Construction engineering acceptance tool
By designing an integrated construction project acceptance tool, the problem of many tools and easy loss is solved, the integration and convenient portability of multiple acceptance operations are realized, and the detection accuracy and efficiency are improved.
Patent Information
- Application Number
- CN202420157589.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-23
AI Technical Summary
In the acceptance of construction projects, there are many acceptance tools that are easy to forget or lose. They are inconvenient to carry and difficult to meet the diverse needs of on-site measurement and testing.
Design an integrated construction engineering acceptance tool, including a retractable ruler component, a level bubble gauge, a tape measure, a lighting component and a weight component. The tool integrates multiple functions. The shell is a polygonal structure and is set with right angle and acceptance error records. Table, the weight can be fixed or used freely, and can be used with the weight line for verticality testing.
It realizes the integration of multiple acceptance operations, reduces the number of tools, improves portability, reduces the risk of loss, and improves detection accuracy and efficiency.
Smart Images

Figure CN221802765U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering acceptance equipment, in particular to a construction engineering acceptance tool. Background Art
[0002] Project acceptance refers to the process of evaluating the quality and results of project construction according to relevant industry standards after the completion of the project. It is an important link in comprehensively assessing the construction work, checking whether the project design and construction quality meet the requirements, and examining whether the use of construction funds is reasonable.
[0003] Some tools commonly used in construction project acceptance include but are not limited to: a ruler for measuring size, a heavy hammer for checking verticality, a ruler for checking flatness, a square for checking the squareness of corners, a small hammer for checking hollows, etc. Acceptance personnel need to carry these tools to the site for measurement and acceptance. Due to the large number of acceptance tools, it is easy to forget or lose them, and it is very inconvenient to carry them. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model aims to provide a construction project acceptance tool that can solve the existing problems.
[0005] In order to achieve the above purpose, the technical solution of the utility model is as follows:
[0006] The utility model is realized through the following technical scheme: a construction engineering acceptance tool, comprising a shell, one end of the shell is fixed with a ruler assembly, the ruler assembly adopts a telescopic structure; a level bubble meter is provided on one side surface of the shell; a tape measure is provided inside the shell, the ruler bar of the tape measure extends out of the shell, and a ruler hook is fixed at the end of the ruler bar; a lighting assembly is provided on the side of the shell; a cavity is formed on one side of the shell, and the cavity is matched with a heavy hammer assembly.
[0007] Furthermore, the weight assembly includes a connecting end, a weight body, a weight wire, a rotating handle and a winding shaft, the connecting end is fixed to the side of the weight body, a connecting hole is provided on the side of the cavity structure of the shell, and the connecting hole is threadedly connected to the connecting end; a groove is provided on one side surface of the shell, and a rotating handle is rotatably connected in the groove; the bottom end of the rotating handle is rotatably connected to the winding shaft, and the weight wire is wound around the outside of the winding shaft; the other end of the weight wire is connected to the connecting end.
[0008] Furthermore, the shell is a polygonal structure, and the shell is provided with one or more right angles.
[0009] Furthermore, the lighting assembly includes a battery, a switch and a lighting lamp; the lighting lamp and the switch are arranged on the side of the shell, and the side of the shell is detachably connected to the battery; the battery, the lighting lamp and the switch are electrically connected.
[0010] Furthermore, the ruler assembly includes a first outrigger, a second outrigger, a third outrigger, a fourth outrigger and a fifth outrigger; the fifth outrigger is plugged into the fourth outrigger, and the fourth outrigger is plugged into the third outrigger; the third outrigger is plugged into the second outrigger, and the second outrigger is plugged into the first outrigger; the first outrigger is fixed to the side of the outer shell.
[0011] Furthermore, the ruler assembly also includes rollers and limit grooves, and the sides of the first cantilever rod, the second cantilever rod, the third cantilever rod and the fourth cantilever rod are provided with sliding grooves; the side walls of the sliding grooves are provided with limit grooves, and the side walls of the second cantilever rod, the third cantilever rod, the fourth cantilever rod and the fifth cantilever rod are rotatably connected with rollers; the rollers are cooperatively connected to the limit grooves.
[0012] Furthermore, an acceptance error record sheet is provided on one side surface of the shell.
[0013] Compared with the prior art, the beneficial effects of the utility model include:
[0014] The construction project acceptance tool of the utility model integrates tools such as a ruler, a level, a weight, a measuring tape and lighting, so that a variety of acceptance operations can be carried out with only one tool. At the same time, a retractable storage structure is provided for the ruler, so that the entire acceptance tool is small in size and easy to carry, and will not be left behind or lost. In addition, the weight of the utility model can be fixed as a hammer for striking to detect hollow drums, and the weight body can also be placed in a free state to cooperate with a weight line to perform verticality detection. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The disclosure of the present invention is described with reference to the accompanying drawings. It should be understood that the drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In the drawings, the same reference numerals are used to refer to the same components. Among them:
[0016] Figure 1 This is a schematic diagram of the overall structure of a construction project acceptance tool of the utility model;
[0017] Figure 2 This is an implementation case of the utility model Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0018] Figure 3 This is a structural schematic diagram of a ruler assembly in an implementation case of the utility model;
[0019] Figure 4 It is a schematic diagram of the partial structure of the ruler assembly of the implementation case of the utility model.
[0020] Explanations in the figure: 1. Shell; 11. Groove; 12. Connecting hole; 2. Ruler assembly; 21. First extension rod; 22. Second extension rod; 23. Third extension rod; 24. Fourth extension rod; 25. Fifth extension rod; 26. Roller; 27. Limiting groove; 3. Acceptance error record sheet; 4. Level bubble meter; 5. Tape measure; 51. Ruler bar; 52. Ruler hook; 6. Weight assembly; 61. Connecting end; 62. Weight body; 63. Weight line; 64. Rotating handle; 65. Winding shaft; 7. Lighting assembly; 71. Battery; 72. Switch; 73. Lighting lamp. DETAILED DESCRIPTION
[0021] It is easy to understand that according to the technical solution of the utility model, without changing the essential spirit of the utility model, a person skilled in the art can propose a variety of interchangeable structural modes and implementation modes. Therefore, the following specific implementation modes and drawings are only exemplary descriptions of the technical solution of the utility model, and should not be regarded as the entirety of the utility model or as a limitation or restriction to the technical solution of the utility model.
[0022] A construction project acceptance tool, such as Figure 1 As shown, it includes a housing 1, one end of which is fixed with a ruler assembly 2, and the ruler assembly 2 adopts a telescopic structure; wherein the ruler assembly 2 is generally 2 meters long after being stretched, and is placed on the wall to detect flatness; specifically, as Figure 3 and Figure 4 As shown, the ruler assembly 2 includes a first outrigger 21, a second outrigger 22, a third outrigger 23, a fourth outrigger 24 and a fifth outrigger 25; the fifth outrigger 25 is plugged into the fourth outrigger 24, and the fourth outrigger 24 is plugged into the third outrigger 23; the third outrigger 23 is plugged into the second outrigger 22, and the second outrigger 22 is plugged into the first outrigger 21; the first outrigger 21 is fixed to the side of the housing 1; and the entire ruler assembly 2 can be extended by pulling the fifth outrigger 25 for flatness detection.
[0023] In order to ensure that the extension rod is stretched more smoothly, the ruler assembly 2 also includes a roller 26 and a limit groove 27. The sides of the first extension rod 21, the second extension rod 22, the third extension rod 23, and the fourth extension rod 24 are provided with a slide groove, wherein the slide groove is adapted to the second extension rod 22, the third extension rod 23, the fourth extension rod 24, and the fifth extension rod 25; a limit groove 27 is provided at the side wall of each of the slide grooves, and the side walls of the second extension rod 22, the third extension rod 23, the fourth extension rod 24, and the fifth extension rod 25 are rotatably connected with a roller 26; the roller 26 is cooperatively connected to the limit groove 27. Specifically, the second cantilever rod 22 is rotatably connected to a roller 26 on its side, a slide groove is provided on the side of the first cantilever rod 21, and a limiting groove 27 is provided on the side wall of the slide groove, the second cantilever rod 22 is inserted into and slidably connected to the slide groove, and the roller 26 cooperates with the connecting limiting groove 27; the connection relationship between the second cantilever rod 22 and the third cantilever rod 23, the connection relationship between the third cantilever rod 23 and the fourth cantilever rod 24, and the connection relationship between the fourth cantilever rod 24 and the fifth cantilever rod 25 are all the same as the relationship between the first cantilever rod 21 and the second cantilever rod 22.
[0024] A level bubble gauge 4 is provided on one side surface of the housing 1, wherein the level bubble gauge 4 is used to detect the levelness; a tape measure 5 is provided inside the housing 1, a ruler 51 of the tape measure 5 extends out of the housing 1, and a ruler hook 52 is fixed at the end of the ruler 51;
[0025] The side of the housing 1 is provided with a lighting assembly 7; the lighting assembly 7 includes a battery 71, a switch 72 and a lighting lamp 73; the lighting lamp 73 and the switch 72 are provided on the side of the housing 1, and the side of the housing 1 is detachably connected to the battery 71; the battery 71, the lighting lamp 73 and the switch 72 are electrically connected. The battery 71 is used to supply power to the lighting lamp 73, and the switch 72 is used to turn the lighting lamp 73 on and off;
[0026] One side of the housing 1 forms a cavity, and the cavity is connected to a weight assembly 6; the weight assembly 6 includes a connecting end 61, a weight body 62, a weight line 63, a rotating handle 64 and a winding shaft 65. Figure 1 and 2As shown, a connecting end 61 is fixed to the side of the weight body 62, and a connecting hole 12 is provided on the side of the cavity structure of the shell 1, and the connecting hole 12 is threadedly connected to the connecting end 61; a groove 11 is provided on one side surface of the shell 1, and a rotating handle 64 is rotatably connected in the groove 11; the bottom end of the rotating handle 64 is rotatably connected to the winding shaft 65, and the outer side of the winding shaft 65 is wound with a weight line 63; the other end of the weight line 63 is connected to the connecting end 61; when the connecting end 61 of the weight assembly 6 is connected to the connecting hole 12, the weight body 62 can be used as a hammer, and knocking can be used to identify whether there is a hollow drum. After separation, the verticality can be detected by the vertically falling weight body 62.
[0027] The housing 1 is a polygonal structure, and the housing 1 is provided with one or more right angles, wherein the right angles are used to correct whether the area to be measured is a right angle, so as to achieve the effect of a square ruler.
[0028] An acceptance error record table 3 is provided on one side surface of the housing 1 .
[0029] When the construction project acceptance tool of the utility model is performing an acceptance operation, for example, when detecting the flatness of a wall surface, the ruler assembly 2 is stretched so that the extension rod is stretched and leaned against the wall surface for detection;
[0030] When checking the verticality, the weight body 62 is rotated, the weight body 62 is taken out, and the weight body 62 is allowed to droop naturally, and then checked with the weight line 63;
[0031] The level bubble meter 4 can be used to detect the levelness of the building surface.
[0032] If it is necessary to detect whether the building has hollows, the heavy hammer body 62 is installed by threading the connection end 61 with the connection hole 12, and then the stowed ruler assembly 2 is used as a handle to knock with the heavy hammer body 62 for detection;
[0033] If the detected light is too dark, the lighting lamp 73 can be turned on by the switch 72 for illumination.
[0034] The construction project acceptance tool of the utility model integrates tools such as a ruler, a level, a weight, a measuring tape and lighting, so that a variety of acceptance operations can be carried out with only one tool. At the same time, a retractable storage structure is provided for the ruler, so that the entire acceptance tool is small in size and easy to carry, and will not be left behind or lost. In addition, the weight of the utility model can be fixed as a hammer for striking to detect hollow drums, and the weight body can also be placed in a free state to cooperate with a weight line to perform verticality detection.
[0035] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0036] In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be fixedly connected or set, or it can be detachably connected or set, or connected or set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in this patent can be understood according to specific circumstances.
[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.
[0038] The technical scope of the present invention is not limited to the contents described above. Those skilled in the art can make various deformations and modifications to the above embodiments without departing from the technical concept of the present invention, and these deformations and modifications should all fall within the protection scope of the present invention.
Claims
1. A construction project acceptance tool, Features: The invention comprises a shell (1), a ruler assembly (2) is fixed at one end of the shell (1), and the ruler assembly (2) adopts a telescopic structure; a bubble level gauge (4) is provided on one side surface of the shell (1); a measuring tape (5) is provided inside the shell (1), a ruler strip (51) of the measuring tape (5) extends out of the shell (1), and a ruler hook (52) is fixed at the end of the ruler strip (51); a lighting assembly (7) is provided on the side of the shell (1); a cavity is formed on one side of the shell (1), and the cavity is connected to a weight assembly (6).
2. A construction project acceptance tool according to claim 1, Features: The weight assembly (6) comprises a connecting end (61), a weight body (62), a weight line (63), a rotating handle (64) and a winding shaft (65); the connecting end (61) is fixed to the side of the weight body (62); a connecting hole (12) is provided on the side of the cavity structure of the housing (1); the connecting hole (12) is threadedly connected to the connecting end (61); a groove (11) is provided on one side surface of the housing (1); a rotating handle (64) is rotatably connected to the groove (11); the bottom end of the rotating handle (64) is rotatably connected to the winding shaft (65), and the weight line (63) is wound around the outside of the winding shaft (65); the other end of the weight line (63) is connected to the connecting end (61).
3. A construction project acceptance tool according to claim 1, Features: The housing (1) is a polygonal structure, and the housing (1) is provided with one or more right angles.
4. A construction project acceptance tool according to claim 1, Features: The lighting assembly (7) comprises a battery (71), a switch (72) and a lighting lamp (73); the lighting lamp (73) and the switch (72) are arranged on the side of the housing (1), and the side of the housing (1) is detachably connected to the battery (71); the battery (71), the lighting lamp (73) and the switch (72) are electrically connected.
5. A construction project acceptance tool according to claim 1, Features: The ruler assembly (2) comprises a first extension rod (21), a second extension rod (22), a third extension rod (23), a fourth extension rod (24) and a fifth extension rod (25); the fifth extension rod (25) is plugged into the fourth extension rod (24), and the fourth extension rod (24) is plugged into the third extension rod (23); the third extension rod (23) is plugged into the second extension rod (22), and the second extension rod (22) is plugged into the first extension rod (21); the first extension rod (21) is fixed to the side of the housing (1).
6. A construction project acceptance tool according to claim 5, Features: The ruler assembly (2) further comprises a roller (26) and a limiting groove (27); a sliding groove is provided on the side of the first extension rod (21), the second extension rod (22), the third extension rod (23) and the fourth extension rod (24); a limiting groove (27) is provided on the side wall of the sliding groove; the side walls of the second extension rod (22), the third extension rod (23), the fourth extension rod (24) and the fifth extension rod (25) are all rotatably connected with a roller (26); and the roller (26) is cooperatively connected to the limiting groove (27).
7. A construction project acceptance tool according to any one of claims 1 to 6, Features: An acceptance error record table (3) is provided on one side surface of the housing (1).