Power construction equipment warehouse-in and warehouse-out management method based on intelligent warehousing

Through intelligent warehousing management methods, the return processing process of power construction equipment is optimized, and the problems of inaccurate inventory and low material reuse rate in the existing technology are solved, and more efficient inventory management and material allocation are achieved.

CN119579059AActive Publication Date: 2025-03-07JINHUA POWER TRANSMISSION & DISTRIBUTION ENG
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411626530.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2025-03-07
Estimated Expiration
2044-11-14

AI Technical Summary

Technical Problem

In the management of the inlet and exit of power construction equipment, it is difficult to quickly and accurately reclassify, inspect and store returned materials, resulting in inaccurate inventory and affect the reuse rate and cost control of materials.

Method used

Through intelligent warehousing management methods, we obtain the reasons for the construction team's withdrawal of construction equipment, determine the types of reasons to which the reason belongs, and implement the distribution time judgment, distribution type judgment and distribution distance screening strategies to optimize the processing flow of the withdrawal of construction equipment.

Benefits of technology

It improves the efficiency of warehouse distribution, reduces the number of power construction machines entering and leaving the warehouse, improves the efficiency of warehouse operation, and ensures inventory accuracy and material reuse rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119579059A_ABST
    Figure CN119579059A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power construction equipment warehouse-in and warehouse-out, and discloses a power construction equipment warehouse-in and warehouse-out management method based on intelligent warehousing, and the method comprises the steps: obtaining a construction equipment returning reason of a construction team applying for construction equipment returning, executing a construction equipment returning reason judgment strategy, and judging the reason type of the construction equipment returning reason; executing a construction machine returning moment prediction strategy, obtaining a moment when the electric power construction machine returned by the second construction team starts to transport, and recording the moment as a construction machine returning moment; executing a distribution time judgment strategy, and judging whether a time condition for sending the electric power construction equipment of the second construction team to the first construction team is met or not; executing a distribution type judgment strategy, judging whether the type of the electric power construction machines of the third construction team is equal to the type of the electric power construction machines purchased and reserved by the first construction team or not, and matching the corresponding third construction team according to the number of the electric power construction machines delivered from the warehouse by the first construction team; executing a distribution distance screening strategy, and screening a fastest distribution mode; the warehouse distribution efficiency is improved, and the number of power construction tools entering and exiting from the warehouse is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power construction machinery and equipment in and out of storage, and in particular to an electric power construction machinery and equipment in and out of storage management method based on intelligent warehousing. Background Art

[0002] The management of the in and out of the warehouse of electric power construction machinery is the core link of the supply chain management of the power industry. Especially in the context of the growing demand for power equipment and materials, efficient inventory management technology is particularly important. For online delivery, the management system of electric power construction machinery needs to ensure that each material is accurately picked and sent out from the warehouse in a timely manner to ensure the smooth progress of the power project and the timeliness of maintenance work. In terms of the recovery and re-warehousing of returned construction machinery, the challenges faced by the management of electric power construction machinery include how to quickly and accurately reclassify, inspect and store the returned materials. This is not only related to the accuracy of inventory, but also affects the reuse rate and cost control of materials. The returned construction machinery materials need to undergo strict quality inspections to ensure that they meet the standards for reuse. In addition, for damaged or outdated materials, there needs to be an effective processing process to avoid inventory backlogs and waste of resources. Efficient logistics distribution and precise inventory control are the key to ensuring the stable operation of the supply chain in the power industry.

[0003] In the prior art, when it is determined that the returned power construction equipment is intact based on the reason for returning the construction equipment, if a new construction team happens to make an appointment to use power construction equipment of the same type as the returned power construction equipment, then the warehouse needs to first recycle the power construction equipment to the warehouse, and then send the power construction equipment to the new construction team. Since the power construction equipment is not damaged, the material warehouse only repackages the returned power construction equipment and sends it to the new construction team. For the power construction equipment, this process is just a matter of repackaging and reshipping. The first holder is the construction team that returns the construction equipment, and the last holder is the new construction team. This eliminates the need for warehouse middlemen, reducing the efficiency of warehouse distribution.

[0004] This scheme proposes that when the construction team is judged to be the second construction team through the reason for withdrawing the construction equipment, the time of withdrawing the construction equipment of the second construction team is predicted, and the delivery time judgment strategy, delivery type judgment strategy and delivery distance screening strategy are respectively implemented to calculate the optimal delivery method for the first construction team. Summary of the invention

[0005] The present invention provides a method for managing the entry and exit of electric power construction tools based on intelligent warehousing, which is used to promote the solution of the problems mentioned in the above background technology.

[0006] The present invention provides the following technical solution: a method for managing the entry and exit of electric power construction tools based on intelligent warehousing, comprising:

[0007] Obtaining warehouse location information for storing electric power construction machinery and tools;

[0008] The electric power construction machinery and tools are inventory materials stored in the electric power construction machinery and tools warehouse;

[0009] Record the order information of each construction team through the warehouse order module;

[0010] Record the construction team information applying for after-sales processing through the warehouse return and exchange module;

[0011] The warehouse entry and exit management module is used to manage the electric construction machinery and tools entering and leaving the warehouse according to the data of the warehouse order module and the warehouse return and exchange module;

[0012] Obtain the reasons for the construction team applying for the withdrawal of construction equipment, execute the strategy for determining the reasons for the withdrawal of construction equipment, and determine the type of reasons to which the reasons for the withdrawal of construction equipment belong, wherein the reasons are divided into the first type and the second type;

[0013] The construction team whose reason for returning construction equipment belongs to the second category will be recorded as the second construction team;

[0014] For each second construction team:

[0015] Obtain the method of returning the construction equipment of the second construction team, execute the prediction strategy of the time of returning the construction equipment, obtain the time when the electric construction equipment returned by the second construction team starts to be transported, and record it as the time of returning the construction equipment;

[0016] The construction team that has made an appointment to receive the electric power construction machinery and equipment but has not yet been delivered is recorded as the first construction team;

[0017] Execute the distribution time judgment strategy to judge whether the time condition for sending the electric power construction equipment returned by the second construction team to the first construction team is met;

[0018] If the time condition is met, the second construction team that meets the time condition will be recorded as the third construction team;

[0019] Execute the distribution type judgment strategy to determine whether the types of electric construction equipment returned by the third construction team are equal to the types of electric construction equipment reserved for use by the first construction team, and match the corresponding third construction team according to the number of electric construction equipment reserved for use by the first construction team;

[0020] The third construction team that is successfully matched is recorded as the fourth construction team;

[0021] Execute the delivery distance screening strategy to select the fastest delivery method from the warehouse and the fourth construction team;

[0022] If the time conditions are not met, the warehouse will send the electrical construction machinery to the first construction team.

[0023] Optionally, the execution of the construction tool retreat reason determination strategy includes:

[0024] The first type of reasons are the reasons for returning the construction equipment due to damage of the electric construction equipment;

[0025] The second type of reasons are the reasons for returning the construction equipment excluding the damage of the electric construction equipment;

[0026] Obtain keywords for damage to electric power construction equipment set in the material warehouse to form the first keyword group;

[0027] Obtain the reasons for the construction team to return the construction equipment;

[0028] Obtain keywords for the reasons for the withdrawal of construction equipment to form a second keyword group;

[0029] Obtain the number of identical elements in the first keyword group and the second keyword group, and record it as the number of broken words;

[0030] When the number of damaged words is > 0, the reason why the construction team returns the construction equipment is the first type of reason;

[0031] When the number of damaged words = 0, the reason why the construction team returns the construction equipment is the second type of reason.

[0032] Optionally, the execution of the construction equipment retreat time prediction strategy includes:

[0033] The methods of returning the construction equipment include sending it out by yourself or sending it back by a designated transport unit;

[0034] When the second construction team returns the construction machinery by designated transport units, the midpoint of the time period selected by the second construction team for the designated transport units to return the construction machinery is obtained and recorded as the time of returning the construction machinery.

[0035] Optionally, the execution of the construction equipment retreat time prediction strategy includes:

[0036] When the second construction team returns the construction equipment by sending it out by itself;

[0037] The time when the second construction team applies to withdraw the construction machinery and equipment is recorded as the application time;

[0038] Set the first application time and the second application time. The first application time is on weekdays, and the second application time is on weekends.

[0039] For any one of the first-category application time and the second-category application time, the application time is recorded as the marked application time:

[0040] The period from the time of application to the time of returning the construction equipment is recorded as the waiting period for returning the construction equipment;

[0041] Obtain the historical records of the second construction team's retired construction equipment;

[0042] Obtain all historical waiting periods for withdrawing construction machinery and equipment whose application time is at the marked application time in the historical records for withdrawing construction machinery and equipment, and record them as the first historical waiting period for withdrawing construction machinery and equipment, the second historical waiting period for withdrawing construction machinery and equipment, and the tth historical waiting period for withdrawing construction machinery and equipment;

[0043] Execute the following formula to calculate the average waiting time for construction equipment to be withdrawn;

[0044] (the first historical waiting period for withdrawing construction machinery and equipment + the second historical waiting period for withdrawing construction machinery and equipment + ... + the tth historical waiting period for withdrawing construction machinery and equipment) / t = the average waiting period for withdrawing construction machinery and equipment;

[0045] Get the average waiting time for the withdrawal of construction equipment during the first and second application times;

[0046] The average waiting period for withdrawing construction equipment at the application time of the second construction team is obtained, and the time of the average waiting period for withdrawing construction equipment at the application time is recorded as the time for withdrawing construction equipment.

[0047] Optionally, the execution of the delivery time determination strategy includes:

[0048] The time when the first construction team places an order for electric construction machinery and tools is recorded as the time of appointment for collection;

[0049] The time agreed by the material warehouse to send out the electric construction machinery and tools is recorded as the delivery time;

[0050] The time interval formed by the reservation collection time and the delivery time is recorded as the delivery waiting interval;

[0051] Get the time when all the second construction teams return their construction equipment, and compare it with the delivery waiting period:

[0052] The second construction team corresponding to the time of returning the construction equipment in the delivery waiting section is obtained, and the second construction team is recorded as the third construction team.

[0053] Optionally, the execution of the delivery type determination strategy includes:

[0054] Obtain the type of electric power construction machinery and tools that the first construction team has reserved for use, and record it as the material type;

[0055] Get all the third construction teams whose types of returned construction tools are equal to the types of materials, and record them as marked construction teams;

[0056] Obtain the number of construction tools returned by each marked construction team to form a set of the number of returned construction tools;

[0057] Get the number of electric construction machines and tools reserved by the first construction team and record it as the material quantity;

[0058] Obtain elements whose quantity is equal to the quantity of materials in the set of the quantity of construction equipment to be withdrawn, and form each element whose quantity is equal to the quantity of materials into a combination;

[0059] In the set of the number of withdrawn construction tools, elements whose number is less than the number of materials are obtained. Among all the elements whose number is less than the number of materials, two or more elements are selected so that the sum of the selected elements is equal to the number of materials. The elements whose sum is equal to the number of materials are combined into a combination.

[0060] If the combination exists, the match is successful;

[0061] If no combination exists, the warehouse will send the electric construction machinery to the first construction team.

[0062] Optionally, the execution of the delivery distance screening strategy includes:

[0063] For any combination;

[0064] Get any fourth construction team in the combination;

[0065] Obtain the time when the fourth construction team's construction equipment is withdrawn;

[0066] Get the appointment time of the first construction team;

[0067] The length of the period formed by the appointment time for receiving the construction equipment and the time for returning the construction equipment is recorded as the first waiting time;

[0068] Get the time spent on a unit journey in the historical delivery records and record it as unit time;

[0069] Get the distance between the fourth construction team and the first construction team, and record it as the delivery distance;

[0070] Calculate the delivery distance * unit time, and record the result as the first delivery time;

[0071] Calculate the first waiting time + the first delivery time, and record the result as the second waiting time;

[0072] Obtain the second waiting time of each fourth construction team, calculate the average, and record the result as the average waiting time of the combination;

[0073] Get the average waiting time of all combinations, get the combination with the minimum average waiting time, and record it as the target construction equipment group.

[0074] Optionally, the execution of the delivery distance screening strategy includes:

[0075] Get the distance from the warehouse to the first construction team, recorded as warehouse distance;

[0076] Get the duration of the delivery waiting interval;

[0077] Set the threshold time for determining whether to ship from the warehouse;

[0078] Calculate warehouse distance * unit duration + interval duration + threshold duration, and record the result as the third waiting time;

[0079] Obtain the average waiting time of the target construction equipment group;

[0080] Compare the average wait time to the third wait time:

[0081] When the average waiting time > the third waiting time;

[0082] Then the address of the warehouse is obtained, and the address of the warehouse is sent to each fourth construction team in the target construction equipment return group as the construction equipment return address of the fourth construction team;

[0083] The warehouse sends electrical construction machinery and tools to the first construction team;

[0084] When the average waiting time is ≦ the third waiting time, the harvest address of the first construction team is obtained, and the harvest address of the first construction team is sent to each fourth construction team in the target construction equipment withdrawal group as the construction equipment withdrawal address of the fourth construction team.

[0085] The present invention has the following beneficial effects:

[0086] 1. The method for managing the entry and exit of electric construction machinery based on intelligent warehousing sets two types of reasons for returning construction machinery, obtains the reasons for returning construction machinery of the construction team, obtains the keywords in the reasons for returning construction machinery of the construction team from the material warehouse, obtains the second keyword group, and compares it with the first keyword group set by the material warehouse, obtains the number of identical elements in the two keyword groups, and obtains the number of damaged words. As long as the number of damaged words is greater than 0, it means that the electric construction machinery returned by the construction team is damaged. At this time, the electric construction machinery returned must be recycled into the warehouse. When the number of damaged words = 0, it means that the electric construction machinery returned is intact, and the electric construction machinery returned can be sent to a new construction team under certain conditions. By judging whether the electric construction machinery returned is intact according to the reasons for returning construction machinery, the first screening is performed according to the reasons for returning construction machinery, so as to facilitate the subsequent judgment of whether the electric construction machinery returned will be sent to a new construction team, thereby improving the efficiency of warehouse distribution, reducing the number of electric construction machinery entering and leaving the warehouse, and improving the efficiency of warehouse operation.

[0087] 2. The method for managing the entry and exit of electric construction machinery based on intelligent warehousing divides the methods for returning construction machinery of the second construction team into return by designated transport units and self-mailing. When the method for returning construction machinery of the second construction team is return by designated transport units, the midpoint time of the time period for return by designated transport units set by the second construction team is obtained to obtain the time for returning the construction machinery; when the method for returning construction machinery of the second construction team is self-mailing, since the application time and the actual time for returning the electric construction machinery vary due to the different habits of each construction team, and are also related to whether the time for applying for the return of the construction machinery is on a weekday or a weekend, the application time categories are divided into two categories, namely, the first application time is on a weekday, and the second application time is on a weekend. For any one of the first application time and the second application time Specifically, the processed application time is recorded as the marked application time; all waiting periods for construction machinery return of the marked application time in the historical records of construction machinery return are obtained, the mean is calculated, and the average waiting period for construction machinery return of the marked application time is obtained, and then the average waiting period for construction machinery return of the first category of application time and the average waiting period for construction machinery return of the second category of application time are obtained, and the average waiting period for construction machinery return of the category of application time in which the second construction team currently applies is obtained to obtain the time of construction machinery return, and the application time for construction machinery return is divided into two categories, and the average waiting period for construction machinery return is calculated in each category. The waiting period for construction machinery return is calculated more accurately, and the time of construction machinery return is predicted, so as to facilitate the subsequent second screening of the construction teams returning the construction machinery through time, thereby improving the efficiency of warehouse distribution.

[0088] 3. The method for managing the entry and exit of electric power construction machinery based on intelligent warehousing obtains the appointment time for collection by the first construction team, obtains the time when the material warehouse agrees to send out the electric power construction machinery to obtain the shipping time, and the time period between the appointment time for collection and the shipping time is recorded as the shipping waiting period. The time for returning the construction machinery obtained by executing the prediction strategy for the time for returning the construction machinery is obtained, and the second construction team corresponding to the time for returning the construction machinery in the shipping waiting period is obtained. The second construction team is recorded as the third construction team, and the second construction team is screened for the second time by time to obtain the second construction team whose time meets the conditions for sending the returned electric power construction machinery to the first construction team, thereby improving the efficiency of warehouse distribution, reducing the number of electric power construction machinery entering and leaving the warehouse, and improving the efficiency of warehouse operation.

[0089] 4. The method for managing the entry and exit of electric construction machinery based on intelligent warehousing obtains the types of materials for which the first construction team has made an appointment to use the electric construction machinery, screens all third construction teams whose types of electric construction machinery returned are equal to the types of materials, and records them as marked construction teams. The construction teams that return the construction machinery are screened for the third time by the types of materials to obtain marked construction teams, obtain the number of construction machinery returned by each marked construction team, obtain the number of construction machinery returned, obtain the number of materials for which the first construction team has made an appointment to use the electric construction machinery, and divide the number of construction machinery returned into multiple combinations based on the standard of being equal to the number of materials. The combination contains one or more elements in the number of construction machinery returned. When there is only one element in the combination, this element is equal to the number of materials. When the combination contains more than 2 elements, it means that each element in the combination is less than the quantity of materials, and the sum of all elements in the combination is equal to the quantity of materials; when there is a combination, it means that the quantity in the combination can just meet the demand of the first construction team for appointment to use the electric construction machinery. When there is no combination, the warehouse must send the electric construction machinery to the first construction team, and conduct a fourth screening of the construction teams returning the construction machinery according to the quantity of materials to obtain the fourth construction team. The fourth construction team can send the electric construction machinery that has returned the construction machinery to the first construction team, and send the electric construction machinery that has returned the construction machinery directly to the first construction team, so as to improve the efficiency of warehouse distribution, reduce the number of electric construction machinery entering and leaving the warehouse, and improve the efficiency of warehouse operation.

[0090] 5. The method for managing the entry and exit of electric power construction machinery based on intelligent warehousing, for any combination, obtains any fourth construction team in the combination, obtains the first waiting time according to the time of returning the construction machinery and the appointment time of the fourth construction team, obtains the distance from the fourth construction team to the first construction team, obtains the delivery distance, calculates the delivery distance*unit time, obtains the first delivery time, calculates the sum of the first delivery time and the first waiting time, obtains the second waiting time, obtains the second waiting time of each fourth construction team in the combination, calculates the mean, obtains the average waiting time of each combination, obtains the combination with the smallest average waiting time, obtains the target construction machinery return group, then, the target construction machinery return group is the group with the fastest delivery time, by calculating the target construction machinery return group with the fastest delivery time, the electric power construction machinery returned in the target construction machinery return group is sent to the first construction team, speeds up the time from appointment to receipt of the first construction team, and improves the service satisfaction of the first construction team.

[0091] 6. The method for managing the entry and exit of electric power construction machinery based on intelligent warehousing sets a threshold time to quantify the additional costs required for shipping from the warehouse, such as labor costs, packaging material costs, etc., obtains the warehouse distance, calculates the warehouse distance * unit time + interval time + threshold time, obtains the third waiting time, and compares the third waiting time with the average waiting time. When the average waiting time > the third waiting time, the warehouse will ship the goods to the first construction team, and the fourth construction team will return the electric power construction machinery to the warehouse. When the average waiting time ≦ the third waiting time, the electric power construction machinery of the fourth construction team in the target returned construction machinery group will be returned to the warehouse. The equipment is sent to the first construction team. This method is suitable for when the time of shipment from the warehouse is much shorter than the time of sending the electric construction equipment returned by the fourth construction team to the first construction team. In this case, the equipment is shipped from the warehouse to the first construction team. The threshold time is a variable value set by the material warehouse. For example, when the threshold time is longer, it means that the material warehouse is more inclined to send the construction equipment returned by the fourth construction team to the first construction team. When the threshold time is shorter, it means that the construction team is more inclined to ship from the warehouse to the first construction team. A warehousing and access method that can be adjusted by the material warehouse is provided to facilitate the material warehouse to better manage the warehousing and access of electric construction equipment and improve the efficiency of warehousing and access. BRIEF DESCRIPTION OF THE DRAWINGS

[0092] Figure 1 Schematic diagram of the method of the present invention. DETAILED DESCRIPTION

[0093] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0094] Embodiment 1, refer to Figure 1 , a method for managing the entry and exit of electric power construction tools based on intelligent warehousing, comprising:

[0095] Obtaining warehouse location information for storing electric power construction machinery and tools;

[0096] The electric power construction machinery and tools are inventory materials stored in the material warehouse;

[0097] Record the order information of each construction team through the warehouse order module;

[0098] Record the construction team information applying for after-sales processing through the warehouse return and exchange module;

[0099] The warehouse entry and exit management module is used to manage the electric construction machinery and tools entering and leaving the warehouse according to the data of the warehouse order module and the warehouse return and exchange module;

[0100] Obtain the reasons for the construction team applying for the withdrawal of construction equipment, execute the strategy for determining the reasons for the withdrawal of construction equipment, and determine the type of reasons to which the reasons for the withdrawal of construction equipment belong, wherein the reasons are divided into the first type and the second type;

[0101] Among them, the return of construction machinery and equipment means that the construction team returns the purchased power construction machinery and equipment to the material warehouse;

[0102] The construction team whose reason for returning construction equipment belongs to the second category will be recorded as the second construction team;

[0103] For each second construction team:

[0104] Obtain the method of returning the construction equipment of the second construction team, execute the prediction strategy of the time of returning the construction equipment, obtain the time when the electric construction equipment returned by the second construction team starts to be transported, and record it as the time of returning the construction equipment;

[0105] The construction team that has made an appointment to receive the electric power construction machinery and equipment but has not yet been delivered is recorded as the first construction team;

[0106] Execute the distribution time judgment strategy to judge whether the time condition for sending the electric power construction equipment returned by the second construction team to the first construction team is met;

[0107] If the time condition is met, the second construction team that meets the time condition will be recorded as the third construction team;

[0108] Execute the distribution type judgment strategy to determine whether the types of electric construction equipment returned by the third construction team are equal to the types of electric construction equipment reserved for use by the first construction team, and match the corresponding third construction team according to the number of electric construction equipment reserved for use by the first construction team;

[0109] The third construction team that is successfully matched is recorded as the fourth construction team;

[0110] Execute the delivery distance screening strategy to select the fastest delivery method from the warehouse and the fourth construction team;

[0111] If the time conditions are not met, the warehouse will send the electrical construction machinery to the first construction team.

[0112] The strategy for determining the reason for the withdrawal of construction equipment includes:

[0113] The first type of reasons are the reasons for returning the construction equipment due to damage of the electric construction equipment;

[0114] The second type of reasons are the reasons for returning the construction equipment excluding the damage of the electric construction equipment;

[0115] Obtain keywords for damage to electric power construction equipment set in the material warehouse to form the first keyword group;

[0116] Obtain the reasons for the construction team to return the construction equipment;

[0117] Obtain keywords for the reasons for the withdrawal of construction equipment to form a second keyword group;

[0118] Obtain the number of identical elements in the first keyword group and the second keyword group, and record it as the number of broken words;

[0119] When the number of broken words is > 0, the reason why the construction team returns the construction equipment is the first type of reason;

[0120] When the number of damaged words = 0, the reason why the construction team returns the construction equipment is the second type of reason.

[0121] By setting two types of reasons for returning construction machinery, the reasons for returning construction machinery by the construction team are obtained. The key words in the reasons for returning construction machinery by the construction team are obtained from the material warehouse to obtain a second key word group. The second key word group is compared with the first key word group set by the material warehouse to obtain the number of identical elements in the two key word groups and the number of damaged words. As long as the number of damaged words is greater than 0, it indicates that the electric construction machinery returned by the construction team is damaged. At this time, the electric construction machinery returned must be recycled into the warehouse. When the number of damaged words = 0, it indicates that the electric construction machinery returned is intact and can be sent to a new construction team under certain conditions. By judging whether the electric construction machinery returned is intact according to the reasons for returning construction machinery, the first screening is performed according to the reasons for returning construction machinery, so as to facilitate the subsequent judgment of whether to send the electric construction machinery returned to the new construction team. This improves the efficiency of warehouse distribution, reduces the number of electric construction machinery entering and leaving the warehouse, and improves the efficiency of warehouse operation.

[0122] The execution of the construction equipment retreat time prediction strategy includes:

[0123] The methods of returning the construction equipment include sending it out by yourself or sending it back by a designated transport unit;

[0124] When the second construction team returns the construction machinery by designated transport units, the midpoint of the time period selected by the second construction team for the designated transport units to return the construction machinery is obtained and recorded as the time of returning the construction machinery.

[0125] The execution of the construction equipment retreat time prediction strategy includes:

[0126] When the second construction team returns the construction equipment by sending it out by itself;

[0127] The time when the second construction team applies to withdraw the construction equipment is recorded as the application time;

[0128] Set the first application time and the second application time. The first application time is on weekdays, and the second application time is on weekends.

[0129] For any one of the first-category application time and the second-category application time, the application time is recorded as the marked application time:

[0130] The period from the time of application to the time of returning the construction equipment is recorded as the waiting period for returning the construction equipment;

[0131] Obtain the historical records of the second construction team's retired construction equipment;

[0132] Obtain all historical waiting periods for withdrawing construction machinery and equipment whose application time is at the marked application time in the historical records for withdrawing construction machinery and equipment, and record them as the first historical waiting period for withdrawing construction machinery and equipment, the second historical waiting period for withdrawing construction machinery and equipment, and the tth historical waiting period for withdrawing construction machinery and equipment;

[0133] Execute the following formula to calculate the average waiting time for construction equipment to be withdrawn;

[0134] (the first historical waiting period for withdrawing construction machinery and equipment + the second historical waiting period for withdrawing construction machinery and equipment + ... + the tth historical waiting period for withdrawing construction machinery and equipment) / t = the average waiting period for withdrawing construction machinery and equipment;

[0135] Get the average waiting time for the withdrawal of construction equipment during the first and second application times;

[0136] The average waiting period for withdrawing construction equipment at the application time of the second construction team is obtained, and the time of the average waiting period for withdrawing construction equipment at the application time is recorded as the time for withdrawing construction equipment.

[0137] The second construction team's return methods for construction machinery are divided into return by designated transportation units and self-mailing. When the second construction team's return method for construction machinery is return by designated transportation units, the midpoint time of the time period for return by designated transportation units set by the second construction team is obtained to obtain the time for returning the construction machinery; when the second construction team's return method for construction machinery is self-mailing, since the application time and the actual time for transporting and returning the power construction machinery vary due to the habits of each construction team, and are also related to whether the time for applying for the return of construction machinery is on a weekday or a weekend, the application time categories are divided into two categories, namely, the first application time is on a weekday, and the second application time is on a weekend. For any one of the first and second application times, the processed application time is recorded as Mark the application time; obtain all the waiting periods for construction machinery return with marked application time in the historical records of construction machinery return, calculate the mean, and obtain the average waiting period for construction machinery return with marked application time, and then obtain the average waiting period for construction machinery return for the first category of application time and the average waiting period for construction machinery return for the second category of application time, obtain the average waiting period for construction machinery return for the category of application time where the current application moment of the second construction team is located, and obtain the time for construction machinery return, divide the application moment for construction machinery return into two categories, calculate the average waiting period for construction machinery return in each category, calculate the waiting period for construction machinery return more accurately, and predict the time for construction machinery return, so as to facilitate the subsequent second screening of the construction teams returning the construction machinery through time, thereby improving the efficiency of warehouse distribution.

[0138] The execution of the delivery time determination strategy includes:

[0139] The time when the first construction team makes an appointment to use the electric construction machinery and tools is recorded as the appointment time;

[0140] The time agreed by the material warehouse to send out the electric construction machinery and tools is recorded as the delivery time;

[0141] The time interval formed by the reservation collection time and the delivery time is recorded as the delivery waiting interval;

[0142] Get the time when all the second construction teams return their construction equipment, and compare it with the delivery waiting period:

[0143] The second construction team corresponding to the time of returning the construction equipment in the delivery waiting section is obtained, and the second construction team is recorded as the third construction team.

[0144] Get the appointment time for picking up the first construction team, get the time when the material warehouse agrees to send out the power construction machinery to get the shipping time, record the time period between the appointment time for picking up the machinery and the shipping time as the shipping waiting interval, get the time for returning the construction machinery obtained by executing the construction machinery return time prediction strategy, get the second construction team corresponding to the time for returning the construction machinery in the shipping waiting interval, record the second construction team as the third construction team, perform a second screening of the second construction team by time, and get the second construction team whose time meets the conditions for sending the returned power construction machinery to the first construction team, so as to improve the efficiency of warehouse distribution, reduce the number of power construction machinery entering and leaving the warehouse, and improve the efficiency of warehouse operation.

[0145] The execution of the delivery type determination strategy includes:

[0146] Obtain the type of electric power construction machinery and tools that the first construction team has reserved for use, and record it as the material type;

[0147] Get all the third construction teams whose types of returned construction tools are equal to the types of materials, and record them as marked construction teams;

[0148] Obtain the number of construction tools returned by each marked construction team to form a set of the number of returned construction tools;

[0149] Get the number of electric construction machines and tools reserved by the first construction team and record it as the material quantity;

[0150] Obtain elements whose quantity is equal to the quantity of materials in the set of the quantity of construction equipment to be withdrawn, and form each element whose quantity is equal to the quantity of materials into a combination;

[0151] In the set of the number of withdrawn construction tools, elements whose number is less than the number of materials are obtained. Among all the elements whose number is less than the number of materials, two or more elements are selected so that the sum of the selected elements is equal to the number of materials. The elements whose sum is equal to the number of materials are combined into a combination.

[0152] If the combination exists, the match is successful;

[0153] If no combination exists, the warehouse will send the electric construction machinery to the first construction team.

[0154] Get the types of materials that the first construction team has reserved for electric construction machinery and tools, filter out all third construction teams whose types of electric construction machinery and tools are equal to the types of materials, record them as marked construction teams, perform a third screening on the construction teams that have returned construction machinery and tools by material types, get marked construction teams, get the number of construction machinery and tools returned by each marked construction team, get the number set of returned construction machinery and tools, get the number of materials that the first construction team has reserved for electric construction machinery and tools, divide the number set of returned construction machinery and tools into multiple combinations based on the standard of being equal to the number of materials, and the combination contains one or more elements in the number set of returned construction machinery and tools. When there is only one element in the combination, this element is equal to the number of materials. When the combination contains two or more elements, this element is equal to the number of materials. When there is an element, it means that each element in the combination is less than the quantity of materials, and the sum of all elements in the combination is equal to the quantity of materials; when there is a combination, it means that the quantity in the combination can just meet the demand of the first construction team for appointment to use the electric construction machinery. When there is no combination, the warehouse must send the electric construction machinery to the first construction team, and conduct a fourth screening of the construction teams that return the construction machinery according to the quantity of materials to obtain the fourth construction team. The fourth construction team can send the electric construction machinery that returns the construction machinery to the first construction team, and send the electric construction machinery that returns the construction machinery directly to the first construction team, so as to improve the efficiency of warehouse distribution, reduce the number of electric construction machinery entering and leaving the warehouse, and improve the efficiency of warehouse operation.

[0155] The execution of the delivery distance screening strategy includes:

[0156] For any combination;

[0157] Get any fourth construction team in the combination;

[0158] Obtain the time when the fourth construction team's construction equipment is withdrawn;

[0159] Get the appointment time of the first construction team;

[0160] The length of the period formed by the appointment time for receiving the construction equipment and the time for returning the construction equipment is recorded as the first waiting time;

[0161] Get the time spent on a unit journey in the historical delivery records and record it as unit time;

[0162] Get the distance between the fourth construction team and the first construction team, and record it as the delivery distance;

[0163] Calculate the delivery distance * unit time, and record the result as the first delivery time;

[0164] Calculate the first waiting time + the first delivery time, and record the result as the second waiting time;

[0165] Obtain the second waiting time of each fourth construction team, calculate the average, and record the result as the average waiting time of the combination;

[0166] Get the average waiting time of all combinations, get the combination with the minimum average waiting time, and record it as the target construction equipment group.

[0167] For any combination, obtain any fourth construction team in the combination, obtain the first waiting time according to the time of returning the construction equipment and the appointment time of the fourth construction team, obtain the distance from the fourth construction team to the first construction team, obtain the delivery distance, calculate the delivery distance * unit time, obtain the first delivery time, calculate the sum of the first delivery time and the first waiting time, obtain the second waiting time, obtain the second waiting time of each fourth construction team in the combination, calculate the mean, obtain the average waiting time of each combination, obtain the combination with the smallest average waiting time, and obtain the target construction equipment return group. Then, the target construction equipment return group is the group with the fastest delivery time. By calculating the target construction equipment return group with the fastest delivery time, the power construction equipment returned in the target construction equipment return group is sent to the first construction team, which speeds up the time from purchase to receipt of the first construction team and improves the service satisfaction of the first construction team.

[0168] The execution of the delivery distance screening strategy includes:

[0169] Get the distance from the warehouse to the first construction team, recorded as warehouse distance;

[0170] Get the duration of the delivery waiting interval;

[0171] Set the threshold time for determining whether to ship from the warehouse;

[0172] Calculate warehouse distance * unit duration + interval duration + threshold duration, and record the result as the third waiting time;

[0173] Obtain the average waiting time of the target construction equipment group;

[0174] Compare the average wait time to the third wait time:

[0175] When the average waiting time > the third waiting time;

[0176] Then the address of the warehouse is obtained, and the address of the warehouse is sent to each fourth construction team in the target construction equipment return group as the construction equipment return address of the fourth construction team;

[0177] The warehouse sends electrical construction machinery and tools to the first construction team;

[0178] When the average waiting time ≦ the third waiting time, the harvest address of the first construction team is obtained, and the harvest address of the first construction team is sent to each fourth construction team in the target construction equipment withdrawal group as the construction equipment withdrawal address of the fourth construction team.

[0179] By setting a threshold time, it is used to quantify the additional costs required for shipping from the warehouse, such as labor costs, packaging material costs, etc., to obtain the warehouse distance, calculate warehouse distance * unit time + interval time + threshold time, and get the third waiting time. The third waiting time is compared with the average waiting time. When the average waiting time > the third waiting time, the warehouse will ship the goods to the first construction team, and the fourth construction team will return the electric construction machinery to the warehouse. When the average waiting time ≦ the third waiting time, the electric construction machinery returned by the fourth construction team in the target construction machinery return group will be sent to the first construction team. This method is applicable when the time for shipping from the warehouse is much shorter than the time for sending the electric construction machinery returned by the fourth construction team to the first construction team. In this case, the goods are shipped from the warehouse to the first construction team, wherein the threshold time is a variable value set by the material warehouse. For example, when the threshold time is longer, it means that the material warehouse is more inclined to send the construction machinery returned by the fourth construction team to the first construction team. When the threshold time is shorter, it means that the construction team is more inclined to ship from the warehouse to the first construction team. This provides an in-and-out storage method that can be adjusted by the material warehouse, so as to better manage the in-and-out storage of electric construction machinery and improve the efficiency of in-and-out storage.

[0180] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0181] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for managing the entry and exit of electric power construction tools based on intelligent warehousing, comprising: Obtaining warehouse location information for storing electric power construction machinery and tools; The electric power construction machinery and tools are inventory materials stored in the electric power construction machinery and tools warehouse; Record the order information of each construction team through the warehouse order module; Record the construction team information applying for after-sales processing through the warehouse return and exchange module; The warehouse entry and exit management module is used to manage the electric construction machinery and tools entering and leaving the warehouse according to the data of the warehouse order module and the warehouse return and exchange module; Obtain the reasons for the construction team that applied for the withdrawal of construction machinery and equipment, execute the strategy for determining the reasons for the withdrawal of construction machinery and equipment, and determine the type of reasons to which the reasons for the withdrawal of construction machinery and equipment belong, wherein the reasons are divided into the first type and the second type; The construction team whose reason for returning construction equipment belongs to the second category will be recorded as the second construction team; For each second construction team: Obtain the method of returning the construction equipment of the second construction team, execute the prediction strategy of the time of returning the construction equipment, obtain the time when the electric construction equipment returned by the second construction team starts to be transported, and record it as the time of returning the construction equipment; The construction team that has made an appointment to receive the electric power construction machinery and equipment but whose required electric power construction machinery and equipment has not yet been delivered shall be recorded as the first construction team; Execute the distribution time judgment strategy to judge whether the time condition for sending the electric power construction equipment returned by the second construction team to the first construction team is met; If the time condition is met, the second construction team that meets the time condition will be recorded as the third construction team; Execute the distribution type judgment strategy to determine whether the types of electric construction equipment returned by the third construction team are equal to the types of electric construction equipment reserved for use by the first construction team, and match the corresponding third construction team according to the number of electric construction equipment reserved for use by the first construction team; The third construction team that is successfully matched is recorded as the fourth construction team; Execute the delivery distance screening strategy to select the fastest delivery method from the warehouse and the fourth construction team; If the time conditions are not met, the warehouse will send the electrical construction machinery to the first construction team.

2. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 1 is characterized in that: The strategy for determining the reason for the withdrawal of construction equipment includes: The first type of reasons are the reasons for returning the construction equipment due to damage of the electric construction equipment; The second type of reasons are the reasons for returning the construction equipment excluding the damage of the electric construction equipment; Obtain keywords for damage to electric power construction equipment set in the material warehouse to form the first keyword group; Obtain the reasons for the construction team to return the construction equipment; Obtain keywords for the reasons for the withdrawal of construction equipment to form a second keyword group; Obtain the number of identical elements in the first keyword group and the second keyword group, and record it as the number of broken words; When the number of broken words is > 0, the reason why the construction team returns the construction equipment is the first type of reason; When the number of damaged words = 0, the reason why the construction team returns the construction equipment is the second type of reason.

3. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 1 is characterized in that: The execution of the construction equipment retreat time prediction strategy includes: The methods of returning the construction equipment include sending it out by yourself or sending it back by a designated transport unit; When the second construction team returns the construction machinery by designated transport units, the midpoint of the time period selected by the second construction team for the designated transport units to return the construction machinery is obtained and recorded as the time of returning the construction machinery.

4. The method for managing the in-and-out storage of electric power construction tools based on intelligent storage according to claim 3 is characterized by: The execution of the construction equipment retreat time prediction strategy includes: When the second construction team returns the construction equipment by sending it out by itself; The time when the second construction team applies to withdraw the construction equipment is recorded as the application time; Set the first application time and the second application time. The first application time is on weekdays, and the second application time is on weekends. For any one of the first-category application time and the second-category application time, the application time is recorded as the marked application time: The period from the time of application to the time of returning the construction equipment is recorded as the waiting period for returning the construction equipment; Obtain the historical records of the second construction team's retired construction equipment; Obtain all historical waiting periods for withdrawing construction machinery and equipment whose application time is at the marked application time in the historical records for withdrawing construction machinery and equipment, and record them as the first historical waiting period for withdrawing construction machinery and equipment, the second historical waiting period for withdrawing construction machinery and equipment, and the tth historical waiting period for withdrawing construction machinery and equipment; Execute the following formula to calculate the average waiting time for construction equipment to be withdrawn; (the first historical waiting period for withdrawing construction machinery and equipment + the second historical waiting period for withdrawing construction machinery and equipment + ... + the tth historical waiting period for withdrawing construction machinery and equipment) / t = the average waiting period for withdrawing construction machinery and equipment; Get the average waiting time for the withdrawal of construction equipment during the first and second application times; The average waiting period for withdrawing construction equipment at the application time of the second construction team is obtained, and the time of the average waiting period for withdrawing construction equipment at the application time is recorded as the time for withdrawing construction equipment.

5. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 1 is characterized in that: The execution of the delivery time determination strategy includes: The time when the first construction team places an order for electric construction machinery and tools is recorded as the time of appointment for collection; The time agreed by the material warehouse to send out the electric construction machinery and tools is recorded as the delivery time; The time interval formed by the reservation collection time and the delivery time is recorded as the delivery waiting interval; Get the time when all the second construction teams return their construction equipment, and compare it with the delivery waiting period: The second construction team corresponding to the time of returning the construction equipment in the delivery waiting section is obtained, and the second construction team is recorded as the third construction team.

6. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 1 is characterized by: The execution of the delivery type determination strategy includes: Obtain the type of electric power construction machinery and tools that the first construction team has reserved for use, and record it as the material type; Get all the third construction teams whose types of returned construction tools are equal to the types of materials, and record them as marked construction teams; Obtain the number of construction tools returned by each marked construction team to form a set of the number of returned construction tools; Get the number of electric construction machines and tools reserved by the first construction team and record it as the material quantity; Obtain elements whose quantity is equal to the quantity of materials in the set of the quantity of construction equipment to be withdrawn, and form each element whose quantity is equal to the quantity of materials into a combination; In the set of the number of withdrawn construction tools, elements whose number is less than the number of materials are obtained. Among all the elements whose number is less than the number of materials, two or more elements are selected so that the sum of the selected elements is equal to the number of materials. The elements whose sum is equal to the number of materials are combined into a combination. If the combination exists, the match is successful; If no combination exists, the warehouse will send the electric construction machinery to the first construction team.

7. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 6 is characterized by: The execution of the delivery distance screening strategy includes: For any combination; Get any fourth construction team in the combination; Obtain the time when the fourth construction team's construction equipment is withdrawn; Get the appointment time of the first construction team; The length of the period formed by the appointment time for receiving the construction equipment and the time for returning the construction equipment is recorded as the first waiting time; Get the time spent on a unit journey in the historical delivery records and record it as unit time; Get the distance between the fourth construction team and the first construction team, and record it as the delivery distance; Calculate the delivery distance * unit time, and record the result as the first delivery time; Calculate the first waiting time + the first delivery time, and record the result as the second waiting time; Obtain the second waiting time of each fourth construction team, calculate the average, and record the result as the average waiting time of the combination; Get the average waiting time of all combinations, get the combination with the minimum average waiting time, and record it as the target construction equipment group.

8. The method for managing the entry and exit of electric power construction tools based on intelligent warehousing according to claim 7 is characterized by: The execution of the delivery distance screening strategy includes: Get the distance from the warehouse to the first construction team, recorded as warehouse distance; Get the duration of the delivery waiting interval; Set the threshold time for determining whether to ship from the warehouse; Calculate warehouse distance * unit duration + interval duration + threshold duration, and record the result as the third waiting time; Obtain the average waiting time of the target construction equipment group; Compare the average wait time to the third wait time: When the average waiting time > the third waiting time; Then the address of the warehouse is obtained, and the address of the warehouse is sent to each fourth construction team in the target construction equipment return group as the construction equipment return address of the fourth construction team; The warehouse sends electrical construction machinery and tools to the first construction team; When the average waiting time ≦ the third waiting time, the harvest address of the first construction team is obtained, and the harvest address of the first construction team is sent to each fourth construction team in the target construction equipment withdrawal group as the construction equipment withdrawal address of the fourth construction team.

Citation Information

Patent Citations

  • Traditional Chinese medicinal material e-commerce transaction system based on big data and Internet of Things

    CN110619561A

  • Electric power tool warehouse-in and warehouse-out management method and device and storage medium

    CN115239247A

  • Order prediction, picking and delivery method and device based on digital twinning and storage medium

    CN118735407A

  • Product placement system, product placement method, and product placement program

    JP6457705B1