River regulation retaining wall
By designing the combined structure and reinforcement mechanism in the river regulation retaining wall, the problems of inconvenient installation and insufficient stability of the retaining wall in the existing technology are solved, and simpler assembly and higher stability are achieved.
Patent Information
- Application Number
- CN202323534037.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The existing river regulation retaining wall is inconvenient to install and fix, which increases labor intensity, and lacks individual reinforcement, resulting in insufficient firmness and stability.
A combined structure including retaining walls, installation blocks, clamping blocks, several-shaped blocks, tension columns, springs, connecting columns, clamping columns and reinforcement mechanisms is designed. It is assembled by pulling the tension columns and connecting columns, using clamping blocks and Slots and threaded connections achieve stable fixation of the retaining wall, and secondary reinforcement is carried out through reinforcing rods and limiting columns.
It simplifies the assembly process of the retaining wall, improves its stability and firmness, reduces the labor intensity of the staff, and ensures the integrity and reliability of the retaining wall through multiple reinforcements.
Smart Images

Figure CN221837497U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of river channel regulation, in particular to a retaining wall for river channel regulation. Background Art
[0002] During the process of river regulation, retaining walls are permanent or temporary walls or artificial structures similar to walls built to ensure the stability of the fill or excavation position. They are widely used in projects such as roads, railway slopes, embankment protection of water conservancy projects, around buildings, and mine tunnels.
[0003] The existing retaining walls for river regulation are generally not simple and convenient to install and fix, and are time-consuming and labor-intensive, which greatly increases the labor intensity of the staff. In addition, there is generally no corresponding reinforcement between the individual retaining walls, which makes the integrity of the various parts of the retaining walls insufficient. This cannot guarantee the firmness of the retaining walls, resulting in the existing retaining walls being unreliable and unstable. Utility Model Content
[0004] The utility model aims to provide a retaining wall for river regulation to solve the technical problems raised in the background technology.
[0005] To achieve the above-mentioned purpose, the specific technical scheme of the present invention is as follows: a retaining wall for river channel regulation, comprising two retaining walls, a mounting block, a clamping block, a several-shaped block, a pulling column, a spring, a connecting column, a clamping column and a reinforcement mechanism, wherein the mounting block is arranged on the right side of the front side of the retaining wall, the clamping block is arranged on the left side of the front side of the retaining wall, a clamping groove for use with the clamping block is opened on the right side of the mounting block, the bottom of the several-shaped block is fixedly connected to the top of the mounting block, the pulling column is arranged on the top of the several-shaped block, the bottom of the pulling column is fixedly connected to the top of the connecting column, the surface of the connecting column is sleeved with the spring, the bottom of the connecting column is fixedly connected to the top of the clamping column, the clamping column is used in conjunction with the clamping block, and the reinforcement mechanism is arranged on the top of the retaining wall;
[0006] The reinforcement mechanism includes a first fixing column, a first reinforcement rod, a limiting column and a first threaded hole. The bottom of the first fixing column is fixedly connected to the top of the retaining wall. The surface of the first fixing column is connected to the inner sleeve of the first reinforcement rod. The side of the reinforcement rod away from the first fixing column is threadedly connected to the limiting column. The first threaded hole is opened at the top of the retaining wall, and the first threaded hole is used in conjunction with the limiting column.
[0007] Preferably, a second threaded hole is provided on the top of the retaining wall, and the second threaded hole is used in conjunction with a limiting column.
[0008] Preferably, a second fixing column is fixedly connected to the right side of the retaining wall, and a second reinforcement rod is sleeved on the surface of the second fixing column. The end of the second reinforcement rod away from the second fixing column is threadedly connected to a limiting stud, and the limiting stud is threadedly connected to the right retaining wall.
[0009] Preferably, the tops of the first fixing column and the second fixing column are both fixedly connected to a limit baffle, and the limit baffle is used in conjunction with the first reinforcement rod and the second reinforcement rod.
[0010] Preferably, a third threaded hole is provided on the top of the retaining wall, and the third threaded hole is used in conjunction with a limiting stud.
[0011] Preferably, the bottom plate of the retaining wall is threadedly connected with positioning screws, and the positioning screws are threadedly connected to the ground.
[0012] The utility model has the following advantages:
[0013] 1. This kind of river channel regulation retaining wall is provided with two retaining walls, mounting blocks, clamping blocks, several-shaped blocks, pulling columns, springs, connecting columns, clamping columns, first fixing columns, first reinforcement rods, limiting columns and first threaded holes. When the user assembles the river channel regulation retaining wall, the user pulls the pulling columns, the pulling columns drive the connecting columns to move, and the connecting columns drive the clamping columns to move. Then the user makes the clamping block on the right retaining wall be clamped into the clamping groove on the mounting block on the left retaining wall. Then the user loosens the pulling columns so that the clamping columns clamp and fix the clamping blocks. Then the user threadably connects the limiting columns to the first threaded holes at the top of the right retaining wall so that the first reinforcement rod reinforces the two retaining walls, thereby making the river channel regulation retaining wall easy to assemble and stable.
[0014] 2. This type of river channel regulation retaining wall is equipped with a second fixing column, a second reinforcement rod and a limiting stud. After the user assembles the two river channel regulation retaining walls, the user threadably connects the limiting stud on the left river channel regulation retaining wall with the right river channel regulation retaining wall, thereby performing secondary reinforcement on the river channel regulation retaining wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2This is a schematic diagram of the right side cross-sectional structure of the river regulation retaining wall of the utility model;
[0018] Figure 3 This is a rear cross-sectional structural diagram of a river channel regulation retaining wall according to the present invention;
[0019] Figure 4 For this utility model Figure 1 A partial enlarged view of point A in the middle;
[0020] Figure 5 For this utility model Figure 2 A partial enlarged view of point B in the middle.
[0021] Explanation of the markings in the figure: 1. Retaining wall; 2. Mounting block; 3. Clamping block; 4. Shaped block; 5. Pull column; 6. Connecting column; 7. Spring; 8. Clamping column; 9. Clamping slot; 10. First fixing column; 11. First reinforcement rod; 12. Limiting column; 13. First threaded hole; 14. Second threaded hole; 15. Limiting baffle; 16. Second fixing column; 17. Second reinforcement rod; 18. Limiting stud; 19. Third threaded hole; 20. Positioning screw. DETAILED DESCRIPTION
[0022] Hereinafter, only certain exemplary embodiments are briefly described. As will be appreciated by those skilled in the art, the described embodiments may be modified in various ways without departing from the spirit or scope of the embodiments of the present invention. Therefore, the drawings and description are to be regarded as illustrative in nature and not restrictive.
[0023] Example 1
[0024] like Figure 1-5As shown, a river channel regulation retaining wall of the present invention comprises two retaining walls 1, a mounting block 2, a clamping block 3, a several-shaped block 4, a pulling column 5, a spring 7, a connecting column 6, a clamping column 8 and a reinforcement mechanism. The mounting block 2 is arranged on the right side of the front side of the retaining wall 1, and the clamping block 3 is arranged on the left side of the front side of the retaining wall 1. A clamping slot 9 for use with the clamping block 3 is provided on the right side of the mounting block 2. The bottom of the several-shaped block 4 is fixedly connected to the top of the mounting block 2. The pulling column 5 is arranged on the top of the several-shaped block 4. The bottom of the pulling column 5 is fixedly connected to the top of the connecting column 6. The surface of the connecting column 6 is sleeved with the spring 7. The bottom of the connecting column 6 is fixedly connected to the top of the clamping column 8. The clamping column 8 is used in conjunction with the clamping block 3. The fixing mechanism is arranged at the top of the retaining wall 1, and the reinforcement mechanism includes a first fixing column 10, a first reinforcing rod 11, a limiting column 12 and a first threaded hole 13. The bottom of the first fixing column 10 is fixedly connected to the top of the retaining wall 1, and the surface of the first fixing column 10 is connected to the inner sleeve of the first reinforcing rod 11. The side of the first reinforcing rod 11 away from the first fixing column 10 is threadedly connected to the limiting column 12. The first threaded hole 13 is opened at the top of the retaining wall 1, and the first threaded hole 13 is used in conjunction with the limiting column 12. By setting two retaining walls 1, mounting blocks 2, card blocks 3, several-shaped blocks 4, pull columns 5, springs 7, connecting columns 6, card columns 8, first fixing columns 10, and first reinforcing rods 11. The limiting column 12 and the first threaded hole 13. When the user assembles the retaining wall for river regulation, the user pulls the pulling column 5, the pulling column 5 drives the connecting column 6 to move, and the connecting column 6 drives the clamping column 8 to move. Then the user clamps the clamping block 3 on the right retaining wall 1 into the clamping groove 9 on the mounting block 2 on the left retaining wall 1. Then the user loosens the pulling column 5, so that the clamping column 8 clamps and fixes the clamping block 3. Then the user screws the limiting column 12 into the first threaded hole 13 at the top of the right retaining wall 1, so that the first reinforcement rod 11 reinforces the two retaining walls 1. A second threaded hole 14 is provided on the top of the retaining wall 1. The second threaded hole 14 cooperates with the limiting column 12 to A second threaded hole 14 is provided, so that the first reinforcing rod 11 can be folded up when not in use to reduce the space occupied. The tops of the first fixing column 10 and the second fixing column 16 are fixedly connected to the limiting baffle 15, and the limiting baffle 15 is used in conjunction with the first reinforcing rod 11 and the second reinforcing rod 17. The limiting baffle 15 is provided to limit and block the first reinforcing rod 11 and the second reinforcing rod 17 to prevent the first reinforcing rod 11 and the second reinforcing rod 17 from detaching from the first fixing column 10 and the second fixing column 16. The bottom plate of the retaining wall 1 is threadedly connected with a positioning screw 20, which is threadedly connected to the ground. The positioning screw 20 is provided to position the retaining wall 1.
[0025] Example 2
[0026] This embodiment is an improvement made on the basis of embodiment 1. For details, please refer to Figures 1 to 3The right side of the retaining wall 1 is fixedly connected to a second fixing column 16, and the surface of the second fixing column 16 is sleeved with a second reinforcing rod 17. The end of the second reinforcing rod 17 away from the second fixing column 16 is threadedly connected to a limiting stud 18, and the limiting stud 18 is threadedly connected to the right retaining wall 1. By setting the second fixing column 16, the second reinforcing rod 17 and the limiting stud 18, after the user assembles the two river channel regulation retaining walls, the user threadably connects the limiting stud 18 on the left river channel regulation retaining wall 1 with the right river channel regulation retaining wall 1, thereby performing secondary reinforcement of the river channel regulation retaining wall, and a third threaded hole 19 is opened on the top of the retaining wall 1, which is used in conjunction with the limiting stud 18. The third threaded hole 19 is set so that it can be folded up when the second reinforcement rod 17 is not in use to reduce the space occupied.
[0027] The working principle of the river channel regulation retaining wall is as follows: when the user assembles the river channel regulation retaining wall, the user pulls the pulling column 5, the pulling column 5 drives the connecting column 6 to move, and the connecting column 6 drives the clamping column 8 to move, and then the user makes the clamping block 3 on the right retaining wall 1 be clamped into the clamping groove 9 on the mounting block 2 on the left retaining wall 1, and then the user loosens the pulling column 5, so that the clamping column 8 clamps and fixes the clamping block 3, and then the user threadably connects the limiting column 12 with the first threaded hole 13 at the top of the right retaining wall 1, so that the first reinforcement rod 11 reinforces the two retaining walls 1. After the user assembles the two river channel regulation retaining walls, the user threadably connects the limiting stud 18 on the left retaining wall 1 with the right retaining wall 1, thereby performing secondary reinforcement on the river channel regulation retaining wall.
[0028] It is understood that the present invention is described by way of certain embodiments, and those skilled in the art will appreciate that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. Furthermore, under the guidance of the present invention, these features and embodiments may be modified to suit specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are intended to be protected by the present invention.
Claims
1. A retaining wall for river regulation, comprising two retaining walls (1), a mounting block (2), a clamping block (3), a shaped block (4), a pull column (5), a spring (7), a connecting column (6), a clamping column (8) and a reinforcement mechanism, characterized in that: The mounting block (2) is arranged on the right side of the front side of the retaining wall (1); the clamping block (3) is arranged on the left side of the front side of the retaining wall (1); a clamping slot (9) for use with the clamping block (3) is provided on the right side of the mounting block (2); the bottom of the several-shaped block (4) is fixedly connected to the top of the mounting block (2); the pulling column (5) is arranged on the top of the several-shaped block (4); the bottom of the pulling column (5) is fixedly connected to the top of the connecting column (6); the surface of the connecting column (6) is sleeved and connected with a spring (7); the bottom of the connecting column (6) is fixedly connected to the top of the clamping column (8); the clamping column (8) is used in conjunction with the clamping block (3); and the reinforcing mechanism is arranged on the top of the retaining wall (1); The reinforcement mechanism comprises a first fixing column (10), a first reinforcement rod (11), a limiting column (12) and a first threaded hole (13); the bottom of the first fixing column (10) is fixedly connected to the top of the retaining wall (1); the surface of the first fixing column (10) is sleeved and connected to the inside of the first reinforcement rod (11); the side of the reinforcement rod away from the first fixing column (10) is threadedly connected to the limiting column (12); the first threaded hole (13) is provided at the top of the retaining wall (1); and the first threaded hole (13) is used in conjunction with the limiting column (12).
2. A retaining wall for river regulation according to claim 1, characterized in that: A second threaded hole (14) is provided on the top of the retaining wall (1), and the second threaded hole (14) is used in conjunction with the limiting column (12).
3. A retaining wall for river regulation according to claim 1, characterized in that: A second fixing column (16) is fixedly connected to the right side of the retaining wall (1); a second reinforcing rod (17) is sleeved and connected to the surface of the second fixing column (16); an end of the second reinforcing rod (17) away from the second fixing column (16) is threadedly connected to a limiting stud (18); and the limiting stud (18) is threadedly connected to the right retaining wall (1).
4. A retaining wall for river regulation according to claim 3, characterized in that: The tops of the first fixing column (10) and the second fixing column (16) are both fixedly connected to a limit baffle (15), and the limit baffle (15) is used in conjunction with the first reinforcement rod (11) and the second reinforcement rod (17).
5. A retaining wall for river regulation according to claim 3, characterized in that: A third threaded hole (19) is provided on the top of the retaining wall (1), and the third threaded hole (19) is used in conjunction with a limiting stud (18).
6. A retaining wall for river regulation according to claim 1, characterized in that: The bottom plate of the retaining wall (1) is threadedly connected with a positioning screw (20), and the positioning screw (20) is threadedly connected to the ground.