Cantilever structure for side slope and construction method thereof
By designing a cantilever structure including main cantilever steel beams and reinforced concrete plane foundations on the slope, and using the fixing method of resistant anchors and bolts, the construction problems of cantilever structures on the slope are solved, the reliability and stability of the structure are improved, and the project costs and construction period are reduced.
Patent Information
- Application Number
- CN202411923856.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-03-21
AI Technical Summary
Setting up cantilever structures on the slopes faces technical problems such as steep terrain, narrow working space, complex geological conditions, low reliability of cantilever structures, and difficulty in ensuring anti-capsulation and anti-slip stability.
A cantilever structure including the main cantilever steel beam and the reinforced concrete plane foundation was designed. It was fixed in the slope foundation groove by a movable anchor rod. The main cantilever steel beam and the reinforced concrete plane foundation were connected by bolts, and steel inclined rods were added when necessary to increase the outer lift length.
It effectively solves the problems of steep terrain and small working space on the slope, improves the reliability and stability of the cantilever structure, reduces engineering measures for slope treatment, reduces project costs, and shortens construction period.