Pre-impregnated oil pool for producing modified asphalt waterproof coiled material
By using asphalt pump-driven circulation pipes and heat transfer oil pipes in the prepreg oil pool, internal circulation and temperature control of the prepreg oil are achieved, which solves the problems of slag deposition and high energy consumption, and improves product quality and equipment safety.
Patent Information
- Application Number
- CN202420089785.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-12
AI Technical Summary
In the current production of modified asphalt waterproofing membranes, the asphalt modifier in the prepreg oil pool is easy to deposit and form slag, resulting in thick prepreg oil, high production energy consumption, product quality cannot be guaranteed, and the maintenance cost of the mixing device is high. Ventilation devices can easily become clogged and present safety hazards.
Design a prepreg oil pool that includes an asphalt pump, a circulation pipe and a heat transfer oil pipe. The oil outlet pipe and the oil inlet pipe in the circulation pipe driven by the asphalt pump drive the prepreg oil to form an internal circulation, and use multiple groups of gradually larger openings to spray out the prepreg oil. Soak the oil to keep the residue suspended, and maintain the pipeline temperature through the heat transfer oil pipe to reduce clogging, and adjust the reducer to control the flow rate.
It effectively reduces slag deposition, improves the fluidity and thermal conductivity of prepreg oil, reduces energy consumption, simplifies the equipment structure, reduces maintenance costs, and improves safety.
Smart Images

Figure CN221908070U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coiled material production equipment, in particular to a pre-soaking oil pool for producing modified asphalt waterproof coiled materials. Background Art
[0002] Modified asphalt waterproofing membrane is a membrane composed of a modified asphalt base material layer and a corresponding tire base layer. The production line of modified asphalt waterproofing membrane mainly includes tire base overlap drying process, pre-impregnation oil coating process, cooling coating process, buffer cooling process and roll felt packaging process. Modified waterproofing membrane generally uses thermoplastic elastomer SBS or APP as a modifier, modified petroleum asphalt as an impregnation coating material, glass fiber felt or polyester felt and other reinforcing materials as a tire body, plastic film, mineral particles, sheets, etc. as an anti-sticking isolation layer. After the above five main processes, a rollable sheet waterproofing material is made.
[0003] The pre-impregnation oil coating process is completed in the pre-impregnation oil pool, in which pre-impregnation oil is placed. Since the pre-impregnation oil pool is in a relatively static state for a long time, the asphalt modifier that is not fully dissolved or carbonized by high temperature is easily deposited on the bottom of the pre-impregnation oil and forms residue, resulting in the pre-impregnation oil being viscous, high energy consumption in production, and difficulty in uniformly impregnating the tire base in the pre-impregnation process; and, since the thermal conductivity of the residue is poor, the pre-impregnation oil temperature cannot reach the required process conditions, resulting in waste of heat transfer oil energy and the inability to guarantee product quality.
[0004] At present, stirring or ventilation methods are usually used to stir the pre-immersion oil in the immersion oil pool, that is, a stirring device or a ventilation device is set at the bottom of the pre-immersion oil pool body. The pre-immersion oil pool body has high requirements on the sealing of the stirring device, and the subsequent maintenance cost of the stirring device is high. Moreover, the ventilation holes of the ventilation device are easily blocked, and there is a risk of the pre-immersion oil in the pre-immersion oil pool splashing into the external environment, which poses certain safety hazards. In view of the above-mentioned technical phenomena, the inventor believes that there is an urgent need for a new pre-immersion oil pool with a simple structure and the ability to quickly disperse the residue. Utility Model Content
[0005] The purpose of the utility model is to provide a pre-impregnation oil pool for the production of modified asphalt waterproofing coiled materials in view of the above-mentioned deficiencies in the prior art.
[0006] The utility model provides a pre-impregnation oil tank for the production of modified asphalt waterproofing coiled materials, which adopts the following technical scheme:
[0007] A pre-soaking oil tank for producing modified asphalt waterproofing coiled material, comprising:
[0008] Pre-soaked oil pool body;
[0009] An asphalt pump is arranged outside the pre-soak oil tank body, and the asphalt pump comprises a machine head and a pump head;
[0010] The circulation pipe includes an oil outlet pipe and an oil inlet pipe, wherein one end of the oil outlet pipe is connected to the pump head outlet, and the other end of the oil outlet pipe is horizontally penetrated to the bottom of the pre-immersion oil pool body, and a plugging piece is provided at one end of the oil outlet pipe located in the pre-immersion oil pool body. The pipe wall of the oil outlet pipe located in the pre-immersion oil pool body is provided with strip holes, and the strip holes are in a state of penetrating the pipe wall of the oil outlet pipe in the horizontal direction. One end of the oil inlet pipe is connected to the pump head inlet, and the other end of the oil inlet pipe is penetrated in the pre-immersion oil pool body.
[0011] Preferably, the strip holes are provided in a plurality of groups, and the plurality of groups of strip holes are arranged at intervals along the length direction of the oil outlet pipe.
[0012] Preferably, the opening size of the strip holes gradually increases from the inside to the outside.
[0013] Preferably, one end of the oil outlet pipe located inside the pre-soak oil pool body extends to the inner wall of the pre-soak oil pool body on a side away from the asphalt pump.
[0014] Preferably, the oil inlet pipe is located above the oil outlet pipe.
[0015] Preferably, the oil outlet pipe is provided with a first pipe interlayer on its wall outside the pre-soak oil pool body, and the oil inlet pipe is provided with a second pipe interlayer on its wall outside the pre-soak oil pool body, and the first pipe interlayer and the second pipe interlayer are respectively connected to heat transfer oil pipes.
[0016] Preferably, a reducer is connected between the machine head and the pump head.
[0017] Preferably, a first coupling is connected between the machine head and the reducer, and a second coupling is connected between the reducer and the pump head.
[0018] In summary, the utility model includes the following beneficial technical effects:
[0019] 1. An asphalt pump is provided, and a circulation pipe is connected to the asphalt pump, wherein the circulation pipe comprises an oil outlet pipe and an oil inlet pipe, wherein the oil outlet pipe is connected to the asphalt pump, and one end of the oil outlet pipe away from the asphalt pump extends to the inside of the pre-immersion oil pool body, one end of the oil inlet pipe is located inside the pre-immersion oil pool body, and the other end of the oil inlet pipe is connected to the pipe wall of the oil outlet pipe located outside the pre-immersion oil pool body, and the asphalt pump is started, and the pre-immersion oil in the pre-immersion oil pool body flows from the oil inlet pipe, and then flows from the oil outlet pipe to the inside of the pre-immersion oil pool body, and the end of the oil outlet pipe is blocked, so that the pre-immersion oil in the oil outlet pipe is sprayed out with pressure from the strip hole to fully stir the pre-immersion oil in the pre-immersion oil pool body, so that the residue is dispersed, so that the pre-immersion oil in the pre-immersion oil pool body forms an internal circulation, and the residue is suspended in the pre-immersion oil pool body and is taken away by the tire base of the process, thereby reducing the phenomenon of residue deposition at the bottom of the pre-immersion oil pool body.
[0020] 2. The first pipe interlayer and the second pipe interlayer are respectively arranged on the pipe walls of the oil outlet pipe and the oil inlet pipe, and the first pipe interlayer and the second pipe interlayer are respectively connected to the heat transfer oil pipe, and the heat transfer oil is input into the first pipe interlayer and the second pipe interlayer, thereby increasing the temperature of the oil outlet pipe and the oil inlet pipe, thereby avoiding the phenomenon that the pre-impregnation oil inside the pre-impregnation oil pool body does not flow and blocks the oil outlet pipe and the oil inlet pipe when the production line is shut down.
[0021] 3. By setting a reducer between the machine head and the pump head, the speed of the internal circulation inside the pre-immersion oil pool body can be achieved by adjusting the reducer according to the actual operating conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of a pre-impregnation oil pool for the production of modified asphalt waterproofing coiled material provided by an embodiment of the utility model;
[0023] Figure 2 It is a schematic diagram of the cross-sectional structure of the oil outlet pipe.
[0024] Explanation of the reference numerals: 1. pre-soaked oil pool body; 2. asphalt pump; 21. machine head; 22. pump head; 3. circulation pipe; 31. oil outlet pipe; 311. plugging piece; 312. bar hole; 313. first pipe interlayer; 32. oil inlet pipe; 321. second pipe interlayer; 4. heat transfer oil pipe; 5. reducer; 51. first coupling; 52. second coupling. DETAILED DESCRIPTION
[0025] The following is combined with Figure 1-2 The utility model is described in further detail.
[0026] The utility model embodiment discloses a pre-soaking oil pool for the production of modified asphalt waterproofing coiled material. Figure 1, including: a pre-soak oil pool body 1, an asphalt pump 2 and a circulation pipe 3, the asphalt pump 2 includes a machine head 21 and a pump head 22, and the asphalt pump 2 is located outside the pre-soak oil pool body 1, the circulation pipe 3 includes an oil outlet pipe 31 and an oil inlet pipe 32, one end of the oil outlet pipe 31 is connected to the outlet of the pump head 22, the end of the oil outlet pipe 31 away from the asphalt pump 2 is horizontally penetrated to the bottom of the pre-soak oil pool body 1, the wall of the oil outlet pipe 31 is welded to the side wall of the pre-soak oil pool body 1, a plugging piece 311 is welded to the end of the oil outlet pipe 31 located in the pre-soak oil pool body 1, a strip hole 312 is opened on the wall of the oil outlet pipe 31 located in the pre-soak oil pool body 1, the strip hole 312 is in a state of penetrating the wall of the oil outlet pipe 31 along the horizontal direction, one end of the oil inlet pipe 32 is connected to the inlet of the pump head 22, the other end of the oil inlet pipe 32 is penetrated in the pre-soak oil pool body 1, and the wall of the oil inlet pipe 32 is welded to the side wall of the pre-soak oil pool body 1. Start the asphalt pump 2, the oil inlet pipe 32 sucks the pre-impregnation oil in the pre-impregnation oil pool body 1, and flows out from the strip hole 312 of the oil outlet pipe 31. Since the end of the oil outlet pipe 31 is in a blocked state, the pre-impregnation oil is sprayed out from the strip hole 312. At this time, the pre-impregnation oil inside the pre-impregnation oil pool body 1 remains in a flowing state, and the residue is dispersed to the middle or top of the pre-impregnation oil pool body 1, thereby reducing the phenomenon of residue depositing at the bottom of the pre-impregnation oil pool body 1.
[0027] Reference Figure 1 and Figure 2 The oil inlet pipe 32 is located above the oil outlet pipe 31 to reduce the impact force of the pre-impregnated oil sprayed out by the oil outlet pipe 31 and the influence on the normal suction of the pre-impregnated oil by the oil inlet pipe 32; a plurality of strip holes 312 are provided, and the plurality of strip holes 312 are arranged at intervals along the length direction of the oil outlet pipe 31. The strip holes 312 in this embodiment are optimally set to three groups, and the opening size of the strip holes 312 is gradually increased from the inside to the outside, so that the strip holes 312 are in an open state, which can increase the spraying area of the pre-impregnated oil; the oil outlet pipe 31 is located at one end inside the pre-impregnated oil pool body 1 and extends to the inner wall of the pre-impregnated oil pool body 1 on the side away from the asphalt pump 2, so as to increase the internal circulation range of the pre-impregnated oil inside the pre-impregnated oil pool body 1.
[0028] Reference Figure 1 The oil outlet pipe 31 is located on the outside of the pre-soak oil pool body 1 and is installed with a first pipe interlayer 313. The oil inlet pipe 32 is located on the outside of the pre-soak oil pool body 1 and is installed with a second pipe interlayer 321. The first pipe interlayer 313 and the second pipe interlayer 321 are respectively connected to the heat transfer oil pipe 4. When the production line is shut down, heat transfer oil is introduced into the first pipe interlayer 313 and the second pipe interlayer 321 through the heat transfer oil pipe 4 to increase the temperature of the oil outlet pipe 31 and the oil inlet pipe 32, thereby reducing the phenomenon of the oil outlet pipe 31 and the oil inlet pipe 32 being blocked due to the non-flow of the pre-soak oil.
[0029] Reference Figure 1A reducer 5 is connected between the machine head 21 and the pump head 22, a first coupling 51 is installed between the machine head 21 and the reducer 5, and a second coupling 52 is connected between the reducer 5 and the pump head 22. The staff can change the flow rate of the pre-immersion oil pool by adjusting the reducer 5 according to the actual operating conditions. The first coupling 51 and the second coupling 52 improve the working performance of the transmission process, play a role in shock absorption and buffering, and play a role in overload protection for the equipment.
[0030] The implementation principle of a pre-impregnation oil tank for the production of modified asphalt waterproofing membrane in the embodiment of the utility model is as follows: start the asphalt pump 2, adjust the reducer 5 so that the pre-impregnation oil reaches a preset flow speed, and the pre-impregnation oil in the pre-impregnation oil tank body 1 is sucked from the oil inlet pipe 32. Since the end of the oil outlet pipe 31 is in a blocked state, the pre-impregnation oil flows out from the strip hole 312 of the oil outlet pipe 31. Since the size of the strip hole 312 is small, the pre-impregnation oil is sprayed out from the strip hole 312. The residue is in a suspended state in the pre-impregnation oil tank body 1 and is taken away by the tire base that has undergone the oil immersion process. The pre-impregnation oil forms an internal circulation in the pre-impregnation oil tank body 1, thereby reducing the deposition of residue at the bottom of the pre-impregnation oil tank body 1. The viscosity of the pre-impregnation oil inside the pre-impregnation oil tank body 1 is reduced, thereby improving the thermal conductivity efficiency and further reducing the energy consumption. The pre-impregnation oil tank in this embodiment has the characteristics of simple structure, reduced residue, safety and reduced consumption.
[0031] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A pre-impregnation oil tank for the production of modified asphalt waterproofing coiled materials, characterized in that: include: Pre-soaking oil pool body (1); An asphalt pump (2) is arranged outside the pre-soaking oil tank body (1), and the asphalt pump (2) comprises a machine head (21) and a pump head (22); The circulation pipe (3) comprises an oil outlet pipe (31) and an oil inlet pipe (32). One end of the oil outlet pipe (31) is connected to the outlet of the pump head (22), and the other end of the oil outlet pipe (31) is horizontally penetrated to the bottom of the pre-soak oil pool body (1). One end of the oil outlet pipe (31) located in the pre-soak oil pool body (1) is provided with a plugging member (311). The wall of the oil outlet pipe (31) located in the pre-soak oil pool body (1) is provided with a strip hole (312), and the strip hole (312) is in a state of penetrating the wall of the oil outlet pipe (31) in the horizontal direction. One end of the oil inlet pipe (32) is connected to the inlet of the pump head (22), and the other end of the oil inlet pipe (32) is penetrated in the pre-soak oil pool body (1).
2. The pre-soaking oil pool for producing modified asphalt waterproofing coiled material according to claim 1, characterized in that: The strip holes (312) are provided in a plurality of groups, and the plurality of groups of strip holes (312) are arranged at intervals along the length direction of the oil outlet pipe (31).
3. The pre-soaking oil pool for producing modified asphalt waterproofing coiled material according to claim 2, characterized in that: The opening size of the strip holes (312) gradually increases from the inside to the outside.
4. The pre-soaking oil pool for producing modified asphalt waterproofing coiled material according to claim 2, characterized in that: One end of the oil outlet pipe (31) located inside the pre-soak oil pool body (1) extends to the inner wall of the pre-soak oil pool body (1) away from the asphalt pump (2).
5. The pre-soaking oil tank for producing modified asphalt waterproofing coiled material according to claim 1, characterized in that: The oil inlet pipe (32) is located above the oil outlet pipe (31).
6. The pre-soaking oil pool for producing modified asphalt waterproofing coiled material according to claim 5, characterized in that: The oil outlet pipe (31) is provided with a first pipe interlayer (313) on its pipe wall located outside the pre-soak oil pool body (1), and the oil inlet pipe (32) is provided with a second pipe interlayer (321) on its pipe wall located outside the pre-soak oil pool body (1), and the first pipe interlayer (313) and the second pipe interlayer (321) are respectively connected to a heat transfer oil pipe (4).
7. The pre-soaking oil tank for producing modified asphalt waterproofing coiled material according to claim 1, characterized in that: A reducer (5) is connected between the machine head (21) and the pump head (22).
8. The pre-soaking oil pool for producing modified asphalt waterproofing coiled material according to claim 7, characterized in that: A first coupling (51) is connected between the machine head (21) and the reducer (5), and a second coupling (52) is connected between the reducer (5) and the pump head (22).