Ecological management system for frozen soil in high and cold mining area
By designing anti-leakage multi-layer soil planting structures and geothermal extraction and recharge systems in alpine mining areas, and using geothermal conduction pipes and corrosion-resistant heat exchange components, the frozen soil problem is solved, ensuring crop growth and groundwater level stability, and achieving environmental protection. of frozen soil ecological regulation.
Patent Information
- Application Number
- CN202420523126.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2034-03-18
AI Technical Summary
The frozen soil in alpine mining areas makes it difficult for crops to survive, and heating in mining areas pollutes the environment in winter. Large areas covered with slag make it difficult to carry out traditional ecological restoration and transformation.
A frozen soil ecological management system in high-cold mining areas is designed, including a leak-proof multi-layer soil planting structure, a geothermal extraction well and a geothermal recharge well. Heat exchange is carried out through geothermal conduction pipelines and corrosion-resistant heat exchange components to avoid soil freezing. The soil is formed, and water storage sedimentation tanks are used to ensure the stability of the groundwater level.
It effectively avoids the formation of frozen soil, ensures the growth of winter crops and the stability of groundwater levels in alpine areas, realizes a virtuous cycle of resources, and reduces environmental pollution.
Smart Images

Figure CN221761889U
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of ecological environment management in mining areas, and in particular relates to a frozen soil ecological management system in high-cold mining areas. Background Art
[0002] The invention patent with patent number ZL202210125495.5 discloses a method for ecological environment restoration and management, which can restore and transform mining areas into fertile fields. However, its technical solution has the following problems:
[0003] (1) Mining areas are located in high-altitude cold regions, such as North China, Northeast my country, Northwest China and the Qinghai-Tibet Plateau. In winter, large areas of seasonal frozen soil will form. After restoration and transformation, the relatively poor soil in the mining areas will become frozen soil, making it difficult for crops to survive. In addition, most mining areas are usually in remote areas far away from cities, and winter heating still uses coal-fired boilers, which not only wastes resources but also pollutes the environment. Using geothermal energy from clean renewable energy to regulate the ecological environment of frozen soil in winter in mining areas is a feasible solution.
[0004] (2) Many mining areas do not have mine pits, but are covered with large areas of slag, making it difficult to repair and transform them according to the technical solution of this patent; if environmental governance is not carried out, strong winds will cause dust pollution, and after rain, it will also pollute groundwater. Utility Model Content
[0005] In order to solve the deficiencies in the prior art, the utility model provides a high-cold mining area frozen soil ecological management system which can transform the mining area into fertile farmland, save energy and protect the environment, and prevent the soil from forming frozen soil.
[0006] In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: a permafrost ecological management system for high-altitude mining areas, including a leak-proof multi-layer soil planting structure, a geothermal extraction well is arranged on the right side of the leak-proof multi-layer soil planting structure, a geothermal recharge well is arranged on the left side of the leak-proof multi-layer soil planting structure, a geothermal conduction pipeline is arranged in the leak-proof multi-layer soil planting structure, the inlet at the right end of the geothermal conduction pipeline is connected to the geothermal extraction well through a geothermal extraction device, and the outlet at the left end of the geothermal conduction pipeline is connected to the geothermal recharge well through a geothermal recharge device.
[0007] The anti-seepage multi-layer soil planting structure includes a slag layer, a crushed stone layer, a cement mortar layer, an insulation layer, a waterproof layer and a soil layer arranged in sequence from bottom to top in a rectangular area. The waterproof layer is inclined with low on the left and high on the right. The geothermal conduction pipeline is located in the soil layer and laid on the surface of the waterproof layer. The upper surface of the soil layer is parallel to the horizontal plane.
[0008] Both the geothermal extraction well and the geothermal recharge well are located outside the rectangular area and are arranged diagonally. A water storage sedimentation tank is provided on the left side of the rectangular area. A long water inlet hole is opened on the right side wall of the water storage sedimentation tank along the front-to-back direction. A filter is provided at the outer end of the long water inlet hole. The middle part of the left side of the waterproof layer extends to the left through the bottom of the long water inlet hole and into the water storage sedimentation tank. The left side of the waterproof layer is folded upward at the front and rear sides of the water storage sedimentation tank to form a water retaining edge.
[0009] The outside of the geothermal extraction well, geothermal re-injection well and water storage sedimentation tank are respectively equipped with an extraction insulation room, a re-injection insulation room and a water storage insulation room.
[0010] The geothermal heat transfer pipeline includes a left geothermal manifold and a right geothermal manifold. The left geothermal manifold is arranged along the left side of the rectangular area, and the right geothermal manifold is arranged along the right side of the rectangular area. The left geothermal manifold and the right geothermal manifold are connected by a plurality of heat exchange tubes. Each heat exchange tube is arranged in the left-right direction, and each heat exchange tube is installed with a plurality of corrosion-resistant heat exchange components.
[0011] Each corrosion-resistant heat exchange component includes an elastic ferrule coaxially mounted on the heat exchange tube. The left and right ends of the bottom of the elastic ferrule are transparent and the bottom is open. The cross-section of the elastic ferrule is an arc structure. The two straight edges at the lower end of the elastic ferrule are bent outward to form a trumpet structure. Three heat exchange fins are radially arranged along the outer circle of the elastic ferrule, and the angle between two adjacent heat exchange fins is 90°.
[0012] The geothermal extraction device includes an extraction pump and a booster pump. A geothermal extraction pipe is provided in the geothermal extraction well. The extraction pump inlet is connected to the upper end of the geothermal extraction pipe. The extraction pump outlet is connected to the booster pump inlet through a filter. The booster pump outlet is connected to the right geothermal manifold through a geothermal discharge pipe.
[0013] The geothermal reinjection device includes a reinjection main pipe, an outer sleeve, an inner sleeve, a water level sensor and a PLC controller. The outer sleeve is vertically arranged in the geothermal reinjection well. The upper end of the outer sleeve extends out of the geothermal reinjection well and is connected to the reinjection main pipe through an elbow pipe. The reinjection main pipe inlet is connected to the left geothermal collector. The inner sleeve is coaxially arranged in the outer sleeve. An annular self-flowing reinjection chamber is formed between the inner sleeve and the outer sleeve. The upper end of the inner sleeve passes upward through the upper pipe wall of the elbow pipe. The inner sleeve and the elbow pipe are sealed and fixedly connected. A reinjection port located at the inner upper side of the outer sleeve is opened on the upper side pipe wall of the inner sleeve. A U-shaped cover with an opening facing downwards that blocks the reinjection port and guides the reinjection water is provided on the outer wall of the inner sleeve. A reinjection pump located below the reinjection port and pumping downward is installed on the inner upper side of the inner sleeve. The water level sensor is arranged on the inner wall of the inner sleeve and above the reinjection port. The PLC controller is respectively controlled and connected with the water level sensor and the reinjection pump.
[0014] By adopting the above technical solution, compared with the prior art, the working principle and technical effects of the utility model are as follows:
[0015] (1) The utility model spreads slag in a designated rectangular area to level the rectangular area, and then lays a crushed stone layer, a mortar layer, an insulation layer, a waterproof layer and a soil layer in sequence. The crushed stone layer is used to fill the larger gaps in the slag layer, and the filling mortar further fills the smaller gaps between the crushed stone layer and the slag layer below, thereby improving the density and flatness of the bottom of the mine. The insulation layer is laid on the flat mortar layer, and the insulation layer serves to reduce the heat conduction of geothermal water downward through the heat exchange tube. The thickness of the soil layer is at least 50 cm, and is set according to different regions. For example, the thickness of the soil layer in Northeast China is greater than that in North China.
[0016] (2) The setting of corrosion-resistant heat exchange components improves the heat exchange surface area and heat exchange efficiency when geothermal water is introduced into the heat exchange tube for heat exchange with soil. The aquiclude is set with a low left and high right angle. When it rains a lot, water from the slope and the soil layer gathers from right to left along the aquiclude and flows into the water storage sedimentation tank through the long water inlet hole. The water storage sedimentation tank stores excess water for irrigation in the dry season and can also be used for recharging into the geothermal recharge well to ensure the stability of the groundwater level.
[0017] (3) Improve the setting of geothermal extraction wells and geothermal recharge wells. In the cold winter season, the geothermal water in the geothermal extraction well is extracted and heat exchanged with the soil layer through heat exchange pipes and corrosion-resistant heat exchange components. The temperature of the entire soil layer rises to avoid the formation of frozen soil. After the heat energy is utilized, it is recharged into the geothermal well. Through such circulation, the geothermal water can avoid the formation of frozen soil in the high-cold mining area after the ecological restoration to arable land (fertile land), realize the ecological regulation of frozen soil in the high-cold mining area, and escort the survival and growth of winter crops in the high-cold area. If there is excess geothermal heat in the geothermal extraction well, the excess geothermal water can also be pumped to the living area of the mining area for use.
[0018] (4) The installation of extraction insulation room, recharge insulation room and water storage insulation room ensures the reliability of the equipment during winter operation. Geothermal water is filtered after extraction to avoid blockage in the heat exchange tube and ensure the smooth recharge process. Therefore, the utility model adopts natural recharge. When there is a certain blockage in natural recharge, the water level in the gravity recharge chamber rises and enters the inner casing through the recharge port, and is naturally recharged through the inner casing. When it is difficult to recharge through the inner casing, the recharge pump is started to pressurize the geothermal water, thereby ensuring the smooth recharge and the benign recycling of geothermal resources.
[0019] To sum up, the utility model carries out ecological transformation of the mined mining areas in the high-altitude and cold regions, turns the areas where slag is piled into fertile fields, and carries out ecological regulation of the areas prone to permafrost formation in winter by extracting geothermal water, thereby preventing the soil layer from permafrost forming in the cold winter and ensuring the safety of crops over the winter. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1It is a schematic diagram of the elevation structure of the utility model;
[0021] Figure 2 yes Figure 1 The enlarged view of point A in the middle;
[0022] Figure 3 yes Figure 1 A top view of the ground heat transfer pipeline;
[0023] Figure 4 yes Figure 3 A vertical cross-sectional diagram of a corrosion-resistant heat exchange component;
[0024] Figure 5 It is a schematic diagram of the connection between the aquiclude and the water storage sedimentation tank. DETAILED DESCRIPTION
[0025] like Figure 1-Figure 5 As shown, the utility model of the high-cold mining area frozen soil ecological management system includes an anti-leakage multi-layer soil planting structure, a geothermal extraction well 1 is provided on the right side of the anti-leakage multi-layer soil planting structure, a geothermal recharge well 2 is provided on the left side of the anti-leakage multi-layer soil planting structure, a geothermal conduction pipeline 3 is provided in the anti-leakage multi-layer soil planting structure, the right end inlet of the geothermal conduction pipeline 3 is connected to the geothermal extraction well 1 through the geothermal extraction device, and the left end outlet of the geothermal conduction pipeline 3 is connected to the geothermal recharge well 2 through the geothermal recharge device.
[0026] The anti-leakage multi-layer soil planting structure includes a slag layer, a crushed stone layer, a cement mortar layer, a heat insulation layer, a waterproof layer 4 and a soil layer 5 arranged in sequence from bottom to top in a rectangular area, the waterproof layer 4 is inclined with the left side lower and the right side higher, the geothermal conduction pipeline 3 is located in the soil layer 5 and laid on the surface of the waterproof layer 4, and the upper surface of the soil layer 5 is parallel to the horizontal plane. Among them, the slag layer, the crushed stone layer, the cement mortar layer and the heat insulation layer are conventional technologies and are not shown in the figure.
[0027] The geothermal extraction well 1 and the geothermal recharge well 2 are both located outside the rectangular area and are arranged diagonally. A water storage sedimentation tank 6 is provided on the left side of the rectangular area. A long water inlet hole 7 is opened on the right side wall of the water storage sedimentation tank 6 along the front-to-back direction. A filter screen 8 is provided at the outer end of the long water inlet hole 7. The middle part of the left side of the waterproof layer 4 extends to the left through the bottom surface of the long water inlet hole 7 and extends into the water storage sedimentation tank 6. The left side of the waterproof layer 4 is folded upward at the front and rear sides of the water storage sedimentation tank 6 to form a water retaining edge (not shown in the figure, which blocks the water on the waterproof layer 4 and guides it to the middle part into the water storage sedimentation tank 6).
[0028] An extraction insulation room 9, a reinjection insulation room 10 and a water storage insulation room 11 are respectively provided outside the geothermal extraction well 1, the geothermal reinjection well 2 and the water storage sedimentation tank 6.
[0029] The geothermal conduction pipeline 3 includes a left geothermal manifold 12 and a right geothermal manifold 13. The left geothermal manifold 12 is arranged along the left side of the rectangular area, and the right geothermal manifold 13 is arranged along the right side of the rectangular area. The left geothermal manifold 12 and the right geothermal manifold 13 are connected by a plurality of heat exchange tubes 14. Each heat exchange tube 14 is arranged in the left-right direction, and each heat exchange tube 14 is installed with a plurality of corrosion-resistant heat exchange components 15.
[0030] Each corrosion-resistant heat exchange component 15 includes an elastic ferrule 16 coaxially mounted on the heat exchange tube 14. The left and right ends of the bottom of the elastic ferrule 16 are transparent and the bottom is open. The cross-section of the elastic ferrule 16 is an arc structure. The two straight edges at the lower end of the elastic ferrule 16 are bent outward to form a trumpet structure 33 (to facilitate opening the elastic ferrule 16 to buckle the outer circle of the heat exchange tube 14). Three heat exchange fins 17 are radially arranged on the outer circle of the elastic ferrule 16, and the angle between two adjacent heat exchange fins 17 is 90°.
[0031] The geothermal extraction device includes an extraction pump 18 and a booster pump 19. A geothermal extraction pipe 20 is provided in the geothermal extraction well 1. The inlet of the extraction pump 18 is connected to the upper end of the geothermal extraction pipe 20. The outlet of the extraction pump 18 is connected to the inlet of the booster pump 19 through a filter 21. The outlet of the booster pump 19 is connected to the right geothermal manifold 13 through a geothermal discharge pipe 22.
[0032] The geothermal recharging device includes a recharging main pipe 23, an outer sleeve 24, an inner sleeve 25, a water level sensor 26 and a PLC controller 27. The outer sleeve 24 is vertically arranged in the geothermal recharging well 2. The upper end of the outer sleeve 24 extends out of the geothermal recharging well 2 and is connected to the recharging main pipe 23 through an elbow pipe 28. The inlet of the recharging main pipe 23 is connected to the left geothermal manifold 12. The inner sleeve 25 is coaxially arranged in the outer sleeve 24. An annular self-flowing recharging chamber 29 is formed between the inner sleeve 25 and the outer sleeve 24. The upper end of the inner sleeve 25 passes upward through the upper side pipe of the elbow pipe 28. The inner sleeve 25 and the elbow pipe 28 are sealed and fixedly connected, the upper side wall of the inner sleeve 25 is provided with a recharging port 30 located on the inner upper side of the outer sleeve 24, the outer wall of the inner sleeve 25 is provided with a U-shaped cover 31 with an opening facing downwards for shielding the recharging port 30 and guiding the recharging water, a recharging pump 32 located below the recharging port 30 and pumping downwards is installed on the inner upper side of the inner sleeve 25, the water level sensor 26 is arranged on the inner wall of the inner sleeve 25 and above the recharging port 30, and the PLC controller 27 is respectively controlled and connected with the water level sensor 26 and the recharging pump 32.
[0033] The working principle and technical effects of the utility model are as follows:
[0034] (1) The utility model spreads slag in a defined rectangular area to level the rectangular area, and then lays a crushed stone layer, a mortar layer, an insulation layer, a waterproof layer 4 and a soil layer 5 in sequence. The crushed stone layer is used to fill the larger gaps in the slag layer, and the mortar is used to further fill the smaller gaps between the crushed stone layer and the slag layer below, thereby improving the density and flatness of the bottom of the mine. The insulation layer is laid on the flat mortar layer, and the insulation layer serves to reduce the heat conduction of geothermal water downward through the heat exchange tube 14. The thickness of the soil layer 5 is at least 50 cm, and is set according to different regions. For example, the thickness of the soil layer 5 in the Northeast is greater than that in North China.
[0035] (2) The arrangement of the corrosion-resistant heat exchange assembly 15 improves the heat exchange surface area and heat exchange efficiency when geothermal water is introduced into the heat exchange tube 14 for heat exchange with soil. The water-blocking layer 4 is inclined with the left side lower and the right side higher. When it rains a lot, the water inside the slope and soil layer 5 gathers from right to left along the water-blocking layer 4 and flows into the water storage sedimentation tank 6 through the water inlet long hole 7. The water storage sedimentation tank 6 stores excess water for irrigation in the dry season and can also be used for recharging into the geothermal recharging well 2 to ensure that the groundwater level remains stable.
[0036] (3) Improve the setting of geothermal extraction well 1 and geothermal recharge well 2. In the cold winter season, the geothermal water in the geothermal extraction well 1 is extracted and heat exchanged with the soil layer 5 through the heat exchange pipe 14 and the corrosion-resistant heat exchange component 15. The temperature of the entire soil layer 5 rises to avoid the formation of frozen soil. After the heat energy is used, it is recharged into the geothermal well. Through such circulation, the geothermal water can avoid the formation of frozen soil in the high-cold mining area after the ecological restoration to arable land (fertile land), realize the ecological regulation of frozen soil in the high-cold mining area, and escort the survival and growth of winter crops in the high-cold area. If there is excess geothermal heat in the geothermal extraction well 1, the excess geothermal water can also be pumped to the living area of the mining area for use.
[0037] The specific process of preventing the soil layer 5 from forming frozen soil in winter is as follows: start the extraction pump 18 to extract the hot water in the geothermal well, first filter the sediment through the filter 21, and then send the clean hot water to the right geothermal manifold 13 through the booster pump 19, and then flow through the heat exchange tube 14. The hot water transfers the heat to the soil layer 5 through the heat exchange tube 14 and the corrosion-resistant heat exchange component 15 installed on the heat exchange tube 14. The three heat exchange plates 17 arranged on the corrosion-resistant heat exchange component 15 increase the heat exchange contact area with the soil, and the heat is gradually transferred upward along the gaps in the soil layer 5, thereby raising the temperature of the soil layer 5 and preventing the soil layer 5 from becoming frozen soil. The geothermal water after heat exchange passes through the left geothermal manifold 12 and the reinjection pipeline system and is injected into the geothermal reinjection well 2.
[0038] (4) The setting of the extraction insulation room 9, the recharging insulation room 10, and the water storage insulation room 11 ensures the reliability of the equipment when working in winter. The geothermal water is first filtered after extraction to avoid blockage in the heat exchange tube 14, and at the same time ensure the smooth recharging process. Therefore, the utility model adopts natural recharging. When there is a certain blockage in the natural recharging, the water level in the gravity recharging chamber 29 rises and enters the inner casing 25 through the recharging port 30, and is naturally recharged through the inner casing 25. When it is difficult to recharge through the inner casing 25, the recharging pump 32 is started to perform pressurized recharging of the geothermal water, thereby ensuring the smooth recharging and ensuring the benign recycling of geothermal resources.
[0039] The specific process of the geothermal water after heat exchange being reinjected into the geothermal reinjection well 2 is as follows: the geothermal water after heat exchange passes through the left geothermal confluence pipe 12, the reinjection main pipe 23 and the elbow pipe 28 in sequence, enters the gravity reinjection chamber 29 between the inner casing 25 and the outer casing 24, and then naturally reinjects downward into the geothermal reinjection well 2. When the water flow rate of the natural reinjection decreases and is lower than the water flow rate of the reinjection main pipe 23, the water level in the gravity reinjection chamber 29 will slowly rise. When the water level in the gravity reinjection chamber 29 rises to the reinjection port 3 0, the geothermal water in the gravity recharge chamber 29 enters the inner casing 25 through the recharge port 30, and the geothermal water is naturally recharged downward through the inner casing 25. When the water level in the inner casing 25 rises to the water level sensor 26, the water level sensor 26 detects the water level and sends a signal to the PLC controller 27. The PLC controller 27 issues a command for the recharge pump 32 to start working. The recharge pump 32 pressurizes the geothermal water in the inner casing 25 and pumps the geothermal water downward to be forced to be recharged into the geothermal recharge well 2.
[0040] The other components involved in the geothermal extraction well and geothermal reinjection well in the utility model are all existing technologies and are not mentioned in the specification. The automatic control involved does not involve any new computer program.
[0041] The above description is only a preferred embodiment of the present invention. The arrangement positions and corresponding directions of the components described in this embodiment are only for the convenience of those skilled in the art to understand the technical solution and are not used to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. The frozen soil ecological management system in the high-cold mining area includes a multi-layer soil planting structure to prevent leakage. Features: A geothermal extraction well is arranged on the right side of the anti-seepage multi-layer soil planting structure, a geothermal reinjection well is arranged on the left side of the anti-seepage multi-layer soil planting structure, a geothermal conduction pipeline is arranged inside the anti-seepage multi-layer soil planting structure, the inlet at the right end of the geothermal conduction pipeline is connected to the geothermal extraction well through the geothermal extraction device, and the outlet at the left end of the geothermal conduction pipeline is connected to the geothermal reinjection well through the geothermal reinjection device.
2. The alpine mining area frozen soil ecological management system according to claim 1, Features: The anti-seepage multi-layer soil planting structure includes a slag layer, a crushed stone layer, a cement mortar layer, an insulation layer, a waterproof layer and a soil layer arranged in sequence from bottom to top in a rectangular area. The waterproof layer is inclined with low on the left and high on the right. The geothermal conduction pipeline is located in the soil layer and laid on the surface of the waterproof layer. The upper surface of the soil layer is parallel to the horizontal plane.
3. The alpine mining area frozen soil ecological management system according to claim 2, Features: Both the geothermal extraction well and the geothermal recharge well are located outside the rectangular area and are arranged diagonally. A water storage sedimentation tank is provided on the left side of the rectangular area. A long water inlet hole is opened on the right side wall of the water storage sedimentation tank along the front-to-back direction. A filter is provided at the outer end of the long water inlet hole. The middle part of the left side of the waterproof layer extends to the left through the bottom of the long water inlet hole and into the water storage sedimentation tank. The left side of the waterproof layer is folded upward at the front and rear sides of the water storage sedimentation tank to form a water retaining edge.
4. The alpine mining area frozen soil ecological management system according to claim 1, Features: The outside of the geothermal extraction well, geothermal re-injection well and water storage sedimentation tank are respectively equipped with an extraction insulation room, a re-injection insulation room and a water storage insulation room.
5. The alpine mining area frozen soil ecological management system according to claim 4, Features: The geothermal heat transfer pipeline includes a left geothermal manifold and a right geothermal manifold. The left geothermal manifold is arranged along the left side of the rectangular area, and the right geothermal manifold is arranged along the right side of the rectangular area. The left geothermal manifold and the right geothermal manifold are connected by a plurality of heat exchange tubes. Each heat exchange tube is arranged in the left-right direction, and each heat exchange tube is installed with a plurality of corrosion-resistant heat exchange components. Each corrosion-resistant heat exchange component includes an elastic ferrule coaxially mounted on the heat exchange tube. The left and right ends of the bottom of the elastic ferrule are transparent and the bottom is open. The cross-section of the elastic ferrule is an arc structure. The two straight edges at the lower end of the elastic ferrule are bent outward to form a trumpet structure. Three heat exchange fins are radially arranged along the outer circle of the elastic ferrule, and the angle between two adjacent heat exchange fins is 90°.
6. The alpine mining area frozen soil ecological management system according to claim 5, Features: The geothermal extraction device includes an extraction pump and a booster pump. A geothermal extraction pipe is provided in the geothermal extraction well. The extraction pump inlet is connected to the upper end of the geothermal extraction pipe. The extraction pump outlet is connected to the booster pump inlet through a filter. The booster pump outlet is connected to the right geothermal manifold through a geothermal discharge pipe.
7. The alpine mining area frozen soil ecological management system according to claim 5, Features: The geothermal reinjection device includes a reinjection main pipe, an outer sleeve, an inner sleeve, a water level sensor and a PLC controller. The outer sleeve is vertically arranged in the geothermal reinjection well. The upper end of the outer sleeve extends out of the geothermal reinjection well and is connected to the reinjection main pipe through an elbow pipe. The reinjection main pipe inlet is connected to the left geothermal collector. The inner sleeve is coaxially arranged in the outer sleeve. An annular self-flowing reinjection chamber is formed between the inner sleeve and the outer sleeve. The upper end of the inner sleeve passes upward through the upper pipe wall of the elbow pipe. The inner sleeve and the elbow pipe are sealed and fixedly connected. A reinjection port located at the inner upper side of the outer sleeve is opened on the upper side pipe wall of the inner sleeve. A U-shaped cover with an opening facing downwards that blocks the reinjection port and guides the reinjection water is provided on the outer wall of the inner sleeve. A reinjection pump located below the reinjection port and pumping downward is installed on the inner upper side of the inner sleeve. The water level sensor is arranged on the inner wall of the inner sleeve and above the reinjection port. The PLC controller is respectively controlled and connected with the water level sensor and the reinjection pump.
