Intelligently associated hydropower station one-stop cockpit comprehensive management and control method
Through the intelligent and related one-stop cockpit comprehensive management and control method of hydropower stations, integrating data, video streaming and tablet computer control, the problems of scattered information, cumbersome operation and slow emergency response of traditional hydropower station monitoring systems are solved, and efficient and safe management needs are achieved.
Patent Information
- Application Number
- CN202411453893.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2025-02-28
AI Technical Summary
Traditional hydropower station monitoring systems have problems such as dispersed information, cumbersome operation, low visualization and slow emergency response, which are difficult to meet the efficient and safe management needs of modern hydropower stations.
The comprehensive management and control method of one-stop cockpit of hydropower stations is adopted. By constructing a one-stop control method integrating data, video streaming and tablet computer control, the internal and external linkage between large screens is realized, dynamic push and correlation is achieved, and the intelligent management and control level of the monitoring room is improved.
It improves the speed and accuracy of exception handling, simplifies the operation process, enhances visual display capabilities, ensures rapid response and efficient decision-making, and improves the overall management efficiency and safety of hydropower stations.
Smart Images

Figure CN119539334A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of intelligent hydropower stations, and in particular relates to an intelligently associated one-stop cockpit integrated control method for hydropower stations. Background Art
[0002] Traditional hydropower station monitoring room management often faces problems such as fragmented information, cumbersome operations, low visualization, and slow emergency response. To address these issues, the industry has begun exploring one-stop control methods and intelligent management and control technologies in recent years.
[0003] 1) Traditional hydropower station monitoring system: Traditional hydropower station monitoring systems typically employ a decentralized approach, with data and video streams processed by separate systems and lacking a unified management platform. These systems primarily monitor various hydropower station parameters in real time, but they are complex to operate and display information in a limited manner.
[0004] Technical means: These systems typically rely on wired network connections and use specialized monitoring software to collect and analyze data. Video and data streams are often managed separately, requiring operators to switch between different systems to obtain comprehensive information.
[0005] Disadvantages: The system suffers from severe information silos, cumbersome operations, and low visibility. In emergencies, the system suffers from slow response times, making it difficult to meet the efficient and safe management needs of modern hydropower stations.
[0006] 2) Web-based hydropower station monitoring solution: With the development of network technology, some hydropower stations have begun to adopt Web-based monitoring solutions, which can be accessed through a browser to achieve remote viewing and control of data.
[0007] Technical means: Data is integrated through web technology, providing a certain degree of centralized management and visual display. Users can log in to the system remotely through a browser to view the real-time operating data of the hydropower station.
[0008] Disadvantages: While web-based solutions improve information accessibility, they still lack one-stop control and intelligent connectivity. The speed and accuracy of these systems in responding to emergencies need to be improved.
[0009] In summary, the shortcomings of the existing technology are: 1) Information dispersion and siloed systems: Traditional hydropower station monitoring systems typically disperse data and video streams across different hardware and software platforms, leading to information fragmentation. This forces operators to switch between different systems to obtain comprehensive operational data, reducing work efficiency.
[0010] 2) Complicated operation: Due to the lack of a unified control platform, monitoring personnel need to manually switch different systems and devices to obtain information. This cumbersome operation process increases the possibility of errors and is not conducive to rapid response.
[0011] 3) Limited visualization: Traditional monitoring rooms typically display only limited information and fail to fully and intuitively reflect the overall operating status of the hydropower station. This limitation affects the efficiency and accuracy of monitoring personnel's decision-making.
[0012] 4) Insufficient emergency response capabilities: In emergency situations, traditional monitoring systems find it difficult to quickly integrate relevant information and resources, resulting in delayed emergency response and increased safety risks. Summary of the Invention
[0013] The technical problem to be solved by the present invention is to provide an intelligent and correlated one-stop cockpit comprehensive management and control method for a hydropower station, so as to solve the problems existing in the current monitoring room of a hydropower station in terms of information integration, ease of operation, rapid response and visual display; by constructing a one-stop control method integrating data, video stream and tablet computer control, and internal and external linkage between various screens, including the construction of a one-stop control method for data, video stream and tablet computer, dynamic push and association of key links are realized based on events, thereby improving the intelligent management and control level of the monitoring room of a hydropower station.
[0014] In order to solve the above technical problems, the technical solution adopted by the present invention is: A one-stop integrated cockpit management and control method for a hydropower station with intelligent linkage includes a comprehensive information management method for abnormal handling, a cockpit large-screen information flow switching method, a cockpit large-screen switching page management and control method, and a multi-source data fusion method; wherein: The content of the comprehensive information management method for abnormal handling includes: configuring the abnormal handling card on the PC side; starting the abnormal handling card; executing the abnormal handling task; The cockpit large screen information flow switching method includes: setting the large screen video stream communication method; setting the Pad control large screen page switching display mode; setting the laser pointer and tablet computer Bluetooth connection method; The cockpit large screen switching page control method includes: setting the large screen display area; setting the Pad large screen switching control area; The multi-source data fusion method includes: connecting to the data collected in the hydropower station monitoring system, using a combination of real-time database and historical database to store various types of collected data; according to the playback time requirements of the comprehensive information screen, announcement notification screen, and emergency event screen, a relationship map of playback request signal-data-event-time-screen switching playback signal is established: associated logic management.
[0015] Preferably, the content of configuring the PC-side abnormality handling card includes: A dynamic configuration algorithm is used to manage exception handling cards. During the configuration process, accident characteristics and handling measures are clearly defined, and work tickets and operation tickets are associated with the exception handling process. Disposal measures are configured in a block manner, and parameters are associated with individual disposal measures. For disposal cards that need to be executed across processes, subsequent processing tasks are matched. The configuration information of the exception handling card includes four contents: accident characteristics, handling measures (including task step configuration, warning parameter configuration, and linking two tickets), precautions configuration, and warning rule configuration; The exception handling template covers abnormal situations including power plant operation abnormalities such as flooding of plant buildings, power outages, fire casualties, power grid accidents, and natural disasters during flood season. The configuration formula for the PC-side exception handling card is: Exception handling card correlation degree = ∑ (work ticket correlation degree × weight 1 + operation ticket correlation degree × weight 2 + parameter correlation degree × weight 3).
[0016] Preferably, the abnormal handling card activation content includes: When the monitoring data is abnormal and triggers the warning rules, the cockpit system (including PC and large screen) automatically pops up the exception handling notification; the cockpit system background service automatically monitors the exception handling card warning information, the user clicks to process, sets the device type and block, and automatically generates an exception handling task in the exception handling task list. The large screen automatically flashes to switch the exception handling task execution progress and content tracking page.
[0017] Preferably, the content of executing the abnormality handling task includes: On-site execution via the mobile app: Tasks are sent to the executor's mobile device, who confirms and accepts them. During the operation, wearable devices or mobile devices are used to capture, record, store, and transmit audio and video, including images and videos, to front-end control equipment. Managers can view and track the execution progress in real time via PCs and large screens. Upon completion, the results are uploaded, and after front-end review, the task window is closed and the next task is executed. Manual execution on the PC: The task is sent to the executor's PC, who confirms and accepts the task. After completing the task, the executor manually uploads the job results to the front-end. After the front-end reviews them, the task window is closed and the next task is executed. Each handling task automatically matches the work ticket and equipment parameters, and the related information is configured in the exception handling card; each task displays the executor, two related tickets, parameter information, execution records, and on-site picture information. The staff will issue the task and two related tickets for each handling task.
[0018] Preferably, the method for setting up large-screen video stream communication is: Network connection is achieved by installing a switch between the one-stop cockpit server and the large-screen host; Obtain relevant verification (key, secret) from the interface provided by the large-screen host; After verification, the flv or rtmp stream address is returned and stored in the one-stop cockpit server; Finally, the screen is displayed synchronously on the left and right screens through web screen projection or background service calls.
[0019] Preferably, the setting pad controls the large screen page switching display mode including: Deploy the cockpit management information system on the industrial Internet platform as the input source for large-screen page display; The tablet computer establishes a network connection with the large-screen host by connecting to Wi-Fi. If the tablet computer cannot use Wi-Fi, a Bluetooth module can be installed on the large-screen host, and the tablet computer establishes a connection with the large-screen host via Bluetooth. Use the WebSocket communication mechanism to establish a communication connection between the industrial Internet platform, the large-screen host client receiving program, and the tablet computer; When the tablet triggers the large-screen linkage display command, the tablet establishes a connection with the large-screen host and sends a connection heartbeat and display command information, including information such as the large-screen content and parameters displayed on the left and right screens; The client receiving program saves the IP, port, and instruction information, and simultaneously parses the left and right screen display parameters included in the instruction information; Call the one-stop cockpit system large-screen page to display the routing address, use the service to open the browser to distribute the page to the left and right screens, and complete the linkage projection function of the left and right screens.
[0020] Preferably, the setting of the Bluetooth connection mode between the laser pen and the tablet computer includes: the laser pen is connected to the tablet computer via Bluetooth, the tablet computer control program receives the control instructions (pg up and pg dn) from the laser pen, and after the connection is successful, the large screen host realizes the switching between the previous screen and the next screen.
[0021] Preferably, the content of setting up the large-screen display area is as follows: deploying a one-stop cockpit system receiving program on the large-screen host, with the main screen divided into two parts, the left screen and the right screen, to connect to the cockpit system data flow; placing a wireless router under the large-screen host as a relay network, and after the tablet computer is turned on, connecting to the relay wireless network by adding a connection, and the screen switching control buttons are distributed on the tablet computer; The content of the setting Pad large screen switching control area is: enter the access address, display name and page display name in the configuration. The page display name needs to be the title name displayed by the browser to ensure that the program finds the relevant page and saves the configuration to support the large screen to support the system page display selection; collect the pages opened by the browser into the tablet, open the page display on the left and right screens through the tablet control, select the corresponding, ensure that the program finds the relevant page, save the configuration to support the browser system page display selection; it is the basic display information played by the large screen when no announcement request is received and no abnormal handling event occurs; that is, the page playback under normal circumstances, different comprehensive basin sub-pages can be switched through the Pad Switch; when the offline user terminal requests an announcement notification, submit a screen switching request for the announcement notification function, inform the cockpit administrator of the announcement information, urgency and other information, and set the announcement time period. After review, it will be automatically included in the playback sequence and wait for automatic screen switching playback; after the announcement playback event, it will automatically seize the right screen control area for automatic playback; the priority is higher than the comprehensive information large-screen information display; when an emergency occurs and the emergency plan measures are activated, it will directly connect to the large-screen host and have the right to play the winter solstice screen. No matter what content is played on the large screen, it will automatically give way to the emergency exception handling large-screen content. The left side plays real-time tracking of the emergency time emergency response step flow, and the right side calls the video surveillance content of the event alarm site; the priority is higher than the comprehensive information large screen and the announcement notification large-screen information display.
[0022] Preferably, the data collected in the docking hydropower station monitoring system is stored in a combination of a real-time database and a historical database; the content is: The real-time database is used to quickly respond to queries, while the historical database is used for long-term storage and data analysis; Clean, integrate and mine the collected data. By defining a unified data model, map data from different sources into the same data structure, and perform data fusion processing to integrate data from different sources to form a unified data view. The data view includes a real-time database and a historical database for comprehensive information data management, a database for managing basic data information display, and an announcement and notification database and an emergency exception database. Connect with the data integration of abnormal emergency events in hydropower stations to sort out the types, urgency and emergency plans.
[0023] Preferably, according to the requirements of the playback time of the comprehensive information large screen, the announcement notification large screen, and the emergency event large screen, a relationship map of the playback request signal-data-event-time-screen switching playback signal is established: the content is: Playback request signal library: records screen playback requests initiated by users or the system, including request source, request content, priority, and other information; Alarm database: stores specific data of emergency abnormal events and closely links with the emergency abnormality management module; Playback event library: integrates various event information to be played, including the content of comprehensive information screens, announcement notification screens, and emergency event screens and their corresponding playback sequences; Playback time series library: records the planned and actual playback time of all playback events, used to track playback history and optimize playback plans; Screen switching playback signal library: stores screen switching instructions and automatically or manually triggers screen content switching based on event priority and playback schedule; The associated logic management includes: setting playback contact levels based on the actual needs and business processes of hydropower station operations, such as regular information display, important notification broadcast, emergency event response, etc. The system automatically adjusts the playback order and screen switching strategy based on the contact level to ensure that key information is delivered to decision makers and operators in the shortest possible time; The play priority formula is: Play priority = contact level coefficient × urgency coefficient × time sensitivity coefficient.
[0024] The present invention can achieve the following beneficial effects: 1. A comprehensive information management approach for exception handling. This approach manages exception handling cards through a dynamic configuration algorithm, automatically adjusting content based on preset rules and parameters to ensure rapid response to new exceptions, improving the speed and accuracy of exception handling. Work tickets and operation tickets are linked to the exception handling process to ensure a reliable basis for each step, reducing human error and improving handling efficiency. Block-based configuration of handling measures enables cross-process task correlation and matching, ensuring a coherent and seamless process. Exception handling templates cover a variety of common exception situations, providing strong support for rapid response and accurate handling.
[0025] 2. The cockpit large-screen information flow switching method uses a switch to connect the one-stop cockpit server and the large-screen host, ensuring network stability and reliability. An authentication mechanism ensures that only authorized users can access the large-screen video stream, ensuring system security. Support for web page projection and backend service invocation allows staff to choose the appropriate display method based on their needs. Flexible switching of large-screen pages using a tablet and laser pointer improves operational convenience and efficiency.
[0026] 3. The cockpit's main screen has page switching control. The main screen is divided into left and right screens, each displaying different content, allowing staff to monitor the hydropower station's operations in real time. Automatically adjust the screen switching strategy based on request type and priority to ensure that key information is delivered to decision makers and operators in a timely manner. Automatic screen switching for announcements and notifications ensures that important information is conveyed quickly. In the event of an emergency, the system automatically takes control of the main screen, prioritizing the display of relevant information to ensure rapid response and resolution.
[0027] 4. By combining a real-time database with a historical database, rapid data response and long-term storage are achieved, facilitating data analysis and decision support. Collected data is cleaned, integrated, and mined to form a unified data view, improving data availability and accuracy. A library of playback request signals, an alarm database, a playback event library, a playback time series library, and a screen switching playback signal library enables precise management and automated control of playback content. Playback trigger levels are defined based on the actual operational needs and business processes of the hydropower station. The system automatically adjusts the playback sequence and screen switching strategy to ensure the timely delivery of critical information. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention will be further described below with reference to the accompanying drawings and examples: Figure 1 This is the functional topology diagram of the one-stop cockpit system of the present invention; Figure 2 This is the network topology diagram of the tablet controlling the large screen of the present invention; Figure 3 This is a flowchart of the information switching business of the large-screen display of the present invention. DETAILED DESCRIPTION
[0029] The preferred solution is Figures 1 to 3 As shown, an intelligent and associated one-stop cockpit comprehensive management and control method for a hydropower station includes a comprehensive information management method for abnormal handling, a cockpit large-screen information flow switching method, a cockpit large-screen switching page management method and a multi-source data fusion method, so as to realize efficient comprehensive management and control of the hydropower station.
[0030] Method 1: Comprehensive information management method for abnormal handling (1) PC side abnormal handling card configuration 1) A dynamic configuration algorithm is used to manage exception handling cards. For example, when a new exception occurs, the system can automatically adjust the content of the exception handling card based on preset rules and parameters, improving response speed and accuracy.
[0031] During the configuration process, clearly define accident characteristics and handling measures, and associate work tickets and operation tickets with the abnormal handling process. For example, for fire casualties, clearly define accident characteristics as smoke and high temperature, and handling measures include activating the fire extinguishing system and evacuating personnel. Associate the corresponding work tickets and operation tickets with these to ensure a standardized and efficient handling process.
[0032] Actions are configured in blocks, with parameters associated with individual action items. For action cards that require cross-process execution, subsequent processing tasks are linked and matched. For example, in the event of a complete plant power outage, the power restoration measures are divided into multiple blocks, each corresponding to different equipment and operating steps. Parameters such as voltage and current are associated with individual action items. For action cards that require cross-process execution, such as those involving both equipment maintenance and personnel scheduling, subsequent processing tasks are linked and matched to ensure a seamless transition throughout the entire process.
[0033] The configuration information for an abnormality handling card includes four components: accident characteristics, handling measures (including task step configuration, warning parameter configuration, and linking two tickets), precautions configuration, and warning rule configuration. For example, for a power grid accident, accident characteristics may include voltage fluctuations and frequency anomalies. Handling measures include adjusting generator output and switching to backup lines. Task step configuration can be detailed down to the specific sequence and timing of each operation. Warning parameter configuration can set voltage and frequency thresholds. Linking two tickets includes work tickets and operation tickets. Precautions configuration can include safety precautions and operating specifications. Warning rule configuration specifies the circumstances under which an alarm is triggered.
[0034] Abnormal handling templates cover a range of abnormal situations, including power plant operational anomalies such as flooding, complete power outages, fires, power grid incidents, and flood-season natural disasters. These templates, developed based on past experience and actual conditions, provide guidance for rapid response and accurate handling.
[0035] The PC-side exception handling card configuration formula is: Exception Handling Card Relevance = ∑(Work Ticket Relevance × Weight 1 + Operation Ticket Relevance × Weight 2 + Parameter Relevance × Weight 3). For example, assuming the work ticket relevance is 0.8, the operation ticket relevance is 0.7, the parameter relevance is 0.6, Weight 1 is 0.4, Weight 2 is 0.3, and Weight 3 is 0.3, then the exception handling card relevance = 0.8 × 0.4 + 0.7 × 0.3 + 0.6 × 0.3 = 0.32 + 0.21 + 0.18 = 0.71.
[0036] (2) Abnormal handling card activation When monitoring data is abnormal and triggers an alert rule, the cockpit system (including the PC and large screen) automatically pops up an exception handling notification. For example, when the water level monitoring data at a hydropower station exceeds the set threshold, the system automatically triggers the alert rule, and the cockpit system immediately pops up an exception handling notification on the PC and large screen, reminding staff to handle it promptly. The cockpit system's backend service automatically monitors the abnormal handling card alert information. The user clicks to process, sets the device type and block, and automatically generates an abnormal handling task in the abnormal handling task list. The large screen automatically flashes to switch to the abnormal handling task execution progress and content tracking page. For example, after the user clicks the abnormal handling notification on the PC, the system automatically determines the device type and block based on the monitoring data and generates a corresponding task in the abnormal handling task list. At the same time, the large screen automatically flashes to switch to the task execution progress and content tracking page, allowing staff to understand the task's execution status in real time.
[0037] (3) Execution of exception handling tasks 1) On-site execution on the mobile app The task is sent to the executor's mobile device, who then confirms and receives the task. For example, when an exception handling task is generated, the system automatically sends the task to the relevant executor's mobile device, who can then confirm and receive the task through the mobile app.
[0038] During operations, soldiers can use wearable devices or mobile devices to capture, record, store, and transmit audio and video data such as pictures and videos to front-end equipment control. For example, while working on-site, soldiers can use wearable devices or mobile devices to capture audio and video data such as pictures and videos. The collected data can then be recorded, stored, and transmitted to the front-end equipment control center in real time, allowing management personnel to understand the on-site situation in real time.
[0039] Managers can view and track the execution progress and process in real time on PCs and large screens. For example, managers can view the progress and process of exception handling tasks in real time on PCs and large screens, including the location of the executor, operation steps, and on-site conditions, allowing them to adjust strategies and provide support in a timely manner.
[0040] After completing a task, upload the results. After the front-end review is passed, the task window is closed and the next task is executed. For example, after the executor completes a task, upload the results to the system. After the front-end review is passed, the task window is closed and the system automatically enters the execution process of the next task.
[0041] 2) Manual execution on PC The task is sent to the executor's PC, who confirms and receives the task. For example, for tasks that require operation on a PC, the system sends the task to the executor's PC, who confirms and receives the task.
[0042] After completing a task, manually upload the results to the front-end. After the front-end approves them, close the task window and proceed to the next task. For example, after completing a task on a PC, manually upload the results to the system front-end. After approval, close the task window and prepare for the next task.
[0043] 3) Each handling task automatically matches the work ticket and equipment parameters, and the associated information is configured on the exception handling card. Each task displays the executor, two associated tickets, parameter information, execution records, and on-site images. Staff members issue the task and associated tickets separately for each handling task. For example, for each exception handling task, the system automatically matches the corresponding work ticket and equipment parameters and displays the executor, two associated tickets, parameter information, execution records, and on-site images within the task, making it easier for staff to understand the specific details of the task. Staff members can issue tasks and associated tickets separately based on task needs, ensuring a standardized and efficient handling process.
[0044] Method 2: How to switch information flow on the cockpit large screen (1) Large screen video streaming communication method 1) Install a switch between the one-stop cockpit server and the large-screen host to establish a network connection. For example, in the control center of a hydropower station, the one-stop cockpit server and the large-screen host are connected through a switch to ensure network stability and reliability.
[0045] 2) Obtain relevant authentication information (key, secret) from the interface provided by the large-screen host. For example, the system obtains authentication information through the interface provided by the large-screen host to ensure that only authorized users can access the large-screen video stream.
[0046] 3) After verification, the flv or rtmp stream address is returned and stored in the one-stop cockpit server. For example, after verification, the system returns the flv or rtmp stream address and stores it in the one-stop cockpit server for subsequent playback and call.
[0047] 4) Finally, the system displays the video stream synchronously on the left and right screens via web page projection or backend service calls. For example, the system can display the video stream synchronously on the left and right screens of a large screen via web page projection or backend service calls, allowing staff to monitor the operation of the hydropower station in real time.
[0048] (2) Pad controls the large screen page to switch display mode 1) Deploy the cockpit management information system on the Industrial Internet platform as the input source for large-screen page displays. For example, deploy the cockpit management information system on the Industrial Internet platform, obtain various data and information about the hydropower station through the platform, and use this as the input source for large-screen page displays, ensuring the real-time and accuracy of the displayed content.
[0049] 2) The tablet establishes a network connection with the large-screen host via Wi-Fi. If Wi-Fi is unavailable on the tablet, a Bluetooth module can be installed on the large-screen host to connect the tablet to the large-screen host via Bluetooth. For example, in a hydropower station's control center, a tablet can establish a network connection with the large-screen host via Wi-Fi to control and switch between large-screen pages. If Wi-Fi is unavailable on the tablet, a Bluetooth module can be installed on the large-screen host to connect the tablet to the large-screen host via Bluetooth to control and switch between large-screen pages.
[0050] 3) Use the WebSocket communication mechanism to establish a communication connection between the Industrial Internet Platform, the large-screen host client program, and the tablet computer. For example, use the WebSocket communication mechanism to establish a communication connection between the Industrial Internet Platform, the large-screen host client program, and the tablet computer to ensure real-time data transmission and interaction.
[0051] 4) When the tablet triggers the large-screen linkage display command, the tablet establishes a connection with the large-screen host and sends a connection heartbeat and display command information, including information such as the large-screen content and parameters displayed on the left and right screens. For example, when a staff member triggers the large-screen linkage display command on the tablet, the tablet establishes a connection with the large-screen host and sends a connection heartbeat and display command information, including information such as the large-screen content and parameters displayed on the left and right screens, to achieve control and switching of the large-screen pages.
[0052] 5) The client program stores the IP address, port number, and command information, and simultaneously parses the left and right display parameters included in the command information. For example, the client program stores the IP address, port number, and command information sent by a tablet computer, and simultaneously parses the left and right display parameters included in the command information to correctly display the large screen content.
[0053] 6) Call the one-stop cockpit system's large-screen page to display the routing address, use the service to open a browser to distribute the page to the left and right screens, and implement the left and right screen linkage projection function. For example, call the one-stop cockpit system's large-screen page to display the routing address, use the service to open a browser to distribute the page to the left and right screens, and implement the left and right screen linkage projection function, allowing staff to view the hydropower station's operating status in real time.
[0054] (3) Laser pointer and tablet computer Bluetooth connection method The laser pointer connects to the tablet computer via Bluetooth. The tablet computer's control program receives the laser pointer's control commands (pg up and pg dn). Once connected, the large-screen host computer switches to the previous and next screens on the large-screen display. For example, in a hydropower station's control center, workers can use a laser pointer to connect to a tablet computer via Bluetooth. The tablet computer's control program receives the laser pointer's control commands (pg up and pg dn). Once connected, the large-screen host computer switches to the previous and next screens on the large-screen display, allowing workers to quickly view different pages.
[0055] Method 3: Cockpit large screen switching page control method (1) Large screen display area The one-stop cockpit system receiver program is deployed on the large-screen host. The main screen is divided into two sections, the left and right, to connect to the cockpit system data stream. A wireless router is placed under the large-screen host as a relay network. After the tablet is powered on, it connects to the relay wireless network, and the screen switching control buttons are distributed on the tablet. For example, in the control center of a hydropower station, the one-stop cockpit system receiver program is deployed on the large-screen host. The main screen is divided into two sections, the left and right, each displaying different content. A wireless router is placed under the large-screen host as a relay network. After the tablet is powered on, it connects to the relay wireless network to communicate with the large-screen host. The screen switching control buttons are distributed on the tablet, allowing staff to control the large-screen switching and display content using the tablet.
[0056] (2) Pad large screen switching control area 1) In the configuration, enter the access address, display name, and page display name. The page display name should be the title displayed in the browser. Ensure that the program can find the relevant page and save the configuration to support the selection of large-screen support system page display. For example, in the Pad large-screen switching control area, staff can enter the access address, display name, and page display name in the configuration. The page display name should be the title displayed in the browser. Ensure that the program can find the relevant page and save the configuration to support the selection of large-screen support system page display.
[0057] 2) Store the pages opened in the browser on the tablet. Use the tablet to control the pages opened and displayed on the left and right screens. Select the corresponding page to ensure that the program can find the relevant page. Save the configuration to support the selection of the browser system page display. For example, store the pages opened in the browser on the tablet. Use the tablet to control the pages opened and displayed on the left and right screens. Select the corresponding page to ensure that the program can find the relevant page. Save the configuration to support the selection of the browser system page display.
[0058] 3) Basic information displayed on the large screen when no announcement request is received or an exception handling event occurs; that is, the page is displayed under normal circumstances. Switching between different comprehensive basin sub-pages can be done using the pad. For example, under normal circumstances, the large screen displays basic information, including the operating status of the hydropower station and equipment parameters. Switching between different comprehensive basin sub-pages can be done using the pad, making it easier for staff to view the status of different areas.
[0059] 4) When an offline user requests an announcement notification, it submits a screen switching request for the announcement notification function. The user informs the cockpit administrator of the announcement information, urgency, and other information, and sets the announcement time period. After review, the announcement is automatically placed in the playback sequence, awaiting automatic screen switching. When the announcement playback event occurs, the right screen control area is automatically seized for automatic playback, with priority over the comprehensive information large screen display. For example, when an offline user requests an announcement notification, it submits a screen switching request for the announcement notification function, informing the cockpit administrator of the announcement information, urgency, and other information, and setting the announcement time period. After review, the announcement is automatically placed in the playback sequence, awaiting automatic screen switching. When the announcement playback event occurs, the right screen control area is automatically seized for automatic playback, with priority over the comprehensive information large screen display.
[0060] 5) When an emergency occurs and the emergency plan is activated, the system directly connects to the large-screen host and takes over screen playback. Regardless of the content being played on the large-screen, it automatically gives way to the emergency exception handling large-screen content. The left side plays real-time tracking of the emergency response process flow, while the right side calls the video surveillance content of the incident alarm. This takes precedence over the information displayed on the comprehensive information screen and the announcement notification screen. For example, when an emergency occurs and the emergency plan is activated, the system directly connects to the large-screen host and takes over screen playback. Regardless of the content being played on the large-screen, it automatically gives way to the emergency exception handling large-screen content. The left side plays real-time tracking of the emergency response process flow, while the right side calls the video surveillance content of the incident alarm. This takes precedence over the information displayed on the comprehensive information screen and the announcement notification screen.
[0061] Method 4: Multi-source data fusion method (1) Collect data from the hydropower station monitoring system and use a combination of real-time database and historical database to store various types of collected data.
[0062] 1) A real-time database is used for rapid query response, while a historical database is used for long-term storage and data analysis. For example, a real-time database can store a hydropower station's real-time operating data, such as water level, flow, voltage, and current, for rapid query response and real-time monitoring. A historical database can store the hydropower station's historical operating data for long-term storage and data analysis to identify potential issues and trends.
[0063] 2) Clean, integrate, and mine collected data. By defining a unified data model, data from different sources can be mapped into a common data structure. This data can then be fused and integrated to form a unified data view. For example, collected data can be cleaned to remove noise and outliers. Data from various sources, such as hydropower station monitoring systems, meteorological systems, and hydrological systems, can be integrated and mined to uncover potential relationships and patterns. By defining a unified data model, data from various sources can be mapped into a common data structure and fused to form a unified data view, facilitating analysis and decision-making.
[0064] 3) The data view includes a real-time and historical database for comprehensive information management, which is used to manage basic data display, as well as a notice database and an emergency exception database. For example, the data view includes a real-time and historical database for comprehensive information management, which manages the operating and historical data of a hydropower station. It also includes a notice database and an emergency exception database, which are used to manage notice and emergency exception data integration, and to organize types, urgency, and emergency response plans.
[0065] (2) According to the playback time requirements of the comprehensive information screen, announcement notification screen, and emergency event screen, a relationship diagram of playback request signal-data-event-time-screen switching playback signal is established.
[0066] 1. Playback Request Signal Library: This library records screenplay requests initiated by users or the system, including information such as the request source, request content, and priority. For example, the library can record screenplay requests initiated by users or the system, including the request source (e.g., PC, mobile, large screen), request content (e.g., comprehensive information large screen, announcement notification large screen, emergency large screen, etc.), and priority, so that the system can play and switch based on the request priority.
[0067] 2. Alarm Database: This database stores specific data on emergency events and closely interacts with the emergency exception management module. For example, the alarm database can store specific data on emergency events, such as event type, time of occurrence, location, and severity. This closely interacts with the emergency exception management module to ensure that the system can respond and handle emergencies in a timely manner.
[0068] 3. Playback event library: This library integrates various types of event information to be played, including the content of comprehensive information screens, announcement notification screens, and emergency event screens, as well as their corresponding playback sequences. For example, the playback event library can integrate various types of event information to be played, including the content of comprehensive information screens, announcement notification screens, and emergency event screens, as well as their corresponding playback sequences, so that the system can play and switch according to the predetermined playback sequence.
[0069] 4. Playback Time Series Library: This library records the planned and actual playback times of all playback events, which is used to track playback history and optimize playback plans. For example, the playback time series library can record the planned and actual playback times of all playback events, which is used to track playback history and optimize playback plans, allowing the system to better arrange playback order and time.
[0070] 5. Screen switching signal library: This stores screen switching instructions and automatically or manually triggers screen content switching based on event priority and playback schedule. For example, the screen switching signal library can store screen switching instructions and automatically or manually trigger screen content switching based on event priority and playback schedule, so that the system can switch screen content and display relevant information in a timely manner when different events occur.
[0071] (3) Association logic management Based on the actual operational needs and business processes of a hydropower station, playback trigger levels are set, such as general information display, important notification broadcasts, and emergency response. The system automatically adjusts the playback order and screen switching strategy based on the trigger level, ensuring that key information is delivered to decision makers and operators in the shortest possible time. The playback priority formula is: Playback priority = trigger level coefficient × urgency coefficient × time sensitivity coefficient. For example, based on the actual operational needs and business processes of a hydropower station, the playback trigger levels can be set, such as a trigger level coefficient of 1 for general information display, a trigger level coefficient of 2 for important notification broadcasts, and a trigger level coefficient of 3 for emergency response. The urgency coefficient can be set based on the severity of the event, and the time sensitivity coefficient can be set based on the timeliness of the event. Based on the trigger level, urgency coefficient, and time sensitivity coefficient, the system automatically adjusts the playback order and screen switching strategy to ensure that key information is delivered to decision makers and operators in the shortest possible time.
[0072] The above embodiments are merely preferred technical solutions of the present invention and should not be construed as limiting the present invention. The scope of protection of the present invention shall be the technical solutions set forth in the claims, including equivalent alternatives to the technical features of the technical solutions set forth in the claims. In other words, equivalent alternatives and improvements within this scope are also within the scope of protection of the present invention.
Claims
1. An intelligent and associated one-stop cockpit integrated management and control method for a hydropower station, characterized in that: It includes a comprehensive information management method for abnormal handling, a cockpit large screen information flow switching method, a cockpit large screen switching page control method and a multi-source data fusion method; among which: The contents of the abnormality handling comprehensive information management method include: configuring the abnormality handling card on the PC side; starting the abnormality handling card; executing the abnormality handling task; The contents of the cockpit large screen information flow switching method include: setting the large screen video stream communication method; setting the Pad control large screen page switching display mode; setting the laser pen and tablet computer Bluetooth connection method; The cockpit large screen switching page control method includes: setting the large screen display area; setting the Pad large screen switching control area; The multi-source data fusion method includes: connecting to the data collected in the hydropower station monitoring system, using a combination of real-time database and historical database to store various types of collected data; according to the requirements of the playback time of the comprehensive information screen, announcement notification screen, and emergency event screen, a relationship map of playback request signal-data-event-time-screen switching playback signal is established: associated logic management.
2. According to claim 1, a one-stop integrated control method for a hydropower station with intelligent linkage, characterized in that: The contents of the PC side abnormal handling card configuration include: Adopt dynamic configuration algorithm to manage abnormal handling cards; during configuration, clarify accident characteristics and handling measures, and associate work tickets, operation tickets with abnormal handling processes; configure handling measures in a block manner, associate parameters for single handling measures, and achieve associated matching of subsequent processing tasks for handling cards that need to be executed across processes; The configuration information of the abnormal handling card includes four contents: accident characteristics, handling measures, precautions configuration, and early warning rule configuration; The abnormal handling template covers abnormal situations including power plant operation abnormalities such as flooding of plant buildings, power outage accidents, fire casualties, power grid accidents, and natural disasters during the flood season. The configuration formula of the PC-side abnormal handling card is: Exception handling card correlation degree = ∑ (work ticket correlation degree × weight 1 + operation ticket correlation degree × weight 2 + parameter correlation degree × weight 3).
3. According to claim 1, a one-stop integrated control method for a hydropower station with intelligent linkage, characterized in that: The abnormal handling card startup content includes: When the monitoring data is abnormal and the warning rule is triggered, the cockpit system automatically pops up the exception handling notification; the cockpit system background service automatically monitors the exception handling card warning information, the user clicks to process, sets the equipment type and block, and automatically generates an exception handling task in the exception handling task list. The large screen automatically flashes to switch the exception handling task execution progress and content tracking page.
4. According to claim 1, a one-stop integrated control method for a hydropower station with intelligent linkage, characterized in that: The content of executing the abnormal handling task includes: On-site execution via mobile app: tasks are sent to the executor's mobile terminal, who confirms and receives the tasks. During the operation, wearable devices or mobile devices are used to collect, record, store, and transmit audio and video such as pictures and videos to front-end devices for control. Managers can view the execution progress and process in real time through PCs and large screens to track the execution process. After completing the task, upload the operation results, and after passing the front-end review, close the task window and proceed to the next task execution. Manual execution on the PC: The task is sent to the executor's PC, and the executor confirms and receives the task. After completing the task, the executor manually uploads the job results to the front-end. After passing the front-end review, the task window is closed and the next task is executed. Each disposal task automatically matches the work ticket and equipment parameters, and the related information is configured in the exception disposal card; each task displays the executor, two related tickets, parameter information, execution records, and on-site picture information, and the staff issues the task and two related tickets for each disposal task.
5. According to claim 1, a one-stop integrated control method for a hydropower station with intelligent linkage, characterized in that: The method for setting up large-screen video stream communication is: Network connection is achieved by installing a switch between the one-stop cockpit server and the large-screen host; Obtain relevant verification from the interface provided by the large-screen host; After verification, the flv or rtmp stream address is returned and stored in the one-stop cockpit server; Finally, the screen is displayed synchronously on the left and right screens through web screen projection or background service calls.
6. The one-stop integrated control method for a hydropower station with intelligent linkage according to claim 1 is characterized by: The setting pad controls the large screen page switching display mode including: Deploy the cockpit management information system on the industrial Internet platform as the input source for the large-screen page display; The tablet computer establishes a network connection with the large-screen host by connecting to wifi. If the tablet computer cannot use wifi, a Bluetooth module can be installed on the large-screen host, and the tablet computer establishes a connection with the large-screen host via Bluetooth. Use the WebSocket communication mechanism to establish a communication connection between the industrial Internet platform, the large-screen host client receiving program, and the tablet computer; When the tablet computer triggers the large-screen linkage display command, the tablet computer establishes a connection with the large-screen host and sends the connection heartbeat and display command information, including the large-screen content and parameters displayed on the left and right screens; The client receiving program saves the IP, port, and instruction information, and simultaneously parses the left and right screen display parameters included in the instruction information; Call the one-stop cockpit system large-screen page to display the routing address, use the service to open the browser to distribute the page to the left and right screens, and complete the linkage projection function of the left and right screens.
7. The one-stop integrated control method for a hydropower station with intelligent linkage according to claim 1 is characterized by: The method of setting up the Bluetooth connection between the laser pen and the tablet computer includes: the laser pen is connected to the tablet computer via Bluetooth, the tablet computer control program receives the control command from the laser pen, and after the connection is successful, the previous screen and the next screen of the large screen are switched through the large screen host.
8. The one-stop integrated control method for a hydropower station with intelligent linkage according to claim 1 is characterized by: The content of setting up the large-screen display area is as follows: deploying a one-stop cockpit system receiving program on the large-screen host, with the main screen divided into two parts, the left screen and the right screen, to connect to the cockpit system data stream; placing a wireless router under the large-screen host as a relay network, and after the tablet computer is turned on, adding a connection to the relay wireless network, and the screen switching control buttons are distributed on the tablet computer; The content of the setting of the Pad large screen switching control area is: input the access address, display name and page display name in the configuration. The page display name needs to be the title name displayed by the browser to ensure that the program finds the relevant page and save the configuration to support the selection of the large screen supporting system page display; collect the pages opened by the browser into the tablet, open the page through the tablet control to display the left and right screens, select the corresponding, ensure that the program finds the relevant page, save the configuration to support the selection of the browser system page display; basic display information played by the large screen when no announcement request is received and abnormal handling events occur; That is, the page playback under normal circumstances, and the switching of different comprehensive basin sub-pages can be switched through the Pad; when the offline user terminal requests an announcement notification, submit a screen switching request for the announcement notification function, inform the cockpit administrator of the announcement information, urgency and other information, and set the announcement time period. After passing the review, it will be automatically included in the playback sequence and wait for automatic screen switching playback; after the announcement playback event, it will automatically seize the right screen control area for automatic playback; the priority is higher than the comprehensive information large-screen information display; when an emergency occurs and the emergency plan measures are initiated, it will directly connect to the large-screen host and have the right to play the winter solstice screen. No matter what content is played on the large screen, it will automatically give way to the emergency event abnormal handling large-screen content. The left side plays real-time tracking of the emergency time emergency response step flow, and the right side calls the video surveillance content of the event alarm site; the priority is higher than the comprehensive information large screen and the announcement notification large-screen information display.
9. The one-stop integrated control method for a hydropower station with intelligent linkage according to claim 1 is characterized by: The docking hydropower station monitoring system collects data and uses a combination of real-time database and historical database to store various types of collected data; the content is: The real-time database is used to quickly respond to queries, while the historical database is used for long-term storage and data analysis; Clean, integrate and mine the collected data. By defining a unified data model, map data from different sources into the same data structure, and perform data fusion processing to integrate data from different sources to form a unified data view. The data view includes a real-time database and a historical database for comprehensive information data management, which is used to manage the basic data information display, including an announcement notification database and an emergency exception database; Connect with the data integration of abnormal emergency events in hydropower stations to sort out the types, urgency and emergency plans.
10. The one-stop integrated control method for a hydropower station with intelligent linkage according to claim 1 is characterized by: According to the requirements of the playback time of the comprehensive information large screen, the announcement notification large screen, and the emergency event large screen, a relationship diagram of the playback request signal-data-event-time-screen switching playback signal is established: the content is: Play request signal library: records screen play requests initiated by users or systems, including request source, request content, priority, and other information; Alarm database: stores specific data of emergency abnormal events and is closely linked with the emergency abnormality management module; Playback event library: integrates various event information to be played, including the content of comprehensive information screen, announcement notification screen, emergency event screen and their corresponding playback sequence; Playback time series library: records the planned and actual playback time of all playback events, which is used to track playback history and optimize playback plans; Screen switching playback signal library: stores screen switching instructions and automatically or manually triggers screen content switching according to event priority and playback schedule; The associated logic management includes: setting the playback contact level according to the actual needs and business processes of the hydropower station operation, such as different levels of regular information display, important notification broadcast, emergency response, etc.; The system automatically adjusts the playback order and screen switching strategy according to the contact level to ensure that key information can be delivered to decision makers and operators in the shortest possible time; The play priority formula is: play priority = contact level coefficient × urgency coefficient × time sensitivity coefficient.
Citation Information
Patent Citations
Configurable intelligent linkage method for hydropower station equipment
CN109541956A
Regional safety emergency integrated platform system and working method thereof
CN114444932A
Intelligent security comprehensive management platform system
CN115907331A
Centralized control integrated intelligent management system for hydropower station
CN116385206A
Intelligent supervision cockpit system for photovoltaic power station
CN117424340A
Cited By
Intelligent large-screen visualization BI system and method based on dynamic data driving
CN120523430A