Self-balancing prefabricated cornice board structure
By embedding anchor rings and anchor bolts in the prefabricated cornice board, combined with grouting and support units, the problem of weak connections between the prefabricated cornice board and the supporting beams and columns is solved, thus speeding up construction and improving safety. Reduces construction costs and hidden dangers.
Patent Information
- Application Number
- CN202420322459.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-02-21
AI Technical Summary
The connection between the existing prefabricated eaves boards and the supporting beams and columns is weak, posing safety risks, and the cast-in-situ construction results in a long construction period and high consumption of labor and materials.
It adopts a self-balancing prefabricated cornice board structure, with round steel anchor rings and anchor bolts pre-embedded on the prefabricated cornice board. It is combined with grouting units, connection units and support units. It is directly hoisted and installed by a tower crane or crane, and is installed in the main structure of the building. For plug and lap joints, use mortar and L-shaped angle steel to enhance connection stability.
It improves the stability and safety of prefabricated cornice boards, reduces construction procedures and construction period, reduces labor and material requirements, and improves construction efficiency and economic benefits.
Smart Images

Figure CN221837859U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of prefabricated cantilever eaves, in particular to a prefabricated cantilever eaves board and a self-balancing prefabricated cantilever eaves board structure. Background Art
[0002] At present, most cantilever board structures are cast-in-place. Cast-in-place cantilever boards need to set up scaffolding on site, lay formwork, tie steel bars, and pour concrete. The construction period is relatively long and the demand for labor and materials is large. When the cast-in-place cantilever is long and is constructed on higher floors or roofs, it is also necessary to pre-embed and set up cantilever I-beams, which increases the amount of work. After the cast-in-place cantilever board is cast, it needs strict maintenance, which can easily cause cracking of the concrete slab, and the cast-in-place construction leads to a long time for concrete forming.
[0003] As disclosed in the Chinese invention patent with an application publication date of 2022.08.19 and application publication number CN217420545A, a device for combining prefabrication and cast-in-place of a roof eave structure and a construction method thereof, the device includes an eave structure, supporting beams, embedded bolts and a post-cast covered reinforced concrete structure. The embedded bolts are embedded in the supporting beams and extend out of the top. Reserved through holes are provided on the inner side section of the eave structure. The eave structure is hoisted on the top of the supporting beams. The embedded bolts pass through the reserved through holes and are tightened and fixed with fixing nuts. The post-cast covered reinforced concrete structure is arranged on the fixing nuts and covered.
[0004] In the above-mentioned prior art, the cantilever board is prefabricated and then hoisted to the supporting beams for connection, which avoids the situation of setting up supports at high altitudes. However, the cantilever board and the supporting beams are overlapped and then fixed by embedded bolts. The fixing relationship between the two is relatively weak, and there are still safety hazards for cantilever boards with longer cantilever lengths.
[0005] Therefore, how to strengthen the connection between the prefabricated cantilever panels and the supporting beams and columns and improve the overall safety and stability of the prefabricated cantilever is a technical problem that needs to be solved urgently. Utility Model Content
[0006] In view of the deficiencies in the above-mentioned background technology, the utility model proposes a self-balancing prefabricated cantilever plate structure, which solves the problem that the connection between the prefabricated cantilever plate and the supporting beams is weak and there are safety hazards in the prefabricated cantilever as a whole.
[0007] The technical solution of this application is:
[0008] A self-balancing prefabricated cantilever board structure includes a prefabricated cantilever board, one end of the prefabricated cantilever board is plugged and matched with a building main body, and the other end of the prefabricated cantilever board is hollow, and a grouting unit, a connecting unit, and a supporting unit are arranged between the prefabricated cantilever board and the building main body. The cantilever board in the utility model is a prefabricated component, and does not require large-scale erection of I-beams, scaffolding and formwork. Round steel anchor rings are pre-embedded on the cantilever board. When the prefabricated cantilever board is transported to the construction site, it only needs a tower crane or a crane to directly hoist and install it in place, which is convenient and fast, and the construction speed is fast; one end of the prefabricated cantilever board is inserted into the cast-in-place concrete beams and columns of the building main body, which plays a role in balancing the force and enhances the stability and durability of the prefabricated cantilever board. At the same time, the grouting unit, the connecting unit, and the supporting unit further strengthen the connection relationship between the prefabricated cantilever board and the building main body, and comprehensively ensure the stability of the prefabricated cantilever board to avoid safety hazards.
[0009] Furthermore, a notch is provided on the structural column of the building body, the prefabricated eaves board is inserted into the notch and overlapped on the structural beam of the building body, the connecting unit, the grouting unit and the supporting unit are provided between the prefabricated eaves board and the structural beam, and the grouting unit is provided between the prefabricated eaves board and the structural column.
[0010] Furthermore, the connection unit includes an anchor bolt embedded in the structural beam, and the prefabricated cantilever plate is provided with an anchor bolt hole. The anchor bolt passes through the anchor bolt hole and cooperates with the nut thread to enhance the firmness of the connection.
[0011] Furthermore, the grouting unit includes a mortar flow channel arranged in the structural column and a grouting hole arranged in the prefabricated cantilever plate, the mortar flow channel is connected to the notch, and the grouting hole is connected to the anchor hole.
[0012] Furthermore, the mortar flow channel includes a grouting pipe and a grouting pipe, the grouting pipe is arranged horizontally, the grouting pipe is arranged obliquely, and the position of the grouting pipe is lower than the position of the grouting pipe. The slurry is injected from the grouting pipe at a lower position, and the slurry fills the gap between the prefabricated cantilever plate and the notch, and then fills the grouting pipe, and the excess slurry flows out from the grouting pipe, making the whole structure more compact and fully filling each gap.
[0013] Furthermore, a pad is provided between the nut and the upper surface of the prefabricated cantilever plate, and a hole for the anchor bolt to pass through is provided on the pad to enhance the firmness of the connection node.
[0014] Furthermore, a cast-in-place sealing layer is provided above the base plate to increase the firmness of the node.
[0015] Furthermore, the supporting unit includes an L-shaped angle steel arranged between the structural beam and the cantilevered part of the prefabricated cantilever board through a connecting piece, the right-angled sides of the L-shaped angle steel are respectively fitted with the end face of the structural beam and the lower surface of the prefabricated cantilever board, and diagonal braces are arranged between the right-angled sides of the L-shaped angle steel, which further enhances the stability of the cantilever board and reduces unsafe factors.
[0016] Furthermore, an anchor ring plate for connecting protective facilities is pre-embedded in the outer end of the prefabricated cantilever board, which is convenient for the subsequent welding and installation of the railings without the need to destroy the prefabricated cantilever board by nailing.
[0017] Furthermore, a joint is provided between adjacent prefabricated eaves panels, and an anti-cracking layer is provided at the bottom of the joint, thereby ensuring the waterproof performance, structural safety and durability of the joint.
[0018] The specific beneficial effects of the utility model include:
[0019] 1. The cantilever plate in the utility model is a prefabricated component, and does not require a large area of I-beams, scaffolding and formwork;
[0020] 2. The prefabricated cantilever board in the utility model is constructed in the factory, with high construction precision, not easy to crack, smooth and beautiful appearance, and no plastering construction is required after on-site installation, which reduces the construction process;
[0021] 3. When installing on high floors or roofs, only a tower crane or a crane is needed to directly hoist and install the structure, which is convenient and fast.
[0022] 4. One end of the prefabricated cantilever plate in the utility model is inserted into the cast-in-place concrete beam column of the building main body, which plays a role in balancing the force and enhancing the stability and durability of the prefabricated cantilever plate. At the same time, the grouting unit, the connection unit and the support unit further strengthen the connection between the cantilever plate and the building main body, and comprehensively ensure the stability of the cantilever plate to avoid safety hazards.
[0023] 5. The utility model solves the difficulties and shortcomings of current conventional construction operations. At present, cast-in-place construction is relatively mature, but the characteristics of long construction period and high labor and material consumption brought about by cast-in-place construction are also relatively common. After research and combining the experience of prefabricated construction, the cantilever board structure is deeply designed on the basis of cast-in-place, and the design drawings of prefabricated cantilever boards are specially specified. Construction personnel only need to batch construct in the factory according to the design drawings. After transporting to the site, construction personnel can also quickly carry out hoisting and installation construction without too many cumbersome construction procedures. The design and construction of this structure can not only speed up the construction period and save labor, but also improve construction efficiency, reduce safety hazards in construction, and greatly improve economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a schematic diagram of the utility model;
[0026] Figure 2 It is a top view of the utility model;
[0027] Figure 3 It is a cross-sectional view of the utility model;
[0028] Figure 4 for Figure 3 Enlarged view of point A in the middle.
[0029] Description of Figure Numbers:
[0030] 1. Prefabricated cantilever board; 2. Building main body;
[0031] 3. Grouting unit; 4. Connection unit; 5. Support unit;
[0032] 21. Structural column; 22. Structural beam; 23. Notch; 24. Steel plate;
[0033] 31. mortar flow channel; 32. grouting channel; 33. grouting pipe; 34. grouting pipe;
[0034] 41. Anchor bolt; 42. Nut; 43. Backing plate; 44. Cast-in-place sealing layer;
[0035] 51. Connector; 52. L-shaped angle steel; 53. Diagonal brace;
[0036] 54. Anchor ring plate; 55. Joint seam. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0038] A self-balancing prefabricated cantilever plate structure, comprising a prefabricated cantilever plate 1, such as Figure 1As shown, one end of the prefabricated cantilever board 1 is plugged and matched with the building main body 2, and the other end of the prefabricated cantilever board 1 is hollow. A grouting unit 3, a connecting unit 4, and a supporting unit 5 are arranged between the prefabricated cantilever board 1 and the building main body 2. The cantilever board in the utility model is a prefabricated component, which does not require the large-scale erection of I-beams, scaffolding and formwork. Round steel anchor rings are pre-embedded on the cantilever board. When the prefabricated cantilever board is transported to the construction site, it only needs a tower crane or a crane to directly hoist and install it in place, which is convenient and fast, and the construction speed is fast; one end of the prefabricated cantilever board 1 is inserted into the cast-in-place concrete beams and columns of the building main body 2, which plays a role in balancing the force and strengthens the stability and durability of the prefabricated cantilever board 1. At the same time, the grouting unit 3, the connecting unit 4, and the supporting unit 5 further strengthen the connection relationship between the prefabricated cantilever board 1 and the building main body 2, and comprehensively ensure the stability of the prefabricated cantilever board 1 to avoid safety hazards.
[0039] Based on the above implementation, as a preferred implementation, Figure 3 , Figure 4 As shown, a groove 23 is provided on the structural column 21 of the building body 2, the prefabricated cantilever board 1 is inserted into the groove 23 and overlapped on the structural beam 22 of the building body 2, the connecting unit 4, the grouting unit 3, and the supporting unit 5 are provided between the prefabricated cantilever board 1 and the structural beam 22, and the grouting unit 3 is provided between the prefabricated cantilever board 1 and the structural column 21.
[0040] Specifically, Figure 3 As shown, the inner surface of the groove 23 is fitted with the outer surface of the plug-in part of the prefabricated cantilever board 1, and a steel plate 24 is embedded in the inner wall of the opening of the groove 23. When the prefabricated cantilever board 1 is inserted into the groove 23, inevitable collision is likely to occur. The groove 23 is prone to bumps and cause gaps. The steel plate 24 effectively strengthens the firmness of the groove opening.
[0041] Preferably, the steel plate may be 100*6.
[0042] On the basis of the above embodiment, as a preferred embodiment, the connection unit 4 includes an anchor bolt 41 embedded in the structural beam 22, and an anchor bolt hole is provided on the prefabricated eaves board 1. The anchor bolt 41 passes through the anchor bolt hole and is threadedly matched with the nut 42.
[0043] Specifically, the lower half of the anchor bolt 41 is embedded in the structural beam 22, and the upper half of the anchor bolt 41 is exposed. The exposed length of the anchor bolt 41 is greater than the thickness of the prefabricated cantilever board 1. Several anchor bolts 41 can be embedded to enhance the firmness of the connection.
[0044] On the basis of the above-mentioned embodiment, as a preferred embodiment, the grouting unit 3 includes a mortar flow channel 31 embedded in the structural column 21 and a grouting channel 32 arranged in the prefabricated cantilever board 1, a grouting port 1 of the mortar flow channel 31 is arranged on the outer surface of the structural column 21, a grouting outlet 1 of the mortar flow channel 31 is connected with the groove 23, a grouting port 2 of the grouting channel 32 is arranged on the upper surface of the prefabricated cantilever board 1, and a grouting outlet 2 of the grouting channel 32 is connected with the anchor hole.
[0045] On the basis of the above-mentioned embodiment, as a preferred embodiment, the mortar flow channel 31 includes a grouting pipe 33 and a slurry outlet pipe 34. The grouting pipe 33 is horizontally arranged, and the slurry outlet pipe 34 is inclinedly arranged. The position of the grouting pipe 33 is lower than the position of the slurry outlet pipe 34. The slurry is injected from the lower grouting pipe 33, and the slurry fills the gap between the prefabricated cantilever board 1 and the groove 23, and then fills the slurry outlet pipe 34. The excess slurry flows out from the slurry outlet pipe 34, making the whole structure more compact and fully filling each gap.
[0046] Preferably, the grouting pipe 33 and the slurry outlet pipe 34 are both made of Φ50 PVC pipes, and a plurality of the grouting pipes 33 and the slurry outlet pipes 34 are provided.
[0047] Specifically, the anchor bolts 41 are arranged in two rows, and the grouting channels 32 are arranged between the two rows of anchor bolts and connected to the two rows of anchor bolts 41. The grouting channels 32 are in an inverted T-shape. The slurry is poured from the grouting holes on the upper surface of the prefabricated cantilever board 1. The slurry flows along the T-shaped grouting channels 32 to fill the gaps between the anchor bolts 41 and the anchor holes, thereby further strengthening the connection firmness between the prefabricated cantilever board 1 and the building main body.
[0048] On the basis of the above-mentioned embodiment, as a preferred embodiment, a pad 43 is arranged between the nut 42 and the upper surface of the prefabricated eaves board 1, and a hole for the anchor bolt 41 to pass through is arranged on the pad 43.
[0049] Preferably, the pad 43 may be a steel plate with a size of 180*580*20 to enhance the firmness of the connection node.
[0050] On the basis of the above-mentioned embodiment, as a preferred embodiment, a cast-in-place sealing layer 44 is arranged above the pad 43 .
[0051] Preferably, the cast-in-place sealing layer 44 is sealed with C35 fine stone concrete to fill the gaps between the nut 42, the pad 43, and the grouting channel 32, and cover them all, thereby increasing the firmness of the node.
[0052] On the basis of the above-mentioned embodiment, as a preferred embodiment, the support unit 5 includes an L-shaped angle steel 52 arranged between the structural beam 22 and the cantilevered part of the prefabricated cantilever board 1 through a connecting member 51, and the right-angle sides of the L-shaped angle steel 52 are respectively fitted with the end face of the structural beam 22 and the lower surface of the prefabricated cantilever board 1.
[0053] Preferably, diagonal braces 53 are provided between the right-angle sides of the L-shaped angle steel 52 to further enhance the stability of the cantilever board and reduce unsafe factors.
[0054] On the basis of the above-mentioned embodiment, as a preferred embodiment, the outer end of the prefabricated eaves board 1 is pre-embedded with an anchor ring plate 54 for connecting protective facilities, which is convenient for the subsequent welding and installation of the railings without the need to nail the prefabricated eaves board 1 for installation.
[0055] Based on the above implementation, as a preferred implementation, adjacent prefabricated cantilever panels 1 are provided with joint seams 55, such as Figure 2 As shown, an anti-cracking layer is provided at the bottom of the joint seam 55 .
[0056] Specifically, the side surfaces of the prefabricated eaves panels 1 are beveled to form triangular joints between adjacent prefabricated eaves panels 1, and fine stone concrete is poured into the joints 55. The anti-cracking layer includes anti-cracking mortar applied under the fine stone concrete to seal the joints of the prefabricated eaves panels 1, thereby ensuring the waterproof performance, structural safety and durability of the joints.
[0057] The cantilever board in the utility model is a prefabricated component, and there is no need to set up I-beams, scaffolding and formwork in a large area; the prefabricated cantilever board is constructed in the factory, with high construction precision, not easy to crack, smooth and beautiful appearance, and no plastering construction is required after on-site installation, thus reducing the construction process; when constructing and installing on high floors or roofs, only a tower crane or a crane is needed to directly lift and install it in place, which is convenient and fast, and the construction speed is fast; one end of the prefabricated cantilever board is inserted into the cast-in-place concrete beams and columns of the main building, which plays a role in balancing the force, enhances the stability and durability of the prefabricated cantilever board, and at the same time the grouting unit, the connection unit and the support unit further strengthen the connection relationship between the cantilever board and the main building, comprehensively ensuring the stability of the cantilever board and avoiding installation All hidden dangers; the utility model solves the difficulties and shortcomings of current conventional construction operations. At present, cast-in-place construction is relatively mature, but the characteristics of long construction period and high labor and material consumption brought about by cast-in-place construction are also relatively common. After research and combining the experience of prefabricated construction, the cantilever board structure is deeply designed on the basis of cast-in-place, and the design drawings of prefabricated cantilever boards are specially specified. Construction personnel only need to carry out batch construction in the factory according to the design drawings. After transporting to the site, construction personnel can also quickly carry out hoisting and installation construction without too many cumbersome construction procedures. The design and construction of this structure can not only speed up the construction period and save labor, but also improve construction efficiency, reduce safety hazards in construction, and greatly improve economic benefits.
[0058] The parts not described in detail in the present invention are all conventional technical means known to those skilled in the art.
[0059] The above content shows and describes the basic principle, main features and beneficial effects of the utility model. The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A self-balancing prefabricated cantilever plate structure, comprising a prefabricated cantilever plate (1), characterized in that: One end of the prefabricated cantilever board (1) is plugged into and matched with the building body (2), and the other end of the prefabricated cantilever board (1) is hollowed out. A grouting unit (3), a connection unit (4), and a support unit (5) are provided between the prefabricated cantilever board (1) and the building body (2).
2. The self-balancing prefabricated cantilever plate structure according to claim 1 is characterized in that: A notch (23) is provided on the structural column (21) of the building body (2); the prefabricated cantilever board (1) is inserted into the notch (23) and overlapped on the structural beam (22) of the building body (2); the connection unit (4), the grouting unit (3), and the support unit (5) are provided between the prefabricated cantilever board (1) and the structural beam (22); and the grouting unit (3) is provided between the prefabricated cantilever board (1) and the structural column (21).
3. The self-balancing prefabricated cantilever plate structure according to claim 2 is characterized in that: The connection unit (4) comprises an anchor bolt (41) pre-buried in the structural beam (22); an anchor bolt hole is provided on the prefabricated cantilever plate (1); the anchor bolt (41) passes through the anchor bolt hole and is threadably engaged with a nut (42).
4. The self-balancing prefabricated cantilever plate structure according to claim 3 is characterized in that: The grouting unit (3) comprises a mortar flow channel (31) pre-buried in the structural column (21) and a grouting hole (32) arranged in the prefabricated cantilever plate (1); the mortar flow channel (31) is connected to the notch (23), and the grouting hole (32) is connected to the anchor bolt hole.
5. The self-balancing prefabricated cantilever plate structure according to claim 4 is characterized in that: The mortar flow channel (31) comprises a grouting pipe (33) and a grouting outlet pipe (34); the grouting pipe (33) is arranged horizontally, and the grouting outlet pipe (34) is arranged obliquely; the position of the grouting pipe (33) is lower than the position of the grouting outlet pipe (34).
6. The self-balancing prefabricated cantilever plate structure according to claim 3 is characterized in that: A backing plate (43) is provided between the nut (42) and the upper surface of the prefabricated cantilever plate (1), and a hole for the anchor bolt (41) to pass through is provided on the backing plate (43).
7. The self-balancing prefabricated cantilever plate structure according to claim 6 is characterized in that: A cast-in-place sealing layer (44) is provided above the pad (43).
8. The self-balancing prefabricated cantilever plate structure according to claim 2 is characterized in that: The support unit (5) comprises an L-shaped angle steel (52) arranged between the structural beam (22) and the cantilevered portion of the prefabricated cantilever plate (1) via a connecting piece (51); the right-angled sides of the L-shaped angle steel (52) are respectively fitted with the end surface of the structural beam (22) and the lower surface of the prefabricated cantilever plate (1); and diagonal braces (53) are arranged between the right-angled sides of the L-shaped angle steel (52).
9. The self-balancing prefabricated cantilever plate structure according to any one of claims 1 to 8, characterized in that: An anchor ring plate (54) for connecting protective facilities is pre-embedded at the outer end of the prefabricated cantilever plate (1).
10. The self-balancing prefabricated cantilever plate structure according to any one of claims 1 to 8, characterized in that: A splicing seam (55) is provided between adjacent prefabricated eaves panels (1), and an anti-cracking layer is provided at the bottom of the splicing seam (55).
