Fastening device for water conservancy and hydropower construction
Through the vertical connection of the arc-shaped frame and the second arc-shaped frame with the extension rod and the stable seat, combined with the design of the rubber ring and the height-adjustable seat, the problem of poor adjustability and looseness of the pipeline fastening device in the existing technology is solved, and the problem of Efficient pipe fastening and sealing.
Patent Information
- Application Number
- CN202420603636.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-26
AI Technical Summary
The existing pipe fastening devices in water conservancy and hydropower construction are difficult to adjust according to the height of the ground, and are prone to loosening when water flows, affecting the fastening and sealing properties.
A fastening device for water conservancy and hydropower construction is designed. The arc-shaped frame and the second arc-shaped frame are vertically connected to the extension rod and the stable base, and are fixed with bolts to increase the tightness of the pipeline and improve the sealing through the rubber ring. And easy to disassemble and assemble, the slot structure of the base and balance base allows height adjustment.
It effectively avoids the loosening and shaking of the pipeline, improves the tightness and sealing, and simplifies the use and disassembly of the device, enhancing the performance and practicality.
Smart Images

Figure CN221880472U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy and hydropower, in particular to a water conservancy and hydropower construction fastening device. Background Art
[0002] Water is a basic element for human survival, and electricity is the main energy source for social development. The discipline of water conservancy and hydropower engineering is an engineering science that regulates and utilizes water resources through engineering or non-engineering measures based on the study of the natural characteristics of water. The major of water conservancy and hydropower engineering focuses on cultivating senior engineering and technical personnel engaged in the planning, design, construction, management and scientific research of large and medium-sized water conservancy and hydropower hubs and their buildings, as well as industrial water conservancy buildings.
[0003] In the prior art, water pipelines need to be fixed during water conservancy and hydropower construction. Existing pipeline fastening devices are not convenient to adjust according to the height of the ground during use, and have certain limitations during use. When water flows inside the pipeline, it will impact the inner wall, which can easily cause the installation structure of the fastening device to loosen. A water conservancy and hydropower construction fastening device is now needed to solve the above technical solution. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the utility model provides a water conservancy and hydropower construction fastening device, which has an arc frame and a second arc frame, both ends of which are connected to the vertical rods by extension rods and a stabilizing seat, and the arc frame and the second arc frame are vertical between the vertical rods, so that the vertically connected pipes can be fastened respectively to avoid loosening or shaking of the pipe body. The extension rods and the stabilizing seat at both ends of the arc frame and the second arc frame are fixed by bolts respectively, and the extension rods and the stabilizing seat pass through the vertical rods respectively, so that the fastening of the pipes can be effectively improved, loosening between the pipes can be avoided, and the sealing of the pipe connection can be extended, thereby solving the above-mentioned technical problems.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a water conservancy and hydropower construction fastening device, comprising a balancing seat, a vertical rod is arranged on the top surface of the balancing seat, an arc frame is arranged on the top surface of the balancing seat, a second arc frame is arranged on the top surface of the arc frame, a reinforcing plate is arranged on the top surface of the balancing seat, a cushion seat is arranged on the bottom surface of the balancing seat, a supporting seat is arranged on the top surface of the balancing seat, an extension rod is arranged on the side of the arc frame, a stabilizing seat is arranged on the side of the second arc frame, a fixing sleeve is arranged on the side of the second arc frame, an outer wall of the arc frame is fixedly connected to an anti-corrosion layer, a waterproof layer is arranged on the side of the anti-corrosion layer, an anti-cracking layer is arranged on the inner wall of the arc frame, a wear-resistant layer is arranged on the side of the anti-cracking layer, and limited seats are arranged at both ends of the vertical rod.
[0008] Preferably, the two ends of the arc frame and the second arc frame are fixedly connected to the anti-cracking layer and the anti-corrosion layer respectively, and the wear-resistant layer is fixedly connected to the anti-cracking layer.
[0009] Through the above technical scheme, the arc frame and the upper arc frame are used to position the horizontal pipe, and the second arc frame and the upper second arc frame are used to position and fasten the vertical pipe. The coordinated use of the two can shape and fasten the vertically connected pipes to avoid shaking between the pipes. The balance seat drives the cushion seat to be positioned underground, and the arc frame drives the rubber plate to fit and fix the two ends of the horizontal pipe respectively, and the arc frame drives the extension rods to slide on the outer circumference of the vertical rods respectively, and the extension rods are fastened by bolts. Rubber rings are connected between the bolts and the extension rods. The rubber rings can improve the sealing between the extension rods and the bolts, thereby avoiding rust at the connection between the bolts and the extension rods that affects the removal of the bolts. Similarly, the bolts and the stable seat are also fixedly connected by bolts and rubber rings, which makes it convenient for the operator to disassemble and assemble, while reducing the difficulty of disassembly and assembly.
[0010] Preferably, both ends of the top surface of the balancing seat are fixedly connected to vertical rods, an upper arc frame is provided on the top surface of the arc frame, the arc frame and the inner wall of the upper arc frame are respectively fixedly connected to rubber plates, and the second arc frame is perpendicular to the arc frame.
[0011] Through the above technical scheme, the two ends of the arc frame and the second arc frame are connected to the vertical rods by extension rods and stabilizing seats respectively, and the arc frame and the second arc frame are vertically arranged between the vertical rods, so that the vertically connected pipes can be tightened respectively to prevent the pipe bodies from loosening or shaking. The extension rods and stabilizing seats at both ends of the arc frame and the second arc frame are fixed by bolts respectively, and the extension rods and stabilizing seats pass through the vertical rods respectively, so as to effectively improve the tightness of the pipes, prevent looseness between the pipes, and extend the sealing of the pipe connections.
[0012] Preferably, an upper second arc frame is provided on the side of the second arc frame, the two ends of the reinforcement plate are respectively fixedly connected to the vertical rod and the balance seat, the support seat is fixedly installed in the middle of the top surface of the support seat, and the support seat and the arc frame are fixedly connected.
[0013] Through the above technical scheme, the fixed connection between the cushion and the balancing seat can increase the height of the balancing seat, and a slot is opened at the bottom end of the cushion, so that it is convenient to insert and connect another cushion into the corresponding slot, which can increase the height of the balancing seat in turn, and facilitate the adjustment of the pipeline according to the height of the ground when it is inconvenient to use, effectively improving the deployability of the device, and the operation is simple and convenient.
[0014] Preferably, the two ends of the arc frame are fixedly connected to the extension rod, and the extension rod passes through the vertical rod, the two ends of the second arc frame are respectively fixedly connected to the stabilizing seats, and the side of the stabilizing seat passes through the vertical rod, the stabilizing seats are connected by bolts, and the limit seats are respectively located at the two ends of the stabilizing seats.
[0015] Through the above technical solution, the extension rod and the stabilizing seat are fixed with bolts. After they are removed, the extension rods and the stabilizing seat slide on the outer peripheral surface of the vertical rod respectively, thereby preventing the extension rods and the stabilizing seat from falling and affecting the secondary disassembly and assembly of the pipeline, effectively improving the practicability of the device.
[0016] Compared with the prior art, the utility model provides a water conservancy and hydropower construction fastening device, which has the following beneficial effects:
[0017] 1. The utility model connects the two ends of the arc frame and the second arc frame to the vertical rods by using extension rods and a stabilizing seat respectively, and the arc frame and the second arc frame are vertically arranged between the vertical rods, so that the vertically connected pipes can be fastened respectively to prevent the pipe bodies from loosening or shaking. The extension rods and the stabilizing seats at both ends of the arc frame and the second arc frame are fixed by bolts respectively, and the extension rods and the stabilizing seats respectively pass through the vertical rods, so that the fastening of the pipes can be effectively improved, loosening between the pipes can be prevented, and the sealing of the pipe connection can be extended.
[0018] 2. The utility model can increase the height of the balancing seat through the fixed connection between the cushion seat and the balancing seat, and a slot is opened at the bottom end of the cushion seat, so that it is convenient to insert and connect another cushion seat into the corresponding slot, which can increase the height of the balancing seat in turn, and facilitate the adjustment of the pipeline according to the height of the ground when it is inconvenient to use, effectively improving the deployability of the device, and the operation method is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the front structure of the balance seat of the utility model;
[0020] Figure 2This is a schematic diagram of the second arc-shaped top surface structure of the cross-section of the balancing seat of the utility model;
[0021] Figure 3 It is a schematic diagram of the cross-sectional structure of the arc frame of the utility model.
[0022] Among them: 1. Balance seat; 2. Vertical rod; 3. Arc frame; 4. Second arc frame; 5. Reinforcement plate; 6. Cushion seat; 7. Support seat; 8. Extension rod; 9. Stable seat; 10. Fixed sleeve; 11. Anti-corrosion layer; 12. Waterproof layer; 13. Anti-cracking layer; 14. Wear-resistant layer; 15. Limit seat. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-3 A fastening device for water conservancy and hydropower construction comprises a balancing seat 1, a vertical rod 2 is arranged on the top surface of the balancing seat 1, an arc frame 3 is arranged on the top surface of the balancing seat 1, a second arc frame 3 is arranged on the top surface of the arc frame 3, a reinforcing plate 5 is arranged on the top surface of the balancing seat 1, a cushion seat 6 is arranged on the bottom surface of the balancing seat 1, a supporting seat 7 is arranged on the top surface of the balancing seat 1, an extension rod 8 is arranged on the side of the arc frame 3, a stabilizing seat 9 is arranged on the side of the second arc frame 3, a fixing sleeve 10 is arranged on the side of the second arc frame 3, an outer wall of the arc frame 3 is fixedly connected to an anti-corrosion layer 11, a waterproof layer 12 is arranged on the side of the anti-corrosion layer 11, an anti-cracking layer 13 is arranged on the inner wall of the arc frame 3, a wear-resistant layer 14 is arranged on the side of the anti-cracking layer 13, and limited position seats 15 are arranged at both ends of the vertical rod 2.
[0025] Specifically, the two ends of the arc frame 3 and the second arc frame 3 are fixedly connected to the anti-cracking layer 13 and the anti-corrosion layer, respectively, and the wear-resistant layer 14 is fixedly connected to the anti-cracking layer 13. The advantage is that the arc frame 3 and the upper arc frame 3 are used to position the horizontal pipeline, and the second arc frame 3 and the second arc frame 3 are used to position and fasten the vertical pipeline. The cooperation between the two can shape and fasten the vertically connected pipelines to avoid shaking between the pipelines. The balance seat 1 drives the cushion seat 6 to be positioned underground, and the arc frame 3 drives the rubber plate to fit and fix the two ends of the horizontal pipeline respectively, and the arc frame 3 drives the extension rod 8 to slide on the outer peripheral surface of the vertical rod 2 respectively, and the extension rods 8 are fastened by bolts, and the bolts and the extension rods 8 are connected with rubber rings. The rubber ring can improve the sealing between the extension rod 8 and the bolt, thereby preventing the connection between the bolt and the extension rod 8 from rusting and affecting the removal of the bolt. Similarly, the bolt and the stable seat 9 are also fixedly connected by bolts and rubber rings, thereby facilitating the operator to disassemble and assemble, while reducing the difficulty of disassembly and assembly.
[0026] Specifically, the two ends of the top surface of the balance seat 1 are fixedly connected to the vertical rod 2, the top surface of the arc frame 3 is provided with an upper arc frame, the arc frame 3 and the inner wall of the upper arc frame are respectively fixedly connected to the rubber patch, and the second arc frame 3 is perpendicular to the arc frame 3. The advantage is that the two ends of the arc frame 3 and the second arc frame 3 are respectively connected to the vertical rod 2 by the extension rod 8 and the stabilizing seat 9, and the arc frame 3 and the second arc frame 3 are perpendicular between the vertical rod 2, so that the vertically connected pipes can be tightened respectively to avoid loosening or shaking of the pipe body, and the extension rod 8 and the stabilizing seat 9 at the two ends of the arc frame 3 and the second arc frame 3 are respectively fixed by bolts, and the extension rod 8 and the stabilizing seat 9 respectively penetrate the vertical rod 2, so that the tightness of the pipe is effectively improved, and the looseness between the pipes can be avoided, and the sealing of the pipe connection is extended.
[0027] Specifically, an upper second arc frame is arranged on the side of the second arc frame 3, the two ends of the reinforcing plate 5 are respectively fixedly connected to the vertical rod 2 and the balance seat 1, the support seat 7 is fixedly installed in the middle of the top surface of the support seat 7, and the support seat 7 is fixedly connected to the arc frame 3. The advantage is that the fixed connection between the cushion seat 6 and the balance seat 1 can increase the height of the balance seat 1, and a slot is provided at the bottom end of the cushion seat 6, so that it is convenient to insert and connect another cushion seat 6 into the corresponding slot, which can increase the height of the balance seat 1 in turn, and facilitate the adjustment of the pipeline according to the height of the ground when it is inconvenient to use, effectively improve the deployability of the device, and the operation method is simple and convenient.
[0028] Specifically, the two ends of the arc frame 3 are fixedly connected to the extension rod 8, and the extension rod 8 passes through the vertical rod 2, the two ends of the second arc frame 3 are respectively fixedly connected to the stabilizing seat 9, and the side of the stabilizing seat 9 passes through the vertical rod 2, the stabilizing seats 9 are connected by bolts, and the limit seats 15 are respectively located at the two ends of the stabilizing seat 9. The advantage is that the extension rod 8 and the stabilizing seat 9 are fixed by bolts, and after the extension rod 8 and the stabilizing seat 9 are removed, they slide on the outer peripheral surface of the vertical rod 2, thereby preventing the extension rod 8 and the stabilizing seat 9 from falling and affecting the secondary disassembly and assembly of the pipeline, and effectively improving the practicality of the device.
[0029] When in use, the arc frame 3 and the upper arc frame 3 are used to position the horizontal pipe, and the second arc frame 3 and the second arc frame 3 are used to position and fasten the vertical pipe. The coordinated use of the two can shape and fasten the vertically connected pipes to avoid shaking between the pipes. The balance seat 1 drives the cushion seat 6 to be positioned underground, and the arc frame 3 drives the rubber plate to fit and fix the two ends of the horizontal pipe respectively, and the arc frame 3 drives the extension rod 8 to slide on the outer peripheral surface of the vertical rod 2 respectively, and the extension rods 8 are fastened by bolts, and rubber rings are connected between the bolts and the extension rod 8. The rubber ring can improve the sealing between the extension rod 8 and the bolt, thereby avoiding rust at the connection between the bolt and the extension rod 8 that affects the removal of the bolt. Similarly, the bolt and the stable seat 9 are also fixedly connected by bolts and rubber rings, which makes it convenient for the operator to disassemble and assemble, and reduces the difficulty of disassembly and assembly.
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water conservancy and hydropower construction fastening device, comprising a balance seat (1), a vertical rod (2) is arranged on the top surface of the balance seat (1), an arc frame (3) is arranged on the top surface of the balance seat (1), a second arc frame (3) is arranged on the top surface of the arc frame (3), and a reinforcing plate (5) is arranged on the top surface of the balance seat (1), characterized in that: The bottom surface of the balancing seat (1) is provided with a cushion seat (6), the top surface of the balancing seat (1) is provided with a support seat (7), the side surface of the arc frame (3) is provided with an extension rod (8), the side surface of the second arc frame (3) is provided with a stabilizing seat (9), the side surface of the second arc frame (3) is provided with a fixing sleeve (10), the outer wall of the arc frame (3) is fixedly connected to the anti-corrosion layer (11), the side surface of the anti-corrosion layer (11) is provided with a waterproof layer (12), the inner wall of the arc frame (3) is provided with an anti-cracking layer (13), the side surface of the anti-cracking layer (13) is provided with a wear-resistant layer (14), and both ends of the vertical rod (2) are provided with limit seats (15).
2. A water conservancy and hydropower construction fastening device according to claim 1, characterized in that: The two ends of the arc frame (3) and the second arc frame (3) are respectively fixedly connected to the anti-cracking layer (13) and the anti-corrosion layer, and the wear-resistant layer (14) is fixedly connected to the anti-cracking layer (13).
3. A water conservancy and hydropower construction fastening device according to claim 1, characterized in that: The two ends of the top surface of the balancing seat (1) are fixedly connected to the vertical rods (2); the top surface of the arc frame (3) is provided with an upper arc frame; the arc frame (3) and the inner wall of the upper arc frame are respectively fixedly connected to rubber plates; the second arc frame (3) is perpendicular to the arc frame (3).
4. A water conservancy and hydropower construction fastening device according to claim 1, characterized in that: An upper second arc frame is arranged on the side of the second arc frame (3); the two ends of the reinforcing plate (5) are respectively fixedly connected to the vertical rod (2) and the balance seat (1); the support seat (7) is fixedly installed in the middle of the top surface of the support seat (7), and the support seat (7) and the arc frame (3) are fixedly connected.
5. A water conservancy and hydropower construction fastening device according to claim 1, characterized in that: The two ends of the arc frame (3) are fixedly connected to the extension rod (8), and the extension rod (8) passes through the vertical rod (2); the two ends of the second arc frame (3) are respectively fixedly connected to the stabilizing seat (9), and the side of the stabilizing seat (9) passes through the vertical rod (2); the stabilizing seats (9) are connected by bolts, and the limit seats (15) are respectively located at the two ends of the stabilizing seat (9).
