Cable erecting device for building installation

By designing the cable erection device for building installation and using components such as arc clamps, two-way screws and threaded rods, the difficulty and friction problems of cable erection at high places are solved, and convenient cable erection and increased service life are achieved.

CN221806389UActive Publication Date: 2024-10-01ANHUI HENGYI CONSTR & INSTALLATION CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420195789.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-01
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

Cables need to be manually fixed during the erection process at high altitudes, which increases the difficulty and work intensity of workers. Moreover, existing technology cannot effectively reduce the complexity and friction of cable erection, which affects the service life of the cables.

Method used

A cable erection device for building installation is designed, which uses components such as arc clamps, two-way screw rods, threaded rods and rollers. The fixation and height adjustment of the cables are achieved by driving the two-way screw rods and threaded rods, and the rollers are used to lower the cable and the fixed The friction of the frame forms a triangular mechanism to improve stability.

Benefits of technology

This device makes it more convenient to erect cables at high altitudes, reduces the work intensity of workers, improves erection efficiency and the service life of cables, and at the same time enhances the stability and practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221806389U_ABST
    Figure CN221806389U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cables, and discloses a cable erecting device for building installation, which comprises a base, the outer wall of the base is fixedly connected with a bracket, the outer wall of the bracket is provided with a groove, the outer wall of the groove is rotatably connected with a threaded rod, and the outer wall of the threaded rod is in threaded sleeve connection with an erecting frame. A plurality of driving grooves are symmetrically formed in the outer walls, located on the two sides of the threaded rod, of the erecting frame, a plurality of bidirectional lead screws are rotationally connected to the outer walls of the multiple driving grooves, two moving blocks are connected to the outer walls of the two sides of the multiple bidirectional lead screws in a threaded and sleeving mode, and arc-shaped clamps are fixedly connected to the outer walls of the two moving blocks; according to the building cable erecting device, a cable of a building can be installed and erected on the ground, then the cable is erected by moving the building cable erecting device to a high position, operation of workers is facilitated, meanwhile, the working intensity of the workers is reduced, and the construction efficiency is improved. And the erection efficiency of workers is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of cable technology, and in particular to a cable laying device for building installation. Background Art

[0002] Wires and cables are wire products used to transmit electrical (magnetic) energy, information and realize electromagnetic energy conversion. Wires and cables in a broad sense are also referred to as cables. Cables in a narrow sense refer to insulated cables, which can be defined as: a collection of the following parts; one or more insulated cores, and their respective coatings, total protective layers and outer sheaths. Cables may also have additional uninsulated conductors. Cable brackets are needed to support cables during installation. There are many types of cable brackets.

[0003] With respect to the above-mentioned related technologies, the inventors believe that in the existing cable installation process, the cables need to be installed at high places, and often need to be fixed manually at high places, thereby increasing the difficulty of manual cable installation. Therefore, a cable installation device for building installation is proposed to solve the above-mentioned problem.

[0004] The above information disclosed in the background technology is only used to increase the understanding of the background technology of the present application, and therefore, it may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content

[0005] In order to solve the problem of difficulty in laying cables at high places, the present application provides a cable laying device for building installation.

[0006] The present application provides a cable installation device for building installation, which adopts the following technical solution:

[0007] A cable laying device for building installation comprises a base, an outer wall of the base is fixedly connected to a bracket, an outer wall of the bracket is provided with a groove, an outer wall of the groove is rotatably connected to a threaded rod, an erection frame is threadedly sleeved on the outer wall of the threaded rod, an outer wall of the erection frame located on both sides of the threaded rod is symmetrically provided with a plurality of driving grooves, an outer wall of a plurality of driving grooves is rotatably connected to a plurality of bidirectional screw rods, two side outer walls of the plurality of bidirectional screw rods are threadedly sleeved with two moving blocks, outer walls of the two moving blocks are fixedly connected with arc clamps, a plurality of bidirectional screw rods located on both sides of the threaded rod of the erection frame are connected, a side outer wall of the erection frame is rotatably connected to a turning handle, and the turning handle is fixedly connected to a plurality of bidirectional screw rods.

[0008] Preferably, multiple connecting blocks are welded to the outer walls on both sides of the mounting frame, multiple long grooves are opened on the outer walls on both sides of the groove, multiple sliding rails are fixedly connected to the outer walls of the multiple sliding rails, multiple sliding blocks are slidably connected to the outer walls of the multiple sliding rails, multiple connecting frames are arranged between the multiple sliding blocks and the multiple connecting blocks, and the multiple connecting frames are fixedly connected to the multiple sliding blocks and the multiple connecting blocks.

[0009] Preferably, the outer wall of the bracket below the threaded rod is provided with a driving chamber, the threaded rod rotates through the driving chamber and is fixedly connected to a worm gear, the outer wall of the driving chamber on one side of the worm gear is rotatably connected to a worm, and the worm is meshed with the worm gear.

[0010] Preferably, a plurality of slide grooves are formed on the outer wall of the arc-shaped clamp, and a plurality of rollers are rotatably connected to the outer walls of the plurality of slide grooves.

[0011] Preferably, the thread directions on both sides of the plurality of bidirectional screw rods are opposite, and the plurality of bidirectional screw rods are fixedly connected in pairs.

[0012] In summary, this application includes the following beneficial technical effects:

[0013] 1. By setting up multiple arc-shaped clamps, the bidirectional screw rod is driven to rotate, so that the bidirectional screw rod drives two arc-shaped clamps to fix and install the cable, and then the threaded rod is driven to rotate, so as to adjust the height of the installed cable to complete the installation of the cable. Compared with the existing technology, the cables of the building can be installed and installed on the ground, and then the cables are installed by moving to a high place, which is convenient for workers to operate, and at the same time reduces the work intensity of workers and improves the installation efficiency of workers;

[0014] 2. By setting up multiple rollers, the friction between the cable and the fixed frame is reduced, and the service life of the cable is increased. At the same time, by setting up a connecting frame, the connecting frame and the erection frame move synchronously, and then the connecting frame is slidably connected with the slide rail on the bracket, thereby forming a triangular mechanism, which improves the stability of the erection device and also improves the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is an overall schematic diagram of an embodiment of the application;

[0016] Figure 2 is a three-dimensional schematic diagram of an embodiment of the application;

[0017] Figure 3 is a schematic diagram of the drive compartment structure of an embodiment of the application;

[0018] Figure 4 for Figure 1 A schematic diagram of the enlarged structure in the middle.

[0019] Explanation of the reference numerals in the accompanying drawings: 1. Base; 2. Bracket; 4. Groove; 5. Threaded rod; 6. Mounting frame; 7. Moving block; 8. Arc clamp; 9. Slide groove; 10. Roller; 11. Drive groove; 12. Turn handle; 13. Slide rail; 14. Long groove; 15. Connecting block; 16. Sliding block; 17. Connecting frame; 18. Bidirectional screw; 19. Worm gear; 20. Worm; 21. Drive compartment. DETAILED DESCRIPTION

[0020] The following is combined with Figure 1-4 This application is described in further detail.

[0021] The present application embodiment discloses a cable installation device for building installation. Figure 1-4 A cable laying device for building installation includes a base 1, an outer wall of the base 1 is fixedly connected to a bracket 2, an outer wall of the bracket 2 is provided with a groove 4, an outer wall of the groove 4 is rotatably connected to a threaded rod 5, an outer wall of the threaded rod 5 is threadedly sleeved with a laying frame 6, and the threaded rod 5 is driven to rotate, so that the threaded rod 5 drives the laying frame 6 to move up and down, thereby facilitating the cable laying of workers, and the outer walls of the laying frame 6 located on both sides of the threaded rod 5 are symmetrically provided with a plurality of driving grooves 11, and the outer walls of the plurality of driving grooves 11 are rotatably connected to a plurality of bidirectional screw rods 18, and the plurality of The outer walls of both sides of a bidirectional screw rod 18 are threadedly sleeved with multiple moving blocks 7, and the outer walls of the multiple moving blocks 7 are fixedly connected with arc clamps 8. By driving the bidirectional screw rod 18 to rotate, the bidirectional screw rod 18 drives the multiple moving blocks 7 to move, and then the multiple moving blocks 7 clamp and fix the cable, thereby completing the quick installation of the cable. The side outer wall of the installation frame 6 is rotatably connected with a turning handle 12, and the turning handle 12 is fixedly connected to the multiple bidirectional screw rods 18. By driving the turning handle 12, the turning handle 12 completes the driving of the multiple bidirectional screw rods 18.

[0022] Please refer to Figure 1 A plurality of connecting blocks 15 are welded to the outer walls on both sides of the erection frame 6, a plurality of long grooves 14 are opened on the outer walls of the bracket 2 on both sides of the groove 4, a plurality of slide rails 13 are fixedly connected to the outer walls of the plurality of long grooves 14, a plurality of sliding blocks 16 are slidably connected to the outer walls of the plurality of slide rails 13, a plurality of connecting frames 17 are arranged between the plurality of sliding blocks 16 and the plurality of connecting blocks 15, and the plurality of connecting frames 17 are fixedly connected to the plurality of sliding blocks 16 and the plurality of connecting blocks 15, so that the connecting frames 17 slide on the slide rails 13 through the sliding blocks 16 following the up and down movement of the erection frame 6, so that the connecting frames 17 support and stabilize the erection frame 6, thereby improving the stability of the erection frame 6.

[0023] Please refer to Figure 3A driving chamber 21 is provided on the outer wall of the bracket 2 below the threaded rod 5. The threaded rod 5 rotates and penetrates into the driving chamber 21 and is fixedly connected to a worm gear 19. The outer wall of the driving chamber 21 on one side of the worm gear 19 is rotatably connected to a worm 20, and the worm 20 is meshed with the worm gear 19. By driving the worm 20 to rotate, the worm 20 drives the worm gear 19 to rotate synchronously, and then the threaded rod 5 is driven by the worm gear 19.

[0024] Please refer to Figure 4 The outer wall of the arc clamp 8 is provided with a plurality of slide grooves 9, and the outer walls of the plurality of slide grooves 9 are rotatably connected with a plurality of rollers 10. Through the plurality of rollers 10, the friction between the cable and the arc clamp 8 is reduced, thereby increasing the service life of the cable.

[0025] Please refer to Figure 2 The thread directions on both sides of the multiple bidirectional screw rods 18 are opposite, and the multiple bidirectional screw rods 18 are fixedly connected in pairs, which is convenient for the handle 12 to drive the multiple arc clamps 8.

[0026] The implementation principle of a cable laying device for building installation in an embodiment of the present application is as follows: first, by placing the cables one by one between the two arc clamps 8, the turning handle 12 is turned, so that the turning handle 12 drives the bidirectional screw rod 18 to rotate, and due to the characteristics of the bidirectional screw rod 18, the bidirectional screw rod 18 drives the two arc clamps 8 to move toward or oppositely, so that the two arc clamps 8 fix the cable, and at the same time, the outer skin of the cable can be protected by multiple rollers 10, and then the worm 20 is driven to rotate, so that the worm 20 drives the worm wheel 19 to rotate synchronously, and then the worm wheel 19 drives the threaded rod 5 to rotate synchronously, thereby driving the fixed and installed cable to rise, thereby completing the laying and installation of the cable.

[0027] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0028] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0029] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

[0030] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cable laying device for building installation, comprising a base (1), characterized in that: The outer wall of the base (1) is fixedly connected to a bracket (2), the outer wall of the bracket (2) is provided with a groove (4), the outer wall of the groove (4) is rotatably connected to a threaded rod (5), the outer wall of the threaded rod (5) is threadedly sleeved with a mounting frame (6), the outer walls of the mounting frame (6) located on both sides of the threaded rod (5) are symmetrically provided with a plurality of driving grooves (11), the outer walls of the plurality of driving grooves (11) are rotatably connected to a plurality of bidirectional screw rods (18), the outer walls of the two sides of the plurality of bidirectional screw rods (18) are threadedly sleeved with two moving blocks (7), the outer walls of the two moving blocks (7) are fixedly connected to arc clamps (8), the side outer wall of the mounting frame (6) is rotatably connected to a turning handle (12), and the turning handle (12) is fixedly connected to the plurality of bidirectional screw rods (18).

2. A cable laying device for building installation according to claim 1, characterized in that: A plurality of connecting blocks (15) are welded to the outer walls on both sides of the mounting frame (6); a plurality of long grooves (14) are provided on the outer walls on both sides of the groove (4); a plurality of slide rails (13) are fixedly connected to the outer walls of the plurality of long grooves (14); a plurality of sliding blocks (16) are slidably connected to the outer walls of the plurality of slide rails (13); a plurality of connecting frames (17) are arranged between the plurality of sliding blocks (16) and the plurality of connecting blocks (15); and the plurality of connecting frames (17) are fixedly connected to the plurality of sliding blocks (16) and the plurality of connecting blocks (15).

3. A cable laying device for building installation according to claim 1, characterized in that: The outer wall of the bracket (2) located below the threaded rod (5) is provided with a driving chamber (21); the threaded rod (5) rotates through the driving chamber (21) and is fixedly connected to a worm wheel (19); the outer wall of the driving chamber (21) located on one side of the worm wheel (19) is rotatably connected to a worm (20), and the worm (20) is meshed with the worm wheel (19).

4. A cable laying device for building installation according to claim 1, characterized in that: The outer wall of the arc-shaped clamp (8) is provided with a plurality of slide grooves (9), and the outer walls of the plurality of slide grooves (9) are rotatably connected to a plurality of rollers (10).

5. A cable laying device for building installation according to claim 1, characterized in that: The thread directions of the two sides of the plurality of bidirectional screw rods (18) are opposite, and the plurality of bidirectional screw rods (18) are fixedly connected in pairs.