Prefabricated platform door waterproof structure
By setting annular concave seams and sealing pads on the side of the prefabricated platform door components, combined with rubber materials, a double sealing structure is formed, which solves the problem of poor waterproofing effect at the joints of prefabricated station segments and improves waterproof performance and service life. Reduced operating costs.
Patent Information
- Application Number
- CN202420379666.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-28
Smart Images

Figure CN221874023U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rail transit engineering, and more specifically to a prefabricated platform door waterproof structure. Background Art
[0002] With the acceleration of urbanization, the construction of tunnels and integrated pipe corridors in municipal engineering is increasing. The traditional open-cut and cast-in-place construction method has problems such as long construction period, large template consumption, complex construction process, difficult concrete quality control, difficult traffic relief, serious environmental and noise pollution, etc., which can no longer meet the requirements of rapid construction and green environmental protection. Therefore, seeking an efficient, environmentally friendly and sustainable construction method has become an important issue in the current municipal engineering construction.
[0003] In recent years, the assembly construction method with prefabricated components as the core has gradually emerged in the fields of construction, railways, highways and bridges. This method uses standard prefabricated components for assembly, and has the advantages of short construction period, controllable quality and small environmental impact. In the field of municipal engineering, the application of assembly construction methods has shown its great potential and prospects.
[0004] At present, the construction technology of municipal underpass tunnels or underground integrated pipe galleries is mainly divided into two types: open excavation + cast-in-place and open excavation + prefabrication and assembly. There are still many problems with the cast-in-place construction process after open excavation, such as large dust and noise pollution, high consumption of formwork materials, slow construction speed, and high safety risks. However, the use of underground prefabricated assembly structure after open excavation can effectively improve construction efficiency, ensure structural strength and sealing, and achieve green and efficient construction by reducing the number of blocks and optimizing joint design.
[0005] Although some municipal projects in China have tried to adopt prefabricated construction, there are still many technical and practical challenges. For example, in the construction process of prefabricated stations, joint waterproofing technology has become a crucial challenge. The existing prefabricated station platform doors are often made of multiple prefabricated segments. The traditional prefabricated station waterproofing measures mainly rely on the self-weight of the segments to apply contact surface stress to ensure longitudinal waterproof performance. The adjacent segments are connected with bolts. By pre-tightening the bolts, a pre-tightening force can be generated between the segments, so that the two segments fit tightly at the joints. This pre-tightening force helps prevent water from leaking through the joints to ensure lateral waterproof performance. However, the prefabricated stations using this waterproofing method have unsatisfactory waterproofing effects at the joints of the prefabricated segments. The problem of poor waterproofing not only affects the service life of the station, but may also have a potential impact on the comfort of passengers. Long-term water penetration may cause corrosion and damage to the structural materials, increase the frequency of maintenance and replacement, and thus increase operating costs. At the same time, water leakage may also damage the internal environment of the station and affect the travel experience of passengers. Utility Model Content
[0006] In order to overcome the deficiencies of the prior art, the utility model provides a prefabricated platform door waterproof structure to improve the waterproof performance of the prefabricated station, thereby extending the service life of the prefabricated station, reducing the maintenance frequency, and thus reducing the operating cost.
[0007] The technical solution of the utility model is as follows: A prefabricated platform door waterproof structure, comprising:
[0008] A prefabricated component, wherein a first annular recess and a second annular recess are arranged on the side of the prefabricated component, wherein the first annular recess is located at the periphery of the second annular recess, a water-facing surface sealing pad is arranged in the first annular recess, and a water-receiving surface sealing pad is arranged in the second annular recess.
[0009] Furthermore, the prefabricated component includes a first prefabricated pipe segment, a second prefabricated pipe segment and a prefabricated center column. The first prefabricated pipe segment and the second prefabricated pipe segment are arranged up and down, and the first prefabricated pipe segment and the second prefabricated pipe segment are connected by the prefabricated center column.
[0010] Furthermore, the end faces of the first prefabricated pipe segment and / or the second prefabricated pipe segment are provided with a first linear groove and a second linear groove, the first groove is connected to the first annular groove, the second groove is connected to the second annular groove, at least a part of the water-facing surface sealing pad is located in the first groove, and at least a part of the water-receiving surface sealing pad is located in the second groove.
[0011] Furthermore, a butyl rubber putty sheet is provided on the top surface of the second prefabricated pipe segment, the butyl rubber putty sheet is in a U-shaped structure, and the opening of the butyl rubber putty sheet faces the first groove.
[0012] Furthermore, a sponge rubber in a U-shaped structure is provided on the top surface of the second prefabricated pipe segment, the opening direction of the sponge rubber is consistent with the opening direction of the butyl rubber putty sheet, the butyl rubber putty sheet surrounds the closed end of the sponge rubber, and at least a portion of the sponge rubber is overlapped on the water-facing surface sealing pad and the water-receiving surface sealing pad.
[0013] Furthermore, at least a portion of the lower end of the first prefabricated pipe segment is recessed inward to form a first clamping groove, and the upper end of the prefabricated center column is provided with a first protrusion, and the first protrusion and the first clamping groove are matched and clamped.
[0014] Furthermore, at least a portion of the upper end of the second prefabricated pipe segment protrudes outward to form a second protrusion, and the lower end of the prefabricated center column is provided with a second slot, and the second protrusion and the second slot are matched and engaged.
[0015] Furthermore, the first prefabricated pipe segment and the second prefabricated pipe segment are both provided with a plurality of tensioning holes, and an EPDM rubber strip is provided in each of the tensioning holes.
[0016] Furthermore, the water-facing surface sealing pad includes a first elastic rubber body and a first water-swellable rubber body, the first water-swellable rubber body is arranged at the upper end of the first elastic rubber body, a plurality of first through holes are arranged inside the first elastic rubber body, a plurality of first abutment columns are arranged at the lower end of the first elastic rubber body, a first arc-shaped notch is formed between two adjacent first abutment columns, and the first abutment column abuts against the inner bottom surface of the first annular groove.
[0017] Furthermore, the back water surface sealing pad includes a second elastic rubber body and a second water-swellable rubber body, the second water-swellable rubber body is arranged at the upper end of the second elastic rubber body, a plurality of second through holes are arranged inside the second elastic rubber body, a plurality of second abutment columns are arranged at the lower end of the second elastic rubber body, a second arc-shaped notch is formed between two adjacent second abutment columns, and the second abutment column abuts on the inner bottom surface of the second annular groove.
[0018] The utility model according to the above scheme has the following beneficial effects:
[0019] (1) The utility model provides a prefabricated platform door waterproof structure, in which a first annular groove and a second annular groove are arranged on the side of the prefabricated component, and a water-facing surface sealing pad and a water-receiving surface sealing pad are arranged therein respectively, forming a two-layer closed waterproof structure, which greatly improves the waterproof performance of the platform door.
[0020] (2) The utility model provides a prefabricated platform door waterproof structure. Due to the design of the first annular groove and the second annular groove, the water-facing surface sealing gasket and the water-receiving surface sealing gasket can be tightly compressed in the first annular groove and the second annular groove. This design enables the sealing gasket to adapt to different seam openings and maintain a stable sealing effect. Even when the seam opening changes slightly due to external factors (such as temperature changes, structural deformation, etc.), the water-facing surface sealing gasket and the water-receiving surface sealing gasket can still effectively prevent the passage of water. Secondly, the convenience of installation and maintenance is also improved. In addition, since the water-facing surface sealing gasket is tightly connected to the prefabricated component and the water-receiving surface sealing gasket is tightly connected to the prefabricated component, problems such as water leakage that may occur during long-term use are reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a structural schematic diagram of a prefabricated platform door waterproof structure in an embodiment of the utility model;
[0023] Figure 2 It is a schematic diagram of the structural decomposition of a prefabricated platform door waterproof structure in an embodiment of the utility model;
[0024] Figure 3 It is a schematic diagram of the top surface structure of the second prefabricated pipe segment in an embodiment of the utility model;
[0025] Figure 4 It is a schematic diagram of the end surface structure of the prefabricated center column in the embodiment of the utility model;
[0026] Figure 5 It is a schematic structural diagram of the water-facing surface sealing pad in the embodiment of the utility model;
[0027] Figure 6 It is a schematic diagram of the installation of the water-facing surface sealing gasket in the embodiment of the utility model;
[0028] Figure 7 It is a structural schematic diagram of the back water surface sealing pad in the embodiment of the utility model;
[0029] Figure 8 It is a schematic diagram of the installation of the back water surface sealing pad in the embodiment of the utility model.
[0030] In the figure, 1, prefabricated component; 11, first annular concave groove; 12, second annular concave groove; 101, first prefabricated pipe segment; 1011, first slot; 102, second prefabricated pipe segment; 1021, second protrusion; 103, prefabricated center column; 2, water-facing surface sealing pad; 21, first elastic rubber body; 211, first through hole; 212, first abutting column; 213, first arc-shaped notch; 22, first water-swellable rubber body; 3, water-receiving surface sealing pad; 31, second elastic rubber body; 311, second through hole; 312, second abutting column; 313, second arc-shaped notch; 32, second water-swellable rubber body; 41, first groove; 42, second groove; 51, butyl rubber putty sheet; 52, sponge rubber; 6, tensioning hole. DETAILED DESCRIPTION
[0031] The following detailed description and drawings of the embodiments of the present invention are used to illustrate the principle of the present invention, but cannot be used to limit the scope of the present invention, that is, the present invention is not limited to the embodiments described.
[0032] In order to better understand the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments:
[0033] See also Figures 1 to 8 As shown, the embodiment of the utility model provides a prefabricated platform door waterproof structure, including: a prefabricated component 1, a first annular recess 11 and a second annular recess 12 are arranged on the side of the prefabricated component 1, the first annular recess 11 is located at the periphery of the second annular recess 12, a water-facing surface sealing pad 2 is arranged in the first annular recess 11, and a water-receiving surface sealing pad 3 is arranged in the second annular recess 12. Specifically, by arranging the first annular recess 11 and the second annular recess 12 on the side of the prefabricated component 1, and installing the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 therein, a double sealing effect is achieved, which not only enhances the waterproof performance of the platform door, but also can effectively cope with the impact of water flow in different directions, and greatly improves the reliability of the seal. Secondly, due to the design of the first annular groove 11 and the second annular groove 12, the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 can be tightly compressed in the first annular groove 11 and the second annular groove 12. This design enables the sealing pads to adapt to different joint openings and maintain a stable sealing effect. Even when the joint opening changes slightly due to external factors (such as temperature changes, structural deformation, etc.), the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 can still effectively prevent the passage of water, and the convenience of installation and maintenance is also improved. In addition, since the water-facing surface sealing pad 2 is tightly connected to the prefabricated component 1 and the water-receiving surface sealing pad 3 is tightly connected to the prefabricated component 1, problems such as water leakage that may occur during long-term use are reduced.
[0034] In this embodiment, the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 are both composite EPDM elastic sealing pads, which are compressed and squeezed to achieve sealing and have the characteristic of swelling in water to achieve waterproof effect. When the seam opening is 2mm, the water-facing surface sealing pad 2 can be completely pressed into and stored in the first annular concave slit 11, and the water-receiving surface sealing pad 3 can be completely pressed into and stored in the second annular concave slit 12. The relationship is in accordance with the following formula: A = (1-1.15) A / O, wherein A-the groove cross-sectional area of the first annular concave slit 11 or the second annular concave slit 12; A / O-the cross-sectional area of the water-facing surface sealing pad 2 or the water-receiving surface sealing pad 3.
[0035] Preferably, the prefabricated component 1 includes a first prefabricated segment 101, a second prefabricated segment 102 and a prefabricated center column 103. The first prefabricated segment 101 and the second prefabricated segment 102 are arranged in an upper and lower arrangement, and the first prefabricated segment 101 and the second prefabricated segment 102 are connected by a prefabricated center column 103. Specifically, the first prefabricated segment 101, the second prefabricated segment 102 and the prefabricated center column 103 can be manufactured in advance and then transported to the site for simple assembly. This modular design greatly simplifies the construction process, reduces the complexity and construction period of on-site operations, and also reduces the risk of construction errors. Secondly, the first prefabricated segment 101 and the second prefabricated segment 102 are connected together by the prefabricated center column 103 to form a stable overall structure, which not only enhances the lateral stability of the platform door, but also provides a stable supporting force when subjected to external forces, thereby reducing the possibility of deformation or damage to the platform door.
[0036] In actual application, it is found that the corner position of the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 is a part that is prone to water leakage. Therefore, it is necessary to perform waterproof treatment on this position to ensure that the corner position of the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 is not damaged during extrusion and sliding. In this embodiment, a first groove 41 and a second groove 42 in a straight line are provided on the end surface of the first prefabricated pipe segment 101 and / or the second prefabricated pipe segment 102. The first groove 41 is connected to the first annular groove 11, and the second groove 42 is connected to the second annular groove 12. At least a part of the water-facing surface sealing pad 2 is located in the first groove 41, and at least a part of the water-receiving surface sealing pad 3 is located in the second groove 42. Specifically, with such a design, when the corner positions of the water surface sealing pad and the water-receiving surface sealing pad 3 are extruded into the first groove 41 and the second groove 42 respectively during extrusion and sliding, the risk of damage to the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3 at the corner position is prevented. Secondly, the front water surface sealing pad 2 and the back water surface sealing pad 3 are compressed by the gravity of the first prefabricated pipe segment 101 and the prefabricated center column 103, thereby enhancing the connection firmness between the front water surface sealing pad 2 and the prefabricated component 1. At the same time, the connection firmness between the back water surface sealing pad 3 and the prefabricated component 1 is also enhanced. When the platform door is subjected to external force, this connection strength can effectively prevent the front water surface sealing pad 2 and the back water surface sealing pad 3 from falling off or shifting, thereby maintaining the stability and sealing of the platform door.
[0037] It is worth mentioning that the two end surfaces of the prefabricated center column 103 can also be provided with a first linear groove 41 and a second linear groove 42 , and their structures and functions are the same as above and will not be described in detail here.
[0038] Preferably, a butyl rubber putty sheet 51 is provided on the top surface of the second prefabricated segment 102, the butyl rubber putty sheet 51 is in a U-shaped structure, and the opening of the butyl rubber putty sheet 51 faces the first groove 41. Specifically, a sponge rubber 52 in a U-shaped structure is provided on the top surface of the second prefabricated segment 102, the opening direction of the sponge rubber 52 is consistent with the opening direction of the butyl rubber putty sheet 51, the butyl rubber putty sheet 51 surrounds the closed end of the sponge rubber 52, and at least a part of the sponge rubber 52 overlaps the water-facing surface sealing pad 2 and the water-receiving surface sealing pad 3. This design enhances the waterproof performance of the prefabricated platform door.
[0039] Of course, the butyl rubber putty sheet 51 and the sponge rubber 52 can also be arranged on the upper and lower end surfaces of the prefabricated center column 103. The structure and function thereof are the same as above and will not be described in detail here.
[0040] Preferably, at least a portion of the lower end of the first prefabricated pipe segment 101 is inwardly recessed to form a first slot 1011, and a first protrusion is provided at the upper end of the prefabricated center column 103, and the first protrusion and the first slot 1011 are engaged with each other; at least a portion of the upper end of the second prefabricated pipe segment 102 is outwardly protruded to form a second protrusion 1021, and a second slot is provided at the lower end of the prefabricated center column 103, and the second protrusion 1021 and the second slot are engaged with each other. This design enhances the connection firmness of the first prefabricated pipe segment 101, the prefabricated center column 103, and the second prefabricated pipe segment 102, thereby enhancing the stability of the prefabricated platform door.
[0041] Preferably, the first prefabricated segment 101 and the second prefabricated segment 102 are both provided with a plurality of tensioning holes 6, and an EPDM rubber strip is provided in each tensioning hole 6. This design can effectively prevent water from penetrating into the platform door through the tensioning holes 6, thereby improving the waterproof performance of the entire prefabricated platform door.
[0042] Preferably, the water-facing surface sealing pad 2 includes a first elastic rubber body 21 and a first water-swellable rubber body 22. The first water-swellable rubber body 22 is arranged at the upper end of the first elastic rubber body 21. A plurality of first through holes 211 are arranged inside the first elastic rubber body 21. A plurality of first abutting columns 212 are arranged at the lower end of the first elastic rubber body 21. A first arc-shaped notch 213 is formed between two adjacent first abutting columns 212. The first abutting columns 212 abut against the inner bottom surface of the first annular recess 11. Specifically, the first water-swellable rubber body 22 will expand after contacting water, thereby filling the tiny gap, thereby enhancing the sealing effect and improving the waterproof performance of the prefabricated platform door. Secondly, a plurality of first through holes 211 are arranged inside the first water-swellable rubber body 22, and a plurality of first abutting columns 212 are arranged at the lower end of the first elastic rubber body 21. A first arc-shaped notch 213 is formed between two adjacent first abutting columns 212. Such a design can enhance the deformation ability of the first elastic rubber body 21.
[0043] Preferably, the back-water sealing pad 3 includes a second elastic rubber body 31 and a second water-swellable rubber body 32, the second water-swellable rubber body 32 is arranged at the upper end of the second elastic rubber body 31, a plurality of second through holes 311 are arranged inside the second elastic rubber body 31, a plurality of second abutting columns 312 are arranged at the lower end of the second elastic rubber body 31, a second arc-shaped notch 313 is formed between two adjacent second abutting columns 312, and the second abutting columns 312 abut against the inner bottom surface of the second annular groove 12. Specifically, the second water-swellable rubber body 32 will expand after contacting water, thereby filling the tiny gap, thereby enhancing the sealing effect and improving the waterproof performance of the prefabricated platform door.
[0044] The indicated orientation or position relationship is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the product of the application is usually placed when used, or the orientation or position relationship commonly understood by technical personnel in this field, or the orientation or position relationship in which the product of the application is usually placed when used. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.
[0045] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the claims attached to the utility model.
[0046] The above is an exemplary description of the utility model patent in conjunction with the accompanying drawings. It is obvious that the implementation of the utility model patent is not limited to the above-mentioned method. As long as various improvements are made by adopting the method concept and technical solution of the utility model patent, or the concept and technical solution of the utility model patent are directly applied to other occasions without improvement, they are all within the protection scope of the utility model.
Claims
1. A prefabricated platform door waterproof structure, It is characterized in that include: A prefabricated component (1), wherein a first annular concave slit (11) and a second annular concave slit (12) are provided on a side surface of the prefabricated component (1), the first annular concave slit (11) being located at the periphery of the second annular concave slit (12), a water-facing surface sealing pad (2) being provided in the first annular concave slit (11), and a water-receiving surface sealing pad (3) being provided in the second annular concave slit (12); The prefabricated component (1) comprises a first prefabricated pipe segment (101), a second prefabricated pipe segment (102) and a prefabricated center column (103), wherein the first prefabricated pipe segment (101) and the second prefabricated pipe segment (102) are arranged up and down, and the first prefabricated pipe segment (101) and the second prefabricated pipe segment (102) are connected via the prefabricated center column (103); The water-facing surface sealing pad (2) comprises a first elastic rubber body (21) and a first water-swellable rubber body (22); the first water-swellable rubber body (22) is arranged at the upper end of the first elastic rubber body (21); a plurality of first through holes (211) are arranged inside the first elastic rubber body (21); a plurality of first abutting columns (212) are arranged at the lower end of the first elastic rubber body (21); a first arc-shaped notch (213) is formed between two adjacent first abutting columns (212); and the first abutting columns (212) abut against the inner bottom surface of the first annular recess (11).
2. A prefabricated platform door waterproof structure as claimed in claim 1, Features: The end surface of the first prefabricated pipe segment (101) and / or the second prefabricated pipe segment (102) is provided with a first groove (41) and a second groove (42) in a straight line; the first groove (41) is connected to the first annular groove (11); the second groove (42) is connected to the second annular groove (12); at least a part of the water-facing surface sealing pad (2) is located in the first groove (41); and at least a part of the water-receiving surface sealing pad (3) is located in the second groove (42).
3. A prefabricated platform door waterproof structure as claimed in claim 2, Features: A butyl rubber putty sheet (51) is provided on the top surface of the second prefabricated pipe segment (102), the butyl rubber putty sheet (51) is in a U-shaped structure, and the opening of the butyl rubber putty sheet (51) faces the first groove (41).
4. A prefabricated platform door waterproof structure as claimed in claim 3, Features: The top surface of the second prefabricated pipe segment (102) is provided with a sponge rubber (52) in a U-shaped structure, the opening direction of the sponge rubber (52) is consistent with the opening direction of the butyl rubber putty sheet (51), the butyl rubber putty sheet (51) surrounds the closed end of the sponge rubber (52), and at least a part of the sponge rubber (52) is overlapped on the water-facing surface sealing pad (2) and the water-receiving surface sealing pad (3).
5. A prefabricated platform door waterproof structure as claimed in claim 2, Features: At least a portion of the lower end of the first prefabricated pipe segment (101) is recessed inward to form a first clamping groove (1011), and the upper end of the prefabricated center column (103) is provided with a first protrusion, and the first protrusion and the first clamping groove (1011) are matched and clamped.
6. A prefabricated platform door waterproof structure as claimed in claim 2, Features: At least a portion of the upper end of the second prefabricated pipe segment (102) protrudes outward to form a second protrusion (1021), and the lower end of the prefabricated center column (103) is provided with a second clamping groove, and the second protrusion (1021) and the second clamping groove are matched and clamped.
7. A prefabricated platform door waterproof structure as claimed in claim 2, Features: The first prefabricated pipe segment (101) and the second prefabricated pipe segment (102) are both provided with a plurality of tensioning holes (6), and each of the tensioning holes (6) is provided with an EPDM rubber strip.
8. A prefabricated platform door waterproof structure as claimed in claim 2, Features: The back-water surface sealing pad (3) comprises a second elastic rubber body (31) and a second water-swellable rubber body (32), wherein the second water-swellable rubber body (32) is arranged at the upper end of the second elastic rubber body (31), a plurality of second through holes (311) are arranged inside the second elastic rubber body (31), a plurality of second abutting columns (312) are arranged at the lower end of the second elastic rubber body (31), a second arc-shaped notch (313) is formed between two adjacent second abutting columns (312), and the second abutting columns (312) abut against the inner bottom surface of the second annular recess (12).