Construction method of super high-rise facade diamond curtain wall

Through the pre-stitching and transfer of modular keel brackets, combined with the segmented installation method and the strategy of fixing the hanging basket position, the problems of high-altitude operation difficulty and construction complexity in traditional construction methods are solved, and efficient and safe construction of curtain walls of super high-rise buildings is achieved.

CN119641003AActive Publication Date: 2025-03-18CSCEC CHANGSHA FUJISASH CURTAIN WALL & DECORATION
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411710830.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-03-18
Estimated Expiration
2044-11-27

AI Technical Summary

Technical Problem

When facing diamond-body construction methods of traditional super high-rise buildings, they need to frequently adjust the installation position of the hanging basket, which increases the difficulty and construction complexity of high-altitude operations.

Method used

By modularizing the main keel, pre-stitching the keel bracket on the ground, and then transferring it to the building for installation, reducing the time of operation at high altitudes. At the same time, a segmented installation method is adopted to set up installation mechanisms for different construction sections to ensure that the hanging basket is fixed and adapt to the complex shape of the diamond body.

Benefits of technology

The glass curtain wall installation without frequent adjustment of the hanging basket position is realized, reducing the time and construction difficulty of high altitude work, and improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119641003A_ABST
    Figure CN119641003A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a super high-rise facade diamond curtain wall. The construction method comprises the following steps: S1, modeling; s2, rechecking and correcting the model; s3, mounting a vertical keel; the main keel comprises a plurality of keel supports which are connected with one another, the keel supports are all fixedly connected with the construction building, and all the keel supports are prefabricated and assembled on the machining site; s5, curtain wall installation at the first construction section: dividing the construction building into multiple layers of construction sections according to the height of the construction building, and if the first layer to the Nth layer are assumed as the first construction section, arranging a protection mechanism at the (N + 3) th layer of the construction building, and arranging a curtain wall installation mechanism at the (N + 2) th layer to perform curtain wall installation on the floor of the first construction section; and S6, curtain wall installation of other construction sections: for construction buildings of other construction sections, glass curtain walls close to the interior of the construction building are installed through an installation mechanism, and the installation mechanism can move towards the side away from the outer wall of the construction building to the top of the construction building so as to fix and seal the glass curtain walls.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain wall installation, and more specifically to a construction method for a super-high-rise facade diamond curtain wall. Background Art

[0002] As people's living standards improve, their spiritual pursuits become more advanced. More and more public buildings with high-end functions and diversified functions are entering people's lives. They have unique shapes. In addition to meeting the requirements of structural safety and expected functions, they also require high-end, atmospheric and high-end facades. In addition to meeting the basic requirements of structure, insulation, energy saving, etc., they also require atmosphere, beauty and high-end, such as concert halls, museums, office buildings, etc. This type of building has novel and unique shapes, complex structures, harsh surrounding environmental conditions, and great construction difficulty. The traditional construction technology has the following problems in the face of super-high-rise multi-folded diamond-shaped buildings: 1. For the keels used in super-high-rise buildings, the keel brackets can usually only be installed section by section at high altitude, which increases a large number of high-altitude operations during the construction process, increases the difficulty of construction, and increases the work intensity; 2. When facing the glass curtain walls located on different planes in the diamond body, high-altitude installation is inconvenient, and the installation position of the lifting basket needs to be adjusted repeatedly.

[0003] Therefore, there is an urgent need for a diamond curtain wall construction method that does not require repeated adjustment of the hanging basket installation position and reduces high-altitude operations and construction difficulty. Summary of the invention

[0004] The purpose of the present invention is to provide a super high-rise facade diamond body curtain wall construction method. The super high-rise facade diamond body curtain wall construction method provided by the present invention modularizes the main keel of the keel so that the keel bracket can be pre-assembled on the ground and then transported to the air for installation, thereby reducing the time of high-altitude operations, and the installation mechanism setting of different construction sections enables the hanging basket in the method to also install glass curtain walls with different entry and exit positions.

[0005] To achieve the above object, the technical solution of the present invention is as follows:

[0006] A super high-rise facade diamond body curtain wall construction method, the super high-rise facade diamond body curtain wall construction method is used for the installation of the facade diamond body glass curtain wall, the diamond body includes a glass curtain wall and a main keel and a vertical keel for supporting the glass curtain wall, the main keel and the vertical keel are fixedly connected to the construction building, characterized in that the super high-rise facade diamond body curtain wall construction method comprises the following steps:

[0007] S1. Modeling: Establish a three-dimensional information model of the construction building through the BIM system;

[0008] S2, model review and correction: Scan and measure the construction building with a 3D scanner, review the 3D information model established in step S1, and correct the model structure with deviations;

[0009] S3. Vertical keel installation: Use the total station to preset the installation points on the construction building, and fix the vertical keel on the construction building;

[0010] S4. Installation of main keel: The main keel includes multiple sections of keel brackets connected to each other, each section of the keel brackets is fixedly connected to the construction building, and each section of the keel brackets is prefabricated and assembled at the processing site;

[0011] S5. Installation of curtain wall in the first construction section: the construction building is divided into multi-layer construction sections according to its height. Assuming that the first construction section is from the first floor to the Nth floor, a protective mechanism is installed at the N+3th floor of the construction building, and a curtain wall installation mechanism is installed at the N+2th floor to install curtain walls on the floors of the first construction section;

[0012] S6. Installation of curtain walls in other construction sections: For construction buildings in other construction sections, the glass curtain walls near the construction buildings are installed by the installation mechanism, and the installation mechanism can move toward the side away from the outer wall of the construction building to the top of the construction building to fix and seal the glass curtain wall.

[0013] Preferably, the keel bracket in step S4 includes a plurality of pairs of steel brackets cross-connected to each other, and adjacent steel brackets are connected to each other.

[0014] Preferably, the width of the keel support in step S4 does not exceed one-fourth of the width of the diamond body of the building under construction, and the height of the keel support does not exceed the height of two floors of the building under construction.

[0015] Preferably, the installation mechanism in the step S5 comprises a lifting assembly and an installation hanging basket, the lifting assembly is fixedly arranged on the construction building, and the installation hanging basket is connected to the output end of the lifting assembly.

[0016] Preferably, in step S5, the installation hanging basket is arranged outside the diamond body of the construction building and the distance between the installation hanging basket and the outer facade of the construction building is equal to the length of the highest entrance and exit position, and in step S6, the installation hanging basket is arranged outside the diamond body of the construction building and the distance between the installation hanging basket and the outer facade of the construction building is equal to the length of the highest entrance and exit position plus 1 meter, and the length of the highest entrance and exit position is the distance between the farthest protruding point of the diamond body of the construction building protruding outward and the farthest recessed point of the diamond body recessed inward.

[0017] Preferably, the lifting assembly comprises a lifting member and a translation member;

[0018] The lifting member is fixedly arranged in the construction building, the output end of the lifting member is connected to the installation hanging basket, the translation member is arranged in the installation hanging basket, and the translation member can make the installation hanging basket move horizontally in the lateral direction to adapt to the protrusions and depressions of the diamond body of the construction building.

[0019] Preferably, the protection mechanism includes a protection shed and a hanging basket parking platform;

[0020] The hanging basket parking platform is connected to the construction building to park the non-working installation mechanism, and the protection shed is connected to the construction building.

[0021] The beneficial effects of the present invention are:

[0022] The present invention proposes a diamond curtain wall construction method, which uses BIM to simulate the construction building according to the height of the construction building, divides the construction building into sections, and modularizes the installation methods of the first construction section and other construction sections. The installation hanging basket of the first construction section is set at the farthest protruding point of the diamond body, and the installation hanging basket of other construction sections is set at 1 meter away from the farthest protruding point of the diamond body. Therefore, when installing glass curtain walls with different entry and exit positions, there is no need to move the installation position of the hanging basket, and the glass curtain walls can be installed in sequence from bottom to top, which is convenient for construction. In addition, the construction method modularizes the main keel of the keel so that the keel bracket can be pre-spliced ​​on the ground and then transported to the air for installation, which reduces the time of high-altitude operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is an overall construction schematic diagram of the super-high-rise facade diamond curtain wall construction method of the present invention;

[0024] Figure 2 It is a schematic diagram of the construction of connection nodes of adjacent keel supports in the construction method of the super-high-rise facade diamond curtain wall of the present invention.

[0025] Description of reference numerals:

[0026] 1. Main keel; 2. Vertical keel; 11. Keel bracket. DETAILED DESCRIPTION

[0027] Many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways than those described herein, and those skilled in the art can make similar modifications without violating the connotation of the present invention, so the present invention is not limited to the specific implementation disclosed below.

[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0029] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0030] like Figure 1 and Figure 2 As shown, the present invention provides a super high-rise facade diamond body curtain wall construction method, which is used for the installation of the facade diamond body glass curtain wall, the diamond body includes a glass curtain wall and a main keel and a vertical keel 2 for supporting the glass curtain wall, the main keel and the vertical keel 2 are fixedly connected to the construction building, and is characterized in that the super high-rise facade diamond body curtain wall construction method includes the following steps:

[0031] S1. Modeling: Establish a three-dimensional information model of the construction building through the BIM system;

[0032] S2, model review and correction: Scan and measure the construction building with a 3D scanner, review the 3D information model established in step S1, and correct the model structure with deviations;

[0033] S3, vertical keel installation: using the total station to preset installation points on the construction building, the vertical keel 2 is fixedly installed on the construction building;

[0034] S4. Main keel installation: The main keel includes multiple sections of keel brackets 11 that are connected to each other. The multiple sections of keel brackets 11 are all fixedly connected to the construction building. Each section of the keel bracket 11 is prefabricated and assembled at the processing site;

[0035] S5. Installation of curtain wall in the first construction section: the construction building is divided into multi-layer construction sections according to its height. Assuming that the first construction section is from the first floor to the Nth floor, a protective mechanism is installed at the N+3th floor of the construction building, and a curtain wall installation mechanism is installed at the N+2th floor to install curtain walls on the floors of the first construction section;

[0036] S6. Installation of curtain walls in other construction sections: For construction buildings in other construction sections, the glass curtain walls close to the construction buildings are installed through the installation mechanism, and the installation mechanism can move toward the side away from the outer wall of the construction building to the top of the construction building to fix and seal the glass curtain wall.

[0037] In this embodiment, the construction building is connected and set at different angles of the glass curtain wall so that the facade of the building appears as a diamond body. Since the diamond body has planes protruding outward and recessed inward, the traditional curtain wall installation method often needs to repeatedly adjust the installation basket position in the installation mechanism to adapt to the farthest protruding point of the diamond body protruding outward and the farthest recessed point of the diamond body recessed inward, which greatly increases the difficulty and complexity of construction and increases the work intensity of construction personnel. Therefore, the present invention proposes a diamond body curtain wall construction method, which uses BIM to simulate the construction building according to the height of the construction building, divides the construction building into sections, and modularizes the installation methods of the first construction section and other construction sections. The installation basket of the first construction section is set at the farthest protruding point of the diamond body protruding outward, and the installation basket of other construction sections is set at 1 meter away from the farthest protruding point of the diamond body protruding outward, so that when installing glass curtain walls with different entry and exit positions, there is no need to move the installation position of the basket, and the glass curtain wall can be installed in sequence from bottom to top. However, in the case of super-high-rise construction, the main keel often crosses floors. If the various brackets of the main keel are directly installed at high altitude, it will undoubtedly greatly increase the workload. Therefore, in this construction method, the main keel is divided into sections, and the keel brackets 11 of each section are pre-spliced ​​and installed on the ground, and then the keel brackets 11 of each section are transported as a whole to the facade of the building for installation.

[0038] like Figure 2 As shown, in step S4, the keel bracket 11 includes a plurality of pairs of steel brackets cross-connected to each other, and adjacent steel brackets are connected to each other. In step S4, the width of the keel bracket 11 does not exceed a quarter of the width of the diamond body of the construction building, and the height of the keel bracket 11 does not exceed the height of two floors of the construction building.

[0039] In this embodiment, the keel bracket 11 after the main keel is modularized is pre-assembled on the ground and then transported as a whole to the facade of the building for installation, thereby avoiding the traditional construction process of directly installing each steel bracket, which results in long construction time and inconvenient construction quality control.

[0040] In a preferred embodiment, in step S5, the installation mechanism includes a lifting assembly and an installation basket, the lifting assembly is fixedly arranged on the construction building, and the installation basket is connected to the output end of the lifting assembly. In step S5, the installation basket is arranged outside the diamond body of the construction building and the installation basket is equal to the length of the highest entry and exit position from the facade of the construction building. In step S6, the installation basket is arranged outside the diamond body of the construction building and the distance between the installation basket and the facade of the construction building is equal to the length of the highest entry and exit position plus 1 meter, and the length of the highest entry and exit position is the distance between the farthest distance protruding point of the diamond body of the construction building and the farthest distance concave point of the diamond body concave inward. The lifting assembly includes a lifting member and a translation member; the lifting member is fixedly arranged in the construction building, the output end of the lifting member is connected to the installation basket, the translation member is arranged in the installation basket, and the translation member can make the installation basket move horizontally in the lateral direction to adapt to the protrusion and depression of the diamond body of the construction building.

[0041] In this embodiment, the lifting member is preferably a lifting motor, and the translation member is preferably a connecting belt with a clamping joint at one end, and the clamping joint of the connecting belt is clamped with the steel column of the building. Through the action of external force, the installation basket can move horizontally, thereby adapting to the installation of glass curtain walls at the protrusions and depressions of the diamond body of the construction building.

[0042] In a preferred embodiment, the protection mechanism includes a protection shed and a hanging basket parking platform; the hanging basket parking platform is connected to the construction building to park the non-working installation mechanism, and the protection shed is connected to the construction building. The setting of the protection shed can effectively prevent falling objects from high altitude during high-altitude operations, improve the safety of construction operations, and avoid falling objects from injuring people.

[0043] In one embodiment, the glass surface in the diamond body groove of the super high-rise facade diamond body building is 1.5 meters away from the entry and exit position of the highest point of the diamond body; first, the main keel has cross-layers. Considering that it is time-consuming and of low quality to install each one directly, the keel bracket 11 is first assembled at the ground processing site. Based on the convenience of lifting, the width direction of the keel bracket 11 is selected as 1 / 4 of the width of the diamond body, and the height direction is selected as 2 layers of the height of the diamond body for arrangement, and then transported to the corresponding floor for installation, which can not only improve efficiency but also ensure the quality of installation; secondly, according to the schedule, the 1-21 floors are the first construction section, and a protective shed and a hanging basket parking platform are set up on the 24th floor, A hanging basket is installed on the 23rd floor. In the construction sections above the 23rd floor, the installation position of the hanging basket is extended to 2.5m. The hanging basket is parked on the ground. When installing the glass panel, the hanging basket of the 23rd floor is used for the first construction section below the 23rd floor. It is first fixed 1.5m away from the facade of the building, and the glass panel is installed from bottom to top; secondly, for the glass in the groove on the same vertical line, a clamping joint is used to hook the steel column to pull the hanging basket closer, and then the connecting belt is used to hold the hanging basket for the installation of the glass panel; finally, for the part above the 23rd floor of the second construction section, the conventional glass curtain wall close to the indoor part is first installed with the hanging basket, and then the hanging basket is moved outward to the position where the highest point glass curtain wall can be installed.

[0044] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0045] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A super high-rise facade diamond body curtain wall construction method, the super high-rise facade diamond body curtain wall construction method is used for the installation of a facade diamond body glass curtain wall, the diamond body comprises a glass curtain wall and a main keel and a vertical keel for supporting the glass curtain wall, the main keel and the vertical keel are fixedly connected to the construction building, characterized in that: The super high-rise facade diamond curtain wall construction method comprises the following steps: S1. Modeling: Establish a three-dimensional information model of the construction building through the BIM system; S2, model review and correction: Scan and measure the construction building with a 3D scanner, review the 3D information model established in step S1, and correct the model structure with deviations; S3. Vertical keel installation: Use the total station to preset the installation points on the construction building, and fix the vertical keel on the construction building; S4. Installation of main keel: The main keel includes multiple sections of keel brackets connected to each other, each section of the keel brackets is fixedly connected to the construction building, and each section of the keel brackets is prefabricated and assembled at the processing site; S5. Installation of curtain wall in the first construction section: the construction building is divided into multi-layer construction sections according to its height. Assuming that the first construction section is from the first floor to the Nth floor, a protective mechanism is installed at the N+3th floor of the construction building, and a curtain wall installation mechanism is installed at the N+2th floor to install curtain walls on the floors of the first construction section; S6. Installation of curtain walls in other construction sections: For construction buildings in other construction sections, the glass curtain walls near the construction buildings are installed by the installation mechanism, and the installation mechanism can move toward the side away from the outer wall of the construction building to the top of the construction building to fix and seal the glass curtain wall.

2. The super high-rise facade diamond curtain wall construction method according to claim 1, characterized in that: In the step S4, the keel support comprises a plurality of pairs of steel supports cross-connected to each other, and adjacent steel supports are connected to each other.

3. The super high-rise facade diamond curtain wall construction method according to claim 1, characterized in that: The width of the keel support in step S4 does not exceed one quarter of the width of the diamond body of the building under construction, and the height of the keel support does not exceed the height of two floors of the building under construction.

4. The super high-rise facade diamond curtain wall construction method according to claim 1, characterized in that: The installation mechanism in step S5 includes a lifting assembly and an installation hanging basket, the lifting assembly is fixedly arranged on the construction building, and the installation hanging basket is connected to the output end of the lifting assembly.

5. The super high-rise facade diamond curtain wall construction method according to claim 4 is characterized in that: In step S5, the installation hanging basket is arranged outside the diamond body of the construction building and the distance between the installation hanging basket and the facade of the construction building is equal to the length of the highest entrance and exit position. In step S6, the installation hanging basket is arranged outside the diamond body of the construction building and the distance between the installation hanging basket and the facade of the construction building is equal to the length of the highest entrance and exit position plus 1 meter. The length of the highest entrance and exit position is the distance between the farthest protruding point of the diamond body of the construction building protruding outward and the farthest concave point of the diamond body concave inward.

6. The super high-rise facade diamond curtain wall construction method according to claim 4, characterized in that: The lifting assembly includes a lifting member and a translation member; The lifting member is fixedly arranged in the construction building, the output end of the lifting member is connected to the installation hanging basket, the translation member is arranged in the installation hanging basket, and the translation member can make the installation hanging basket move horizontally in the lateral direction to adapt to the protrusions and depressions of the diamond body of the construction building.

7. The super high-rise facade diamond curtain wall construction method according to claim 1, characterized in that: The protection mechanism includes a protection shed and a hanging basket parking platform; The hanging basket parking platform is connected to the construction building to park the non-working installation mechanism, and the protection shed is connected to the construction building.

Citation Information

Patent Citations

  • Unreasonable multidirectional curved surface double-layer curtain wall construction structure and method based on BIM platform

    CN112177210A

  • Construction method of broken line dislocation special-shaped curtain wall

    CN113530254A

  • Irregular curved surface curtain wall delicate steel keel installation system and construction method

    CN115853179A

  • Construction method for quickly assembling building outer curtain wall

    CN116220263A

  • Large double-curved-surface GRC curtain wall structure and construction method

    CN117489020A