Waste air conditioner treatment line process and equipment
By using a double-layer belt conveyor and an offline refrigerant extraction station in the waste air conditioner treatment line, and using two sets of power roller lines to extract refrigerant at the same time, the problem of low refrigerant extraction efficiency in the prior art is solved, and a more efficient waste air conditioner treatment is achieved.
Patent Information
- Application Number
- CN202411860646.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-17
- Publication Date
- 2025-03-04
AI Technical Summary
The existing waste air conditioner treatment line is inefficient during refrigerant extraction, affecting the disassembly efficiency of the entire line body.
A double-layer belt conveyor and an offline refrigerant extraction station are used to extract refrigerant simultaneously through two sets of power roller lines, which improves the refrigerant extraction efficiency.
It effectively improves the overall efficiency of the waste air conditioner treatment line, shortens the refrigerant extraction time, and improves the disassembly efficiency.
Smart Images

Figure CN119549505A_ABST
Abstract
Description
Technical Field
[0001] The field involved in this application, in particular, relates to a waste air conditioner processing line process and equipment. Background Art
[0002] As people's quality of life gradually improves, air conditioners, as an electrical appliance that can improve the quality of life, have gradually entered every household. Through air conditioners, people can maintain the indoor temperature at a more comfortable temperature, thereby improving people's quality of life.
[0003] Since the production of air conditioners requires a large number of parts and some precious metals, after the air conditioners are scrapped, they need to be processed and disassembled so that some of the parts and precious metals in the air conditioners can be recycled.
[0004] In the industry, waste air conditioner processing lines mostly use drum-type production lines. The drum line serves as both a transmission line and a disassembly station. According to the designed disassembly process, the products are arranged on the drum line from front to back. The disassembled products are placed in the material collection box behind the disassembly station. In this process, the refrigerant must be extracted before the air conditioner outdoor unit is disassembled. The refrigerant extraction time is long, which affects the disassembly efficiency of the entire line. Summary of the invention
[0005] In order to improve the efficiency of the overall processing of waste air conditioners in the production line, the present application provides a waste air conditioner processing line process and equipment.
[0006] In the first aspect, the present application provides a waste air conditioner processing line process, which adopts the following technical solution: A waste air conditioner processing line process comprises the following steps: S1: Place the waste air conditioner on the upper layer of the double-layer belt conveyor, and transport the waste air conditioner to the refrigerant extraction station through the conveyor; S2: At the refrigerant extraction station, the refrigerant is extracted from the waste air conditioner through the power roller line. After the extraction is completed, the workers move the waste air conditioner outdoor unit to the upper layer of the double-layer belt conveyor and transport it to the disassembly station at the back; S3: The disassembly worker moves it to the work station and carries out disassembly operations.
[0007] By adopting the above technical solution, the refrigerant extraction is designed to be offline. During the refrigerant extraction process, the refrigerant inside the waste air conditioner can be extracted simultaneously through two sets of power drum lines, and multiple units can be extracted at one time, which effectively improves the efficiency of refrigerant extraction.
[0008] In the second aspect, the present application provides a waste air conditioner processing line equipment, which adopts the following technical solution: A waste air conditioner processing line equipment includes: a conveyor belt, a plurality of lifting frames are provided on one side of the conveyor belt, the upper side wall of each lifting frame is located on the upper side of the conveyor belt, the upper side of the conveyor belt is located on the lower side of each lifting frame and a lifting plate is provided, a lifting hydraulic cylinder is fixedly connected between each lifting plate and the adjacent lifting frame, a clamping assembly is connected to the lower side of each lifting plate, each clamping assembly is used to clamp the waste air conditioner, a material receiving electromagnet is provided on one side of the conveyor belt near each lifting plate, and a material receiving box is provided on the lower side of each material receiving electromagnet.
[0009] By adopting the above technical solution, in the actual use process, the lifting plate is driven to move downward by the lifting hydraulic cylinder, and then the waste air conditioner on the lower side of the lifting plate is clamped by the clamping assembly, and then the lifting hydraulic cylinder is started to drive the lifting plate and the clamped waste air conditioner to move upward, and then the waste air conditioner is disassembled. The disassembled air-conditioning parts can be collected by the receiving electromagnet and placed in the receiving box, so that the subsequent waste air conditioner can continue to move along the conveyor belt, thereby reducing the need to pause the entire conveyor belt to disassemble the waste air conditioner, resulting in the phenomenon that the work efficiency of all workstations of the current conveyor belt is affected due to the reasons of a single or part of the staff.
[0010] Optionally, the clamping assembly includes two relatively arranged clamping plates slidably inserted into the lower side of the lifting plate, and two adjacent clamping plates are penetrated and threadedly connected with the same clamping screw, and the clamping screw is used to drive the two clamping plates to move toward or away from each other.
[0011] By adopting the above technical solution, when it is necessary to clamp the waste air conditioner, the clamping screw is rotated. During the rotation, the clamping screw drives the two clamping plates to move towards each other, so that the two clamping plates can clamp the waste air conditioner, thereby realizing the clamping process of the waste air conditioner.
[0012] Optionally, a baffle is provided in the middle position of the two clamping plates, and the upper end of the baffle is slidably inserted into the adjacent lifting plate, and one end of the baffle located inside the lifting plate is penetrated by and threadedly connected with a driving screw, and the end of the driving screw is fixedly connected with a driving bevel gear, and the driving bevel gear is meshed with a driven bevel gear, and the driven bevel gear is fixedly sleeved on the clamping screw and is used to drive the clamping screw to rotate.
[0013] By adopting the above technical solution, when the conveyor belt drives the waste air conditioner to abut against the baffle, the baffle moves driven by the waste air conditioner, and the baffle drives the connected driving screw to rotate during the movement, and the driving screw drives the connected driving bevel gear to rotate during the rotation, and the driving bevel gear drives the connected driven bevel gear to rotate during the rotation, and the driven bevel gear drives the connected clamping screw to rotate during the rotation, thereby reducing the need for staff to rotate the clamping screw.
[0014] Optionally, the lifting frame is connected to a connecting rope, which is connected to the clamping screw via a connecting piece and can drive the clamping screw to rotate when the relative distance between the lifting frame and the lifting plate increases.
[0015] By adopting the above technical solution, during the downward movement of the lifting plate, the connecting rope drives the clamping screw to rotate through the connecting piece, and the clamping screw drives the two clamping plates to move away from each other, thereby reducing the need for staff to manually move the clamping plates after the processing of the waste air conditioner is completed.
[0016] Optionally, the connecting member includes a winding reel fixedly connected to the connecting rope, a connecting cylinder is provided inside the winding reel, the connecting cylinder is fixedly sleeved to the outside of the clamping screw, the winding reel and the connecting cylinder are connected via a winding ratchet and a connecting ratchet, and a coil spring is provided on one side of the winding reel for driving the winding reel to rotate to tighten the connecting rope.
[0017] By adopting the above technical scheme, during the upward movement of the lifting plate, the coil spring drives the winding reel to rotate, so that the winding reel can gather the connecting rope, and at this time, the multiple winding ratchets are not engaged with the multiple connecting ratchets, and during the downward movement of the connecting plate, the connecting rope drives the winding reel to rotate, and during the rotation process, the winding reel drives the connected connecting tube to rotate through the engaged winding ratchets and connecting ratchets, and during the rotation process, the connecting tube drives the connected clamping screw to rotate, thereby realizing the process of driving the connected clamping screw to rotate through the up and down movement of the lifting plate.
[0018] Optionally, two oppositely arranged abutment plates are provided on opposite sides of the two clamping plates, and each of the abutment plates is connected to the adjacent clamping plates via a compression spring.
[0019] By adopting the above technical solution and arranging the compression spring and the abutment plate, the phenomenon that the clamping plate is unable to fully clamp the waste air conditioner due to deformation of the shell of the waste air conditioner during the disassembly process is reduced.
[0020] Optionally, one end of each baffle located inside the lifting plate is fixedly connected to a push spring for driving the baffle to move to a side away from the moving direction of the waste air conditioner on the conveyor belt.
[0021] By adopting the above technical solution and setting a push spring, after the old air conditioner is disassembled, the push spring can drive the baffle to move, and the movement of the baffle can drive the clamping screw to rotate, so that the clamping screw can clamp the subsequent old air conditioner.
[0022] Optionally, the lifting plate is connected to a linkage component, the linkage component is connected to the material collecting electromagnet, and the lifting plate can drive the material collecting electromagnet to collect the waste on the conveyor belt through the linkage component during the up and down movement.
[0023] By adopting the above technical solution and setting a linkage component, the trouble of workers manually moving the material receiving electromagnet is reduced.
[0024] Optionally, the linkage assembly includes a driving rack fixedly connected to the lifting plate on one side close to the material receiving electromagnet, the driving rack is meshed with a driving gear, the driving gear is fixedly connected with an active bevel gear, one side of the active bevel gear is meshed with a connecting bevel gear, the connecting bevel gear is penetrated by and threadedly connected with a connecting screw, and the connecting screw is fixedly connected to the material receiving electromagnet.
[0025] By adopting the above technical solution, during the movement of the lifting plate, the lifting plate drives the connected driving rack to move, and during the movement of the driving rack, it drives the connected driving gear to rotate, and during the rotation of the driving gear, it drives the connected active bevel gear to rotate, and during the rotation of the active bevel gear, it drives the connected driven bevel gear to rotate, and during the rotation of the driven bevel gear, it drives the connecting screw to move, and during the movement of the connecting screw, it drives the connected material receiving electromagnet to move, thereby realizing the process of driving the connected material receiving electromagnet to move by the lifting and lowering of the lifting plate.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. By setting the lifting plate, lifting hydraulic cylinder and clamping assembly, different workstations on the same production line can be operated separately, and after the operation is completed, the next disassembly process of the waste air conditioner can be carried out, which improves the overall work efficiency; 2. By setting the connecting rope, connecting piece and push spring, it reduces the trouble of workers manually moving the clamping plate after disassembling the old air conditioner; 3. By setting up the linkage components, the trouble of workers manually moving the collecting hydraulic cylinder to collect the debris and parts of the waste air conditioners is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0028] Figure 2 It is a cross-sectional view of the overall structure of an embodiment of the present application.
[0029] Figure 3 It is a cross-sectional view of an embodiment of the present application that highlights the connection relationship between the baffle and the clamping screw.
[0030] Figure 4 yes Figure 2 A partial enlarged schematic diagram of the structure A in the middle.
[0031] Explanation of the accompanying drawings: 1. Conveyor belt; 2. Lifting frame; 3. Lifting plate; 4. Lifting hydraulic cylinder; 5. Clamping assembly; 51. Clamping plate; 52. Clamping screw; 53. Baffle; 531. Push spring; 54. Driving screw; 55. Driving bevel gear; 551. Driven bevel gear; 56. Connecting rope; 57. Connecting piece; 571. Winding reel; 572. Connecting cylinder; 573. Winding ratchet; 574. Connecting ratchet; 575. Coil spring; 58. Abutment plate; 59. Compression spring; 6. Material receiving electromagnet; 61. Limit rod; 7. Material receiving box; 8. Linkage assembly; 81. Driving rack; 82. Driving gear; 83. Active bevel gear; 84. Connecting bevel gear; 85. Connecting screw. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1 -Attached Figure 4 This application is described in further detail.
[0033] The present application embodiment discloses a waste air conditioner processing line equipment. Figure 1 and Figure 2 , including a conveyor belt 1, the conveyor belt 1 is arranged horizontally, and a plurality of lifting racks 2 are arranged on one side of the conveyor belt 1. In this embodiment, the number of lifting racks 2 is three, and the three lifting racks 2 are arranged at a certain distance from each other. Each lifting rack 2 is arranged in an L shape, and the upper side wall of each lifting rack 2 is located on the upper side of the conveyor belt 1 and is arranged parallel to the upper surface of the conveyor belt 1.
[0034] Each lifting frame 2 is provided with a horizontally arranged lifting plate 3 on the lower side of the upper side wall of the conveyor belt 1, and the upper side of each lifting plate 3 is fixedly connected to a vertically arranged lifting hydraulic cylinder, and the side of each lifting hydraulic cylinder away from the lifting plate 3 is fixedly connected to the side wall of the lifting frame 2 adjacent to the upper side.
[0035] A clamping assembly 5 is provided on the lower side of each lifting plate 3, and the clamping assembly 5 is used to clamp the waste air conditioner transported on the conveyor belt 1. A receiving electromagnet 6 is provided on the side of each lifting plate 3 away from the connected lifting frame 2 of the conveyor belt 1, and a receiving box 7 is provided on the side of the conveyor belt 1 away from the lifting frame 2 and below each receiving electromagnet 6.
[0036] During actual use, the waste air conditioner is placed on the conveyor belt 1, and then the conveyor belt 1 is turned on to drive the waste air conditioner to move. When the waste air conditioner moves to the lower side of the lifting plate 3, the lifting hydraulic cylinder 4 is started to move the lifting plate 3 to the upper side of the waste air conditioner close to the waste air conditioner. Then, the adjacent waste air conditioner is clamped by the clamping assembly 5, and the lifting hydraulic cylinder 4 is turned on to drive the air conditioner and the lifting plate 3 to move upward, so that the subsequent air conditioners can continue to move along the conveyor belt 1.
[0037] The air conditioner is moved to the upper side of the conveyor belt 1 by the lifting plate 3 in cooperation with the clamping assembly 5, so that the conveyor belt 1 on the lower side of the air conditioner being processed can continue to transport the air conditioner, thereby increasing the overall work efficiency of processing waste air conditioners at multiple workstations on the entire conveyor belt 1.
[0038] Reference Figure 2 , Figure 3 and Figure 4 The clamping assembly 5 includes two clamping plates 51 disposed opposite to each other at the lower side of the lifting plate 3. Each clamping plate 51 is disposed perpendicularly to the adjacent lifting plate 3 and the upper end of each clamping plate 51 is inserted into the adjacent lifting plate 3 and is slidably connected to the lifting plate 3. The two lifting plates 3 are penetrated and threadedly connected with the same clamping screw 52, which is a bidirectional screw and is disposed perpendicularly to the connected lifting plate 3.
[0039] A baffle plate 53 is also provided between the two clamping plates 51. The baffle plate 53 is vertically arranged with the clamping plates 51, and the upper end of the baffle plate 53 is inserted into the inside of the lifting plate 3 and is slidably connected with the side wall of the lifting plate 3. One end of the baffle plate 53 located inside the lifting plate 3 is penetrated and threadedly connected with a driving screw 54, and the driving screw 54 is vertically arranged with the baffle plate 53. The end of the driving screw 54 close to the clamping screw 52 is fixedly connected with a driving bevel gear 55, and the driving bevel gear 55 is meshed with a driven bevel gear 551, and the driven bevel gear 551 is fixedly sleeved on the clamping screw 52. A push spring 531 is sleeved on the outside of the driving screw 54, and one end of the push spring 531 is fixedly connected with the adjacent baffle plate 53, and the end of the push spring 531 away from the baffle plate 53 is fixedly connected with the inner wall of the lifting plate 3. The push spring 531 is arranged on the side of the baffle plate 53 away from the direction of the conveyor belt 1 transporting the waste air conditioner.
[0040] A connecting rope 56 is fixedly connected to one side of the lifting frame 2 close to the lifting plate 3. The end of the connecting rope 56 away from the lifting frame 2 is inserted into the interior of the lifting plate 3 and is connected to a connecting member 57. The connecting member 57 is sleeved on the outside of the clamping screw 52 and can drive the clamping screw 52 to rotate through the connecting rope 56 when the lifting plate 3 moves downward.
[0041] During actual use, when it is necessary to clamp the air conditioner on the conveyor belt 1, the lifting hydraulic cylinder 4 is started to drive the lifting plate 3 to move downward, so that the lower side wall of the baffle 53 moves to the position on the upper side of the conveyor belt 1 to block the waste air conditioner. Thereafter, during the movement of the waste air conditioner, the waste air conditioner abuts against the baffle 53 and drives the baffle 53 to move. During the movement, the baffle 53 drives the driving screw 54 to rotate, and the driving screw 54 drives the connected driving bevel gear 55 to rotate during the rotation. The driving bevel gear 55 drives the connected driven bevel gear 551 to rotate during the rotation. The driven bevel gear 551 drives the connected clamping screw 52 to rotate during the rotation. The clamping screw 52 drives the two clamping plates 51 to move in a direction close to each other and clamp the waste air conditioner during the rotation.
[0042] When the disassembly of the old air conditioner is completed, the baffle 53 moves under the action of the push spring 531, and cooperates with the connecting rope 56 and the connecting piece 57 to drive the connected driving screw 54 to rotate in the opposite direction, and the driving screw 54 drives the driving bevel gear 55 and the driven bevel gear 551 to rotate in the opposite direction, and the driven bevel gear 551 drives the clamping screw 52 to rotate in the opposite direction, so that the two clamping plates 51 move away from each other, thereby realizing the resetting process of the clamping plates 51.
[0043] The connecting member 57 includes a winding drum 571 fixedly connected to the connecting rope 56, and the connecting rope 56 is wound around the outside of the winding drum 571. A connecting drum 572 is provided inside the winding drum 571, and the connecting drum 572 is fixedly sleeved to the outside of the clamping screw 52. A plurality of winding ratchets 573 are fixedly connected to the inner wall of the winding drum 571 near the connecting drum 572, and a plurality of connecting ratchets 574 capable of engaging with the winding ratchets 573 are fixedly connected to the outer wall of the connecting drum 572 near the winding drum 571. The winding drum 571 is fixedly connected to a coil spring 575, which is connected to the clamping screw 52 and can drive the winding drum 571 to rotate, and when the coil spring 575 drives the winding drum 571 to rotate, the plurality of winding ratchets 573 are not engaged with the plurality of connecting ratchets 574.
[0044] During actual use, when the lifting plate 3 moves upward, the coil spring 575 drives the winding drum 571 to rotate, thereby tightening the connecting rope 56, and when the lifting plate 3 moves downward, the connecting rope 56 drives the winding drum 571 to rotate. During the rotation of the winding drum 571, multiple winding ratchets 573 are engaged with multiple connecting ratchets 574. At this time, the winding drum 571 drives the connecting tube 572 to rotate, and the connecting tube 572 drives the clamping screw 52 to rotate, thereby realizing the process of the connecting rope 56 cooperating with the push spring 531 to drive the clamping screw 52 to rotate during the downward movement of the lifting plate 3.
[0045] A contact plate 58 is provided on one side of each clamping plate 51 close to another adjacent clamping plate 51 . Each contact plate 58 is arranged parallel to the adjacent clamping plate 51 , and a compression spring 59 is fixedly connected between each contact plate 58 and the adjacent clamping plate 51 .
[0046] By providing the abutment plate 58 and the compression spring 59, the abutment plate 58 abuts against and clamps the waste air conditioner during the process of the clamping plate 51 moving toward the side close to the waste air conditioner, and because the compression spring 59 is provided, when the waste air conditioner is disassembled and causes the waste air conditioner to be deformed, the abutment plate 58 can still abut against and clamp the waste air conditioner driven by the compression spring 59.
[0047] A linkage assembly 8 is connected between each material receiving electromagnet 6 and the adjacent lifting plate 3. During the rising process of the lifting plate 3, the linkage assembly 8 can drive the material receiving electromagnet 6 to move to the upper side of the conveyor belt 1. During the descending process of the lifting plate 3, the linkage assembly 8 can drive the material receiving electromagnet 6 to move to the upper side of the material receiving box 7.
[0048] The provision of the linkage assembly 8 reduces the trouble of the staff in controlling the movement of the material receiving electromagnet 6 .
[0049] The linkage assembly 8 includes a driving rack 81 fixedly connected to the side of the lifting plate 3 near the adjacent receiving electromagnet 6, and the driving rack 81 is vertically arranged. A driving gear 82 is meshed on one side of the driving rack 81, and a driving bevel gear 83 is fixedly connected to the side of the driving gear 82 near the adjacent receiving electromagnet 6, and a connecting bevel gear 84 is fixedly connected to one side of the driving bevel gear 83. A connecting lead screw 85 is penetrated through the middle of the connecting bevel gear 84 and is threadedly connected, and one end of the connecting lead screw 85 is fixedly connected to the adjacent receiving electromagnet 6. A limiting rod 61 for limiting the rotation of the receiving electromagnet 6 is fixedly connected to one side of the receiving electromagnet 6.
[0050] During the upward movement of the lifting plate 3, the lifting plate 3 drives the connected driving rack 81 to move upward, and the driving rack 81 drives the connected driving gear 82 to rotate during the upward movement, and the driving gear 82 drives the connected active bevel gear 83 to rotate during the rotation, and the active bevel gear 83 drives the connected driven bevel gear 551 to rotate during the rotation, and the driven bevel gear 551 drives the connected connecting bevel gear 84 to rotate during the rotation, and the connecting bevel gear 84 drives the connected movement during the rotation, and the connecting screw 85 drives the connected material receiving electromagnet 6 to move during the movement, thereby realizing the process of driving the material receiving electromagnet 6 to move by the lifting and lowering of the lifting plate 3.
[0051] The embodiment of the present application also discloses a waste air conditioner processing line process.
[0052] S1: Place the waste air conditioner on the upper layer of the double-layer belt conveyor, and transport the waste air conditioner to the refrigerant extraction station through the conveyor; S2: The worker at the refrigerant extraction station moves it to the power drum line to extract the refrigerant. The process designs the refrigerant extraction as an offline type. In this embodiment, two sets of power drum lines are arranged. The two sets of power drum lines are operated simultaneously to extract the refrigerant inside multiple waste air conditioners at one time, which effectively improves the efficiency of refrigerant extraction. After the extraction is completed, the worker moves the waste air conditioner outdoor unit to the upper layer of the double-layer belt conveyor and transports it to the disassembly station at the back.
[0053] S3: The disassembly worker moves it to the work station and performs disassembly operations, specifically: A1: Start the lifting hydraulic cylinder 4 to drive the lifting plate 3 to move downward, so that the lifting plate 3 moves to the upper side of the waste air conditioner, and the baffle plate 53 moves under the drive of the waste air conditioner. During the movement, the baffle plate 53 drives the two clamping plates 51 to clamp the waste air conditioner; A2: Start the lifting screw to move upward. During the upward movement, the lifting screw drives the receiving electromagnet 6 to move to the upper side of the conveyor belt 1 through the linkage assembly 8, and supplies power to the receiving electromagnet 6 so that the receiving electromagnet 6 can absorb the disassembled parts of the waste air conditioner. At this time, the staff disassembles the waste air conditioner on the upper side of the conveyor belt 1; A3: Start the lifting hydraulic cylinder 4 to drive the lifting plate 3 to move downward to clamp the next waste air conditioner. At the same time, the lifting plate 3 drives the receiving electromagnet 6 to move to the upper side of the receiving box 7 during the movement. At this time, the power supply of the receiving electromagnet 6 is turned off, so that the parts on the receiving electromagnet 6 can fall into the receiving box 7; A4: Classify the waste air-conditioning parts collected internally as needed to facilitate subsequent processing.
[0054] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A waste air conditioner processing line process, characterized by: The following steps are involved: S1: Place the waste air conditioner on the upper layer of the double-layer belt conveyor, and transport the waste air conditioner to the refrigerant extraction station through the conveyor; S2: At the refrigerant extraction station, the refrigerant is extracted from the waste air conditioner through the power roller line. After the extraction is completed, the workers move the waste air conditioner outdoor unit to the upper layer of the double-layer belt conveyor and transport it to the disassembly station at the back; S3: The disassembly worker moves it to the work station and carries out disassembly operations.
2. A waste air conditioner processing line equipment, specifically used in a waste air conditioner processing line process as claimed in claim 1, characterized in that: include: A conveyor belt (1), wherein a plurality of lifting frames (2) are provided on one side of the conveyor belt (1), wherein the upper side wall of each lifting frame (2) is located on the upper side of the conveyor belt (1), and a lifting plate (3) is provided on the upper side of the conveyor belt (1) and the lower side of each lifting frame (2), wherein a lifting hydraulic cylinder (4) is fixedly connected between each lifting plate (3) and the adjacent lifting frame (2), and a clamping assembly (5) is connected to the lower side of each lifting plate (3), and each clamping assembly (5) is used to clamp the waste air conditioner, and a material receiving electromagnet (6) is provided on one side of the conveyor belt (1) near each lifting plate (3), and a material receiving box (7) is provided on the lower side of each material receiving electromagnet (6).
3. The waste air conditioner processing line equipment according to claim 2 is characterized in that: The clamping assembly (5) comprises two clamping plates (51) arranged opposite to each other and slidably plugged into the lower side of the lifting plate (3), and two adjacent clamping plates (51) are penetrated by and threadedly connected with the same clamping screw (52), and the clamping screw (52) is used to drive the two clamping plates (51) to move in a direction toward or away from each other.
4. The waste air conditioner processing line equipment according to claim 3 is characterized in that: A baffle (53) is provided in the middle position of the two clamping plates (51), and the upper end of the baffle (53) is slidably inserted into the adjacent lifting plate (3), and one end of the baffle (53) located inside the lifting plate (3) is penetrated by and threadedly connected with a driving screw (54), and the end of the driving screw (54) is fixedly connected with a driving bevel gear (55), and the driving bevel gear (55) is meshed with a driven bevel gear (551), and the driven bevel gear (551) is fixedly sleeved on the clamping screw (52) and is used to drive the clamping screw (52) to rotate.
5. The waste air conditioner processing line equipment according to claim 4 is characterized in that: The lifting frame (2) is connected to a connecting rope (56), and the connecting rope (56) is connected to the clamping screw (52) through a connecting piece (57) and can drive the clamping screw (52) to rotate when the relative distance between the lifting frame (2) and the lifting plate (3) increases.
6. The waste air conditioner processing line equipment according to claim 5, characterized in that: The connecting member (57) includes a winding drum (571) fixedly connected to the connecting rope (56), a connecting drum (572) is provided inside the winding drum (571), and the connecting drum (572) is fixedly sleeved to the outside of the clamping screw (52), the winding drum (571) and the connecting drum (572) are connected via a winding ratchet (573) and a connecting ratchet (574), and a coil spring (575) is provided on one side of the winding drum (571) for driving the winding drum (571) to rotate to tighten the connecting rope (56).
7. The waste air conditioner processing line equipment according to claim 3 is characterized by: Two oppositely arranged abutment plates (58) are provided on opposite sides of the two clamping plates (51), and each of the abutment plates (58) is connected to the adjacent clamping plate (51) via a compression spring (59).
8. The waste air conditioner processing line equipment according to claim 4 is characterized in that: One end of each baffle (53) located inside the lifting plate (3) is fixedly connected to a push spring (531) for driving the baffle (53) to move to a side away from the moving direction of the waste air conditioner on the conveyor belt (1).
9. The waste air conditioner processing line equipment according to claim 2, characterized in that: The lifting plate (3) is connected to a linkage component (8), and the linkage component (8) is connected to the material collecting electromagnet (6). The lifting plate (3) can drive the material collecting electromagnet (6) to collect the waste on the conveyor belt (1) through the linkage component (8) during the process of moving up and down.
10. The waste air conditioner processing line equipment according to claim 9, characterized in that: The linkage assembly (8) includes a driving rack (81) fixedly connected to the lifting plate (3) on one side close to the receiving electromagnet (6), the driving rack (81) is meshed with a driving gear (82), the driving gear (82) is fixedly connected with an active bevel gear (83), one side of the active bevel gear (83) is meshed with a connecting bevel gear (84), the connecting bevel gear (84) is penetrated by and threadedly connected with a connecting screw (85), and the connecting screw (85) is fixedly connected to the receiving electromagnet (6).
Citation Information
Patent Citations
Disassembly line for waste air conditioner
CN108907648A
Semi-automatic disassembling and classifying wire for waste conditioner
CN110834029A
Disassembling device used in waste washing machine treatment process
CN115870910A
Waste household appliance disassembling treatment system and disassembling method
CN118927457A
Air conditioner disassembling production line
CN209303411U