Side wall bottom node for subway station

By using mortise-and-tenon connections between the side walls and wall bottoms of subway stations and wrapping steel connection components, the problems of low construction efficiency and difficult quality assurance caused by wet connections are solved, and efficient and stable side walls and wall bottoms are achieved. connections, enhancing shear and seismic resistance.

CN221822953UActive Publication Date: 2024-10-11SHAANXI CONSTR ENG HLDG GRP FUTURE CITY INNOVATION TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323628207.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-10-11
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

In existing prefabricated subway stations, there are many wet connections between the side walls and the bottom of the wall, resulting in low construction efficiency and difficulty in ensuring construction quality.

Method used

The mortise-and-tenon connection of the side wall mortise and the mortise and groove at the bottom of the wall is used, and steel connecting components are wrapped around it. High-strength nuts and screws are used for fixed connections to enhance the shear and rotation capabilities. At the same time, through the sliding friction and friction of the steel connecting components Buckling deformation dissipates energy to ensure dry connections and structural stability.

Benefits of technology

It improves the construction efficiency and quality of side walls and wall bottoms, enhances shear resistance and seismic resistance, and ensures the controllability and safety of structural deformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822953U_ABST
    Figure CN221822953U_ABST
Patent Text Reader

Abstract

The utility model discloses a side wall bottom node for a subway station. The side wall bottom node is used between a bottom layer side wall and a bottom plate of the subway station. The side wall bottom joint comprises a side wall body, a side wall base and a steel connecting assembly. A side wall tenon is arranged at the bottom end of the side wall body; a wall bottom mortise is formed in the upper surface of the side wall base; the side wall tenon is arranged in the wall bottom mortise in a matched mode. The steel connecting assembly wraps the outer side of the side wall tenon and is arranged between the side wall tenon and the wall bottom mortise; the side wall base and the steel connecting assembly are fixedly connected together through a first high-strength nut and a first high-strength screw. The node is in dry type connection, the force transmission process is clear, the structure is simple, installation is convenient, structural damage points can be concentrated in a node connection area, controllability of structural deformation is ensured, and construction efficiency and construction quality of the side wall and the wall bottom are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of subway construction, relates to the technical field of assembled subway station construction, and particularly relates to a side wall bottom node used for a subway station. Background Art

[0002] At present, the buildings in subway stations generally adopt on-site casting construction, but on-site casting construction has the disadvantages of long construction period and difficult to control construction quality. With the development of prefabricated building structures, the use of prefabricated assembly technology to build subway stations has become widely popular. It can not only reduce the difficulty of construction, speed up the construction progress, and restore road traffic as soon as possible, but also reduce environmental pollution.

[0003] In existing prefabricated subway stations, the side walls and the bottom of the walls are mostly connected by grouting sleeves or overlapping connection technology. When the side walls and the bottom of the walls are connected by grouting sleeves or overlapping connection technology, although the reliable connection between the side walls and the bottom of the walls can be ensured, there are a large number of wet connections, which seriously affects the construction efficiency. In addition, the prefabricated assembly seams in the grouting sleeve connection are often prone to cracking, affecting the construction quality. In the overlapping connection, the waterproof layer of the side wall is difficult to form a closed protective layer, which poses a great safety hazard, and it is also impossible to detect the construction quality of the post-pouring and overlapping surfaces. Utility Model Content

[0004] In view of the technical problems existing in the prior art, the utility model provides a side wall bottom node for a subway station to solve the technical problems in the prior art of too many wet connections between the side wall and the wall bottom, low construction efficiency and unguaranteed construction quality.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] The utility model provides a side wall bottom node for a subway station, wherein the side wall bottom node is used between the bottom side wall and the bottom plate of the subway station; the side wall bottom node comprises a side wall body, a side wall base and a steel connection assembly;

[0007] The bottom end of the side wall body is provided with a side wall tenon; the upper surface of the side wall base is provided with a wall bottom tenon groove; wherein the side wall tenon is matched and arranged in the wall bottom tenon groove;

[0008] The steel connection component is wrapped around the outside of the side wall tenon and placed between the side wall tenon and the wall bottom tenon groove; and the side wall base and the steel connection component are fixedly connected together by a first high-strength nut and a first high-strength screw.

[0009] Further, the steel connection assembly includes a rectangular steel plate, a first U-shaped steel plate and a plurality of connecting channel steels;

[0010] The rectangular steel plate is horizontally arranged on the bottom surface of the side wall body and is located on both sides of the side wall tenon; the first U-shaped steel plate is wrapped around the outer surface of the side wall tenon, and the upper ends of the two side plates of the first U-shaped steel plate extend horizontally toward the two side surfaces of the side wall body to form upper connecting ears; wherein the upper connecting ears are arranged parallel to and spaced apart from the rectangular steel plate; a plurality of connecting channel steels are evenly fixed between the rectangular steel plate and the upper connecting ears, and the openings of the connecting channel steels are arranged toward the outer surface of the side wall body;

[0011] The lower end of the first high-strength screw is buried in the side wall base, and the upper end of the first high-strength screw is exposed to the outside of the upper surface of the side wall base and passes through the upper connecting ear; wherein the upper end extension of the first high-strength screw and the upper connecting ear are fixedly connected together by a first high-strength nut.

[0012] Furthermore, it also includes a second high-strength screw; the upper end of the second high-strength screw is buried in the side wall body, and the lower end of the second high-strength screw is exposed to the outside of the bottom end of the side wall body and penetrates the rectangular steel plate; wherein the lower end extension of the second high-strength screw and the rectangular steel plate are fixedly connected together by a second high-strength nut.

[0013] Furthermore, the side wall body includes side wall concrete and a side wall steel cage; part of the longitudinal bars in the side wall steel cage are used to replace the second high-strength screw, and the lower end of the remaining longitudinal bars in the side wall steel cage is welded and fixed to the upper surface of the rectangular steel plate.

[0014] Furthermore, the upper end of the connecting channel steel and the lower surface of the rectangular steel plate, as well as the lower end of the connecting channel steel and the upper surface of the upper connecting ear are fixed by welding; wherein the flange of the connecting channel steel is vertically arranged and perpendicular to the outer surface of the side wall.

[0015] Furthermore, it also includes a second U-shaped steel plate; the second U-shaped steel plate is embedded in the wall bottom mortise and tenon, and is placed between the lower surface of the first U-shaped steel plate and the upper surface of the wall bottom mortise and tenon.

[0016] Furthermore, the upper ends of the two side plates of the second U-shaped steel plate extend horizontally in a direction away from the center line of the wall bottom mortise to form a lower connecting ear; wherein the lower surface of the lower connecting ear is in close contact with the upper surface of the side wall base, the upper surface of the lower connecting ear is in close contact with the lower surface of the upper connecting ear, and the first high-strength screw is arranged to penetrate the lower connecting ear and the upper connecting ear in sequence.

[0017] Furthermore, the side wall base includes wall bottom concrete and a wall bottom steel cage; part of the longitudinal reinforcement in the wall bottom steel cage is used to replace the first high-strength screw, and the upper end of the remaining longitudinal reinforcement in the wall bottom steel cage is welded and fixed to the lower surface of the lower connecting ear.

[0018] Furthermore, the side wall base is cast and formed simultaneously with the floor slab and floor slab longitudinal beams of the subway station.

[0019] Compared with the prior art, the beneficial effects of the utility model are:

[0020] The utility model provides a side wall bottom node for a subway station, which realizes the mortise and tenon connection between the side wall body and the side wall base by arranging a side wall tenon at the bottom end of the side wall body, and matching the side wall tenon in the wall bottom mortise groove of the side wall base, thereby effectively enhancing the shear resistance of the side wall bottom node; at the same time, the mortise and tenon connection between the side wall body and the side wall base can release part of the constraints, thereby enhancing the rotation ability and deformation ability of the side wall bottom node; secondly, by wrapping a steel connection component on the outer side of the side wall tenon, the steel connection component is connected to the side wall base by using a first high-strength nut and a first high-strength screw, and the sliding friction between the steel connection component and the high-strength nut and the buckling deformation of the steel connection component can be used to dissipate energy; the node is a dry connection, the force transmission process is clear, the structure is simple, the installation is convenient, and the structural damage points can be concentrated in the node connection area, thereby ensuring the controllability of the structural deformation, and effectively improving the construction efficiency and construction quality of the side wall and the wall bottom.

[0021] Furthermore, the steel connection assembly adopts a combined structure of a rectangular steel plate, a first U-shaped steel plate and a connecting channel steel. The first U-shaped steel plate is used to wrap the side wall tenon, effectively ensuring the structural strength of the side wall tenon; the rectangular steel plate and the first U-shaped steel plate are connected into an integral structure by arranging the connecting channel steel, thereby ensuring the reliability of the steel connection assembly and providing an installation space for the first high-strength nut; after the first high-strength screw is passed through the upper connecting ear, it is tightened and fixed with the first high-strength nut, thereby achieving energy dissipation through the sliding friction between the first high-strength nut and the upper connecting ear, thereby improving the seismic performance of the node.

[0022] Furthermore, the rectangular steel plate is fixed to the bottom end of the side wall body by using a second high-strength screw and a second high-strength nut, which effectively improves the reliable and quick connection between the steel connection assembly and the side wall body; secondly, the sliding friction between the second high-strength nut and the rectangular steel plate is effectively improved to improve the seismic performance of the node.

[0023] Furthermore, the longitudinal bars in the wall bottom reinforcement cage are used to replace the first high-strength screw rod, and the longitudinal bars in the side wall reinforcement cage are used to replace the second high-strength screw rod, thereby improving the manufacturing efficiency of the side wall and the wall bottom and ensuring the integrity of the structure.

[0024] Furthermore, by arranging a second U-shaped steel plate in the mortise and tenon at the bottom of the wall, the structural strength of the concrete at the side wall base is effectively improved, and the risk of local concrete collapse is avoided; at the same time, the contact between the two U-shaped steel plates replaces the direct contact between the steel connection assembly and the mortise and tenon concrete, thereby improving the rotation and deformation capabilities of the side wall bottom node. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of the side wall bottom node of the utility model;

[0026] Figure 2 This is a schematic diagram of the connection structure between the side wall and the steel connection assembly in the utility model;

[0027] Figure 3 This is a schematic diagram of the structure of the side wall base in the utility model;

[0028] Figure 4 It is a structural schematic diagram of the steel connection assembly in the utility model;

[0029] Figure 5 It is a schematic diagram of the connection structure between the steel connection assembly and the second U-shaped steel plate in the utility model;

[0030] Figure 6 It is a schematic diagram of the connection structure between the second U-shaped steel plate and the second high-strength screw in the utility model.

[0031] Among them, 1 is the side wall body, 2 is the side wall tenon, 3 is the rectangular steel plate, 4 is the first U-shaped steel plate, 5 is the side wall base, 6 is the second U-shaped steel plate, 7 is the first high-strength nut, 8 is the first high-strength screw, 9 is the connecting channel steel, 10 is the second high-strength screw, and 11 is the second high-strength nut. DETAILED DESCRIPTION

[0032] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail in the following specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0033] As attached Figure 1-6 As shown, the utility model provides a side wall bottom node for a subway station, which is used between the bottom side wall and the bottom plate of the subway station; the side wall bottom node includes a side wall body 1, a side wall base 5, a steel connection assembly, a second U-shaped steel plate 6, a first high-strength nut 7, a first high-strength screw 8, a second high-strength screw 10 and a second high-strength nut 11.

[0034] The side wall body 1 is located above the side wall base 5, and the side wall body 1 serves as the bottom side wall of the subway station; a side wall tenon 2 is provided at the bottom end of the side wall body 1, and the side wall tenon 2 is arranged along the axis of the side wall body 1; the side wall base 5 is arranged on the bottom plate of the subway station, and a wall bottom tenon groove is provided on the upper surface of the side wall base 5; wherein, the wall bottom tenon groove is arranged along the axis direction of the side wall body 1, and the side wall tenon 2 is arranged in the wall bottom tenon groove.

[0035] The steel connection component is wrapped around the outside of the side wall tenon 2 and placed between the side wall tenon 2 and the wall bottom tenon groove; the side wall body 5 and the steel connection component are fixedly connected together by the first high-strength nut 7 and the first high-strength screw 8; the side wall body 1 and the steel connection component are fixedly connected together by the second high-strength screw 10 and the second high-strength nut.

[0036] In the utility model, the first high-strength screw 8 is vertically arranged in the side wall base 5, and is symmetrically arranged on both sides of the wall bottom tenon; wherein, the lower end of the first high-strength screw 8 is buried in the side wall base 5, and the upper end of the first high-strength screw 8 extends to the outside of the upper surface of the side wall base 5; the second high-strength screw 10 is vertically arranged in the side wall body 1, and is symmetrically arranged on both sides of the side wall tenon 2; wherein, the upper end of the second high-strength screw 10 is buried in the side wall body 1, and the lower end of the second high-strength screw 10 extends to the outside of the bottom end of the side wall body 1.

[0037] In the utility model, the steel connection assembly includes a rectangular steel plate 3, a first U-shaped steel plate 4 and a plurality of connecting channel steels 9; the rectangular steel plate 3 is horizontally arranged on the bottom surface of the side wall body 1 and is located on both sides of the side wall tenon 2; wherein the width of the rectangular steel plate 3 is equal to the horizontal distance between the side surface of the side wall tenon 2 and the outer surface of the side wall body 1; the opening of the first U-shaped steel plate 4 is arranged upward, and the first U-shaped steel plate 4 is wrapped around the outer surface of the side wall tenon 2; wherein the spacing between the two side plates of the first U-shaped steel plate 4 is adapted to the thickness of the side wall tenon 2, and the opening depth of the first U-shaped steel plate 4 is less than the height of the side wall tenon 2.

[0038] The upper ends of the two side plates of the first U-shaped steel plate 4 extend horizontally toward the two side surfaces of the side wall body 1 to form upper connecting ears; wherein the upper connecting ears are arranged parallel to and spaced apart from the rectangular steel plate 3, and the width of the upper connecting ears is the same as the width of the rectangular steel plate 3; that is, the outer edges of the upper connecting ears and the rectangular steel plate 3 are arranged flush with the outer surface of the side wall body 1.

[0039] A plurality of connecting channel steels 9 are evenly fixed between the rectangular steel plate 3 and the upper connecting ear portion, and the opening of the connecting channel steel 9 is arranged toward the outer surface direction of the side wall body 1; wherein, the connecting channel steels 9 are arranged at intervals along the axial direction of the side wall body 1, and the position of the connecting channel steels 9 is adapted to the position of the second high-strength screw 10; specifically, the flange of the connecting channel steel 9 is arranged vertically and perpendicular to the outer surface of the side wall body 1; the web of the connecting channel steel 9 is arranged parallel to the surface of the side wall body 1; the upper end of the connecting channel steel 9 is fixed to the lower surface of the rectangular steel plate 3 by welding, and the lower end of the connecting channel steel 9 is fixed to the upper surface of the upper connecting ear portion by welding.

[0040] The upper surface of the rectangular steel plate 3 is in close contact with the bottom surface of the side wall 1, and the rectangular steel plate 3 is evenly provided with first screw holes, and the first screw holes are arranged one by one with the second high-strength screws 10; the lower end extension of the second high-strength screw 10 passes through the first screw hole and extends to the upper part of the opening side of the connecting channel steel 9; the second high-strength nut 11 is sleeved on the lower end extension of the second high-strength screw 10 and is placed under the rectangular steel plate 3 to fix the second high-strength screw 10 and the rectangular steel plate 3 together.

[0041] In the utility model, the opening of the second U-shaped steel plate 4 is set upward and embedded in the wall bottom mortise and tenon; wherein, the net distance between the two side plates of the second U-shaped steel plate 6 is adapted to the distance between the outer surfaces of the two side plates of the first U-shaped steel plate 4, the distance between the outer surfaces of the two side plates of the second U-shaped steel plate 6 is adapted to the width of the wall bottom mortise and tenon, and the height of the second U-shaped steel plate 6 is adapted to the depth of the wall bottom mortise and tenon; that is, the upper surface of the second U-shaped steel plate 6 is in close contact with the lower surface of the first U-shaped steel plate 4, and the lower surface of the second U-shaped steel plate 6 is in close contact with the upper surface of the wall bottom mortise and tenon.

[0042] The upper ends of the two side plates of the second U-shaped steel plate 6 extend horizontally in a direction away from the center line of the wall bottom mortise to form a lower connecting ear; wherein the lower surface of the lower connecting ear is in close contact with the upper surface of the side wall base 5, and the upper surface of the lower connecting ear is in close contact with the lower surface of the upper connecting ear.

[0043] In the utility model, the second bolt holes are evenly arranged on the upper connecting ear, and the third bolt holes are evenly arranged on the lower connecting ear; the second bolt holes, the third bolt holes and the first high-strength screw rod 8 are arranged one by one; the upper end extension portion of the first high-strength screw rod 8 sequentially penetrates the third bolt hole and the second bolt hole and then extends to the lower part of the opening side of the connecting channel steel 9; the first high-strength nut 7 is sleeved on the upper end extension portion of the first high-strength screw rod 8 and is placed above the upper surface of the upper connecting ear to fix the first high-strength screw rod 8 with the first U-shaped steel plate 4 and the second U-shaped steel plate 6.

[0044] In the utility model, the side wall body 1 includes side wall concrete and side wall steel cage, and the side wall concrete is coated on the outside of the side wall steel cage; the side wall base 5 includes wall bottom concrete and wall bottom steel cage, and the wall bottom concrete is coated on the outside of the wall bottom steel cage; the side wall base 5 is cast and formed simultaneously with the floor slab and the floor slab longitudinal beam of the subway station.

[0045] The main reason for the collapse of the subway station's prefabricated structure during an earthquake is the inharmonious horizontal deformation of the side walls. The utility model discloses a side wall bottom node for a subway station, wherein the side wall tenon is cooperatively arranged in the wall bottom tenon groove of the side wall base, so as to realize the mortise and tenon connection between the side wall body and the side wall base, and effectively enhance the shear resistance of the side wall bottom node. The mortise and tenon connection between the side wall body and the side wall base can release some constraints, enhance the rotation and deformation capabilities of the side wall bottom node, and thus effectively reduce the shear force borne by the subway center column, and greatly ensure the stability of the subway station structure under earthquake. At the same time, the sliding friction between the steel connection assembly and the high-strength nut and the buckling deformation of the steel connection assembly are used to dissipate energy, and effectively improve the seismic performance of the node.

[0046] The construction method of the side wall bottom node for a subway station described in the utility model comprises the following steps:

[0047] Prefabricated side wall body 1; wherein, the prefabrication process of the side wall body 1 is as follows: tie the steel bars of the side wall body 1, fix the prefabricated steel connection assembly to the steel bars of the side wall body 1, and pour concrete after formwork; prefabricated side wall base; wherein, during the prefabrication process of the side wall base, the first high-strength screw 8 is pre-embedded in the side wall base; hoist the side wall body 1 onto the side wall base so that the side wall tenon 2 wrapped with the steel connection assembly is inserted into the wall bottom tenon groove of the side wall base; use the first high-strength nut 7 and the first high-strength screw 8 to fix the side wall base and the steel connection assembly in the side wall base together.

[0048] Specifically, the construction of the side wall bottom node for a subway station described in the utility model includes a factory construction stage and an on-site construction stage;

[0049] Among them, during the factory construction stage, according to the design requirements and dimension drawings, the steel cage of the side wall body 1 is tied; the rectangular steel plate 3, the connecting channel steel 9 and the first U-shaped steel plate 4 are welded and fixed to form a steel connection assembly; the second high-strength screw 10 is installed in the steel cage of the side wall body 1, and the steel connection assembly is connected to the second high-strength screw 10 by using the second high-strength nut 11; then, the side wall body formwork is supported, the side wall body concrete is poured, and the curing is carried out to obtain the side wall body 1 with the steel connection assembly; the steel cage of the side wall base 2 is tied, the first high-strength screw 8 is installed in the steel cage of the side wall base 2, and the second U-shaped steel plate 6 is connected to the first high-strength bolt 8; then, the side wall base formwork is supported, the side wall base concrete is poured, and the curing is carried out to obtain the side wall base 2 with the second U-shaped steel plate;

[0050] During the on-site construction stage, the side wall body 1 with the steel connection assembly is hoisted and aligned, and the upper end extension of the first high-strength bolt 8 is passed through the second U-shaped steel plate 6 in the steel connection assembly; finally, the second U-shaped steel plate 6, the first U-shaped steel plate 4 and the side wall base 2 are fixed together using the first high-strength nut 7, and the construction of the side wall bottom node is completed.

[0051] The utility model also provides another implementation method, which is as follows:

[0052] In the side wall body 1, part of the longitudinal bars in the side wall steel cage are used to replace the second high-strength screw 10, and the lower end of the remaining longitudinal bars in the side wall steel cage is welded and fixed to the upper surface of the rectangular steel plate 3; wherein, the lower end of part of the longitudinal bars in the side wall steel cage passes through the rectangular steel plate 3 and is fixed by the second high-strength nut 11; at this time, during the prefabrication of the side wall body 1, the rectangular steel plate is first welded to the connecting channel steel and the second U-shaped steel plate to form a steel connection assembly, and then part of the longitudinal bars of the tied side wall steel cage are passed through the preset bolt holes on the rectangular steel plate and tightened and fixed with the second high-strength nut, and finally the formwork is supported and concrete is poured, and after curing and forming, the side wall body with the steel connection assembly is obtained.

[0053] In the side wall base 5, part of the longitudinal reinforcement in the wall bottom steel cage is used to replace the first high-strength screw 8, and the upper end of the remaining longitudinal reinforcement in the wall bottom steel cage is welded and fixed to the lower surface of the lower connecting ear; wherein, the upper ends of part of the longitudinal reinforcement in the wall bottom steel cage are sequentially passed through the lower connecting ear and the upper connecting ear, and are fixed with the second high-strength nut 11; at this time, during the prefabrication construction of the side wall base 5, part of the longitudinal reinforcement is passed through the preset bolt holes on the second U-shaped steel plate 6, fixed with formwork, and cast together with the bottom plate and the bottom longitudinal beam, so that the second U-shaped steel plate is embedded in the concrete surface of the wall bottom, and after curing and forming, a side wall base with a second U-shaped steel plate is obtained.

[0054] The utility model discloses a side wall bottom node for a subway station, wherein a concrete tenon and a steel connection assembly are arranged on the side wall body, and the concrete tenon is wrapped by the steel connection assembly to form a steel-clad concrete tenon; a second U-shaped steel plate is arranged in the wall bottom tenon groove of the side wall base, and the second U-shaped steel plate is embedded in the wall bottom tenon groove to form a steel tenon groove; during assembly construction, the steel-clad concrete tenon on the side wall body and the steel tenon groove on the side wall base are aligned and assembled to form a mortise and tenon structure, thereby effectively increasing the shear resistance of the cage side wall bottom node, and Part of the constraints are released, and the rotation and deformation capabilities of the side wall bottom nodes are enhanced; by setting a steel connection component, the high-strength screw and the high-strength nut are used to tighten and fix the rectangular steel plate and the second U-shaped steel plate, so that the sliding friction between the steel plate and the high-strength nut and the buckling deformation of the steel connection component are used to dissipate energy; at the same time, the utility model is a dry connection, which effectively improves the construction efficiency and quality of the side wall and the wall bottom; the node structure has clear force transmission, simple structure, and can concentrate the damage in the connection area, which is more controllable.

[0055] The above embodiment is only one of the implementation methods that can realize the technical solution of the utility model. The scope of protection required by the utility model is not limited only to this embodiment, but also includes within the technical scope disclosed by the utility model, any changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field.

Claims

1. A side wall bottom node for a subway station, characterized in that: The side wall bottom node is used between the bottom side wall and the bottom plate of a subway station; the side wall bottom node comprises a side wall body (1), a side wall base (5) and a steel connection assembly; The bottom end of the side wall body (1) is provided with a side wall tenon (2); the upper surface of the side wall base (5) is provided with a wall bottom tenon groove; wherein the side wall tenon (2) is arranged in the wall bottom tenon groove; The steel connection component is wrapped around the outside of the side wall tenon (2) and is placed between the side wall tenon (2) and the wall bottom tenon groove; and the side wall base (5) and the steel connection component are fixedly connected together using a first high-strength nut (7) and a first high-strength screw (8).

2. A side wall bottom node for a subway station according to claim 1, characterized in that: The steel connection assembly comprises a rectangular steel plate (3), a first U-shaped steel plate (4) and a plurality of connecting channel steels (9); The rectangular steel plate (3) is horizontally arranged on the bottom surface of the side wall body (1) and is located on both sides of the side wall tenon (2); the first U-shaped steel plate (4) is wrapped around the outer surface of the side wall tenon (2), and the upper ends of the two side plates of the first U-shaped steel plate (4) extend horizontally toward the two side surfaces of the side wall body (1) to form upper connecting ears; wherein the upper connecting ears are arranged parallel to and spaced apart from the rectangular steel plate (3); a plurality of connecting channel steels (9) are evenly fixed between the rectangular steel plate (3) and the upper connecting ears, and the openings of the connecting channel steels (9) are arranged toward the outer surface of the side wall body (1); The lower end of the first high-strength screw rod (8) is buried in the side wall base (5), and the upper end of the first high-strength screw rod (8) is exposed to the outside of the upper surface of the side wall base (5) and penetrates the upper connecting ear portion; wherein the upper end extension portion of the first high-strength screw rod (8) and the upper connecting ear portion are fixedly connected together by a first high-strength nut (7).

3. The side wall bottom node for a subway station according to claim 2, characterized in that: It also includes a second high-strength screw (10); the upper end of the second high-strength screw (10) is buried in the side wall body (1), and the lower end of the second high-strength screw (10) is exposed to the outside of the bottom end of the side wall body (1) and penetrates the rectangular steel plate (3); wherein the lower end extension of the second high-strength screw (10) and the rectangular steel plate (3) are fixedly connected together by a second high-strength nut (11).

4. A side wall bottom node for a subway station according to claim 3, characterized in that: The side wall body (1) comprises side wall concrete and a side wall steel cage; part of the longitudinal bars in the side wall steel cage are used to replace the second high-strength screw rod (10), and the lower end of the remaining longitudinal bars in the side wall steel cage is welded and fixed to the upper surface of the rectangular steel plate (3).

5. The side wall bottom node for a subway station according to claim 2, characterized in that: The upper end of the connecting channel steel (9) and the lower surface of the rectangular steel plate (3) as well as the lower end of the connecting channel steel (9) and the upper surface of the upper connecting ear are fixed by welding; wherein the flange of the connecting channel steel (9) is arranged vertically and is perpendicular to the outer surface of the side wall body (1).

6. The side wall bottom node for a subway station according to claim 2, characterized in that: It also includes a second U-shaped steel plate (6); the second U-shaped steel plate (6) is embedded in the wall bottom groove and placed between the lower surface of the first U-shaped steel plate (4) and the upper surface of the wall bottom groove.

7. The side wall bottom node for a subway station according to claim 6, characterized in that: The upper ends of the two side plates of the second U-shaped steel plate (6) extend horizontally in a direction away from the center line of the wall bottom mortise to form a lower connecting ear; wherein the lower surface of the lower connecting ear is in close contact with the upper surface of the side wall base (5), the upper surface of the lower connecting ear is in close contact with the lower surface of the upper connecting ear, and the first high-strength screw (8) is sequentially arranged to penetrate the lower connecting ear and the upper connecting ear.

8. The side wall bottom node for a subway station according to claim 7, characterized in that: The side wall base (5) comprises wall bottom concrete and a wall bottom steel cage; part of the longitudinal reinforcement in the wall bottom steel cage is used to replace the first high-strength screw (8), and the upper end of the remaining longitudinal reinforcement in the wall bottom steel cage is welded and fixed to the lower surface of the lower connecting ear.

9. The side wall bottom node for a subway station according to claim 1, characterized in that: The side wall base (5) is cast and formed simultaneously with the bottom plate and bottom plate longitudinal beams of the subway station.