Natural gas pollution discharge blowout preventer

By designing a combined structure of a buffer cylinder and a cover shell in a natural gas sewage discharge device, the problem of sewage liquid splashing during the sewage discharge process is solved, and stable discharge of sewage liquid and environmental protection are achieved.

CN221880634UActive Publication Date: 2024-10-22KARAMAY GAS CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202422208330.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-10-22
Estimated Expiration
2034-09-10

AI Technical Summary

Technical Problem

When the liquid and impurities produced during the natural gas pressure regulation process are discharged through the sewage outlet, the excessive impact force causes the sewage liquid to splash, causing environmental pollution.

Method used

A natural gas sewage blowout prevention device is designed, including a central union pipe and a buffer cylinder. The buffer cylinder is clamped on the central union pipe through an L-shaped structure and is equipped with a pressing structure composed of an arc-shaped pressure plate and a spring. It is equipped with a drain hole and a cover shell. The cover shell is threaded to connect the buffer cylinder and the drain collection pool to change the direction of the flushing out of the dirty liquid and disperse the impact force.

Benefits of technology

It effectively prevents the buffer cylinder from falling off and ensures the stability and safety of the device. At the same time, by changing the direction in which the dirty liquid rushes out, it reduces the splashing of the dirty liquid and avoids environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221880634U_ABST
    Figure CN221880634U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of natural gas pollution discharge, in particular to a natural gas pollution discharge blowout preventer. The natural gas pollution discharge blowout preventer comprises a middle connecting pipe and a buffer cylinder mounted on the middle connecting pipe, and a plurality of clamping cavity structures which are annularly distributed and used for clamping the buffer cylinder are arranged on the middle connecting pipe; a plurality of annularly distributed connecting plates are fixedly installed at the top of the buffer cylinder, sliding protrusions perpendicular to the connecting plates are fixedly installed on plate heads of the connecting plates, and the sliding protrusions and the connecting plates form an L-shaped structure. According to the natural gas pollution discharge blowout preventer provided by the utility model, the plurality of pollution discharge holes which are uniformly distributed are formed in the buffer cylinder, so that the flushing-out direction of the dirty liquid is changed, the discharge impact force of the dirty liquid is effectively dispersed, and the splashing force when the dirty liquid is discharged is further reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of natural gas sewage discharge, in particular to a natural gas sewage discharge anti-blowout device. Background Art

[0002] During the natural gas pressure regulation process, due to the temperature change and local pressure imbalance caused by the expansion of natural gas, a small amount of liquid and impurities, such as water vapor, sediment, oil, etc., are easily generated. These liquids and impurities will affect the stability and safety of the natural gas pressure regulation process. In order to ensure the stability and safety of the natural gas pressure regulation process, the natural gas pressure regulating cabinet is usually equipped with a drain port. The drain port is a device used to discharge the liquid and impurities generated during the natural gas pressure regulation process, and the functions of the drain port are mainly as follows:

[0003] 1. To ensure the stability of the natural gas pressure regulation process, the sewage outlet can regularly discharge the liquid and impurities generated during the natural gas pressure regulation process, thereby ensuring the stability of the entire pressure regulation process and preventing system failures caused by the accumulation of excessive liquid and impurities;

[0004] 2. Ensure the safety of the natural gas pressure regulation process. The accumulation of a small amount of liquid and impurities will cause blockage and leakage of the natural gas pressure regulation equipment, thereby causing harm to the equipment and the use environment. By discharging liquid and impurities, such harm can be avoided and the safety of the natural gas pressure regulation process can be ensured;

[0005] 3. Extend the service life of natural gas pressure regulating equipment. The use of sewage outlets can extend the service life of natural gas pressure regulating equipment, reduce the possibility of equipment failure, reduce maintenance costs, and save corporate economic costs;

[0006] However, the sewage outlet for natural gas pressure regulation currently enters the collection tank vertically through the sewage pipe, and the discharged sewage is easily splashed due to the large impact force, causing serious pollution to the surrounding environment.

[0007] Therefore, it is necessary to provide a new natural gas blowout prevention device to solve the above technical problems. Utility Model Content

[0008] In order to solve the above technical problems, the utility model provides a natural gas sewage blowout prevention device.

[0009] The natural gas sewage discharge and blowout prevention device provided by the utility model comprises:

[0010] Intermediate pipe, and

[0011] A buffer cylinder installed on the central link pipe, and the central link pipe is provided with a plurality of annularly distributed clamping cavity structures for clamping the buffer cylinder;

[0012] A plurality of annularly distributed connecting plates are fixedly installed on the top of the buffer cylinder, and a sliding protrusion vertically arranged with the connecting plate is fixedly installed on the plate head of each connecting plate, and the sliding protrusion and the connecting plate form an L-shaped structure;

[0013] The buffer cylinder is provided with a plurality of evenly distributed sewage discharge holes.

[0014] Preferably, the clamping cavity structure consists of an inner push slide groove, a rotating arc groove and a limit groove, the rotating arc groove is opened on the outer tube wall of the middle connecting tube, one end of the rotating arc groove is interconnected with the inner push slide groove opened on the middle connecting tube, and the opening on the bottom side of the inner push slide groove is flush with the bottom tube opening of the middle connecting tube, the other end of the rotating arc groove is interconnected with the limit groove opened on the middle connecting tube, and the limit groove is arranged parallel to the inner push slide groove and are both arranged along the axial direction of the middle connecting tube.

[0015] Preferably, a slidably connected arc-shaped pressing plate is installed in the rotating arc groove, and a plurality of equidistantly distributed springs A are fixedly installed on the upper plate wall of the arc-shaped pressing plate, and the other end of the spring A is fixedly connected to the inner top wall of the rotating arc groove.

[0016] Preferably, an external thread section is provided on the barrel body of the buffer barrel near the top barrel mouth, and a cover shell is installed on the buffer barrel. The cover shell is threadedly connected to the external thread section of the buffer barrel through a threaded interface opened at the top, and a blanking port is provided at the bottom of the cover shell.

[0017] Preferably, a connecting flange is fixedly installed at the upper pipe opening of the central connecting pipe, and an inner tube is fixedly installed at the upper pipe opening of the central connecting pipe.

[0018] Compared with the related art, the natural gas sewage blowout prevention device provided by the utility model has the following beneficial effects:

[0019] The entire buffer cylinder in the utility model is easy to install and disassemble on the central connecting pipe. At the same time, because the buffer cylinder is clamped in the clamping cavity structure of the central connecting pipe by using an L-shaped structure and is abutted by a compression structure composed of an arc-shaped compression plate and a spring A, the buffer cylinder will not fall off from the central connecting pipe when subjected to a strong impact of dirty liquid in actual use. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic structural diagram of a preferred embodiment of the natural gas sewage blowout prevention device provided by the utility model;

[0021] Figure 2 for Figure 1 Schematic diagram of the explosion structure shown;

[0022] Figure 3 for Figure 2 The structural schematic diagram of the middle connecting pipe shown;

[0023] Figure 4 for Figure 3 The schematic diagram of the installation structure of the arc-shaped pressing plate in the middle connecting pipe is shown;

[0024] Figure 5 for Figure 2 Schematic diagram of the structure of the buffer cylinder shown.

[0025] Numbers in the figure: 1, central connecting pipe; 1a, inner push slide; 1b, rotating arc groove; 1c, limit groove; 11, connecting flange; 12, inner tube; 2, buffer cylinder; 2a, drain hole; 21, connecting plate; 22, sliding protrusion; 23, external thread section; 3, cover shell; 3a, threaded interface; 4, arc-shaped pressing plate; 5, spring A. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0027] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0028] See also Figures 1 to 5 The utility model provides a natural gas sewage discharge blowout prevention device in an embodiment, and the natural gas sewage discharge blowout prevention device includes: a central connecting pipe 1, a buffer cylinder 2 and a cover shell 3.

[0029] In the embodiments of the present invention, please refer to Figures 1 to 5 The middle pipe 1 has a connection flange 11 fixedly mounted on the pipe opening, and a buffer cylinder 2 is mounted on the middle pipe 1, and a plurality of evenly distributed drainage holes 2a are provided on the buffer cylinder 2, and a plurality of annularly distributed clamping cavity structures for clamping the buffer cylinder 2 are provided on the middle pipe 1, and the clamping cavity structure is composed of an inner push slide groove 1a, a rotating arc groove 1b and a limiting groove 1c, and the rotating arc groove 1b is provided on the outer pipe wall of the middle pipe 1, and one end of the rotating arc groove 1b is mutually connected with the inner push slide groove 1a provided on the middle pipe 1. The inner push slide groove 1a is connected, and the opening at the bottom side of the inner push slide groove 1a is flush with the bottom pipe opening of the middle link pipe 1, the other end of the rotating arc groove 1b is connected to the limiting groove 1c opened in the middle link pipe 1, and the limiting groove 1c is arranged in parallel with the inner push slide groove 1a and is arranged along the axial direction of the middle link pipe 1, and a sliding arc pressing plate 4 is installed in the rotating arc groove 1b, and a plurality of equidistantly distributed springs A5 are fixedly installed on the upper plate wall of the arc pressing plate 4, and the other end of the spring A5 is fixedly connected to the inner top wall of the rotating arc groove 1b;

[0030] A plurality of annularly distributed connecting plates 21 are fixedly mounted on the top of the buffer cylinder 2, and a sliding protrusion 22 vertically arranged with the connecting plate 21 is fixedly mounted on the plate head of each connecting plate 21, and the sliding protrusion 22 and the connecting plate 21 form an L-shaped structure.

[0031] It should be noted that: a butt flange is fixedly installed at the end of the sewage pipe of the natural gas pressure regulating cabinet in advance, and then the connecting flange 11 on the central link pipe 1 is fixedly connected with the butt flange on the sewage pipe, thereby completing the installation of the central link pipe 1 at the vertical end of the sewage pipe;

[0032] When installing the buffer cylinder 2, after the sliding protrusion 22 on the buffer cylinder 2 is aligned with the opening at the bottom of the inner push slide groove 1a on the middle link tube 1, the buffer cylinder 2 is pushed up so that the sliding protrusion 22 slides along the inner push slide groove 1a to the top of the inner push slide groove 1a. At this time, the sliding protrusion 22 presses against the arc-shaped pressing plate 4 and compresses the spring A5. Then, the buffer cylinder 2 is rotated along the rotating arc groove 1b so that the sliding protrusion 22 slides to the limiting groove 1c, and the buffer cylinder 2 is released, so that the spring A5 pushes the arc-shaped pressing plate 4 to press down the sliding protrusion 22, so that the sliding protrusion 22 falls into the limiting groove 1c to realize the fixed installation of the buffer cylinder 2 on the middle link tube 1;

[0033] When the buffer cylinder 2 needs to be maintained or replaced, the buffer cylinder 2 is pushed up so that the sliding protrusion 22 on the buffer cylinder 2 slides up to the highest point along the limiting groove 1c. At this time, the sliding protrusion 22 presses against the arc-shaped pressing plate 4 and compresses the spring A5. Then, the buffer cylinder 2 is rotated along the rotating arc groove 1b so that the sliding protrusion 22 slides to the inner push groove 1a. Then, the buffer cylinder 2 is lowered so that the sliding protrusion 22 slips off the inner push groove 1a, thereby completing the removal of the buffer cylinder 2 from the middle link pipe 1.

[0034] The entire buffer cylinder 2 is easy to install and disassemble on the central connecting pipe 1. At the same time, since the buffer cylinder 2 is clamped in the clamping cavity structure of the central connecting pipe 1 by using an L-shaped structure and is abutted by a compression structure composed of an arc-shaped compression plate 4 and a spring A5, the buffer cylinder 2 will not fall off from the central connecting pipe 1 when subjected to a strong impact of dirty liquid in actual use;

[0035] The inner tube 12 is fixedly installed at the upper tube opening of the central tube 1, so that the inner tube 12 can be inserted into the buffer cylinder 2, thereby improving the sealing effect of the joint between the central tube 1 and the inner tube 12, and avoiding the hidden danger of dirty liquid leakage at the joint;

[0036] In this embodiment, the buffer cylinder 2 is made of stainless steel to reduce static electricity.

[0037] In the embodiments of the present invention, please refer to Figures 1 to 5The buffer tube 2 is provided with an external thread section 23 at the barrel body near the top barrel mouth, and a cover shell 3 is installed on the buffer tube 2. The cover shell 3 is threadedly connected with the external thread section 23 provided on the buffer tube 2 through a threaded interface 3a opened at the top, and a blanking port is provided at the bottom of the cover shell 3.

[0038] It should be noted that: the buffer cylinder 2 is inserted into the cover shell 3 from the threaded interface 3a at the top of the cover shell 3 until the external thread section 23 on the buffer cylinder 2 contacts the threaded interface 3a, and then the buffer cylinder 2 is rotated so that the external thread section 23 is threadedly fixedly connected with the threaded interface 3a, thereby completing the docking of the buffer cylinder 2 and the cover shell 3. The bottom of the cover shell 3 is directly connected to the natural gas sewage collection pool, so the cover shell 3 also further plays a buffering role on the sewage;

[0039] In this embodiment, a limiting ring with a diameter larger than the external thread section 23 is arranged on the top of the buffer tube 2, so that after the buffer tube 2 and the cover shell 3 are tightened, the limiting ring abuts against the top threaded interface 3a of the cover shell 3;

[0040] It is worth noting that: in the present application, when installing the buffer cylinder 2 on the central tube 1, the buffer cylinder 2 can be installed on the central tube 1 first, and then the cover shell 3 can be installed on the buffer cylinder 2, or the cover shell 3 can be installed on the buffer cylinder 2 first, and then the buffer cylinder 2 is installed on the central tube 1. The specific selection can be made according to actual needs.

[0041] The working principle of the natural gas sewage discharge and blowout prevention device provided by the utility model is as follows:

[0042] A docking flange is pre-installed on the end of the sewage pipe of the natural gas pressure regulating cabinet, and the connecting flange 11 on the central link pipe 1 is subsequently fixedly connected to the docking flange on the sewage pipe, thereby completing the installation of the central link pipe 1 at the vertical end of the sewage pipe, and the buffer cylinder 2 is inserted from the threaded interface 3a at the top of the cover shell 3 into the cover shell 3 until the external thread section 23 on the buffer cylinder 2 contacts the threaded interface 3a, and then the buffer cylinder 2 is rotated so that the external thread section 23 is threadedly fixedly connected to the threaded interface 3a, thereby completing the docking of the buffer cylinder 2 with the cover shell 3. When installing the buffer cylinder 2 on the central link pipe 1, after the sliding protrusion 22 on the buffer cylinder 2 and the opening at the bottom of the inner push groove 1a on the central link pipe 1 correspond to each other, the buffer cylinder 2 is pushed up so that the sliding protrusion 22 moves along After sliding along the inner push slide 1a to the top of the inner push slide 1a, the sliding protrusion 22 presses against the arc-shaped pressing plate 4 and compresses the spring A5, and then the buffer cylinder 2 is rotated along the rotating arc groove 1b, so that the sliding protrusion 22 slides to the limiting groove 1c, and then the buffer cylinder 2 is released, so that the spring A5 pushes the arc-shaped pressing plate 4 to press down the sliding protrusion 22, so that the sliding protrusion 22 falls into the limiting groove 1c to realize the fixed installation of the buffer cylinder 2 on the central joint pipe 1, and the bottom of the cover shell 3 is directly connected to the natural gas sewage collection pool, and the cover shell 3 also further plays a buffering role for the dirty liquid, and a plurality of evenly distributed sewage holes 2a are opened on the buffer cylinder 2, so as to change the direction of the dirty liquid (including gas and liquid) rushing out, and effectively disperse the impact force of the sewage liquid discharge;

[0043] When the buffer cylinder 2 needs to be maintained or replaced, the buffer cylinder 2 is pushed up so that the sliding protrusion 22 on the buffer cylinder 2 slides up to the highest point along the limit groove 1c. At this time, the sliding protrusion 22 presses against the arc-shaped pressing plate 4 and compresses the spring A5. Then, the buffer cylinder 2 is rotated along the rotating arc groove 1b so that the sliding protrusion 22 slides to the inner push slide groove 1a. Then, the buffer cylinder 2 is moved down so that the sliding protrusion 22 slips out of the inner push slide groove 1a, thereby completing the removal of the buffer cylinder 2 from the middle link pipe 1. The entire buffer cylinder 2 is easy to install and disassemble on the middle link pipe 1. At the same time, since the buffer cylinder 2 is clamped in the clamping cavity structure of the middle link pipe 1 using an L-shaped structure, and has a pressing structure composed of the arc-shaped pressing plate 4 and the spring A5 for abutment, in actual use, when the buffer cylinder 2 is subjected to a strong impact of dirty liquid, the buffer cylinder 2 will not fall off from the middle link pipe 1.

[0044] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A natural gas blowout prevention device, characterized in that: include: The intermediate pipe (1), and A buffer cylinder (2) is mounted on the central connecting pipe (1), and the central connecting pipe (1) is provided with a plurality of annularly distributed clamping cavity structures for clamping the buffer cylinder (2); A plurality of annularly distributed connecting plates (21) are fixedly mounted on the top of the buffer cylinder (2), and a sliding protrusion (22) vertically arranged with the connecting plate (21) is fixedly mounted on the plate head of each connecting plate (21), and the sliding protrusion (22) and the connecting plate (21) form an L-shaped structure; The buffer cylinder (2) is provided with a plurality of evenly distributed sewage discharge holes (2a).

2. The natural gas blowout prevention device according to claim 1 is characterized in that: The clamping cavity structure is composed of an inner push slide groove (1a), a rotating arc groove (1b) and a limit groove (1c); the rotating arc groove (1b) is provided on the outer tube wall of the central tube (1); one end of the rotating arc groove (1b) is interconnected with the inner push slide groove (1a) provided on the central tube (1); and the opening on the bottom side of the inner push slide groove (1a) is flush with the bottom tube opening of the central tube (1); the other end of the rotating arc groove (1b) is interconnected with the limit groove (1c) provided on the central tube (1); and the limit groove (1c) is arranged in parallel with the inner push slide groove (1a) and is arranged along the axial direction of the central tube (1).

3. The natural gas blowout prevention device according to claim 2 is characterized in that: A slidably connected arc-shaped pressing plate (4) is installed in the rotating arc groove (1b), and a plurality of equidistantly distributed springs A (5) are fixedly installed on the upper plate wall of the arc-shaped pressing plate (4), and the other end of the spring A (5) is fixedly connected to the inner top wall of the rotating arc groove (1b).

4. The natural gas blowout prevention device according to claim 1, characterized in that: The buffer cylinder (2) is provided with an external thread section (23) at the barrel body near the top barrel opening, and a cover shell (3) is mounted on the buffer cylinder (2). The cover shell (3) is threadedly connected to the external thread section (23) provided on the buffer cylinder (2) via a threaded interface (3a) provided at the top, and a material drop opening is provided at the bottom of the cover shell (3).

5. The natural gas blowout prevention device according to claim 1, characterized in that: A connecting flange (11) is fixedly mounted on the upper pipe opening of the central connecting pipe (1), and an inner tube (12) is fixedly mounted on the upper pipe opening of the central connecting pipe (1).

Citation Information

Cited By

  • Natural gas pollution discharge blowout preventer

    CN223782368U