly arranged at the front end of the first clamping plate 5-1;
[0040] In this embodiment, the steel sheet pile clamp 5 is used to be mounted on the top of the steel sheet pile that has been driven to position the movable frame 1, so that the lateral positioning groove 3 and the front positioning groove 4 can calibrate and guide the steel sheet pile that is being driven, thereby ensuring the stable and effective development of the piling operation.
[0041] During the piling operation, one of the steel sheet pile clamps 5 is located at the rear end of the mobile frame 1 and is mounted on the top of the last steel sheet pile that has been driven. The other steel sheet pile clamp 5 is located at the front end of the mobile frame 1 and is located in the lateral positioning groove 3 on the same side as the mobile frame 1. The steel sheet pile being driven will pass through the steel sheet pile clamp 5 when it moves downward in the lateral positioning groove 3.
[0042] After a steel sheet pile is driven, the second clamping plate 5-2 on the steel sheet pile clamp 5 located at the rear end of the movable frame 1 rotates backward at one end facing inward to avoid the steel sheet pile on which it is mounted, so that the movable frame 1 can switch to a state of moving on the steel guide beam after a steel sheet pile is driven.
[0043] A clamp lock plate 6 is rotatably provided on both sides of the rear end of the mobile frame 1, and is used to block the rear end surface of the second clamp plate 5-2 on the same side thereof, to prevent the second clamp plate 5-2 from rotating backward and disengaging from the steel sheet pile;
[0044] In this embodiment, the clamp lock plate 6 can rotate inward to abut against the rear end surface of the second clamp plate 5-2 in the steel sheet pile clamp 5 located at the rear end of the mobile frame 1 to limit the backward rotation of the second clamp plate 5-2, so that the steel sheet pile clamp 5 located at the rear end of the mobile frame 1 can be stably mounted on the top of the steel sheet pile that has been driven, thereby realizing the positioning of the mobile frame 1 and the alignment and guidance of the steel sheet piles being driven.
[0045] When the steel sheet pile in the piling operation completes the piling operation, after the next steel sheet pile enters the corresponding lateral positioning groove 3, it can drive the clamp lock plate 6 to rotate outward and disengage from the second clamp plate 5-2 restricted by it.
[0046] An outer top block 7 is provided on the outer side wall of each of the two lateral positioning grooves 3, and is used to drive the clamp lock plate 6 on the same side to rotate outward and disengage from the second clamp plate 5-2 when being squeezed outward by the steel guide beam; when the steel sheet pile to be piled enters the corresponding lateral positioning groove 3, the outer top block 7 is squeezed outward to cause the outer top block 7 to move outward, and the outer top block 7 drives the clamp lock plate 6 on the same side to rotate outward and disengage from the second clamp plate 5-2 restricted by it.
[0047] A clamping plate 8 is rotatably provided at the front end of each of the two lateral positioning grooves 3, and the clamping plate 8 is located on the side of the front end positioning groove 4. The front end of the third clamping plate 5-3 is connected to the clamping plate 8, and the clamping plate 8 is arranged so that when the steel guide beam is placed in the lateral positioning groove 3, its outer end rotates forward and drags the corresponding side steel sheet pile clamp 5 forward until it is aligned with the steel guide beam.
[0048] In this embodiment, the fixture drag plate 8 is used to drag the steel sheet pile fixture 5 connected thereto to move forward on the mobile frame 1. Specifically, when the steel sheet pile to be piled enters the corresponding lateral positioning groove 3 and the fixture lock plate 6 is driven to rotate outward by the outer top block 7, after the mobile frame 1 is displaced forward by the forward thrust of the steel sheet pile to be piled, the fixture drag plate 8 rotates forward through the rear end, and the steel sheet pile fixture 5 located at the rear end of the mobile frame 1 is dragged forward as a whole to the position of the front end of the mobile frame 1, and is aligned with the lateral positioning groove 3, so as to facilitate the positioning and guidance of the steel sheet pile to be piled during the downward movement process. At the same time, after the steel sheet pile to be piled completes the piling operation, it is sleeved on the top of the steel sheet pile to limit the next forward movement distance of the mobile frame 1, so as to ensure that the distance of each movement of the mobile frame 1 is the same, so as to be suitable for the piling operation of each steel sheet pile.
[0049] The moving frame 1 has a "C" - shaped structure with an open end facing the rear. Walking wheels 9 for traveling in the outer cavity of the steel guide beam are provided on both sides of the bottom of the moving frame 1. Longitudinal guide rollers 10 are provided on both side walls of the steel sheet pile inlet 2, and the mid - lines of the steel sheet pile inlet 2 and the front - end positioning groove 4 coincide. In this embodiment, the steel sheet pile inlet 2 is in a state with an open rear end. The longitudinal guide rollers 10 limit and guide the steel sheet pile during the process of the steel sheet pile passing through the steel sheet pile inlet 2. At the same time, the resistance is reduced, so that the steel sheet pile can enter the lateral positioning groove 3 more accurately. The walking wheels 9 make it more convenient for the moving frame 1 to move on the steel guide beam.
[0050] A first sliding groove 11 is formed in the inner side wall of the moving frame 1. The first clamping plate 5 - 1 is slidably arranged in the first sliding groove 11. A second sliding groove 12 is formed in the side wall of the moving frame 1. The second clamping plate 5 - 2 is slidably arranged in the second sliding groove 12, and a slope 13 is provided at the front end of the inner side wall of the second sliding groove 12. The top of the slope 13 is flush with the inner side wall of the moving frame 1. When the second clamping plate 5 - 2 moves forward to the top of the slope, it is in a state of closely adhering to the rear - end inclined surface of the outer wall of the steel sheet pile.
[0051] In this embodiment, when the steel sheet pile clamp 5 moves forward from the rear end of the moving frame 1 to the lateral positioning groove 3 on the same side, the first clamping plate 5 - 1 moves forward in the first sliding groove 11 to the front end of the first sliding groove 11, and the second clamping plate 5 - 2 moves forward in the second sliding groove 12. Among them, before the second clamping plate 5 - 2 passes through the slope 13, it is in a state with the inner end facing backward. In this state, the inner side surface of the second clamping plate 5 - 2 is flush with the outer side surface of the steel sheet pile. During the process of the second clamping plate 5 - 2 passing through the slope 13 and moving to the top of the slope 13, the second clamping plate 5 - 2 is blocked by the slope 13, so that the second clamping plate 5 - 2 switches to a state with the rear - side end facing inward after passing over the previous steel sheet pile. At this time, an isosceles trapezoid structure adapted to the outer surface of the steel sheet pile is formed among the first clamping plate 5 - 1, the second clamping plate 5 - 2 and the third clamping plate 5 - 3, and it is in a state capable of sleeving the steel sheet pile. And after the second clamping plate 5 - 2 moves to the top of the slope, its outer side surface contacts the surface of the top of the slope. At this time, the second clamping plate 5 - 2 can be locked in this state.
[0052] The clamp locking plate 6 has an inverted "L" - shaped structure. A connecting rod 14 is fixedly connected to the top end of the front side surface of the clamp locking plate 6. The front end of the connecting rod 14 is fixedly connected to a rotating sleeve 15. The top end of the rotating sleeve 15 is rotatably connected to the outer wall surface of the moving frame 1. Longitudinal slots 16 are formed on both the front and rear sides of the rotating sleeve 15. A transverse sliding rod 17 is slidably connected between the two longitudinal slots 16. The side surface of the transverse sliding rod 17 facing the moving frame 1 is connected with an elastic telescopic rod 18, and the elastic telescopic rod 18 is fixedly installed on the moving frame 1. The outer top block 7 is within the range of the rotating sleeve 15 in the height direction, and the top block rotates the rotating sleeve 15 outward so that the clamp locking plate 6 rotates outward and disengages from the second clamping plate 5 - 2.
[0053] In this embodiment, by utilizing the elastic force of the elastic telescopic rod 18, in the initial state, the elastic telescopic rod 18 can keep the fixture lock plate 6 rotating to a state where the second fixture plate 5-2 can be restricted. When the outer top block 7 pushes the rotating sleeve 15 to rotate outward, the connecting rod 14 drives the fixture lock plate 6 to rotate outward and detach from the rear area of the second fixture plate 5-2 on the same side as the outer top block 7.
[0054] A transverse groove 19 is provided on the clamping plate 8, and a longitudinal slide bar 20 is fixedly connected to the front end of the third clamping plate 5-3, and the longitudinal slide bar 20 is slidably arranged in the transverse groove 19. In this embodiment, when the clamping plate 8 rotates, the longitudinal slide bar 20 slides in the transverse groove 19.
[0055] Among them, the top of the inner end of the clamping carriage 8 is fixedly connected with a mounting shaft 21, and the mounting shaft 21 is rotatably mounted on the mobile frame 1. The outer side of the mounting shaft 21 is fixedly provided with a first push block 22 and a second push block 23. The first push block 22 and the second push block 23 are symmetrically distributed, and the first push block 22 is parallel to the clamping carriage 8.
[0056] The mounting shaft 21 serves as a rotation fulcrum of the fixture carriage 8, and the fixture carriage 8 is stably rotatably mounted on the mobile frame 1. The first push block 22 and the second push block 23 are both used to be hit by the steel sheet piles to be driven into the lateral positioning groove 3, and then, the force of the steel sheet piles to be driven is used to push the mobile frame 1 and drive the fixture carriage 8 to rotate automatically, so as to achieve the adaptive adjustment of the positions of the mobile frame 1 and the steel sheet pile fixture 5.
[0057] The side surface of the first push block 22 facing the center of the moving frame 1 is an arc-shaped surface. When the steel sheet pile clamp 5 is located at the rear end of the moving frame 1, the distance between the rear end of the first push block 22 and the rear inner wall surface of the lateral positioning groove 3 is greater than the width of the outer wall of the steel sheet pile. In this way, the first push block 22 can more effectively provide driving force for the rotation of the clamp carriage 8 when it is pushed by the steel sheet pile.
[0058] The front side of the mobile frame 1 located at the lateral positioning groove 3 is provided with an accommodating cavity, which connects the lateral positioning groove 3 with the front positioning groove 4, wherein:
[0059] When the steel sheet pile fixture 5 is located at the rear end of the mobile frame 1, the fixture drag plate 8 is in a state where the rear end is tilted outward, the end of the first push block 22 away from the installation shaft 21 is located in the inner cavity of the lateral positioning groove 3, and the end of the second push block 23 away from the installation shaft 21 is located in the accommodating cavity;
[0060] When the steel sheet pile clamp 5 is located at the front end of the mobile frame 1, the clamp drag plate 8 is perpendicular to the mobile frame 1, the end of the first push block 22 away from the installation shaft 21 is located in the accommodating cavity, and the end of the second push block 23 away from the installation shaft 21 is located in the front end positioning groove 4.
[0061] In this embodiment, when the steel sheet pile to be driven is completely inserted into the front end positioning groove 4 , its front end is inserted into the front end positioning groove 4 .
[0062] A baffle 24 is provided at the bottom of the steel sheet pile entrance 2, and the height of the baffle 24 is greater than the height of the fixture drag plate 8, and the height of the baffle 24 is less than the height of the outer top block 7. The baffle 24 is used to limit the height of the steel sheet pile lifted by the pile driver, so that the height of the steel sheet pile is always greater than the height of the fixture drag plate 8 during the process of moving the steel sheet pile into the lateral positioning groove 3, so as to prevent the fixture drag plate 8 from blocking the steel sheet pile from effectively entering the lateral positioning groove 3.
[0063] The following further describes the use of the roadbed pile-sheet wall construction device of this embodiment:
[0064] ① First, use the pile driver to complete the piling operation of the first steel sheet pile. After completion, slide the mobile frame 1 onto the steel guide beam through the walking wheels 9. At this time, the mobile frame 1 is stably slidably sleeved on the steel guide beam. Then, move the steel sheet pile fixture 5 on the same side as the first steel sheet pile to the rear end of the mobile frame 1 and sleeve it onto the first steel sheet pile.
[0065] Move the steel sheet pile fixture 5 on the opposite side of the first steel sheet pile to the front end of the mobile frame 1, and rotate the fixture drag plate 8 on the opposite side of the first steel sheet pile to a state perpendicular to the mobile frame 1. At this time, the mobile frame 1 is positioned by the steel sheet pile fixture 5 on the first steel sheet pile, and the steel sheet pile fixture 5 on the opposite side of the first steel sheet pile is aligned with the lateral positioning groove 3, the second push block 23 on the opposite side of the first steel sheet pile is located in the front end positioning groove 4, the first push block 22 on the opposite side of the first steel sheet pile is located in the accommodating cavity, and the second clamping plate 5-2 on the first steel sheet pile is located on the top of the slope 13 and is fixed.
[0066] ② Use a pile driver to lift the second steel sheet pile and make it pass through the steel sheet pile entrance 2. After the outer side of the second steel sheet pile enters the lateral positioning groove 3, use the pile driver to move the second steel sheet pile to the opposite side of the first steel sheet pile. At this time, the second steel sheet pile will push the outer top block 7 located on the opposite side of the first steel sheet pile outward, causing the fixture lock plate 6 located on the opposite side of the first steel sheet pile to rotate outward. After the outer side of the second steel sheet pile contacts the side wall of the lateral positioning groove 3 located on the opposite side of the first steel sheet pile, use the pile driver to drive the second steel sheet pile to move forward, so that the front end of the second steel sheet pile is inserted into the front end positioning groove 4.
[0067] At this time, the second steel sheet pile fits into the lateral positioning groove 3, and the steel sheet pile fixture 5 located on the opposite side of the first steel sheet pile is located directly below the second steel sheet pile and is in an aligned state.
[0068] Then, the second steel sheet pile starts to move downward. Under the guidance of the lateral positioning groove 3 and the front positioning groove 4, the second steel sheet pile passes through the steel sheet pile clamp 5 below it and is clamped with the first steel sheet pile. After that, the steel sheet pile driving operation is carried out.
[0069] After the piling operation of the second steel sheet pile is completed, the two steel sheet pile fixtures 5 are respectively sleeved on the top of the first steel sheet pile and the second steel sheet pile.
[0070] ③ Use a pile driver to lift the third steel sheet pile and move the third steel sheet pile from the steel sheet pile entrance 2 into the range of the lateral positioning groove 3. The pile driver makes the outer side of the third steel sheet pile stick to the side wall of the lateral positioning groove 3 on the opposite side of the second steel sheet pile. At this time, the third steel sheet pile pushes the outer top block 7 on the opposite side of the second steel sheet pile outward, so that the clamp lock plate 6 at the rear end of the first steel sheet pile rotates outward and disengages from the second clamp plate 5-2 at the rear end of the first steel sheet pile.
[0071] ④ Use the pile driver to move the third steel sheet pile forward, and the third steel sheet pile provides forward thrust for the mobile frame 1. At this time, the mobile frame 1 moves forward on the steel guide beam, and the steel sheet pile fixture 5 located on the side of the first steel sheet pile moves forward synchronously with the mobile frame 1 and crosses the first steel sheet pile, while the steel sheet pile fixture 5 located on the second steel sheet pile remains clamped on the second steel sheet pile. When the second clamping plate 5-2 sleeved on the rear side of the second steel sheet pile contacts the fixture lock plate 6, the mobile frame 1 moves forward to the farthest position. At this time, under the thrust of the third steel sheet pile, the first push block 22 located on the opposite side of the second steel sheet pile is pushed by the third steel sheet pile, causing the fixture drag plate 8 to swing, and the fixture drag plate 8 pulls the steel sheet pile fixture 5 located on the opposite side of the second steel sheet pile forward, causing it to move to the lateral positioning groove 3 located on the opposite side of the second steel sheet pile and be located directly below the third steel sheet pile.
[0072] ⑤ Use the pile driver to move the third steel sheet pile downward, and the third steel sheet pile passes downward through the steel sheet pile fixture 5 located on the opposite side of the second steel sheet pile, and then the third steel sheet pile is driven. And so on, the steel sheet piles are driven one by one in sequence.
[0073] In summary, after applying the roadbed pile-sheet wall construction device provided in this embodiment, the insertion of the steel sheet piles into the steel guide beam and the interlocking calibration of the two steel sheet piles do not require manual intervention, and can be directly performed by the pile driver by adjusting the position of the steel sheet piles in the mobile frame 1, so that the piling operation of each steel sheet pile can be carried out more conveniently and efficiently, which not only has high piling efficiency, but also utilizes the guiding effect to ensure the verticality of the steel sheet piles.
[0074] The technical scope of the present invention is not limited to the contents of the above description. Those skilled in the art can make various deformations and modifications to the above implementation without departing from the technical idea of the present invention, and these deformations and modifications should all fall within the scope of the present invention.
Claims
1. A roadbed pile-sheet wall construction device, characterized in that: Including: A moving frame (1) for displacing on a steel guide beam. A steel sheet pile inlet (2) is provided at the tail end of the moving frame (1). Lateral positioning grooves (3) are provided on both sides of the front end of the moving frame (1). A front-end positioning groove (4) is provided between the front ends of the two lateral positioning grooves (3); Steel sheet pile clamps (5) for sleeving on the top of the outer side surface of the steel sheet piles that have been driven. One steel sheet pile clamp (5) is slidably provided on each side of the moving frame (1). The steel sheet pile clamp (5) includes a first clamping plate (5-1), a second clamping plate (5-2) rotatably provided at the rear end of the first clamping plate (5-1), and a third clamping plate (5-3) fixedly provided at the front end of the first clamping plate (5-1); Clamp locking plates (6) are rotatably provided on both sides of the rear end of the moving frame (1) for blocking on the rear end surface of the second clamping plate (5-2) on the same side to prevent the second clamping plate (5-2) from rotating backward and disengaging from the steel sheet pile; Outer top blocks (7) are penetrated through the outer side walls of the two lateral positioning grooves (3) for driving the clamp locking plate (6) on the same side to rotate outward and disengage from the second clamping plate (5-2) when being extruded outward by the steel guide beam; Clamp drag plates (8) are rotatably provided at the front ends of the two lateral positioning grooves (3), and the clamp drag plates (8) are located laterally of the front-end positioning groove (4). The front end of the third clamping plate (5-3) is connected to the clamp drag plate (8), and when the steel guide beam is placed in the lateral positioning groove (3), the outer end of the clamp drag plate (8) rotates forward and drags the corresponding steel sheet pile clamp (5) forward to align with the steel guide beam.
2. A roadbed pile-sheet wall construction device as claimed in claim 1, characterized in that: The moving frame (1) has an open-back "C" - shaped structure. Traveling wheels (9) for traveling in the outer cavity of the steel guide beam are provided on both sides of the bottom of the moving frame (1). Longitudinal guide rollers (10) are provided on both side walls of the steel sheet pile inlet (2). The center line of the steel sheet pile inlet (2) coincides with that of the front-end positioning groove (4).
3. A roadbed pile-sheet wall construction device as claimed in claim 1, characterized in that: A first sliding groove (11) is formed on the inner side wall of the moving frame (1). The first clamping plate (5-1) is slidably provided in the first sliding groove (11). A second sliding groove (12) is formed on the side wall of the moving frame (1). The second clamping plate (5-2) is slidably provided in the second sliding groove (12). A slope surface (13) is provided at the front end of the inner side wall of the second sliding groove (12). The top of the slope surface (13) is flush with the inner side wall of the moving frame (1). When the second clamping plate (5-2) moves forward to the top of the slope, it is in a state of closely adhering to the rear inclined surface of the outer wall of the steel sheet pile.
4. A roadbed pile-sheet wall construction device as claimed in claim 1, characterized in that: The clamp lock plate (6) is in an inverted "L"-shaped structure. The top end of the front side of the clamp lock plate (6) is fixedly connected to a connecting rod (14). The front end of the connecting rod (14) is fixedly connected to a rotating sleeve (15). The top end of the rotating sleeve (15) is rotatably connected to the outer wall surface of the mobile frame (1). The front and rear sides of the rotating sleeve (15) are both provided with longitudinal grooves (16). A transverse sliding rod (17) is slidably connected between the two longitudinal grooves (16). The transverse sliding rod (17) is connected to an elastic telescopic rod (18) on one side facing the mobile frame (1), and the elastic telescopic rod (18) is fixedly mounted on the mobile frame (1).
5. A roadbed pile-sheet wall construction device as claimed in claim 4, characterized in that: The outer top block (7) is located within the range of the rotating sleeve (15) in the height direction, and the top block enables the clamp lock plate (6) to rotate outward and disengage from the second clamp plate (5-2) through the outer top rotating sleeve (15).
6. A roadbed pile-sheet wall construction device as claimed in claim 1, characterized in that: The clamping plate (8) is provided with a transverse groove (19), the front end of the third clamping plate (5-3) is fixedly connected with a longitudinal slide bar (20), and the longitudinal slide bar (20) is slidably arranged in the transverse groove (19).
7. A roadbed pile-sheet wall construction device as claimed in claim 6, characterized in that: The top of the inner end of the clamping carriage (8) is fixedly connected with a mounting shaft (21), and the mounting shaft (21) is rotatably mounted on the movable frame (1). The outer side surface of the mounting shaft (21) is fixedly provided with a first push block (22) and a second push block (23), and the first push block (22) and the second push block (23) are symmetrically distributed, and the first push block (22) is parallel to the clamping carriage (8).
8. A roadbed pile-sheet wall construction device as claimed in claim 7, characterized in that: The side surface of the first push block (22) facing the center of the movable frame (1) is an arc-shaped surface. When the steel sheet pile clamp (5) is located at the rear end of the movable frame (1), the distance between the rear end of the first push block (22) and the rear inner wall surface of the lateral positioning groove (3) is greater than the width of the outer wall of the steel sheet pile.
9. A roadbed pile-sheet wall construction device as claimed in claim 7, characterized in that: The movable frame (1) is provided with a receiving cavity on the front side of the lateral positioning groove (3), and the receiving cavity connects the lateral positioning groove (3) with the front positioning groove (4), wherein: When the steel sheet pile clamp (5) is located at the rear end of the mobile frame (1), the clamp drag plate (8) is in a state where the rear end is tilted outward, the end of the first push block (22) away from the installation shaft (21) is located in the inner cavity of the lateral positioning groove (3), and the end of the second push block (23) away from the installation shaft (21) is located in the accommodating cavity; When the steel sheet pile clamp (5) is located at the front end of the moving frame (1), the clamp drag plate (8) is in a state perpendicular to the moving frame (1), the end of the first push block (22) away from the installation shaft (21) is located in the accommodating cavity, and the end of the second push block (23) away from the installation shaft (21) is located in the front end positioning groove (4).
10. A roadbed pile-sheet wall construction device as claimed in claim 1, characterized in that: A baffle (24) is provided at the bottom of the steel sheet pile entrance (2), the height of the baffle (24) being greater than the height of the fixture drag plate (8), and the height of the baffle (24) being less than the height of the outer top block (7).