Garbage transportation mechanism for building construction
By adopting a storage box and a lifting mechanism in the construction waste transportation mechanism, and using adjusting wheels, connecting frames, motors and steel rope rings to realize the lifting and lowering of the sealing plate, the problem of labor-intensive garbage cleaning in the existing technology is solved and the efficiency of garbage transportation is improved. Efficiency and practicality.
Patent Information
- Application Number
- CN202420022160.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-04
AI Technical Summary
Existing construction waste transportation methods require a large amount of manpower for cleaning and transportation, resulting in reduced practicality during use.
A garbage transport mechanism for construction is designed, which uses storage boxes and lifting mechanisms. It realizes the lifting and lowering of the sealing plate through adjusting wheels, connecting frames, motors and steel rope rings, simplifying the loading and unloading process of garbage, and placing the plates and storage boxes. Balance rods are installed between them to improve sealing.
It improves the transportation efficiency and practicality of construction waste, enables workers to discharge and backfill waste from storage bins more quickly and conveniently, and improves the use effect of transportation equipment.
Smart Images

Figure CN221915828U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction waste treatment, in particular to a waste transportation mechanism for construction. Background Art
[0002] Construction waste refers to various waste and garbage generated during the construction process, including the remnants of building materials, waste, packaging materials, waste equipment, sewage and waste gas generated during the construction process. These wastes need to be properly handled to protect the environment and human health. Common treatment methods include classified recycling, landfill, incineration, etc.
[0003] Construction waste transport agencies are organizations or companies that specialize in collecting, transporting, and processing construction waste from construction sites. These agencies usually provide containers such as trash cans and garbage bags so that workers at construction sites can sort and load the generated waste. Once the containers are full, the waste transport agency will send special vehicles to collect the waste and transport it to a waste treatment center for processing, such as recycling, landfill, or incineration. These agencies play a very important role in the construction industry and can effectively help construction sites clean up and process waste, protect the environment and public health.
[0004] However, in the prior art, the existing construction waste is generally transported by workers using tools such as shovels to shovel the construction waste into transportation equipment. This transportation method requires workers to spend a lot of time cleaning and transporting the waste, which wastes the workers' energy, thus reducing its practicality in actual use. Therefore, we provide a construction waste transportation mechanism. Utility Model Content
[0005] The purpose of the utility model is to solve the shortcomings of the prior art and provide a garbage transportation mechanism for construction.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a garbage transportation mechanism for construction, comprising: a storage mechanism, the storage mechanism comprises a storage box, both ends of the storage box are provided with fixed frames, one end of the two fixed frames is provided with a movement cavity, the movement cavity is provided with a lifting mechanism, the lifting mechanism comprises an adjusting wheel, the outer surface of the adjusting wheel is provided with a connecting frame, one end of the connecting frame is provided with a placing plate, a motor is provided on the side of the placing plate away from the connecting frame, a steel rope ring is provided between the two motors, and a balance bar is provided on the outer surface of the motor.
[0007] As a preferred embodiment, one side of the two fixing frames is fixedly connected to the two ends of the storage box, and the bottom end of the movement cavity is fixedly connected to the top end of the fixing frame.
[0008] As a preferred implementation, the outer surface of the adjusting wheel is limited in the movement cavity for movement and adjustment, and one end of the connecting frame is butted against the adjusting wheel.
[0009] As a preferred implementation, one end of the connecting frame away from the adjusting wheel is fixed to the placement plate by welding, and one side of the motor is fixedly connected to the side of the placement plate away from the connecting frame.
[0010] As a preferred implementation, both sides of the steel rope ring are butted against one end of two motors, and one end of the balance bar is fixedly connected to one side of the placement plate.
[0011] As a preferred implementation, one end of the balancing rod away from the placement plate is docked in the storage box.
[0012] Compared with the prior art, the advantages and positive effects of the utility model are:
[0013] The utility model controls the regulating wheel to perform regulating movement in the motion cavity, so that the placement plate drives the motor and the steel rope ring to perform regulating movement through the connecting frame. When the placement plate moves to a suitable position, it stops moving by controlling the start and stop of the motor, and then the motor drives the steel rope ring to rotate and lift to control the lifting of the sealing plate in the storage box, so that the construction waste can be discharged from the storage box. This improves its practicality in actual use. In order to allow the sealing plate to block the storage box later, a balance bar is provided between the placement plate and the storage box, so that the sealing plate can be lifted and lowered with the balance bar limiting it, thereby further improving its practicality in actual use. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model provides a structural schematic diagram of a garbage transportation mechanism for construction.
[0015] Figure 2 The utility model provides a schematic diagram of the storage mechanism structure of a garbage transportation mechanism for construction.
[0016] Figure 3 The utility model is a schematic diagram of the lifting mechanism structure of a garbage transport mechanism for construction.
[0017] Figure 4 The utility model provides a schematic diagram of the structure of a transfer mechanism of a garbage transport mechanism for construction.
[0018] Legend:
[0019] 1. Storage mechanism; 11. Storage box; 12. Fixed frame; 13. Movement chamber;
[0020] 2. Lifting mechanism; 21. Adjusting wheel; 22. Connecting frame; 23. Placing plate; 24. Balancing rod; 25. Motor; 26. Steel rope ring;
[0021] 3. Transfer mechanism; 31. Frame; 32. Bottom cover plate; 33. Top cover plate; 34. Limit rod; 35. Spring; 36. Closing plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1
[0024] like Figure 1-3 As shown, the utility model provides a technical solution: a garbage transportation mechanism for construction, comprising: a storage mechanism 1, the storage mechanism 1 comprises a storage box 11, both ends of the storage box 11 are provided with fixed frames 12, one side of the two fixed frames 12 are fixedly connected to the two ends of the storage box 11, one end of the two fixed frames 12 is provided with a movement cavity 13, the bottom end of the movement cavity 13 is fixedly connected to the top end of the fixed frame 12, the movement cavity 13 is provided with a lifting mechanism 2, the lifting mechanism 2 comprises an adjusting wheel 21, the outer surface of the adjusting wheel 21 is limited in the movement cavity 13 for movement and adjustment, the outer surface of the adjusting wheel 21 is provided with a connecting frame 22, the connecting frame 22 One end of the connecting frame 22 is docked with the adjusting wheel 21, a placing plate 23 is provided at one end of the connecting frame 22, and the end of the connecting frame 22 away from the adjusting wheel 21 is fixed to the placing plate 23 by welding, a motor 25 is provided on the side of the placing plate 23 away from the connecting frame 22, one side of the motor 25 is fixedly connected to the side of the placing plate 23 away from the connecting frame 22, a steel rope ring 26 is provided between the two motors 25, both sides of the steel rope ring 26 are docked with one end of the two motors 25, a balance rod 24 is provided on the outer surface of the motor 25, one end of the balance rod 24 is fixedly connected to one side of the placing plate 23, and the end of the balance rod 24 away from the placing plate 23 is docked in the storage box 11.
[0025] In this embodiment, before using the transportation mechanism to transport construction waste, the staff can store the waste in the storage box 11 on the frame 31, and then adjust and move it in the motion cavity 13 by controlling the adjustment wheel 21, so that the placement plate 23 drives the motor 25 and the steel rope ring 26 to adjust and move through the connecting frame 22. When the placement plate 23 moves to the appropriate position, it stops moving and controls the start and stop of the motor 25, and then drives the steel rope ring 26 to rotate and lift to control the sealing plate in the storage box 11 to lift and lift, so that the construction waste can be discharged from the storage box 11. This improves its practicality in actual use. In order to allow the sealing plate to block the storage box 11 later, a balance bar 24 is provided between the placement plate 23 and the storage box 11, so that the sealing plate can be lifted and lowered with the balance bar 24 limiting the position, thereby further improving its practicality in actual use.
[0026] Example 2
[0027] like Figure 1-4 As shown, a transfer mechanism 3 is provided on the outer surface of the storage box 11, and the transfer mechanism 3 includes a frame 31, a bottom cover plate 32 is provided on the outer surface of the bottom end of the frame 31, a top cover plate 33 is provided on the upper layer of the frame 31, a limit rod 34 is provided in the frame 31, a spring 35 is provided on the outer surface of the limit rod 34, a closing plate 36 is provided on the limit rod 34, the outer surface of the bottom cover plate 32 is fixedly connected to the bottom of the frame 31 by welding, the outer surface of the top cover plate 33 is fixedly connected to the upper layer of the frame 31 by welding, both ends of the limit rod 34 are fixedly connected to the frame 31, one end of the spring 35 is fixedly connected to the frame 31, and the end of the spring 35 away from the frame 31 is fixedly connected to the closing plate 36, and the closing plate 36 is limited on the frame 31 for lifting and lowering adjustment.
[0028] In this embodiment, in order to allow construction waste to be dumped more directly into the transportation equipment, certain limiting components are provided on the frame 31. When placing the transportation equipment in the frame 31, the staff can pull the closing plate 36 to compress the spring 35, and the limiting rod 34 can effectively limit the lifting and lowering of the closing plate 36, allowing it to be lifted and lowered more smoothly, thereby further improving its practicality in actual use.
[0029] Working principle:
[0030] like Figure 1-4As shown, before using the transport mechanism to transport construction waste, workers can store the waste in the storage box 11 on the frame 31. Afterwards, they can adjust and move the adjustment wheel 21 in the motion cavity 13, so that the placement plate 23 drives the motor 25 and the steel rope ring 26 to adjust and move through the connecting frame 22. When the placement plate 23 moves to a suitable position and stops, the motor 25 is controlled to start and stop, and then the motor 25 drives the steel rope ring 26 to rotate and rise, and the sealing plate in the storage box 11 is controlled to rise and fall, so that the construction waste can be discharged from the storage box 11. This design improves the practicality in actual use.
[0031] In order to achieve the blocking of the storage box 11, a balance bar 24 is provided between the placement plate 23 and the storage box 11, so that the sealing plate can be raised and lowered with the balance bar 24 limiting the position. In addition, a certain limiting component is provided on the frame 31, and the staff can pull the closing plate 36 to compress the spring 35 when placing the transport equipment in the frame 31, and the limiting bar 34 can effectively limit the lifting and lowering of the closing plate 36, so that it can be lifted and lowered more smoothly. These improvements further improve the practicality of the transport equipment in actual use, so that construction waste can be dumped more directly into the transport equipment.
[0032] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A garbage transport mechanism for construction, characterized in that: include: A storage mechanism (1), the storage mechanism (1) comprising a storage box (11), both ends of the storage box (11) are provided with a fixed frame (12), one end of the two fixed frames (12) is provided with a movement cavity (13), a lifting mechanism (2) is provided on the movement cavity (13), the lifting mechanism (2) comprises an adjusting wheel (21), the outer surface of the adjusting wheel (21) is provided with a connecting frame (22), one end of the connecting frame (22) is provided with a placement plate (23), a motor (25) is provided on the side of the placement plate (23) away from the connecting frame (22), a steel rope ring (26) is provided between the two motors (25), and a balance rod (24) is provided on the outer surface of the motor (25).
2. A construction waste transport mechanism according to claim 1, characterized in that: One side of the two fixing frames (12) is fixedly connected to the two ends of the storage box (11), and the bottom end of the movement chamber (13) is fixedly connected to the top end of the fixing frames (12).
3. A construction waste transport mechanism according to claim 2, characterized in that: The outer surface of the adjusting wheel (21) is limited in the movement cavity (13) for movement and adjustment, and one end of the connecting frame (22) is butted against the adjusting wheel (21).
4. A construction waste transport mechanism according to claim 1, characterized in that: One end of the connecting frame (22) away from the regulating wheel (21) is fixed to the placement plate (23) by welding, and one side of the motor (25) is fixedly connected to the side of the placement plate (23) away from the connecting frame (22).
5. A construction waste transport mechanism according to claim 1, characterized in that: Both sides of the steel rope ring (26) are butt-jointed to one end of two motors (25), and one end of the balancing rod (24) is fixedly connected to one side of the placement plate (23).
6. A construction waste transport mechanism according to claim 1, characterized in that: One end of the balance bar (24) away from the placement plate (23) is docked in the storage box (11).