Temporary supporting assembly for steel bar truss floor support plate

By designing a temporary support component for reinforced truss floor bearing plates, the problems of deflection and collapse in the construction of floor bearing plates are solved, an efficient and safe construction process is achieved, and the requirements for rapid construction of super high-rise buildings are met.

CN119641133AInactive Publication Date: 2025-03-18NINGBO CONSTR ENG GROUP
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202510174161.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2025-03-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction of steel bar truss bearing plates, large deflection or even collapse are prone to occur at the middle of the bearing plate. The traditional temporary support method is costly and has low construction efficiency, making it difficult to meet the requirements of rapid construction of super high-rise buildings.

Method used

A temporary support assembly is designed, including connecting rods, support portions, fixing grooves, fixing blocks, mounting grooves and mounting springs. Through the combination and adjustment of these components, it can be installed between adjacent steel beams to provide temporary support for the floor bearing plates and avoid scaffolding.

Benefits of technology

This temporary support component can improve construction efficiency, reduce construction period, ensure construction safety, and meet the needs of rapid construction of super high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119641133A_ABST
    Figure CN119641133A_ABST
Patent Text Reader

Abstract

The temporary supporting assembly for the steel bar truss floor support plate comprises a connecting rod, a supporting part used for supporting the floor support plate is installed on the connecting rod, fixing grooves are formed in the two ends of the connecting rod, fixing blocks are slidably connected into the fixing grooves, one end of each fixing block extends out of the corresponding fixing groove and is provided with a mounting groove, and the mounting grooves are connected with the connecting rod. Mounting springs used for abutting against the fixing blocks are connected between the fixing blocks and the bottom walls of the mounting grooves. When the temporary supporting assembly is mounted, the fixing blocks on the two fixing rods are pressed into the fixing grooves firstly, then the fixing rods are lifted to the lower flanges of the steel beams, the fixing blocks are loosened, the lower flanges of the steel beams are clamped into the mounting grooves in the fixing blocks, accordingly, the connecting rods are mounted between the adjacent steel beams, and the supporting parts on the connecting rods can support the floor support plate; the whole temporary supporting assembly is installed between the adjacent steel beams, a scaffold does not need to be erected, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction, and in particular to a temporary support assembly for a steel truss floor deck. Background Art

[0002] In the field of modern construction, especially for high-rise or large-span buildings, steel structures are widely used due to their high strength, light weight and good earthquake resistance. Floor deck is a prefabricated component used to form the floor of a building, which combines the advantages of two materials: steel truss and concrete. The stress-bearing process of the floor deck is divided into the construction stage and the use stage. The construction stage is the process from the beginning of the assembly of the floor deck to the concrete strength reaching the design requirements. In this process, the self-weight of the floor deck, the weight of the wet concrete and the construction live load are all borne by the steel truss, which is usually welded by steel bars; when the concrete strength reaches the design requirements, the floor deck enters the use stage. In this stage, the upper and lower chord steel bars of the steel frame work together with the concrete, and its stress performance and bearing capacity are the same as those of ordinary cast-in-place concrete floor slabs. In actual applications, the floor deck is usually installed on a pre-constructed steel beam. The steel beam is the basic structure for bearing the floor deck, and the steel beam is usually made of H-shaped steel.

[0003] When the floor decking is laid or the temporary load of pouring concrete is too high, it is inevitable that there will be a large deflection or even collapse in the mid-span of the floor decking. In order to ensure construction safety and the overall strength, rigidity and stability of the floor decking, it is sometimes necessary to set up temporary supports under the floor decking after the floor decking is installed and before the concrete is poured. The temporary supports and the floor decking as a whole bear the deadweight of the components and the construction load. Traditional temporary supports are mostly in the form of steel pipe supports, and the cost of using full-floor scaffolding is relatively high. In addition, this method must be carried out after the lower layer of concrete has been poured and cured to reach a certain strength before it can be supported on it. The entire construction process can only be carried out from bottom to top, which seriously reduces construction efficiency and has an adverse impact on the construction period. It is difficult to meet the requirements of rapid construction of super-high-rise buildings, so it needs to be improved. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present application provides a temporary support assembly for a steel truss floor deck, aiming to solve the above problems.

[0005] A temporary support assembly for a steel bar truss floor deck, comprising a connecting rod, on which a support portion for supporting the floor deck is installed, both ends of the connecting rod are provided with fixing grooves, a fixing block is slidably connected in the fixing groove, one end of the fixing block extends out of the fixing groove and is provided with an installation groove, and an installation spring for tightening the fixing block is connected between the fixing block and the bottom wall of the installation groove.

[0006] By adopting the above technical solution, when installing the temporary support assembly, first press the fixing blocks on the two fixing rods into the fixing grooves, then lift the fixing rods to the lower flange of the steel beam, loosen the fixing blocks, and insert the lower flange of the steel beam into the installation groove on the fixing blocks, so that the connecting rods are installed between adjacent steel beams. The supporting parts on the connecting rods can support the floor decking plates, and the entire temporary support assembly is installed between adjacent steel beams without the need to set up scaffolding, thereby improving construction efficiency.

[0007] Optionally, the connecting rod includes an adjusting rod and two fixing rods arranged at both ends of the adjusting rod, and one end of each of the fixing rods is provided with an adjusting groove for inserting the adjusting rod, and a fixing hole is formed through the fixing rod, and the fixing hole is connected to the adjusting groove, and a fixing bolt is passed through the fixing hole. The adjusting rod is provided with a plurality of adjustment holes spaced apart along its length direction, and the fixing bolt is threadedly connected to the adjustment hole.

[0008] By adopting the above technical solution, the staff needs to adjust the length of the temporary support assembly according to the distance between adjacent steel beams. First, unscrew the fixing bolts and adjust the distance between the two fixing rods. After adjusting the distance between the two fixing rods, screw the fixing bolts into the corresponding adjustment holes on the adjustment rods, thereby fixing the adjustment rods in the adjustment slots, and then adjusting the length of the temporary support assembly.

[0009] Optionally, the support portion includes at least two support rods mounted on a fixed rod, the upper ends of the support rods are connected to support plates, the lower ends of the support rods are threadedly connected to adjustment cylinders, and the adjustment cylinders are rotatably connected to the fixed rods.

[0010] By adopting the above technical solution, the staff rotates the support rod according to the height difference between the lower flange of the steel beam and the floor decking, thereby adjusting the distance between the support plate and the fixed rod, so that the support plate can always be close to the floor decking, which is more flexible and convenient to use.

[0011] Optionally, an elastic support pad is installed on the upper end surface of the support plate.

[0012] By adopting the above technical solution, the support pad has a certain deformation ability, thereby ensuring that the support plate can be pressed against the floor decking, so that the floor decking can obtain sufficient supporting force.

[0013] Optionally, ends of the two fixing rods that are away from each other are hingedly connected to a first extension rod and a second extension rod respectively.

[0014] By adopting the above technical solution, when installing the temporary support assembly, the staff holds the first extension rod and the second extension rod. At this time, the first extension rod and the second extension rod are both vertical to the fixed rod. The staff lifts and rotates the fixed rod through the first extension rod and the second extension rod, so that the lower flange of the steel beam is stuck in the installation groove on the fixed block, thereby fixing the fixed rod between the two steel beams. The staff does not need to climb up to install, which ensures the safety of construction and improves construction efficiency.

[0015] Optionally, each of the fixed blocks is connected to a limiting rod, and the inner wall of the fixed groove is provided with a first sliding hole for the limiting rod to pass through and slide, one end of the first extension rod and one end of the second extension rod are provided with a connecting groove for the fixing block to be inserted into, and the fixing block is tightly attached to the inner wall of the connecting groove.

[0016] By adopting the above technical solution, when it is necessary to increase the length of the temporary support assembly through the first extension rod and the second extension rod, first press the fixed block into the fixed groove through the limiting rod, then fold the first extension rod and the second extension rod to one end of the two fixed rods respectively, and then release the limiting rod to allow the fixed block to extend from the fixed groove and fit into the connecting groove, thereby forming a lock, limiting the accidental folding of the first extension rod and the second extension rod, and thereby increasing the length of the temporary support assembly.

[0017] Optionally, a positioning groove is provided at the movable end of the first extension rod, a positioning block is slidably connected in the positioning groove, a locking groove is provided on the positioning block, a fastening spring is connected between the positioning block and the bottom wall of the positioning groove for tightening the positioning block, a positioning rod is connected to the outer wall of the positioning block, a second sliding hole is provided on the inner wall of the positioning groove for the positioning rod to pass through and slide, a fastening groove is provided on the movable end of the second extension rod, a limiting groove is provided on the inner wall of the fastening groove for the positioning block to be inserted into, and the positioning block is tightly attached to the inner wall of the limiting groove.

[0018] By adopting the above technical scheme, the positioning block on the first extension rod is clamped on the lower flange of the steel beam through the positioning groove, and then the positioning block is squeezed so that the positioning block is clamped into the positioning groove, and the temporary support assembly is rotated so that the temporary support assembly and the steel beam form a vertical state, and the squeezing of the positioning block is released so that the lower flange of the steel beam on the other side is clamped into the fastening groove of the second extension rod, thereby installing the temporary support assembly between the two steel beams; in addition, when the first extension rod and the second extension rod are stored, the positioning block is first pressed into the positioning groove through the positioning rod, and then the first extension rod and the second extension rod are folded until they are tightly attached to the lower end surface of the fixed rod. At this time, the movable end of the first extension rod faces the movable end of the second extension rod, and the positioning rod is released. The positioning block is clamped into the limit groove under the action of the fastening spring, thereby forming a lock, limiting the rotation of the first extension rod and the second extension rod, thereby facilitating the installation and transportation of the temporary support assembly.

[0019] Optionally, a placement hole is formed through the outer walls of the first extension rod and the second extension rod, a mounting rod is provided in the placement hole, one end of the mounting rod is hinged to the inner wall of the placement hole, and an elastic protective sleeve is fixed on the outer wall of the mounting rod, and the protective sleeve is tightly attached to the inner wall of the placement hole.

[0020] By adopting the above technical solution, the installation rod is rotated out of the placement holes on the first extension rod and the second extension rod, and the staff can move the first extension rod and the second extension rod through the installation rod without the need for high-altitude operations, thereby increasing the safety factor.

[0021] Optionally, a slot is provided at one end of each of the first extension rod and the second extension rod hinged to the fixing rod.

[0022] Optionally, a fastening hole for screwing a fixing bolt into is provided on the outer side wall of the movable end of the mounting rod.

[0023] By adopting the above technical solution, after the fixing bolt fixes the adjusting rod, the fixing bolt is continued to be rotated to screw one end of the fixing bolt into the fastening hole on the mounting rod, thereby fixing the mounting rod in the placement hole, saving time and effort.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. When installing the temporary support assembly, first press the fixing blocks on the two fixing rods into the fixing grooves, then lift the fixing rods to the lower flange of the steel beam, loosen the fixing blocks, and insert the lower flange of the steel beam into the installation groove on the fixing blocks, so that the connecting rods are installed between adjacent steel beams. The supporting parts on the connecting rods can support the floor decking. The entire temporary support assembly is installed between adjacent steel beams without the need to set up scaffolding, thereby improving construction efficiency.

[0025] 2. When installing the temporary support assembly, the worker holds the first extension rod and the second extension rod. At this time, the first extension rod and the second extension rod are both vertical to the fixed rod. The worker lifts and rotates the fixed rod through the first extension rod and the second extension rod, so that the lower flange of the steel beam is stuck in the installation groove on the fixed block, thereby fixing the fixed rod between the two steel beams. The worker does not need to climb up to install, which ensures the safety of construction and improves construction efficiency.

[0026] 3. The positioning block on the first extension rod is clamped on the lower flange of the steel beam through the positioning groove, and then the positioning block is squeezed so that the positioning block is stuck in the positioning groove, and the temporary support assembly is rotated so that the temporary support assembly and the steel beam form a vertical state, and the squeezing of the positioning block is released so that the lower flange of the steel beam on the other side is stuck in the fastening groove of the second extension rod, thereby installing the temporary support assembly between the two steel beams; in addition, when storing the first extension rod and the second extension rod, the positioning block is first pressed into the positioning groove through the positioning rod, and then the first extension rod and the second extension rod are folded until they are tightly attached to the lower end surface of the fixed rod. At this time, the movable end of the first extension rod faces the movable end of the second extension rod, and the positioning rod is released. The positioning block is stuck in the limit groove under the action of the fastening spring, thereby forming a lock, limiting the rotation of the first extension rod and the second extension rod, and thus facilitating the installation and transportation of the temporary support assembly.

[0027] 4. After fixing the adjusting rod with the fixing bolt, continue to turn the fixing bolt and screw one end of the fixing bolt into the fastening hole on the mounting rod, thereby fixing the mounting rod in the placement hole, saving time and effort. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the structure in which the fixing rod is installed on the steel beam in an embodiment of the present application.

[0029] Figure 2 It is an exploded schematic diagram of two fixing rods in an embodiment of the present application.

[0030] Figure 3 It is a schematic diagram of the state when the installation rod is moved out of the placement hole in the embodiment of the present application.

[0031] Figure 4 It is a schematic diagram of the state after the first extension rod and the second extension rod in the embodiment of the present application are folded.

[0032] Figure 5 It is an exploded schematic diagram of the first extension rod in the embodiment of the present application.

[0033] Description of reference numerals: 1. Connecting rod; 2. Support part; 21. Support rod; 22. Support plate; 221. Support pad; 23. Adjusting cylinder; 3. Fixing rod; 31. Fixing slot; 32. Fixing block; 321. Mounting slot; 322. Limiting rod; 33. Mounting spring; 34. Adjusting slot; 35. Fixing hole; 36. Fixing bolt; 37. First sliding hole; 4. Adjusting rod; 41. Adjusting hole; 5. First extension rod; 51. Positioning slot; 52. Positioning block; 521. Locking slot; 522. Positioning rod; 53. Fastening spring; 54. Second sliding hole; 6. Second extension rod; 61. Fastening slot; 62. Limiting slot; 7. Connecting slot; 8. Placement hole; 81. Mounting rod; 811. Fastening hole; 812. Protective cover; 9. Slot. DETAILED DESCRIPTION

[0034] In order to facilitate the understanding of the present application, the present application is described in more detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that when an element is described as "fixed to" another element, it can be directly on the other element, or there can be one or more centered elements therebetween. When an element is described as "connected to" another element, it can be directly connected to the other element, or there can be one or more centered elements therebetween. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this specification are for illustrative purposes only.

[0035] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The term "and / or" used in this specification includes any and all combinations of one or more of the related listed items.

[0036] The present application embodiment discloses a temporary support assembly for a steel truss floor deck. Figure 1 and Figure 2 , including a connecting rod 1 for installation between adjacent steel beams, and a supporting part 2 for supporting the floor deck is installed on the connecting rod 1. The supporting part 2 can provide supporting force to the floor deck, and the entire temporary supporting assembly is installed between adjacent steel beams, without the need to set up scaffolding, thereby improving construction efficiency.

[0037] Reference Figure 1 , Figure 2 and Figure 3 The connecting rod 1 includes an adjusting rod 4 and two fixing rods 3 slidably connected to the two ends of the adjusting rod 4. The two fixing rods 3 are provided with fixing grooves 31 at the ends away from each other. A fixing block 32 is slidably connected in each fixing groove 31. One end of the fixing block 32 extends out of the fixing groove 31 and is provided with a mounting groove 321 for the lower flange of the steel beam to be inserted into. A mounting spring 33 for pressing against the fixing block 32 is fixedly connected between the fixing block 32 and the bottom wall of the mounting groove 321, and the mounting spring 33 always presses against the fixing block 32. A limiting rod 322 is fixedly connected to the outer wall of each fixing block 32, and a first sliding hole 37 is provided on the inner wall of the fixing groove 31 for the limiting rod 322 to pass through and slide. When installing the temporary support assembly, first press the fixing blocks 32 on the two fixing rods 3 into the fixing grooves 31 through the limiting rods 322, then lift the fixing rods 3 to the lower flange of the steel beam, loosen the fixing blocks 32, and the lower flange of the steel beam is inserted into the installation grooves 321 on the fixing blocks 32, so that the connecting rod 1 is installed between adjacent steel beams, and the supporting part 2 on the connecting rod 1 can support the floor decking.

[0038] Reference Figure 2 and Figure 3 , the ends of the two fixing rods 3 facing each other are provided with adjustment slots 34 for the adjustment rod 4 to be inserted, and the fixing rods 3 are provided with fixing holes 35, which are connected with the adjustment slots 34. A fixing bolt 36 is inserted into the fixing hole 35, and the adjustment rod 4 is provided with six adjustment holes 41 spaced apart along its length direction, and the fixing bolt 36 is threadedly connected with the adjustment hole 41. The staff adjusts the length of the temporary support assembly according to the distance between adjacent steel beams, first unscrews the fixing bolt 36, adjusts the distance between the two fixing rods 3, and after adjusting the distance between the two fixing rods 3, screws the fixing bolt 36 into the corresponding adjustment hole 41 on the adjustment rod 4, thereby fixing the adjustment rod 4 in the adjustment slot 34, and then adjusting the length of the temporary support assembly.

[0039] Reference Figure 1 , Figure 2 and Figure 3 The support part 2 includes four support rods 21 respectively mounted on two fixed rods 3, the upper end of the support rod 21 is vertically fixedly connected with a support plate 22, the lower end of the support rod 21 is threadedly connected with an adjustment cylinder 23, and the adjustment cylinder 23 is rotatably connected with the upper end surface of the fixed rod 3. The staff rotates the support rod 21 according to the height difference between the lower flange of the steel beam and the floor decking, thereby adjusting the distance between the support plate 22 and the fixed rod 3, so that the support plate 22 can always be pressed against the floor decking, which is more flexible and convenient to use. The upper end surface of the support plate 22 is fixedly mounted with an elastic support pad 221, and the support pad 221 is made of rubber material. The support pad 221 has a certain deformation ability, and the support pad 221 provides a certain tolerance range for the adjustment of the support plate 22. When there is a gap between the support plate 22 and the floor decking, the support pad 221 can be pressed against the floor decking, thereby ensuring that the support plate 22 can provide support force to the floor decking, so that the floor decking can obtain sufficient support force.

[0040] Reference Figure 1 and Figure 2 , the ends of the two fixing rods 3 that are away from each other are respectively hinged with the first extension rod 5 and the second extension rod 6. When installing the temporary support assembly, the staff holds the first extension rod 5 and the second extension rod 6, at which time the first extension rod 5 and the second extension rod 6 are both in a vertical state with the fixing rod 3. The staff lifts the fixing rod 3 through the first extension rod 5 and the second extension rod 6. At this time, the fixing rod 3 and the lower flange of the steel beam are not in a vertical state. The lower flange of the steel beam is aligned with the installation groove 321 on the fixing block 32, and then the two fixing rods 3 are rotated in the horizontal direction so that the fixing rod 3 and the steel beam are in a vertical state. The lower flange of the steel beam is stuck in the installation groove 321 on the fixing block 32, so that the temporary support assembly is fixed between the two steel beams. The staff does not need to climb up to install, which ensures the safety of construction and improves construction efficiency.

[0041] Reference Figure 2 , Figure 3 and Figure 4 , one end of the first extension rod 5 and one end of the second extension rod 6 are both provided with a connection groove 7 for the fixing block 32 to be inserted into, and the fixing block 32 is in close contact with the inner side wall of the connection groove 7. When the length of the temporary support assembly needs to be increased through the first extension rod 5 and the second extension rod 6, the fixing block 32 is first pressed into the fixing groove 31 through the limiting rod 322, and then the first extension rod 5 and the second extension rod 6 are respectively folded to one end of the two fixing rods 3, and then the limiting rod 322 is released, so that the fixing block 32 extends from the fixing groove 31 and is inserted into the connection groove 7, thereby forming a lock, limiting the accidental folding of the first extension rod 5 and the second extension rod 6, and thus increasing the length of the temporary support assembly.

[0042] Reference Figure 2 , Figure 3 and Figure 5 The movable end of the first extension rod 5 is provided with a positioning groove 51, and a positioning block 52 is slidably connected in the positioning groove 51. The positioning block 52 is provided with a locking groove 521, and a fastening spring 53 is fixedly connected between the positioning block 52 and the bottom wall of the positioning groove 51 for pressing against the positioning block 52. A positioning rod 522 is fixedly connected to the outer wall of the positioning block 52, and a second sliding hole 54 is provided on the inner wall of the positioning groove 51 for the positioning rod 522 to pass through and slide. A fastening groove 61 is provided on the movable end of the second extension rod 6, and a limiting groove 62 is provided on the inner wall of the fastening groove 61 for the positioning block 52 to be inserted into, and the positioning block 52 is in close contact with the inner wall of the limiting groove 62. The positioning block 52 on the first extension rod 5 is clamped on the lower flange of the steel beam through the positioning groove 51, and then the positioning block 52 is squeezed so that the positioning block 52 is clamped in the positioning groove 51, and the temporary support assembly is rotated so that the temporary support assembly and the steel beam form a vertical state, and the squeezing of the positioning block 52 is released so that the lower flange of the steel beam on the other side is clamped in the fastening groove 61 of the second extension rod 6, thereby installing the temporary support assembly between the two steel beams; in addition, when the first extension rod 5 and the second extension rod 6 are stored, the positioning block 52 is first pressed into the positioning groove 51 through the positioning rod 522, and then the first extension rod 5 and the second extension rod 6 are folded until they are tightly attached to the lower end surface of the fixed rod 3. At this time, the movable end of the first extension rod 5 faces the movable end of the second extension rod 6, and the positioning rod 522 is released. The positioning block 52 is clamped in the limiting groove 62 under the action of the fastening spring 53, thereby forming a lock, limiting the rotation of the first extension rod 5 and the second extension rod 6, and thus facilitating the installation and transportation of the temporary support assembly.

[0043] Reference Figure 3 , Figure 4 and Figure 5, the outer wall of the first extension rod 5 and the second extension rod 6 are penetrated with a placement hole 8, and a mounting rod 81 is arranged in the placement hole 8, and one end of the mounting rod 81 is hinged with the inner wall of the placement hole 8. The mounting rod 81 is rotated out of the placement hole 8 on the first extension rod 5 and the second extension rod 6, and the staff can move the first extension rod 5 and the second extension rod 6 through the mounting rod 81, without the need for high-altitude work, and the safety factor is high. A fastening hole 811 for screwing in the fixing bolt 36 is opened on the outer wall of the movable end of the mounting rod 81. After the fixing bolt 36 fixes the adjustment rod 4, continue to rotate the fixing bolt 36, and screw one end of the fixing bolt 36 into the fastening hole 811 on the mounting rod 81, so that the mounting rod 81 is fixed in the placement hole 8, saving time and effort. An elastic protective sleeve 812 is fixed on the outer wall of the mounting rod 81. Specifically, the protective sleeve 812 is made of silicone material, and the protective sleeve 812 is tightly attached to the inner wall of the placement hole 8. On the one hand, the protective cover 812 can increase the friction between the palm and the mounting rod 81 to prevent slipping between the palm and the mounting rod 81; on the other hand, after the mounting rod 81 is inserted into the placement hole 8, the protective cover 812 can press against the inner wall of the placement hole 8, thereby preventing the mounting rod 81 from accidentally falling out of the placement hole 8.

[0044] Reference Figure 2 and Figure 3 The first extension rod 5 and the second extension rod 6 are hinged to the fixed rod 3 at one end thereof, and the clamping groove 9 is connected to the connecting groove 7. When the distance between the lower flange of the steel beam and the floor deck exceeds the adjustment range of the support rod 21, the first extension rod 5 and the second extension rod 6 are folded so that the first extension rod 5 and the second extension rod 6 are closely attached to the lower end surface of the fixed rod 3, and the lower flange of the steel beam is clamped into the clamping groove 9, thereby increasing the distance between the support plate 22 and the lower flange of the steel beam, ensuring that the support plate 22 can be pressed against the floor deck.

[0045] The implementation principle of a temporary support assembly for a steel truss floor decking plate in an embodiment of the present application is as follows: when installing the temporary support assembly, the staff holds the first extension rod 5 and the second extension rod 6, at which time the first extension rod 5 and the second extension rod 6 are both in a vertical state with the fixed rod 3, and the staff lifts the fixed rod 3 through the first extension rod 5 and the second extension rod 6. At this time, the fixed rod 3 and the lower flange of the steel beam are not in a vertical state, and the lower flange of the steel beam is aligned with the installation groove 321 on the fixed block 32, and then the two fixed rods 3 are rotated in the horizontal direction so that the fixed rod 3 and the steel beam are in a vertical state, and the lower flange of the steel beam is stuck in the installation groove 321 on the fixed block 32, thereby fixing the temporary support assembly between the two steel beams, and the staff does not need to climb up to install, thereby ensuring the safety of construction and improving construction efficiency.

[0046] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A temporary support assembly for a steel truss floor deck, characterized in that: The invention comprises a connecting rod (1), a supporting part (2) for supporting a floor deck is installed on the connecting rod (1), fixing grooves (31) are provided at both ends of the connecting rod (1), a fixing block (32) is slidably connected in the fixing groove (31), one end of the fixing block (32) extends out of the fixing groove (31) and is provided with a mounting groove (321), and a mounting spring (33) for pressing against the fixing block (32) is connected between the fixing block (32) and the bottom wall of the mounting groove (321).

2. A temporary support assembly for a steel truss floor deck according to claim 1, characterized in that: The connecting rod (1) comprises an adjusting rod (4) and two fixing rods (3) arranged at both ends of the adjusting rod (4); one end of each fixing rod (3) is provided with an adjusting groove (34) for the adjusting rod (4) to be inserted; a fixing hole (35) is provided through the fixing rod (3); the fixing hole (35) is connected with the adjusting groove (34); a fixing bolt (36) is passed through the fixing hole (35); a plurality of adjusting holes (41) are provided at intervals along the length direction of the adjusting rod (4); the fixing bolt (36) is threadedly connected with the adjusting hole (41).

3. A temporary support assembly for a steel truss floor deck according to claim 2, characterized in that: The support portion (2) comprises at least two support rods (21) mounted on the fixed rod (3), the upper ends of the support rods (21) are connected to support plates (22), the lower ends of the support rods (21) are threadedly connected to adjustment cylinders (23), and the adjustment cylinders (23) are rotatably connected to the fixed rods (3).

4. A temporary support assembly for a steel truss floor deck according to claim 3, characterized in that: An elastic support pad (221) is installed on the upper end surface of the support plate (22).

5. A temporary support assembly for a steel truss floor deck according to claim 2, characterized in that: The ends of the two fixed rods (3) that are away from each other are respectively hinged with a first extension rod (5) and a second extension rod (6).

6. A temporary support assembly for a steel truss floor deck according to claim 5, characterized in that: Each of the fixing blocks (32) is connected to a limiting rod (322); a first sliding hole (37) is provided on the inner side wall of the fixing groove (31) for the limiting rod (322) to pass through and slide; one end of the first extension rod (5) and one end of the second extension rod (6) are provided with a connecting groove (7) for the fixing block (32) to be inserted into; the fixing block (32) is in close contact with the inner side wall of the connecting groove (7).

7. A temporary support assembly for a steel truss floor deck according to claim 6, characterized in that: The movable end of the first extension rod (5) is provided with a positioning groove (51), a positioning block (52) is slidably connected in the positioning groove (51), a locking groove (521) is provided on the positioning block (52), a fastening spring (53) for pressing against the positioning block (52) is connected between the positioning block (52) and the bottom wall of the positioning groove (51), a positioning rod (522) is connected to the outer wall of the positioning block (52), a second sliding hole (54) for the positioning rod (522) to pass through and slide is provided on the inner wall of the positioning groove (51), a fastening groove (61) is provided on the movable end of the second extension rod (6), a limiting groove (62) for the positioning block (52) to be inserted into is provided on the inner wall of the fastening groove (61), and the positioning block (52) is tightly attached to the inner wall of the limiting groove (62).

8. A temporary support assembly for a steel truss floor deck according to claim 7, characterized in that: A placement hole (8) is formed through the outer walls of the first extension rod (5) and the second extension rod (6), a mounting rod (81) is provided in the placement hole (8), one end of the mounting rod (81) is hinged to the inner wall of the placement hole (8), an elastic protective sleeve (812) is fixedly sleeved on the outer wall of the mounting rod (81), and the protective sleeve (812) is tightly attached to the inner wall of the placement hole (8).

9. A temporary support assembly for a steel truss floor deck according to claim 8, characterized in that: A clamping groove (9) is provided at one end of the first extension rod (5) and the second extension rod (6) which are hinged to the fixing rod (3).

10. A temporary support assembly for a steel truss floor deck according to claim 9, characterized in that: A fastening hole (811) for screwing a fixing bolt (36) is provided on the outer side wall of the movable end of the mounting rod (81).

Citation Information

Patent Citations

  • Tray supporting mechanism

    CN107830371A

  • Adjustable steel girder support device and system

    CN109025368A

  • Adjustable aluminum mold transfer opening delayed mold removal supporting system and construction method thereof

    CN119434623A

  • Portable drawing supporting device convenient to assemble for building

    CN211984621U

  • Temporary supporting device for floor slab

    CN212249329U