Tower crane test bed

By using the load-bearing frame, connecting frame and connecting components to build the tower crane test bench, and using standard sections to simplify installation and disassembly, the existing tower crane test bench problems of long construction period and difficulty in recycling are solved, achieving high efficiency, Low-cost pilot testing.

CN221840749UInactive Publication Date: 2024-10-15湖南省特种设备检验检测研究院 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420494100.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing climbing tower crane test bench has a long construction period and is difficult to recycle, resulting in low test efficiency.

Method used

A tower crane test bench is designed, which uses a load-bearing frame, a connecting frame and connecting components, and is built using standard sections, which simplifies the installation and disassembly process. The material is steel, which is easy to recycle.

Benefits of technology

The construction period of the test bench is shortened, the efficiency of the test is improved, the cost is reduced, and the accuracy and safety of the test are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221840749U_ABST
    Figure CN221840749U_ABST
Patent Text Reader

Abstract

The utility model discloses a tower crane test bed, which is used for testing a climbing type tower crane, the climbing type tower crane comprises a tower body and a climbing frame, the tower crane test bed comprises a bearing frame, the bearing frame is provided with a test area and a mounting area which are arranged at an interval, and the position, corresponding to the test area, on the bearing frame is sleeved on the outer side of the tower body; the climbing frame is mounted on the bearing frame corresponding to the test area; the position, corresponding to the mounting area, of the connecting frame is connected to the bearing frame, and the connecting frame and the bearing frame are jointly arranged outside the tower body in a surrounding mode; the connecting assembly is suitable for being connected with a standard knot, the connecting assembly comprises an upper connecting part and a lower connecting part, the connecting frame is provided with an upper mounting part and a lower mounting part, the upper connecting part is mounted on the upper mounting part, the lower connecting part is mounted on the lower mounting part, and the upper connecting part and the lower connecting part are connected through a connecting column; the standard knots are connected to the upper side and the lower side of the connecting assembly through the upper connecting parts and / or the lower connecting parts respectively. According to the utility model, the construction period and cost of the tower crane test bed can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tower crane machinery, in particular to a tower crane test bench. Background Art

[0002] With the advancement of urbanization, land resources are becoming increasingly scarce, and the demand for the construction of high-rise buildings and narrow spaces is increasing. The emergence of climbing tower cranes can meet the construction needs of high-rise buildings and solve the installation problems in narrow urban spaces. In order to detect the key performance parameters of the climbing tower crane, such as the lifting capacity, climbing speed, and rotation accuracy, the operation safety, and to detect and eliminate the potential defects of the climbing tower crane, in order to improve the operation efficiency and reliability of the climbing tower crane, a climbing tower crane test bench is often used to test the climbing tower crane. In the related art, a concrete test bench simulating the elevator shaft structure is usually built to simulate the use scenario of the climbing tower crane to test the climbing tower crane. The construction period of this test bench is long, and it is difficult to recycle after use, resulting in low test efficiency of the climbing tower crane. Utility Model Content

[0003] The main purpose of the utility model is to provide a tower crane test bench and a tower crane, aiming to solve the technical problem in the prior art that the climbing tower crane test bench is inconvenient to install and disassemble, resulting in low test efficiency of the climbing tower crane.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] The utility model provides a tower crane test bench for testing a climbing tower crane, wherein the climbing tower crane comprises a tower body and a climbing frame, and the tower crane test bench comprises:

[0006] A bearing frame, wherein the bearing frame has a test area and an installation area arranged at intervals, a position on the bearing frame corresponding to the test area is sleeved on the outside of the tower body, and the climbing frame is installed on the bearing frame at a position corresponding to the test area;

[0007] A connecting frame, the connecting frame is connected to the bearing frame at a position corresponding to the installation area, and the connecting frame and the bearing frame are jointly arranged outside the tower body;

[0008] A connection assembly, suitable for connecting with a standard section, the connection assembly comprises an upper connection part and a lower connection part, the connection frame comprises an upper mounting part and a lower mounting part, the upper connection part is mounted on the upper mounting part, the lower connection part is mounted on the lower mounting part, and the upper connection part and the lower connection part are connected by a connection column;

[0009] A plurality of standard sections are respectively connected to the upper and lower sides of the connection assembly through the upper connection part and / or the lower connection part.

[0010] In some embodiments, the supporting frame includes two supporting beams, which are spaced apart to form the test area and the two installation areas; along the extension direction of the supporting beams, the test area is located between the two installation areas; the number of the connecting frames is two, and the two connecting frames are respectively connected to the two supporting beams.

[0011] In some embodiments, the connecting frame includes two connecting longitudinal beams and two connecting cross beams, the two connecting longitudinal beams are spaced apart in the transverse direction, and the two connecting cross beams are spaced apart in the longitudinal direction and connected between the two connecting longitudinal beams; the upper and lower sides of the connecting longitudinal beams respectively form the upper mounting portion and the lower mounting portion.

[0012] In some embodiments, the connecting longitudinal beam includes two connecting sections, the two connecting sections are arranged at intervals along the longitudinal direction, an assembly section is formed between the two connecting sections, the connecting cross beam is connected to the assembly section, the upper side of the intersection of each connecting section and the assembly section forms the upper mounting portion, and the lower side of the intersection of each connecting section and the assembly section forms the lower mounting portion.

[0013] In some embodiments, the connection assembly includes an upper main chord, a lower main chord, a plurality of upper connecting tubes and a plurality of lower connecting tubes, the upper main chord forming the upper connecting portion, and the plurality of upper connecting tubes are connected to the outside of the upper main chord at intervals along the circumference of the upper main chord; the lower main chord forming the lower connecting portion, and the plurality of lower connecting tubes are connected to the outside of the lower main chord at intervals along the circumference of the lower main chord, the number of the lower connecting tubes is consistent with the number of the upper connecting tubes and are arranged one-to-one, and each of the upper connecting tubes is connected to the corresponding lower connecting tube through the connecting column; the bottom end of the standard section located above the connection assembly is connected to the upper main chord, and the top end of the standard section located below the connection assembly is connected to the lower main chord.

[0014] In some embodiments, the tower body includes a plurality of column feet, and the number of the connecting components is multiple, and the number of the connecting components is consistent with the number of the column feet and they are connected and matched one by one.

[0015] In some embodiments, the tower crane test bench further includes a walkway assembly and a guardrail, wherein the walkway assembly is mounted on the carrier frame, and the guardrail is disposed around the walkway assembly.

[0016] In some embodiments, the walkway assembly includes a first walkway and two second walkway boards, the first walkway board is installed on a side of the support frame close to the test area corresponding to the position of the installation area, the second walkway boards are installed on opposite sides of the support frame, and the guardrail is provided on one side of each of the second walkway boards facing away from the support frame.

[0017] The above one or more technical solutions provided by the present utility model may have the following advantages or at least achieve the following technical effects:

[0018] The tower crane test bench provided by the tower crane test bench proposed in the utility model can cooperate with the existing tower crane standard section to build a tower crane test bench that meets the test requirements for testing the internal climbing tower crane by arranging a load-bearing frame and a connecting component. The tower crane standard section itself has a high structural strength. At the same time, for tower crane production, use and testing users, the tower crane standard section belongs to the existing common materials and is relatively easy to obtain. Therefore, the construction of the tower crane test bench based on the existing materials can be realized. Compared with the test bench with a concrete structure, there is no need to wait for the concrete to solidify, which can shorten the construction period of the test bench. At the same time, the various materials selected are all steel, which can be recycled, and help to reduce the testing cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0020] Figure 1 It is a structural schematic diagram of a tower crane test bench in one embodiment of the utility model;

[0021] Figure 2 This is a schematic structural diagram of a connecting frame involved in one embodiment of the utility model;

[0022] Figure 3 This is a structural schematic diagram of a connecting longitudinal beam involved in an embodiment of the utility model;

[0023] Figure 4 This is a schematic diagram of the structure of a connection assembly involved in one embodiment of the utility model;

[0024] Figure 5 It is a structural schematic diagram of a walkway assembly and a guardrail involved in an embodiment of the utility model;

[0025] Figure 6 The figure is a schematic diagram of the installation structure of the first walkway involved in one embodiment of the utility model.

[0026] Description of Figure Numbers:

[0027]

[0028]

[0029] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0031] It should be noted that in the embodiments of the present utility model, all directional indications (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0032] In the present utility model, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "includes..." does not exclude the presence of other identical elements in the process, method, article or system including the element. In addition, the meaning of "and / or" appearing throughout the text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B.

[0033] In the present utility model, unless otherwise clearly stipulated and limited, the terms "connection", "fixed" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between the two elements.

[0034] In the present invention, if there is a description involving "first", "second", etc., the description of "first", "second", etc. is only used for descriptive purposes and cannot be understood as indicating or implying its relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0035] In the present invention, suffixes such as "module", "assembly", "part", "component" or "unit" used to represent elements are used only to facilitate the description of the present invention and have no specific meaning. Therefore, "module", "component" or "unit" can be used interchangeably.

[0036] For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances. In addition, the technical solutions of various embodiments can be combined with each other, but this is based on the fact that ordinary technicians in this field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by this utility model.

[0037] The technical concept of the present utility model is further described below in conjunction with some specific implementation methods.

[0038] The utility model provides a tower crane test bench and a tower crane.

[0039] Reference Figure 1 and Figure 2 , an embodiment of the utility model provides a tower crane test bench.

[0040] The tower crane test bench is used to test a climbing tower crane, which includes a tower body and a climbing frame. When in use, the climbing frame is fixed to a building. Exemplarily, it can be fixed to the elevator shaft of the building or to the outer edge of the building. The tower body can move upward relative to the climbing frame through the climbing action of the climbing assembly. The structure of the climbing tower crane itself can refer to relevant technologies and is not further limited or described here.

[0041] The tower crane test bench includes a bearing frame 100, a connecting frame 200 and a connecting assembly 300. The bearing frame 100 has a test area 101 and an installation area 102 that are spaced apart. The position of the bearing frame 100 corresponding to the test area 101 is sleeved on the outside of the tower body, and the climbing frame is installed on the bearing frame 100 at a position corresponding to the test area 101; the connecting frame 200 is connected to the bearing frame 100 at a position corresponding to the installation area 102, and the connecting frame 200 and the bearing frame 100 are jointly surrounded outside the tower body.

[0042] The connecting assembly 300 includes an upper connecting part 310 and a lower connecting part 320 , and the connecting frame 200 has an upper mounting part 210 and a lower mounting part 220 . The upper connecting part 310 is mounted on the upper mounting part 210 , and the lower connecting part 320 is mounted on the lower mounting part 220 . The upper connecting part 310 and the lower connecting part 320 are connected by a connecting column 400 .

[0043] A plurality of standard sections (not shown) are respectively connected to the upper and lower sides of the connection assembly 300 through the upper connection part 310 and / or the lower connection part 320; the standard sections are standard sections of existing tower cranes or additional standard sections required for the installation of a tower crane test bench.

[0044] The tower crane test bench provided by the technical solution of this embodiment can cooperate with the standard section of the existing tower crane to build a tower crane test bench that meets the test requirements and test the internal climbing tower crane by setting the support frame 100 and the connecting assembly 300. The standard section of the tower crane itself has a high structural strength. At the same time, for tower crane production, use and testing users, the standard section belongs to the existing common materials and is relatively easy to obtain. Therefore, the construction of the tower crane test bench can be realized based on the existing materials.

[0045] During implementation, the number of interconnected standard sections can be selected as needed to adjust the height of the tower crane test bench. At the same time, the connecting frame 200 and the connecting assembly 300 are installed at the required position to install the supporting frame 100, and the climbing frame is further installed to realize the construction of the tower crane test bench.

[0046] Compared with the test bench with concrete structure in the related art, the technical solution of this embodiment does not need to wait for the concrete to solidify, which can shorten the construction period of the test bench. At the same time, the various materials selected are all steel, which can be recycled, helping to reduce the testing cost.

[0047] During implementation, the tower body of the climbing tower crane is accommodated in the test area 101 of the tower crane test bench, and the climbing frame is installed on the test bench. During the test, the tower body of the climbing tower crane moves upward relative to the climbing frame through the climbing assembly, thereby simulating the climbing operation of the climbing tower crane during actual use.

[0048] It should be noted that the support frame 100 and the connecting frame 200 are arranged horizontally, and the connecting assembly 300 extends vertically. Figure 1 The extension direction of the middle load-bearing frame 100, that is, the length direction, is horizontal; the top end of the upper connecting part 310 is recessed downward to form an upper connecting port, which is used to connect and cooperate with the bottom end of the standard section, and the bottom end of the lower connecting part 320 is recessed upward to form a lower connecting port, which is used to connect and cooperate with the top end of the standard section.

[0049] It should be understood that when installing the tower crane test bench, the upper and lower sections of the standard section are respectively connected to the upper connecting part 310 and the lower connecting part 320 of the connecting component 300, that is, the two ends of the connecting component 300 along the vertical direction, and the tower crane test bench can be assembled on the standard section. When the standard section is connected to the connecting component 300, the standard section can be connected to the connecting frame 200 and the supporting frame 100, which facilitates the installation and disassembly operations of the tower crane test bench and improves the test efficiency of the tower crane.

[0050] After the standard section is assembled on the connecting assembly 300, the upper connecting part 310 and the lower connecting part 320 are fixedly connected by the connecting column 400, thereby improving the connection stability between the connecting assembly 300 and the standard section, ensuring the connection stability between the standard section and the tower crane test bench, preventing the tower crane test bench from shaking during the tower crane test and interfering with the test results of the tower crane, improving the reliability and accuracy of the tower crane test results, and ensuring the working safety of the workers on the tower crane test bench; in addition, compared with the existing tower crane test bench, since the structure of the tower crane test bench is simple, when preparing the tower crane test bench, while ensuring the structural strength of the tower crane test bench, the existing materials on the work site can be fully utilized to build the support frame 100 and the connecting frame 200, so that the manufacturing cost of the tower crane test bench is low, the material versatility is high, and the recyclability is strong.

[0051] As an optional implementation of this embodiment, the connecting frame 200 is connected to the bottom end of the supporting frame 100 at the position corresponding to the installation area 102, so that the top end of the supporting frame 100 has an assembly space for assembling other auxiliary structures such as a walkway assembly and a guardrail 600, so as to further improve the operating convenience and safety of the operators.

[0052] The technical solution of the utility model connects the tower body with the connecting frame 200 and the bearing frame 100 by connecting the standard section to the connecting assembly 300, which facilitates the installation and disassembly operations of the tower crane test bench and improves the test efficiency of the tower crane.

[0053] The support frame 100 and the connecting frame 200 are connected to form a stable frame structure, which ensures the stability of the tower crane test bench when testing the tower crane and prevents the tower crane test bench from interfering with the tower crane test and outputting inaccurate test results. The connecting component 300 improves the stability of the standard section, making the tower crane more stable under test and better simulating actual use conditions, thereby improving the accuracy and reliability of the test and ensuring that the test results are closer to actual operating conditions, thereby improving the operating safety of the tower crane and the accuracy of the tower crane functional verification and improving the safety of the operators.

[0054] In one embodiment, continue to refer to Figure 1 The bearing frame 100 includes two bearing beams 110, which are arranged at intervals to form a test area 101 and two installation areas 102; along the extension direction of the bearing beams 110, the test area 101 is located between the two installation areas 102; the number of connecting frames 200 is two, and the two connecting frames 200 are respectively connected to the two bearing beams 110.

[0055] It should be noted that the two installation areas 102 are arranged on opposite sides of the test area 101 , and the test area 101 and the two installation areas 102 are distributed in the lateral direction.

[0056] It should be understood that the test area 101 formed by the two bearing beams 110 provides an installation space for the climbing frame of the tower crane, and the installation area 102 formed by the two bearing beams 110 provides an installation range for the connecting frame 200. The actual installation position of the climbing frame can be adjusted within the test area 101 according to the position of the tower body and the climbing frame of different tower cranes, and the actual installation position of the standard section can be adjusted in the installation area 102 according to the size of the standard section used to build the test bench. The two bearing beams 110 are arranged at intervals, so that the installation area 102 and the test area 101 have structural adaptability, which can be suitable for testing tower cranes of different sizes and types, and can also use standard sections of different sizes to build the test bench, thereby enhancing the versatility and flexibility of the tower crane test bench, reducing the need to design test benches separately for different models of tower cranes, and can also use standard sections of different specifications to build the test bench, saving cost and time.

[0057] In one embodiment, continue to refer to Figure 1 and Figure 2 The connecting frame 200 includes two connecting longitudinal beams 201 and two connecting cross beams 202. The two connecting longitudinal beams 201 are spaced apart in the transverse direction, and the two connecting cross beams 202 are spaced apart in the longitudinal direction and connected between the two connecting longitudinal beams 201. The upper and lower sides of the connecting longitudinal beams 201 respectively form an upper mounting portion 210 and a lower mounting portion 220.

[0058] It should be understood that the connecting frame 200 formed by the combination of two connecting longitudinal beams 201 and two connecting transverse beams 202 provides a more stable connection structure, strengthens the connection stability between the tower crane and the tower crane test bench, enables the tower crane to remain stable during the test, and reduces the test error caused by unstable installation.

[0059] In one embodiment, continue to refer to Figure 1 to Figure 2 , and refer to Figure 3 The connecting longitudinal beam 201 includes two connecting sections 211, and the two connecting sections 211 are arranged at intervals along the longitudinal direction. An assembly section 212 is formed between the two connecting sections 211. The connecting cross beam 202 is connected to the assembly section 212. The upper side of the intersection of each connecting section 211 and the assembly section 212 forms an upper mounting portion 210, and the lower side of the intersection of each connecting section 211 and the assembly section 212 forms a lower mounting portion 220.

[0060] It should be noted that the two connecting sections 211 are respectively arranged at the two ends of the connecting longitudinal beam 201 along the longitudinal direction. The connecting section 211 provides an assembly space for the connecting longitudinal beam 201 and the bearing cross beam 110, which is more convenient for the preparation and assembly operation of the tower crane test bench.

[0061] It should be understood that the connection of the connecting crossbeam 202 to the assembly section 212 not only meets the connection strength requirement, but also improves the assembly convenience between the connecting longitudinal beam 201 and the connecting crossbeam 202. The tower crane test bench improves the connection reliability and assembly flexibility between the connecting longitudinal beam 201 and the connecting crossbeam 202 by means of the connecting longitudinal beam 201 having two connecting sections 211 and the assembly section 212.

[0062] In one embodiment, continue to refer to Figures 1 to 3 , and refer to Figure 4 The connection assembly 300 includes an upper main chord 301, a lower main chord 302, a plurality of upper connection tubes 311 and a plurality of lower connection tubes 321. The upper main chord 301 forms an upper connection portion 310, and the plurality of upper connection tubes 311 are connected to the outside of the upper main chord 301 at intervals along the circumference of the upper main chord 301; the lower main chord 302 forms a lower connection portion 320, and the plurality of lower connection tubes 321 are connected to the outside of the lower main chord 302 at intervals along the circumference of the lower main chord 302. The number of the lower connection tubes 321 is consistent with the number of the upper connection tubes 311 and is arranged one by one. Each upper connection tube 311 is connected to the corresponding lower connection tube 321 through a connection column 400; the bottom end of the standard section located above the connection assembly 300 is connected to the upper main chord 301, and the top end of the standard section located below the connection assembly 300 is connected to the lower main chord 302.

[0063] It should be noted that an upper connection port is formed at the top of the upper main chord 301, and the upper connection port is used to connect with the bottom end of the standard section. The bottom of the lower main chord 302 is recessed upward to form a lower connection port, and the lower connection port is used to connect with the top end of the standard section.

[0064] In order to ensure the connection stability between each upper main chord 301 and its corresponding lower main chord 302 and improve the shear stress resistance of the tower crane test bench, there are multiple connecting columns 400, and the number of connecting columns 400 is consistent with the number of upper connecting tubes 311 and is arranged one by one.

[0065] It should be understood that in order to reduce the connection complexity between the tower crane test bench and the various components of the tower crane, improve the adaptability of the tower crane test bench to the tower crane tower body, simplify the connection process of the tower crane test bench installation, enhance the matching accuracy between the tower crane test bench and the tower crane components, achieve fast and accurate assembly, improve the efficiency of test preparation, and ensure the structural stability and safety during the test.

[0066] In one embodiment, continue to refer to Figures 1 to 4 The upper connecting tube 311 and the lower connecting tube 321 are both through holes, and the connecting column 400 is a stud. The connecting column 400 passes through the through hole and is further connected with a nut to fix the upper connecting tube 311 and the lower connecting tube 321. In some embodiments, each stud is connected with multiple nuts to prevent loosening.

[0067] It should be understood that since the connecting column 400 is passed through and threadedly connected to the upper connecting tube 311 and the lower connecting tube 321, the fixed connection strength and reliability between the upper main chord 301 and the lower connecting tube 321 are enhanced, preventing the upper main chord 301 and the lower connecting tube 321 from loosening due to shaking of the tower crane during the test, thereby improving safety; and since the connecting column 400 is arranged vertically, after the upper connecting tube 311 and the lower connecting tube 321 are connected through the connecting column 400, the connecting column 400 increases the shear stress resistance of the tower crane test bench, improves the connection firmness and long-term stability of the tower crane test bench, and reduces the safety risks during the test.

[0068] In one embodiment, continue to refer to Figures 1 to 4 The tower body includes a plurality of column feet, and the number of the connecting components 300 is multiple, and the number of the connecting components 300 is consistent with the number of the column feet and they are connected and matched one by one.

[0069] It should be noted that when installing the tower crane test bench, the column foot of the standard section is connected and matched with the upper main chord 301 from the top end of the upper main chord 301, and the column foot of the standard section is connected and matched with the lower main chord 302 from the bottom end of the lower main chord 302, so as to install the tower crane test bench on the tower body.

[0070] It should be understood that, due to the wide variety of tower bodies in the prior art, in order to adapt to different tower body configurations, a plurality of connecting components 300 are designed that are consistent with the number of column feet and cooperate with each other, thereby improving the adaptability of the tower crane test bench to different tower bodies, making the tower crane test bench applicable to a wider range of tower crane models and configurations, and improving the versatility and market adaptability of the tower crane test bench.

[0071] In one embodiment, continue to refer to Figures 1 to 4 , and refer to Figure 5 The tower crane test bench further includes a walkway assembly 500 and a guardrail 600 . The walkway assembly 500 is installed on the carrier frame 100 , and a guardrail 600 is arranged around the walkway assembly 500 .

[0072] It should be understood that in the process of testing the performance of the tower crane, in order to ensure the safety of the operators and the convenience of operation, a walkway assembly 500 and a guardrail 600 are arranged on the carrier frame 100, thereby improving the safety of the test platform and the convenience of the operators, making it easier for the operators to observe and record the test process of the tower crane from different perspectives at different positions, thereby improving the safety protection capability for the operators, reducing the safety risks during the test, and enhancing the convenience and efficiency of the test operation.

[0073] In one embodiment, continue to refer to Figures 1 to 5 , and refer to Figure 6The walkway assembly 500 includes a first walkway 510 and two second walkway boards 520. The first walkway board 510 is installed on the side of the support frame 100 close to the test area 101 corresponding to the position of the installation area 102, and the second walkway boards 520 are installed on the opposite sides of the support frame 100. A guardrail 600 is provided on the side of each second walkway board 520 facing away from the support frame 100.

[0074] It should be noted that this embodiment is only an exemplary description of the arrangement and number of the walkway assembly 500, and the number of the first walkway 510 and the number of the second walkway 520 can be increased or decreased according to the actual tower crane test requirements.

[0075] It should be understood that in the process of testing the performance of the tower crane, in order to provide the operating personnel with a safe operating space, the layout of the operating space is optimized by setting up the first walkway 510 and the two second walkways 520, thereby enhancing the flexibility and safety of the tower crane test bench. The first walkway 510, the second walkway 520 and the guardrail 600 provide the operating personnel with a safer and more convenient working environment, ensuring the smooth progress of the testing process while improving work efficiency and safety.

[0076] It should be understood that this implementation, by applying the tower crane test bench to the tower crane, enables the performance of the tower crane to be effectively evaluated under controlled and simulated conditions, thereby ensuring the reliability and safety of the tower crane design and performance, promoting the development and application of tower crane technology, and improving the efficiency and safety of tower crane use.

[0077] Finally, it should be noted that the serial numbers of the above embodiments of the utility model are only for description and do not represent the advantages and disadvantages of the embodiments. The above embodiments are only optional embodiments of the utility model, and do not limit the patent scope of the utility model. All equivalent structures or equivalent process changes made by using the contents of the utility model specification and drawings under the technical concept of the utility model, or directly or indirectly applied in other related technical fields, are included in the patent protection scope of the utility model.

Claims

1. A tower crane test bench, It is characterized in that Used to test a climbing tower crane, the climbing tower crane includes a tower body and a climbing frame, and the tower crane test bench includes: A bearing frame, wherein the bearing frame has a test area and an installation area arranged at intervals, a position on the bearing frame corresponding to the test area is sleeved on the outside of the tower body, and the climbing frame is installed on the bearing frame at a position corresponding to the test area; A connecting frame, the connecting frame is connected to the bearing frame at a position corresponding to the installation area, and the connecting frame and the bearing frame are jointly arranged outside the tower body; A connection assembly, suitable for connecting with a standard section, the connection assembly comprises an upper connection part and a lower connection part, the connection frame comprises an upper mounting part and a lower mounting part, the upper connection part is mounted on the upper mounting part, the lower connection part is mounted on the lower mounting part, and the upper connection part and the lower connection part are connected by a connection column; A plurality of standard sections are respectively connected to the upper and lower sides of the connection assembly through the upper connection part and / or the lower connection part.

2. The tower crane test bench according to claim 1, It is characterized in that The bearing frame includes two bearing beams, which are spaced apart to form the test area and the two installation areas; along the extension direction of the bearing beams, the test area is located between the two installation areas; the number of the connecting frames is two, and the two connecting frames are respectively connected to the two bearing beams.

3. The tower crane test bench according to claim 2, It is characterized in that The connecting frame includes two connecting longitudinal beams and two connecting cross beams, the two connecting longitudinal beams are spaced apart in the transverse direction, and the two connecting cross beams are spaced apart in the longitudinal direction and connected between the two connecting longitudinal beams; the upper and lower sides of the connecting longitudinal beams respectively form the upper mounting portion and the lower mounting portion.

4. The tower crane test bench according to claim 3, It is characterized in that The connecting longitudinal beam includes two connecting sections, the two connecting sections are spaced apart in the longitudinal direction, an assembly section is formed between the two connecting sections, the connecting cross beam is connected to the assembly section, the upper side of the intersection of each connecting section and the assembly section forms the upper mounting portion, and the lower side of the intersection of each connecting section and the assembly section forms the lower mounting portion.

5. The tower crane test bench according to any one of claims 1 to 4, It is characterized in that The connection assembly comprises an upper main chord, a lower main chord, a plurality of upper connection tubes and a plurality of lower connection tubes, wherein the upper main chord forms the upper connection portion, and the plurality of upper connection tubes are connected to the outside of the upper main chord at intervals along the circumference of the upper main chord; the lower main chord forms the lower connection portion, and the plurality of lower connection tubes are connected to the outside of the lower main chord at intervals along the circumference of the lower main chord, the number of the lower connection tubes is consistent with the number of the upper connection tubes and is arranged in one-to-one correspondence, and each of the upper connection tubes is connected to the corresponding lower connection tube via the connection column; The bottom end of the standard section located above the connection assembly is connected to the upper main chord, and the top end of the standard section located below the connection assembly is connected to the lower main chord.

6. The tower crane test bench according to any one of claims 1 to 4, It is characterized in that The tower body comprises a plurality of column feet, and the number of the connection components is plural, the number of the connection components is consistent with the number of the column feet and they are connected and matched in a one-to-one correspondence.

7. The tower crane test bench according to any one of claims 1 to 4, It is characterized in that It also includes a walkway assembly and a guardrail. The walkway assembly is installed on the bearing frame, and the guardrail is arranged around the walkway assembly.

8. The tower crane test bench according to claim 7, It is characterized in that The walkway assembly includes a first walkway and two second walkway boards. The first walkway board is installed on a side of the load-bearing frame close to the test area corresponding to the position of the installation area, and the second walkway boards are installed on opposite sides of the load-bearing frame. The guardrail is provided on one side of each of the second walkway boards facing away from the load-bearing frame.