Detection device for settlement of lap joint surface of new roadbed and old roadbed
By introducing the support spacing adjustment and connection mechanism into the subgrade settlement detection device, the problem that the detection device in the existing technology requires multiple measurements and position adjustments is solved, the horizontal state of the detection component is maintained and the position is stable, and the subgrade settlement inspection is improved. effectiveness and convenience.
Patent Information
- Application Number
- CN202420545015.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-03-20
AI Technical Summary
When the existing settlement detection device detects the overlap surface of the old and new roadbed, it needs to conduct multiple measurements at different positions, and the detection piles and observation piles are set up independently. The positions need to be readjusted when moving, which is inconvenient to use.
A device for detecting settlement of the overlapping surface of old and new roadbeds is designed. Through the support spacing adjustment and connection mechanism, the measuring piles and observation piles are connected as a whole, with stable positions and angles, adaptable to different road conditions, and simplified position replacement.
It improves the effect of roadbed settlement inspection, simplifies the movement and use of the detection device, and enhances the convenience and accuracy of detection.
Smart Images

Figure CN221897478U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of roadbed settlement detection, and more specifically to a detection device for settlement of the overlapping surface of a new and old roadbed. Background Art
[0002] Roadbed refers to the foundation of the road surface, which is a geotechnical structure formed by excavation or filling. Over time, with the passage of vehicles and natural reasons, the roadbed is prone to damage and needs to be repaired. The settlement detection device is used to detect the flatness of the joint surface between the new and old roadbeds, to ensure the flatness of the joint between the new and old roadbeds and to improve the road quality.
[0003] Based on the above, the inventors found that the existing settlement detection device is mainly composed of detection piles and observation piles. The detection piles emit horizontal rays to the observation piles, so as to detect the settlement difference of the overlapping surface of the new and old roadbeds. However, the overlapping surface is large, so it is necessary to perform multiple measurements at different positions. The detection piles and observation piles are independently arranged, and each time they are moved, the measurement position needs to be readjusted, which is inconvenient to use. Therefore, in view of this, the existing structure is studied and improved, and a detection device for detecting the settlement of the overlapping surface of the new and old roadbeds is provided, in order to achieve a more practical purpose. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the problems existing in the prior art, the purpose of the utility model is to provide a detection device for the settlement of the overlapping surface of a new and old roadbed. This solution adapts to road surfaces in different conditions by adjusting the support spacing, so that the detection component remains in a horizontal state, improves the effect of roadbed settlement inspection, and arranges a connecting component to connect the measuring pile and the observation pile into a whole, so that the position and angle of the two are stable and unchanged, which is convenient for movement when the measurement position is changed later.
[0006] 2. Technical solution
[0007] To solve the above problems, the utility model adopts the following technical solutions.
[0008] A detection device for settlement of the overlapped surface of a new and old roadbed comprises two bases, wherein a measuring pile and an observation pile are fixedly connected in the middle of the top surfaces of the two bases, and a group of threaded barrels are fixedly connected to the sides of the top surfaces of the two bases, and a threaded rod is threadedly connected to the top of the threaded barrel, and a group of supporting rods are penetrated and arranged on the sides of the bottom surface of the base, a ray meter is fixedly connected to the top of the measuring pile, a scale is provided on the inner side of the upper end of the observation pile, and a connecting mechanism is provided at the bottom of the opposite surface of the measuring pile and the observation pile;
[0009] The connecting mechanism includes a fixing plate, one end of which is penetrated by an extension plate, one end of the extension plate is fixedly connected to a positioning rod 1, and the other end of the extension plate is fixedly connected to a pair of positioning rods 2, and nuts are threadedly connected to the outer sides of the positioning rods 1 and 2.
[0010] Furthermore, the measuring pile and the observation pile are symmetrically arranged, the ray meter is matched with the scale, and a level meter is fixedly connected to the lower outer side of the measuring pile and the lower outer side of the observation pile.
[0011] Furthermore, an anti-slip ring is provided at the bottom end of the threaded rod, the anti-slip ring is located inside the support rod near the top end, and the anti-slip ring is movably connected to the support rod.
[0012] Furthermore, a group of sliding blocks are fixedly connected to the top end of the support rod close to the side, and the support rod is slidably connected to the base.
[0013] Furthermore, the fixing plate is fixedly connected to the measuring pile, and the extension plate is slidably connected to the observation pile.
[0014] Furthermore, the first positioning rod is arranged in a vertical direction, and the second positioning rod is arranged in a horizontal direction.
[0015] Furthermore, the inner side of the nut on the outer side of the first positioning rod is fitted with the top surface of the fixing plate, and the inner side of the nut on the outer side of the second positioning rod is fitted with the inner side of the observation pile.
[0016] 3. Beneficial effects
[0017] Compared with the prior art, the advantages of the present invention are:
[0018] (1) This solution sets a rotating threaded rod and cooperates with a threaded tube to displace the threaded rod, thereby causing the support rod to move vertically and adjusting the distance between the bottom end of the support rod and the support base surface to make the base horizontal. Compared with the prior art, the support distance can be adjusted to adapt to different road conditions, so that the detection component can remain horizontal, thereby improving the effect of roadbed settlement inspection.
[0019] (2) By setting up a connecting mechanism, the extension plate can be slid and adjusted in the horizontal and vertical directions to adapt to the installation of the measuring pile and the observation pile. Finally, the fixing plate and the extension plate are fixedly connected through the threaded connection of the nut and the positioning rod, and the extension plate and the observation pile are fixedly connected, so that the position of the observation pile and the measuring pile is fixed. Compared with the prior art, the connection assembly is set to connect the measuring pile and the observation pile into a whole, so that the position and angle of the two are stable and unchanged, which is convenient for movement when the measuring position is changed later. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 This is a disassembled diagram of the threaded rod and the support rod of the utility model;
[0022] Figure 3 It is a structural schematic diagram of the connection mechanism of the utility model;
[0023] Figure 4 This is a disassembled view of the fixed plate and the extension plate of the utility model.
[0024] Explanation of the numbers in the figure: 1. Base; 2. Measuring pile; 3. Observation pile; 4. Threaded rod; 5. Support rod; 6. X-ray instrument; 7. Scale; 8. Connecting mechanism; 9. Fixed plate; 10. Extension plate; 11. Positioning rod one; 12. Positioning rod two; 13. Nut; 14. Threaded barrel. DETAILED DESCRIPTION
[0025] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.
[0026] Example:
[0027] See also Figure 1-4 A detection device for settlement of the overlapped surface of a new and old roadbed comprises two bases 1, wherein a measuring pile 2 and an observation pile 3 are fixedly connected to the center of the top surfaces of the two bases 1, and a group of threaded tubes 14 are fixedly connected to the sides of the top surfaces of the two bases 1, and a threaded rod 4 is threadedly connected to the top of the threaded tube 14, and a group of supporting rods 5 are penetrated and arranged on the side of the bottom surface of the base 1, a ray meter 6 is fixedly connected to the top of the measuring pile 2, and a scale 7 is provided on the inner side of the upper end of the observation pile 3, and a connecting mechanism 8 is provided at the bottom of the opposite surface of the measuring pile 2 and the observation pile 3;
[0028] The connecting mechanism 8 includes a fixing plate 9, one end of which is penetrated by an extension plate 10, one end of the extension plate 10 is fixedly connected to a positioning rod 11, and the other end of the extension plate 10 is fixedly connected to a pair of positioning rods 2 12, and the outer sides of the positioning rods 11 and 12 are both threadedly connected with nuts 13. In order to connect the measuring pile 2 and the observation pile 3 as a whole, so as to facilitate the stability of the position and angle during subsequent movement, a connecting mechanism 8 is provided.
[0029] See also Figure 1The measuring pile 2 and the observation pile 3 are symmetrically arranged, the ray meter 6 is adapted to the scale meter 7, and a level meter is fixedly connected to the outer side and lower part of the measuring pile 2 and the outer side and lower part of the observation pile 3. The output end of the ray meter 6 emits horizontal rays toward the observation pile 3, and displays the measured value through the scale meter 7, so as to understand the settlement of the overlapping surface of the new and old roadbeds.
[0030] See also Figure 2 The bottom end of the threaded rod 4 is provided with an anti-slip ring, which is located inside the support rod 5 near the top, and the anti-slip ring is movably connected to the support rod 5. The two bases 1 are placed on the surfaces of the new and old roadbeds respectively. At the same time, the level meter understands the horizontal situation of the base 1. If a tilt problem occurs, the corresponding threaded rod 4 can be rotated, and the threaded tube 14 can be cooperated to displace the threaded rod 4, so that the support rod 5 can be moved vertically, and the distance between the bottom end of the support rod 5 and the supporting base surface can be adjusted to make the base 1 horizontal.
[0031] See also Figure 2 A set of sliding blocks is fixedly connected to the top of the support rod 5 by the side, and the support rod 5 is slidably connected to the base 1. The sliding blocks are used to keep the support rod 5 slidably adjusted, and the angle is stable.
[0032] See also Figure 3 The fixed plate 9 is fixedly connected to the measuring pile 2, and the extension plate 10 is slidably connected to the observation pile 3. The distance between the measuring pile 2 and the observation pile 3 can be adjusted according to the detection situation, so that the extension plate 10 and the fixed plate 9 can be slidably adjusted in the horizontal direction.
[0033] See also Figure 3 The positioning rod 11 is arranged in a vertical direction, and the positioning rod 2 12 is arranged in a horizontal direction. According to the height difference between the overlapping surfaces of the new and old roadbeds, the other end of the extension plate 10 is slidably adjusted in the vertical direction inside the observation pile 3.
[0034] See also Figure 3 The inner side of the nut 13 on the outer side of the positioning rod 11 fits with the top surface of the fixing plate 9, and the inner side of the nut 13 on the outer side of the positioning rod 2 12 fits with the inner side of the observation pile 3. The movement of the extension plate 10 drives the adjustment of the positioning rod 11 and the positioning rod 2. Finally, the fixing plate 9 is fixedly connected to the extension plate 10 through the threaded connection between the nut 13 and the positioning rod, and the extension plate 10 is fixedly connected to the observation pile 3, thereby fixing the position of the observation pile 3 and the measuring pile 2, which is convenient for movement when the measuring position is changed later.
[0035] When in use: the two bases 1 are placed on the surfaces of the new and old roadbeds respectively. The distance between the measuring pile 2 and the observation pile 3 can be adjusted according to the detection situation, so that the extension plate 10 and the fixed plate 9 can be adjusted to slide in the horizontal direction. At the same time, according to the height difference of the overlapping surface of the new and old roadbeds, the other end of the extension plate 10 can be adjusted to slide in the vertical direction inside the observation pile 3. The movement of the extension plate 10 drives the adjustment of the positioning rod 11 and the positioning rod 2. Finally, the nut 13 is threadedly connected to the positioning rod to fix the fixed plate 9 and the extension plate 10. The extension plate 10 and the observation pile 3 are connected to each other. The observation pile 3 is fixedly connected, so that the position of the observation pile 3 and the measuring pile 2 is fixed, which is convenient for moving when the measuring position is changed later. Then, the level of the base 1 can be understood through the level meter. If a tilt problem occurs, the corresponding threaded rod 4 can be rotated, and the threaded tube 14 can be cooperated to displace the threaded rod 4, so that the support rod 5 can be moved vertically, and the distance between the bottom end of the support rod 5 and the supporting base surface can be adjusted to make the base 1 horizontal. Finally, the output end of the ray meter 6 emits horizontal rays toward the observation pile 3, and the measured value is displayed through the scale 7, so as to understand the settlement of the overlapping surface of the new and old roadbeds.
[0036] Finally, it should be noted that in the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.
[0037] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0038] The above is only a preferred specific implementation of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and improved ideas of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model.
Claims
1. A detection device for settlement of the overlap surface of a new and old roadbed, comprising two bases (1), wherein the top surfaces of the two bases (1) are respectively fixedly connected with a measuring pile (2) and an observation pile (3) in the middle, and the top surfaces of the two bases (1) are fixedly connected with a set of threaded tubes (14) on the side edges, characterized in that: The top end of the threaded cylinder (14) is threadedly connected to a threaded rod (4); a group of support rods (5) are provided through the side of the bottom surface of the base (1); the top end of the measuring pile (2) is fixedly connected to a ray meter (6); a scale (7) is provided on the inner side of the upper end of the observation pile (3); and a connecting mechanism (8) is provided at the lower side of the opposite surface of the measuring pile (2) and the observation pile (3); The connecting mechanism (8) comprises a fixing plate (9), one end of which is penetrated by an extension plate (10), one end of which is fixedly connected to a positioning rod 1 (11), and the other end of which is fixedly connected to a pair of positioning rods 2 (12), and the outer sides of the positioning rods 1 (11) and 2 (12) are both threadedly connected with nuts (13).
2. A device for detecting settlement of the overlap surface of a new and old roadbed according to claim 1, characterized in that: The measuring pile (2) and the observation pile (3) are symmetrically arranged, the ray meter (6) and the scale (7) are matched, and a level meter is fixedly connected to the lower outer side of the measuring pile (2) and the lower outer side of the observation pile (3).
3. A detection device for settlement of the overlap surface of a new and old roadbed according to claim 1, characterized in that: The bottom end of the threaded rod (4) is provided with an anti-slip ring, which is located inside the support rod (5) near the top, and is movably connected to the support rod (5).
4. A device for detecting settlement of the overlap surface of a new and old roadbed according to claim 1, characterized in that: A group of sliding blocks are fixedly connected to the top end of the support rod (5) on the side, and the support rod (5) is slidably connected to the base (1).
5. The device for detecting settlement of the overlap surface of new and old roadbed according to claim 1, characterized in that: The fixed plate (9) is fixedly connected to the measuring pile (2), and the extension plate (10) is slidably connected to the observation pile (3).
6. The device for detecting settlement of the overlap surface of new and old roadbed according to claim 1, characterized in that: The first positioning rod (11) is arranged in a vertical direction, and the second positioning rod (12) is arranged in a horizontal direction.
7. The device for detecting settlement of the overlap surface of new and old roadbed according to claim 1, characterized in that: The inner side of the nut (13) on the outer side of the first positioning rod (11) is in contact with the top surface of the fixing plate (9), and the inner side of the nut (13) on the outer side of the second positioning rod (12) is in contact with the inner side of the observation pile (3).
