Scaffold guardrail connecting structure
By using the fastening mechanism of studs and nuts in the scaffold connection structure, combined with the curved plate and rubber pad, the problem of easy damage and high complexity of the connecting steel rope in the existing technology is solved, and the stability and stability of the scaffold and guardrail are achieved. Low-cost, simple-to-operate connections.
Patent Information
- Application Number
- CN202323536089.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The connecting steel ropes of the existing scaffolding connection structure are easily damaged when the load is large or used for a long time, and the connection method is complex and costly, making it difficult to meet construction needs.
Use the outside of the hoop pole to connect the scaffolding pole and the guardrail. Through the fastening mechanism of studs and nuts, combined with the curved plate and rubber pad, a simple and firm connection is achieved, and the guardrail is further fixed through bolts and nuts.
It achieves a stable connection between the scaffolding and the guardrail, avoids disconnection problems, is simple to operate, has low cost, and is suitable for multiple connection and disassembly.
Smart Images

Figure CN221799126U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a scaffold guardrail connection structure and belongs to the technical field of scaffold connection. Background Art
[0002] Scaffolding is a working platform set up to ensure the smooth progress of each construction process. According to the location of the scaffolding, it can be divided into external scaffolding and internal scaffolding; according to different materials, it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding; according to the structural form, it can be divided into vertical pole scaffolding, bridge scaffolding, door scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, and climbing scaffolding. During the construction process, guardrails are usually connected to the scaffolding to facilitate workers to work better. A variety of scaffolding connection structures have been developed in the industry. For example, the Chinese utility model patent with the authorization announcement number CN215212270U discloses a scaffolding connection mechanism for construction engineering, and specifically discloses a scaffolding body, one end of the scaffolding body is fixedly connected with a connecting plate, the lower end of the connecting plate is rotatably provided with a rotating rod, the lower end of the rotating rod is provided with a circular mounting plate, and the lower surface of the rotating rod is provided with a limited clamping groove, and the inside of the limited clamping groove is provided with a connecting steel rope. However, this solution connects the scaffolding body and the fixed rod body through connecting steel ropes. When the load is large or the connecting steel ropes are used for a long time, the connecting steel ropes may be damaged, affecting the firmness of the connection. In addition, the connection method of this solution is relatively complicated and requires the use of a motor. The cost is high when more scaffolding connections are required. Utility Model Content
[0003] The purpose of the utility model is to provide a scaffold guardrail connection structure. The utility model connects the scaffolding pole and the guardrail by hooping the outside of the pole, and the connection is firm and not easy to be disconnected; and the utility model has a simple structure, convenient operation, and low use cost.
[0004] The technical solution of the utility model: a scaffolding guardrail connecting structure, used for connecting scaffolding poles and guardrails, including a connecting seat, a first notch is provided at one end of the upper portion of the connecting seat, and a first stud is rotatably connected in the first notch; a first arc-shaped plate is rotatably connected to the other end of the upper portion of the connecting seat, and a first slot is provided at the other end of the first arc-shaped plate; the first stud passes through the first slot and is connected to a first nut; a second notch is provided at one end of the lower portion of the connecting seat, and a second stud is rotatably connected in the second notch; the other end of the lower portion of the connecting seat is rotatably connected to the second arc-shaped plate, and a second slot is provided at the other end of the second arc-shaped plate; the second stud passes through the second slot and is connected to a second nut; the scaffolding pole is clamped between the connecting seat and the second arc-shaped plate; a guardrail pole is clamped between the connecting seat and the first arc-shaped plate, and a connecting buckle is provided at the other end of the guardrail pole, and the connecting buckle is connected to the guardrail.
[0005] The above-mentioned scaffolding guardrail connection structure, the connection seat includes a first vertical part and a second vertical part, the first vertical part and the second vertical part are perpendicular to each other; the first arc plate is rotatably connected to the upper part of the first vertical part; the second arc plate is rotatably connected to the lower part of the second vertical part.
[0006] The aforementioned scaffolding guardrail connection structure has a first threaded hole at the rear end of the upper portion of the second vertical portion; and a through hole corresponding to the first threaded hole is penetrated through the guardrail rod.
[0007] The aforementioned scaffolding guardrail connection structure, the first vertical part has a first arc groove matched with the first arc plate on the upper part; the second vertical part has a second arc groove matched with the second arc plate on the lower part; the second vertical part has a third arc groove matched with the first arc groove on the upper part.
[0008] The aforementioned scaffolding guardrail connection structure has a second threaded hole on the upper portion of the first arc-shaped plate, and a first locking bolt is connected to the second threaded hole; a first rubber pad is provided between the first arc-shaped plate and the guardrail rod; and the threaded portion of the first locking bolt passes through the second threaded hole and contacts the first rubber pad.
[0009] The aforementioned scaffolding guardrail connection structure has a third threaded hole at the lower part of the second arc-shaped plate, and a second locking bolt is connected in the third threaded hole; a second rubber pad is provided between the scaffolding pole and the second arc-shaped plate; the threaded portion of the second locking bolt passes through the third threaded hole and contacts the second rubber pad.
[0010] In the aforementioned scaffold guardrail connection structure, the connection seat, the first curved plate and the second curved plate are all made of steel.
[0011] The aforementioned scaffolding guardrail connection structure, the connecting buckle includes a connecting buckle body, the cross section of the connecting buckle body is U-shaped, and a stopper is provided on the outer end of the connecting buckle body; the upper and lower ends of the guardrail are respectively provided with convex strips.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] 1. The utility model is fixed to the scaffold by passing the scaffolding pole through the connection seat and the second curved plate, then the second curved plate is close to the outside of the scaffolding pole, the second stud is passed through the second slot, and then the second nut is screwed into the outer end of the second stud until the second nut is close to the second curved plate and cannot be screwed in, thereby completing the fixation with the scaffolding. Then the guardrail pole is passed through the connection seat and the first curved plate, then the first curved plate is close to the outside of the guardrail pole, the first stud is passed through the first slot, and then the first nut is screwed into the outer end of the first stud until the first nut is close to the first curved plate and cannot be screwed in, thereby completing the fixation with the guardrail pole. Then the guardrail is connected by a connecting buckle, so that the guardrail and the scaffold are kept fixed. Because the utility model is not connected to the end of the pole, there will be no problem of disconnection of the pole connection. The disassembly or connection between the poles can be completed by simply unscrewing or tightening the first nut and the second nut, and the operation is simple.
[0014] 2. The first threaded hole of the utility model is used to limit the movement of the guardrail pole again. After the guardrail pole is connected and fixed to the first arc plate, a hole is drilled in the guardrail pole, and the hole is coaxial with the first threaded hole. Thereafter, a bolt is screwed in so that the threaded portion of the bolt is screwed into the first threaded hole and the lower end of the nut of the bolt is tightly attached to the guardrail pole, so that the guardrail pole and the utility model are completely fixed.
[0015] 3. The first arc groove, the second arc groove and the third arc groove of the utility model are used to fit the outer diameter of the rod, so that the rod is fixed more stably and is not easy to roll during the connection process.
[0016] 4. When the diameter of the pole is too small so that the corresponding arc plate cannot be tightly attached to the pole, the first locking bolt or the second locking bolt is screwed into the second threaded hole or the third threaded hole so that the first rubber pad or the second rubber pad is tightly attached to the outer side of the pole for fixation.
[0017] 5. The connecting buckle of the utility model clamps the convex strip of the guardrail in the U-shaped part of the connecting buckle body, and limits the lower end of another guardrail through the baffle, so that multiple guardrails can be fixed. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the connection structure of the utility model;
[0019] Figure 2 It is a partial structural schematic diagram of the utility model;
[0020] Figure 3 This is a schematic diagram of the rear structure of the connecting buckle;
[0021] Figure 4 It is a structural diagram of the connecting seat;
[0022] Figure 5 yes Figure 4 Schematic diagram of the rear structure.
[0023] The marks in the accompanying drawings are: 1-connecting seat, 2-first notch, 3-first stud, 4-first arc plate, 5-first slot, 6-first nut, 7-second notch, 8-second stud, 9-second arc plate, 10-second slot, 11-second nut, 12-first vertical portion, 13-second vertical portion, 14-first threaded hole, 15-first arc groove, 16-second arc groove, 17-second threaded hole, 18-first locking bolt, 19-first rubber pad, 20-third threaded hole, 21-second locking bolt, 22-second rubber pad, 23-third arc groove, 24-scaffolding pole, 25-guardrail pole, 26-guardrail, 27-connecting buckle, 28-through hole, 29-connecting buckle body, 30-block, 31-convex strip. DETAILED DESCRIPTION
[0024] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0025] Embodiment: A scaffold guardrail connection structure is used to connect a scaffold pole 24 and a guardrail 26, and is formed as follows: Figure 1-5As shown, it includes a connecting seat 1, one end of the upper part of the connecting seat 1 has a first notch 2, a first stud 3 is rotatably connected in the first notch 2, and the first stud 3 extends upward; the other end of the upper part of the connecting seat 1 is rotatably connected to a first arc plate 4, and the other end of the first arc plate 4 has a first slot 5; the first stud 3 passes through the first slot 5 and is connected to a first nut 6, and the first nut 6 is tightened when the connection is fixed and tightly adheres to the upper part of the first slot 5 so that the first stud 3 is fixed and cannot rotate, thereby preventing the first arc plate 4 from rotating and affecting the connection due to the falling off of the first stud 3; one end of the lower part of the connecting seat 1 has a second notch 7, a second stud 8 is rotatably connected in the second notch 7, and the second stud 8 extends downward; the other end of the lower part of the connecting seat 1 is rotatably connected with a second arc plate 9, and the other end of the second arc plate 9 has a second slot 10; the second stud 8 passes through the second slot 10 and is connected with a second nut 11, and the second nut 11 is tightened when connected and fixed to be close to the upper part of the second slot 10 so that the second stud 8 is fixed and cannot rotate, so as to prevent the second arc plate 9 from rotating and affecting the connection due to the second stud 8 falling off; the scaffolding rod 24 is clamped between the connecting seat 1 and the second arc plate 9; a guardrail rod 25 is clamped between the connecting seat 1 and the first arc plate 4, and a connecting buckle 27 is welded at the other end of the guardrail rod 25, and the connecting buckle 27 is connected to the guardrail 26. The connecting seat 1 includes a first vertical portion 12 and a second vertical portion 13, and the first vertical portion 12 and the second vertical portion 13 are perpendicular to each other; the first arc plate 4 is rotatably connected to the upper part of the first vertical portion 12; the second arc plate 9 is rotatably connected to the lower part of the second vertical portion 13. The rear end of the upper part of the second vertical portion 13 is provided with a first threaded hole 14; the guardrail rod 25 is penetrated with a through hole 28 corresponding to the first threaded hole 14. The first threaded hole 14 is used to limit the movement of the guardrail rod 25 again. After the guardrail rod 25 is connected and fixed to the first arc plate 4, the guardrail rod 25 is drilled to form a through hole 28, and the through hole 28 is coaxial with the first threaded hole 14. Then, by screwing in a bolt, the threaded portion of the bolt is screwed into the first threaded hole 14 and the lower end of the nut of the bolt is tightly attached to the guardrail rod 25, so that the guardrail rod 25 and the utility model are completely fixed. The upper part of the first vertical portion 12 has a first arc groove 15 that matches the first arc plate 4; the lower part of the second vertical portion 13 has a second arc groove 16 that matches the second arc plate 9; the upper part of the second vertical portion 13 has a third arc groove 23 that matches the first arc groove 15. The first arc groove 15, the second arc groove 16 and the third arc groove 23 are used to fit the outer diameter of the pole, so that the pole is fixed more stably and is not easy to roll during the connection process. The first arc plate 4 has a second threaded hole 17 on the upper part, and the first locking bolt 18 is connected in the second threaded hole 17; a first rubber pad 19 is placed between the first arc plate 4 and the guardrail pole 25; the threaded part of the first locking bolt 18 passes through the second threaded hole 17 and contacts the first rubber pad 19.The lower part of the second arc plate 9 has a third threaded hole 20, and the third threaded hole 20 is connected with a second locking bolt 21; a second rubber pad 22 is placed between the scaffolding pole 24 and the second arc plate 9; the threaded part of the second locking bolt 21 passes through the third threaded hole 20 and contacts the second rubber pad 22. When the diameter of the pole is too small so that the corresponding arc plate cannot be tightly attached to the pole, the first locking bolt 18 or the second locking bolt 21 is screwed into the second threaded hole 17 or the third threaded hole 20 so that the first rubber pad 19 or the second rubber pad 22 is tightly attached to the outer side of the pole for fixing. The connecting seat 1, the first arc plate 4 and the second arc plate 9 are all made of steel. The connecting buckle 27 includes a connecting buckle body 29, the cross section of the connecting buckle body 29 is U-shaped, and a stopper 30 is provided on the outer end of the connecting buckle body 29; the upper and lower ends of the guardrail 26 are respectively provided with convex strips 31. The convex strip 31 is clamped in the U-shaped portion of the connecting buckle body 29 to complete the fixation of the upper part of the guardrail 26. The stopper 30 is used to limit the lower end of the upper guardrail so that multiple guardrails can be connected and fixed.
[0026] How it works
[0027] The scaffolding pole 24 is passed between the connection seat 1 and the second curved plate 9, and then the second curved plate 9 is pressed against the outside of the scaffolding pole 24, and the second stud 8 is passed through the second slot 10, and then the second nut 11 is screwed into the outer end of the second stud 8 until the second nut 11 is pressed against the second curved plate 9 and cannot be screwed in any further, thereby completing the fixation with the scaffolding. Then the guardrail pole 25 is passed between the connection seat 1 and the first curved plate 4, and then the first curved plate 4 is pressed against the outside of the guardrail pole 25, and the first stud 3 is passed through the first slot 5, and then the first nut 6 is screwed into the outer end of the first stud 3 until the first nut 6 is pressed against the first curved plate 4 and cannot be screwed in any further, thereby completing the fixation with the guardrail pole. By rotating the first curved plate 4 and the second curved plate 9, poles of various diameters can be placed, and because they are not connected to the ends of the poles, there will be no problem of disconnection of the pole connection. The guardrail 26 is then connected via the connecting buckle 27 so that the guardrail 26 and the scaffolding remain fixed.
Claims
1. A scaffold guardrail connection structure, used to connect a scaffold pole (24) and a guardrail (26), characterized in that: The invention comprises a connecting seat (1), wherein one end of the upper portion of the connecting seat (1) is provided with a first notch (2), and a first stud (3) is rotatably connected in the first notch (2); the other end of the upper portion of the connecting seat (1) is rotatably connected to a first arc-shaped plate (4), and the other end of the first arc-shaped plate (4) is provided with a first slot (5); the first stud (3) passes through the first slot (5) and is connected to a first nut (6); one end of the lower portion of the connecting seat (1) is provided with a second notch (7), and a second stud (8) is rotatably connected in the second notch (7); the connecting seat (1) The other end of the lower part is rotatably connected to a second arc plate (9), and the other end of the second arc plate (9) is provided with a second slot (10); the second stud (8) passes through the second slot (10) and is connected with a second nut (11); the scaffolding rod (24) is clamped between the connecting seat (1) and the second arc plate (9); a guardrail rod (25) is clamped between the connecting seat (1) and the first arc plate (4), and the other end of the guardrail rod (25) is provided with a connecting buckle (27), and the connecting buckle (27) is connected to the guardrail (26).
2. The scaffolding guardrail connection structure according to claim 1 is characterized in that: The connecting seat (1) comprises a first vertical portion (12) and a second vertical portion (13), wherein the first vertical portion (12) and the second vertical portion (13) are perpendicular to each other; the first arc-shaped plate (4) is rotatably connected to the upper portion of the first vertical portion (12); and the second arc-shaped plate (9) is rotatably connected to the lower portion of the second vertical portion (13).
3. The scaffolding guardrail connection structure according to claim 2 is characterized in that: A first threaded hole (14) is provided at the rear end of the upper portion of the second vertical portion (13); and a through hole (28) corresponding to the first threaded hole (14) is penetrated through the guardrail rod (25).
4. The scaffolding guardrail connection structure according to claim 2, characterized in that: The first vertical portion (12) has a first arc groove (15) on its upper portion that matches the first arc plate (4); the second vertical portion (13) has a second arc groove (16) on its lower portion that matches the second arc plate (9); and the second vertical portion (13) has a third arc groove (23) on its upper portion that matches the first arc groove (15).
5. The scaffolding guardrail connection structure according to claim 1, characterized in that: A second threaded hole (17) is provided on the upper portion of the first arc-shaped plate (4), and a first locking bolt (18) is connected inside the second threaded hole (17); a first rubber pad (19) is provided between the first arc-shaped plate (4) and the guardrail rod (25); a threaded portion of the first locking bolt (18) passes through the second threaded hole (17) and contacts the first rubber pad (19).
6. The scaffolding guardrail connection structure according to claim 2, characterized in that: A third threaded hole (20) is provided at the lower part of the second arc-shaped plate (9), and a second locking bolt (21) is connected inside the third threaded hole (20); a second rubber pad (22) is provided between the scaffolding rod (24) and the second arc-shaped plate (9); the threaded portion of the second locking bolt (21) passes through the third threaded hole (20) and contacts the second rubber pad (22).
7. The scaffolding guardrail connection structure according to claim 2, characterized in that: The connecting seat (1), the first arc-shaped plate (4) and the second arc-shaped plate (9) are all made of steel.
8. The scaffolding guardrail connection structure according to claim 1, characterized in that: The connecting buckle (27) comprises a connecting buckle body (29) having a U-shaped cross section and a stopper (30) provided on the outer end of the connecting buckle body (29); and convex strips (31) are provided at the upper and lower ends of the guardrail (26), respectively.
