Elliptical perforated permeable pipe pile supported in steel gasket

By using steel gasket internal support and oval opening design in permeable pipe piles, combined with prestressed longitudinal reinforcement and drainage devices, the problem of reduced bearing capacity of permeable pipe piles is solved, and higher bearing capacity and construction efficiency are achieved.

CN221837577UActive Publication Date: 2024-10-15宋太行
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420317465.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-15
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing permeable pipe pile technology reduces the ultimate bearing capacity of the pile foundation during the drilling process. How to improve the pile foundation bearing capacity while ensuring water permeability and construction speed.

Method used

The design of oval permeable pipe piles with openings supported within steel gaskets is adopted. By evenly distributing oval permeable holes and prestressed longitudinal bars and stirrup structures on the pile wall, combined with drainage devices, the cross-sectional area of ​​the openings is reduced and weak points are reinforced. place to improve the carrying capacity.

Benefits of technology

While maintaining good water permeability, it improves the bearing capacity of permeable pipe piles, meets practical application requirements, and reduces construction costs and resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837577U_ABST
    Figure CN221837577U_ABST
Patent Text Reader

Abstract

The utility model discloses an oval perforated water-permeable pipe pile supported in a steel gasket, which relates to the technical field of pile foundation engineering, and comprises a pile body, a drainage device, a water-permeable hole and a steel gasket inner support, and the pile body comprises a hollow cylindrical pile body, a conical pile shoe, a prestressed longitudinal bar and a stirrup; the drainage device comprises a drainage pipe and a water pump; the steel gasket inner support comprises a steel gasket and an inner framework. The prestressed longitudinal bars are embedded in the hollow cylindrical pile body, the stirrups are arranged around the prestressed longitudinal bars and are welded and fixed at connecting points, the upper end of the drainage pipe is connected with the water suction pump, and the lower end of the drainage pipe extends into a cavity of the hollow cylindrical pile body to the bottom. On one hand, the dissipation rate of ultra-static pore water of the soil body around the pile can be increased, then the bearing capacity of the pile can be brought into play quickly, on the other hand, the ultimate bearing capacity of the pile body can be improved through the design of the steel gasket inner supports and the oval open holes, and the problem that the bearing capacity is reduced due to the open holes of the pile body is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile foundation engineering, in particular to an elliptical permeable pipe pile with an opening supported by a steel gasket. Background Art

[0002] Soft soil foundations are widely distributed in coastal cities in my country. Due to their high compressibility and low permeability, they need to be treated before they can be put into use. Driving pile foundations to form composite foundations is a common treatment method. However, piling will disturb and damage the soil around the piles, and produce excess pore water pressure within the disturbance range. This phenomenon is not conducive to the bearing capacity of the pile foundation. To overcome this problem, existing pile foundation projects often need to add drainage boards around the piles to accelerate the discharge of pore water during design, which increases construction costs and causes waste of resources.

[0003] The permeable pipe pile technology opens appropriate holes in the pile wall so that water in the soil around the pile can flow into the pile from the holes, which can effectively speed up the dissipation of the pore water pressure in the soil around the pile. This technology can also speed up the bearing capacity of the pile foundation without the need to install drainage boards around the pile. It is a new type of pipe pile with a simple construction method, fast construction speed, and is conducive to subsequent engineering construction.

[0004] The advantage of permeable pipe piles is due to the characteristics of the holes in the pile wall, but this characteristic also brings about the problem of reduced ultimate bearing capacity of the pile foundation. The larger the total area of ​​the holes, the lower the bearing capacity of the pile foundation. How to ensure that the ultimate bearing capacity meets the construction requirements while making holes in the pile wall is the key to promoting the permeable pipe pile technology from concept to practical application. For this purpose, an elliptical permeable pipe pile with holes supported by a steel gasket is provided. Utility Model Content

[0005] The purpose of the utility model is to provide an elliptical permeable pipe pile with an opening supported by a steel gasket in view of the defects of the prior art, so as to solve the problems raised by the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an elliptical permeable pipe pile with an inner support of a steel gasket, comprising a pile body, a drainage device, permeable holes and an inner support of a steel gasket, wherein the pile body comprises a hollow cylindrical pile body, a conical pile shoe, prestressed longitudinal reinforcement and stirrups; the drainage device comprises a drainage pipe and a water pump; the inner support of the steel gasket comprises a steel gasket and an internal skeleton.

[0007] As a preferred technical solution of the utility model, the prestressed longitudinal reinforcement is embedded in the hollow cylindrical pile body, and the stirrups are arranged around the prestressed longitudinal reinforcement and are welded and fixed at the connection points.

[0008] As a preferred technical solution of the utility model, the upper end of the drainage pipe is connected to a water pump, and the lower end of the drainage pipe extends into the cavity of the hollow cylindrical pile body to the bottom.

[0009] As a preferred technical solution of the utility model, the water-permeable holes are elliptical holes, evenly distributed on the pile wall of the hollow cylindrical pile body, the major axis of the water-permeable holes is parallel to the pile axis, the minor axis is arranged perpendicular to the pile axis, and the ratio of the major axis to the minor axis is 1.5 to 2.5.

[0010] As a preferred technical solution of the utility model, the internal skeleton is a hollow thin-walled cylindrical shape, and its outer diameter is equal to the inner diameter of the hollow cylindrical pile body.

[0011] As a preferred technical solution of the utility model, the bottom of the hollow cylindrical pile body is welded to the conical pile shoe.

[0012] As a preferred technical solution of the utility model, the prestressed longitudinal reinforcement and stirrups are made of HPB235 grade steel bars, and the steel gaskets and internal skeleton are made of 235 steel.

[0013] As a preferred technical solution of the utility model, the hollow cylindrical pile body is made of C80 high-strength concrete through a centrifugal molding process.

[0014] The beneficial effect of the utility model is that compared with the permeable pipe piles with circular permeable holes, the utility model adopts elliptical permeable holes to reduce the cross-sectional area of ​​the openings of the pipe piles when they are under pressure. Under the condition of the same opening area, the water permeability is not affected, while the bearing capacity is improved. In addition, the design of the internal support of the steel gasket can further reinforce the weak points of the openings, so that the permeable pipe piles can maintain good water permeability while their bearing capacity can meet the requirements of actual use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional perspective structural schematic diagram of the utility model;

[0016] Figure 2 It is a top view of the pile body in the utility model;

[0017] Figure 3 It is a cross-sectional view of the pile body in the utility model;

[0018] Figure 4 It is a three-dimensional diagram of the inner support of the steel gasket in the utility model;

[0019] Figure 5 It is a schematic diagram of the pile-soil action mechanism of the utility model;

[0020] Figure 6 It is a numerical test schematic diagram of the utility model;

[0021] Figure 7 It is a comparison chart of the bearing capacity of numerical tests.

[0022] In the figure: 1. Hollow cylindrical pile body; 101. Conical pile shoe; 102. Prestressed longitudinal reinforcement; 103. Stirrups; 201. Drain pipe; 202. Water pump; 3. Elliptical water-permeable hole; 401. Steel gasket; 402. Internal skeleton; 5. Soil around the pile; 6. Water flow direction; 7. Loading direction; 8. Numerical test pile without a hole; 9. Numerical test pile. DETAILED DESCRIPTION

[0023] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.

[0024] Example 1: Figure 1-5 As shown, an elliptical permeable pipe pile supported by a steel gasket includes a hollow cylindrical pile body 1 formed by centrifugation, a conical pile shoe 101 welded to the bottom end of the hollow cylindrical pile body 1, a plurality of prestressed longitudinal reinforcements 102 embedded in the hollow cylindrical pile body 1, and annular hoop reinforcements 103 arranged around the prestressed longitudinal reinforcements 102. The annular hoop reinforcements 103 are used to fix the prestressed longitudinal reinforcements 102. The lower end of the drainage pipe 201 is placed at the bottom of the cavity of the hollow cylindrical pile body 1. The upper end is connected to a water pump 202, and the permeable holes 3 evenly distributed on the hollow cylindrical pile body 1 are used to discharge the pore water of the soil 5 around the pile into the cavity of the hollow cylindrical pile body 1, and then the water in the cavity is pumped out by the drainage pipe 201 and the water pump 202. The steel gasket 401 is connected to the internal skeleton 402 and placed in the centrifugal mold before the hollow cylindrical pile body 1 is formed. The soil 5 around the pile is distributed around the hollow cylindrical pile body 1, and the flow direction of the pore water in the soil 5 around the pile is the water flow direction 6.

[0025] The hollow cylindrical pile body 1 is made of C80 high-strength concrete through a centrifugal molding process. Before molding, the inner skeleton 402 connected with the steel gasket 401 needs to be placed in a centrifugal mold. After molding, the hollow cylindrical pile body 1 forms an elliptical water-permeable hole 3.

[0026] Among them, the elliptical permeable holes 3 are evenly distributed on the hollow cylindrical pile body 1 at a certain interval, and the pore water of the soil around the pile is Figure 3 The water flows into the cavity of the hollow cylindrical pile body 1 according to the law shown, and is then drawn out through the drainage device. The long axis of the elliptical water-permeable hole 3 is parallel to the pile axis, and the short axis is perpendicular to the pile axis. The ratio of the long axis to the short axis is 2. The inside of the elliptical hole is supported by a steel gasket 401, which can effectively improve the bearing capacity of the permeable pipe pile.

[0027] When the utility model is implemented, the following steps are specifically included:

[0028] 1: A plurality of prestressed longitudinal bars 102 are stretched by a pre-tensioning method and placed in a centrifugal mold;

[0029] 2: Place the inner frame 402 connected with the steel gasket 401 in the centrifugal mold;

[0030] 3: Place stirrups 103 around the prestressed longitudinal reinforcement 102 and weld them at the connection points;

[0031] 4: Pour cement, sand, gravel and additives into the centrifugal mold according to the proportion required for preparing C80 high-strength concrete;

[0032] 5: Centrifugal forming and steam curing, after the preparation is completed, the lower end of the hollow cylindrical pile body 1 is welded to the conical pile shoe 101;

[0033] 6: Keep the construction site flat and drive the piles into the soil;

[0034] 7: After driving, the pore water flows into the cavity of the hollow cylindrical pile body 1 through the elliptical water-permeable holes 3, and a drainage device is deployed, including a drainage pipe 201 and a water pump 202, to pump out the water in the cavity.

[0035] Embodiment 2:

[0036] In order to further discuss the bearing capacity performance of an elliptical permeable pipe pile with a steel gasket as an internal support, this embodiment numerically calculates its axial bearing capacity through numerical experiments and compares it with ordinary pipe piles without holes.

[0037] It should be noted that, except for the lack of holes and steel gasket internal support, the other features of the ordinary pipe pile are consistent with those of the utility model. The hollow cylindrical pile body 1 adopts C80 concrete, the prestressed longitudinal reinforcement 102 and stirrups 103 adopt HPB235 grade steel bars, and the steel gasket 401 and the internal skeleton 402 adopt 235 steel.

[0038] In this example, the pile body is cut into 2000mm lengths for uniaxial compression test. The stress conditions of the numerical test pile 9 of the utility model and the numerical test pile 8 without a hole are as follows: Figure 6 As shown, the bottom surface of the pile is a support that cannot be moved, and a load 7 is applied downward on the top surface to simulate the working condition when the top of the pile is subjected to building load. Figure 7 The numerical test results shown show that the bearing capacity of the utility model is improved compared with ordinary pipe piles without holes.

[0039] The utility model is an elliptical permeable pipe pile supported by a steel gasket. On the one hand, the elliptical permeable holes 3 and the drainage device evenly distributed in the hollow cylindrical pile body 1 can be used to timely discharge the pore water in the soil around the pile, thereby accelerating the dissipation speed of the pore water pressure, quickly increasing the soil strength, and then improving the pile-soil composite bearing capacity. On the other hand, considering the problem of reduced bearing capacity caused by the opening of the pile body, the utility model makes the bearing capacity of the pile body sufficient to meet the engineering design value through the steel gasket internal support structure and the elliptical opening method.

[0040] The above embodiments only express the implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the utility model patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.

Claims

1. An elliptical permeable pipe pile with a steel gasket inner support, comprising a pile body, a drainage device, a permeable hole (3) and a steel gasket inner support, characterized in that: The pile body comprises a hollow cylindrical pile body (1), a conical pile shoe (101), prestressed longitudinal reinforcement (102) and stirrups (103); the drainage device comprises a drainage pipe (201) and a water pump (202); and the steel gasket inner support comprises a steel gasket (401) and an internal skeleton (402).

2. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The prestressed longitudinal reinforcement (102) is embedded in the hollow cylindrical pile body (1), and the stirrups (103) are arranged around the prestressed longitudinal reinforcement (102) and are welded and fixed at the connection points.

3. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The upper end of the drainage pipe (201) is connected to the water pump (202), and the lower end of the drainage pipe (201) extends into the cavity of the hollow cylindrical pile body (1) to the bottom.

4. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The water-permeable holes (3) are elliptical holes, evenly distributed on the pile wall of the hollow cylindrical pile body (1), the major axis of the water-permeable holes (3) is parallel to the pile axis, the minor axis is arranged perpendicular to the pile axis, and the ratio of the major axis to the minor axis is 1.5 to 2.

5.

5. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The internal skeleton (402) is in the shape of a hollow thin-walled cylinder, and its outer diameter is equal to the inner diameter of the hollow cylindrical pile body (1).

6. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The bottom of the hollow cylindrical pile body (1) is welded to the conical pile shoe (101).

7. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The prestressed longitudinal reinforcement (102) and stirrups (103) are both made of HPB235 grade steel bars, and the steel gasket (401) and the internal skeleton (402) are both made of 235 steel.

8. The elliptical permeable pipe pile supported by a steel gasket according to claim 1, characterized in that: The hollow cylindrical pile body (1) is made of C80 high-strength concrete through a centrifugal molding process.