Boring bar storage device
Through the design of the two-stage transfer mechanism and the hydraulic cylinder, the problems of large occupied area and long replacement time of the boring bar storage device are solved, and the effect of fast and accurate storage of boring bars and reduced deflection is achieved.
Patent Information
- Application Number
- CN202090001118.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-17
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2030-03-17
AI Technical Summary
The existing boring bar storage device occupies a large area, is difficult to store accurately, and takes a long time to replace the boring bar. It is especially difficult to solve the deflection problem of heavy boring bars.
A boring bar storage device including a frame, a first transfer mechanism, a second transfer mechanism and a clamping mechanism is designed. The two-stage transfer mechanism realizes the rapid replacement and storage of boring bars. The hydraulic cylinder is used to correct the deflection caused by thrust. And the boring bar is clamped by the clamping block to reduce the load.
The area of the boring bar storage device is reduced and the replacement time is shortened. At the same time, the deflection of the boring bar is suppressed, and the storage efficiency and replacement speed of the boring bar are improved.
Smart Images

Figure CN221833876U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a boring bar storage device, in particular to a device for storing boring bars with a relatively long length. Background Art
[0002] Typically, a boring machine can be used when precisely machining a hole in a longer workpiece. The boring machine can include a longer boring bar for machining the inner side of the hole in the longer workpiece. In addition, the boring machine can also include a device for storing a plurality of boring bars to replace the boring bars.
[0003] According to the related art, the boring bar storage device may have a one-stage linear moving structure. The boring bar storage device of the one-stage linear moving structure may require a relatively wide space. In addition, due to the increase in the deformation of the heavier boring bar, the storage of the heavier boring bar may be limited. In particular, in the storage of the boring bar, it may be difficult to select an accurate storage position. At the same time, there may also be a disadvantage that the boring bar storage time is too long. Utility Model Content
[0004] Technical issues
[0005] The utility model provides a boring bar storage device which occupies a narrow area and is easy to store boring bars and can accurately replace the boring bars in a short time.
[0006] Technical Solution
[0007] According to one aspect of the utility model, a boring bar storage device may include a frame, a first transfer mechanism, a second transfer mechanism, and a clamping mechanism. The first transfer mechanism may be movably connected to the frame. The second transfer mechanism may be movably connected to the first transfer mechanism. The clamping mechanism may clamp at least one boring bar. The clamping mechanism may be transferred to a boring bar replacement position by the second transfer mechanism.
[0008] In an exemplary embodiment, the boring bar storage device may further include a first guide rail configured on the frame to guide movement of the first transfer mechanism.
[0009] In an exemplary embodiment, the boring bar storage device may further include a second guide rail configured on the first transfer mechanism to guide the movement of the second transfer mechanism.
[0010] In an exemplary embodiment, the first conveying mechanism and the second conveying mechanism can move in a horizontal direction.
[0011] In an exemplary embodiment, the first transfer mechanism and the second transfer mechanism may include cylinders.
[0012] In an exemplary embodiment, the first transfer mechanism may include a hydraulic cylinder that corrects deflection of the boring bar caused by thrust.
[0013] In an exemplary embodiment, the clamping mechanism may include a clamping block having a clamping groove for clamping the boring bar.
[0014] In an exemplary embodiment, a plurality of the clamping blocks may be arranged in a horizontal direction.
[0015] Effect of utility model
[0016] According to the above-mentioned utility model, the boring bar can be transferred to the storage position by the two-stage transfer mechanism. Therefore, the area occupied by the boring bar storage device is narrow, and the boring bar can be easily stored. In addition, since the boring bar is transferred by the simultaneous operation of the two-stage transfer mechanism, the replacement time of the boring bar can be greatly shortened. In particular, the weight center of the two-stage transfer mechanism is located at a position adjacent to the frame of the boring bar storage device, so that the bending of the boring bar can be suppressed. At the same time, since the first transfer mechanism is a hydraulic cylinder, the bending of the boring bar caused by the thrust can be suppressed. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 The present invention is a perspective view of a boring machine equipped with a boring bar storage device according to an embodiment of the present invention.
[0018] Figure 2 It is enlarged to show Figure 1 A perspective view of a boring bar storage device is shown.
[0019] Figure 3 It is shown Figure 1 A front view of a boring bar storage device is shown.
[0020] Figure 4 It is shown Figure 3 A plan view of a boring bar storage device is shown.
[0021] Figure 5 It is shown Figure 2 A front view showing a state in which the boring bar storage device is advanced one step.
[0022] Figure 6 It is shown Figure 5 A plan view of a boring bar storage device is shown.
[0023] Figure 7 It is shown Figure 2 A perspective view showing a state where the boring bar storage device is advanced two stages.
[0024] Figure 8 It is shown Figure 7 A front view of a boring bar storage device is shown.
[0025] Fig. 9 It is shown Figure 8 A plan view of a boring bar storage device is shown.
[0026] Figures 10 to 13 It is shown in sequence from Figure 1 A front view of the boring bar storage device showing the action of replacing boring bars. DETAILED DESCRIPTION
[0027] The preferred embodiments of the present utility model are described in detail below with reference to the accompanying drawings.
[0028] The present invention may be subjected to various changes and may have various forms. Some specific embodiments will be illustrated in the drawings and described in detail in the text. However, this is not intended to limit the present invention to a specific disclosed form, but should be understood to include all changes, equivalents and even substitutes that fall within the scope of the idea and technology of the present invention. When describing each figure, similar reference numerals are used for similar components.
[0029] The terms "first" and "second" can be used to describe a variety of components, but these components should not be limited by these terms. These terms are only used to distinguish one component from other components. For example, without departing from the scope of the present invention, the first component can be named as the second component, and similarly, the second component can also be named as the first component.
[0030] The terms used in this application are only used to illustrate specific embodiments and are not intended to limit the utility model. Unless clearly defined differently in the context, singular expressions include plural expressions. In this application, terms such as "including" or "having" should be understood as being used to specify the existence of features, numbers, steps, actions, constituent elements, parts or combinations thereof recorded in the specification, and do not preclude the existence or additivity of one or more other features or numbers, steps, actions, constituent elements, parts or combinations thereof.
[0031] Unless defined differently, all terms used herein, including technical or scientific terms, have the same meaning as those commonly understood by a person skilled in the art in the art to which the present invention belongs. Terms such as those defined in commonly used dictionaries should be interpreted as having the same meaning as that in the context of the relevant technology, and should not be interpreted as ideal or overly formal meanings unless explicitly defined in this application.
[0032] Figure 1 The present invention is a perspective view of a boring machine equipped with a boring bar storage device according to an embodiment of the present invention.
[0033] Reference Figure 1 The boring machine may include a spindle 110 , a shock-proof mechanism 120 , a spindle 130 , a tailstock 140 , a transfer platform 150 , and a boring bar storage device 200 .
[0034] The spindle 110 may be arranged in a horizontal direction to fix one end of the workpiece W. The workpiece may have a long tube shape having a hole. The anti-vibration mechanism 120 may support the other end of the workpiece W to prevent the workpiece W from vibrating.
[0035] The spindle 130 may clamp the boring bar B. The spindle 130 may rotate the boring bar B. The boring bar B may process the inner circumference of the hole of the workpiece W. The boring bar B may have a long rod shape. The transfer table 150 may transfer the spindle 130 in the vertical direction and the horizontal direction. The tailstock 140 may rotatably support the end of the boring bar B fixed to the spindle 130.
[0036] The boring bar storage device 200 may be disposed on an upper portion of the tailstock 140. A door 160 may be disposed between the boring bar storage device 200 and the spindle 130. The boring bar storage device 200 may store a plurality of new boring bars B.
[0037] Figure 2 It is enlarged to show Figure 1 A perspective view of a boring bar storage device is shown, Figure 3 It is shown Figure 1 A front view of a boring bar storage device is shown, Figure 4 It is shown Figure 3 A plan view of a boring bar storage device is shown.
[0038] Reference Figures 2 to 4 The boring bar storage device 200 may include a frame 210 , a first guide rail 220 , a first transfer mechanism 230 , a second guide rail 240 , a second transfer mechanism 250 , and a clamping mechanism 260 .
[0039] The frame 210 may include a plurality of beams arranged vertically. The first guide rail 220 may be arranged on the frame 210 in a horizontal direction.
[0040] The first transfer mechanism 230 may be movably connected to the first guide rail 220. The first transfer mechanism 230 may move forward and backward in the horizontal direction along the first guide rail 220. In this embodiment, the first transfer mechanism 230 may include a cylinder. In particular, the first transfer mechanism 230 may include a hydraulic cylinder. Since the first transfer mechanism 230 is a hydraulic cylinder for transferring a plurality of heavy boring bars B, the deflection of the boring bars B caused by the thrust may be corrected.
[0041] The second guide rail 240 may be disposed on an upper surface of the first transfer mechanism 230. The second guide rail 240 may be arranged in the same direction as the first guide rail 220, that is, in a horizontal direction.
[0042] The second transfer mechanism 250 may be movably connected to the second guide rail 240. Therefore, the second transfer mechanism 250 may move forward and backward in the horizontal direction along the second guide rail 240. As a result, while the first transfer mechanism 230 moves in the horizontal direction along the first guide rail 220, the second transfer mechanism 250 may also move in the horizontal direction along the second guide rail 240. The second transfer mechanism 250 may include a cylinder such as a pneumatic cylinder or a hydraulic cylinder.
[0043] The clamping mechanism 260 may be installed on the upper surface of the second transfer mechanism 250. The clamping mechanism 260 may include a plurality of clamping blocks 262. Each clamping block 262 may have a clamping groove 264 for clamping the boring bar B. The clamping blocks 262 may be arranged in a horizontal direction. Therefore, the boring bar B clamped by the clamping blocks 262 may also be arranged in a horizontal direction.
[0044] In this embodiment, the second transfer mechanism 250 can transfer the clamping blocks 262 individually. That is, the second transfer mechanism 250 can only move one of the clamping blocks 262 forward and backward. Therefore, the second transfer mechanism 250 can be configured as a structure corresponding to each clamping block 262.
[0045] Figure 5 It is shown Figure 2 A front view of the boring bar storage device shown in the state of advancing one step, Figure 6 It is shown Figure 5 A plan view of a boring bar storage device is shown.
[0046] Reference Figure 5 and Figure 6 , the first transfer mechanism 230 can move forward one step along the first guide rail 220 toward the spindle 130. At this time, the first transfer mechanism 230 as a hydraulic cylinder can correct the deflection caused by the thrust of the heavy boring bars B. Therefore, the second guide rail 240, the second transfer mechanism 250 and the clamping mechanism 260 can also move toward the transfer platform 150. As a result, the multiple boring bars B clamped by the clamping mechanism 260 can also move toward the transfer platform 150.
[0047] Figure 7 It is shown Figure 2 A three-dimensional view of the boring bar storage device shown in the state of advancing two stages, Figure 8 It is shown Figure 7 A front view of a boring bar storage device is shown, Fig. 9 It is shown Figure 8 A plan view of a boring bar storage device is shown.
[0048] Reference Figures 7 to 9 , in a state where the first transfer mechanism 230 advances one step, the second transfer mechanism 250 may advance two steps toward the transfer platform 150 along the second guide rail 240. In particular, the second transfer mechanism 250 may advance only one clamping block 262 clamping a certain boring bar B designated as a storage object among the plurality of boring bars B toward the transfer platform 150 to move to the replacement position. Therefore, the remaining clamping blocks 262 may not advance toward the transfer platform 150.
[0049] In this way, the boring bar B is replaced in a state where the second transfer mechanism 250 is advanced two steps after the first transfer mechanism 230 is advanced one step, thereby significantly shortening the replacement time of the boring bar B. In addition, since the first transfer mechanism 230 and the second transfer mechanism 250 bear the heavy load of the boring bar B together, the load of the boring bar B applied to the second transfer mechanism 250 can be reduced. Therefore, the time for the second transfer mechanism 250 to transfer the boring bar B to the storage position can also be shortened.
[0050] Furthermore, since the weight centers of the first transfer mechanism 230 , the second transfer mechanism 250 , and the clamping mechanism 260 that advance two stages are located adjacent to the frame 210 , deflection of the heavy boring bar B can also be suppressed.
[0051] Figures 10 to 13 It is shown in sequence Figure 1 A front view of the boring bar storage action of the boring bar storage device is shown.
[0052] Reference Fig.10 , the first transfer mechanism 230 can move forward one step toward the transfer platform 150 along the first guide rail 220. The second transfer mechanism 250 can move forward two steps toward the transfer platform 150 along the second guide rail 240. The second transfer mechanism 250 can move only one clamping block 262 clamping one of the multiple boring bars B toward the transfer platform 150 to transfer the boring bar B to the replacement position.
[0053] Reference Fig.11 , the transfer platform 150 can be lowered to the replacement position so that the spindle 130 clamps the boring bar B transferred to the replacement position.
[0054] Reference Fig.12 , the spindle 130 holding the new boring bar B can be raised to its original position via the transfer platform 150 .
[0055] Reference Fig.13 , the second transfer mechanism 250 can retreat to its original position along the second guide rail 240. The first transfer mechanism 230 can retreat to its original position along the first guide rail 220. The retreating actions of the first transfer mechanism 230 and the second transfer mechanism 250 can be performed simultaneously.
[0056] As described above, according to the present embodiment, the boring bar can be transferred to the replacement position by the two-stage transfer mechanism. Therefore, the area occupied by the boring bar storage device is narrow, and the boring bar can be easily stored. In addition, since the boring bar is transferred by the simultaneous operation of the two-stage transfer mechanism, the replacement time of the boring bar can be greatly shortened. In particular, the weight center of the two-stage transfer mechanism is located at a position adjacent to the frame of the boring bar storage device, so that the bending of the boring bar can be suppressed. At the same time, since the first transfer mechanism is a hydraulic cylinder, the bending of the boring bar caused by the thrust can be suppressed.
[0057] As described above, although the preferred embodiments of the present invention have been described with reference to the invention, those skilled in the art will appreciate that various modifications and variations may be made to the present invention without departing from the scope of the invention and the art described in the following claims.
[0058] Reference numerals
[0059] 110: spindle, 120: anti-vibration mechanism, 130: spindle, 140: tailstock, 150: transfer platform, 160: door, 200: boring bar storage device, 210: frame, 220: first guide rail, 230: first transfer mechanism, 240: second guide rail, 250: second transfer mechanism, 260: clamping mechanism, 262: clamping block, 264: clamping groove.
Claims
1. A boring bar storage device, It is characterized in that include: frame; a first transfer mechanism movably connected to the frame; a second transfer mechanism, which is movably connected to the first transfer mechanism; as well as The clamping mechanism is installed on the second transfer mechanism to clamp at least one boring bar and is transferred to a replacement position of the boring bar by the second transfer mechanism.
2. The boring bar storage device according to claim 1, It is characterized in that It also includes a first guide rail, which is configured on the frame to guide the movement of the first transfer mechanism.
3. The boring bar storage device according to claim 1, It is characterized in that It also includes a second guide rail, which is configured on the first transfer mechanism to guide the movement of the second transfer mechanism.
4. The boring bar storage device according to claim 1, It is characterized in that The first conveying mechanism and the second conveying mechanism move in a horizontal direction.
5. The boring bar storage device according to claim 1, It is characterized in that The first transfer mechanism and the second transfer mechanism include cylinders.
6. The boring bar storage device according to claim 5, It is characterized in that The first transfer mechanism includes a hydraulic cylinder which corrects the deflection of the boring bar caused by the thrust force.
7. The boring bar storage device according to claim 1, It is characterized in that The clamping mechanism comprises a clamping block having a clamping groove for clamping the boring bar.
8. The boring bar storage device according to claim 7, It is characterized in that A plurality of the clamping blocks are arranged in a horizontal direction.
