Waste gas stamping structure of hot blast stove
By arranging filters and exhaust gas main pipes in the exhaust gas stamping structure of the hot blast furnace, the problems of high energy loss and accumulation of particulate matter during the exhaust gas stamping process are solved, and the effects of saving compressed air use and preventing clogging are achieved.
Patent Information
- Application Number
- CN202323300524.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-04
AI Technical Summary
The hot blast furnace exhaust gas causes high energy loss and low utilization rate during the stamping process, and the particulate matter in the exhaust gas easily accumulates in the pipes, causing blockage problems.
Design a hot blast stove waste gas stamping structure. By setting a filter in the gas outlet pipe and using the control of the waste gas main pipe and waste gas valve, the filtration and stamping compensation of the waste gas can be achieved to prevent the accumulation of particulate matter.
It saves the use of compressed air, reduces costs, and prevents pipeline clogging through filters, improving energy utilization and equipment maintenance convenience.
Smart Images

Figure CN221918141U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of chemical equipment, in particular to a hot blast furnace waste gas stamping structure. Background Art
[0002] The hot blast furnace is a heat exchange device used to preheat the air for the blast furnace; its working process includes: hot blast furnace burning, burning to air supply and air supply to furnace burning. Among them, the hot blast furnace burning is the blast furnace gas through the gas combustion valve and the combustion air through the combustion air valve through the burner to mix and burn, the high-temperature flue gas generated heats the checkered bricks or refractory balls in the heat storage chamber, and is used to heat and become low-temperature flue gas through the flue pipe and chimney into the atmosphere; when the hot blast furnace vault temperature and the low-temperature flue gas temperature reach the specified value, the hot blast furnace burning valve is closed. Burning to air supply: open the cold air pressure valve, pressurize the hot blast furnace to a pressure close to the cold air duct through blasting, open the hot air valve and the cold air valve, the low-temperature cold air is heated by the hot blast furnace checkered bricks (or refractory balls) to become high-temperature hot air, and then sent to the blast furnace through the hot air duct. After the hot blast furnace heats the cold air for a period of time, the air temperature begins to drop and cannot meet the blast furnace's requirement for high-temperature hot air, so the air is supplied to the furnace for burning. That is, the hot blast furnace closes the air supply valve and discharges the flue gas in the hot blast furnace into the atmosphere through the chimney. The hot blast furnace is switched to the burning state after the internal pressure drops to close to the atmospheric pressure. Each blast furnace is generally equipped with 3 to 4 hot blast furnaces to ensure that 1 to 2 hot blast furnaces are always in the air supply or burning state, cyclically circulating to keep the blast furnace continuous and meet the high-temperature hot air and heat storage requirements of the hot blast furnace.
[0003] In actual operation, when the hot blast furnace is turned into the burning furnace after the air supply, the internal pressure of the hot blast furnace will be discharged into the atmosphere through the flue pipe when the exhaust gas is discharged, resulting in serious energy loss and low energy utilization rate. When the hot blast furnace is turned into the air supply after the burning, it can only be pressurized through the cold air pipe, which takes a long time and will cause fluctuations in the internal pressure of the blast furnace. If the exhaust gas in the hot blast furnace is used for pre-pressurization, it is easy to cause the particles in the exhaust gas to accumulate in the pipe, and the pipe is too thick with dust, which is not easy to clean and maintain and causes blockage. Utility Model Content
[0004] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model of this application to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.
[0005] In view of the above-mentioned problems and / or problems existing in the use of the hot blast furnace waste gas stamping structure, the present utility model is proposed.
[0006] Therefore, the purpose of the utility model is to provide a hot blast furnace waste gas stamping structure, which saves compressed air use and saves costs. The waste gas is filtered through a filter during the flow process to prevent particulate matter in the waste gas from accumulating inside each pipe and preventing the pipe from being blocked.
[0007] In order to solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:
[0008] A hot blast furnace waste gas stamping structure, comprising:
[0009] A hot blast furnace mechanism, wherein the hot blast furnace mechanism comprises a first hot blast furnace, a second hot blast furnace, a third hot blast furnace and a fourth hot blast furnace;
[0010] Filters, the filters are respectively arranged on the air outlet ducts of the first hot blast stove, the second hot blast stove, the third hot blast stove and the fourth hot blast stove;
[0011] The discharge mechanism comprises an exhaust gas main pipe connected to the exhaust pipes of the first hot blast stove, the second hot blast stove, the third hot blast stove and the fourth hot blast stove respectively, and a chimney connected to the exhaust gas main pipe, wherein the exhaust gas main pipe is connected to an exhaust gas main valve.
[0012] The discharge mechanism is used for discharging the waste gas of the first hot blast stove, the second hot blast stove, the third hot blast stove and the fourth hot blast stove.
[0013] As a preferred solution of the hot blast furnace exhaust gas stamping structure described in the utility model, the exhaust pipes of the first hot blast furnace, the second hot blast furnace, the third hot blast furnace and the fourth hot blast furnace are respectively connected to the exhaust valve No. 1, the exhaust valve No. 2, the exhaust valve No. 3 and the exhaust valve No. 4.
[0014] As a preferred solution of a hot blast furnace waste gas stamping structure described in the utility model, the top and bottom of the filter are respectively provided with an upper end cover and a lower end cover, the top of the upper end cover is provided with an upper connecting pipe, and the bottom of the lower end cover is provided with a lower connecting pipe.
[0015] As a preferred solution of the hot blast furnace waste gas stamping structure described in the utility model, the interior of the filter is provided with an adsorption layer, an upper filter layer and a lower filter layer, the upper filter layer is located at the top of the adsorption layer, and the lower filter layer is located at the bottom of the adsorption layer.
[0016] Compared with the prior art, the utility model has the following beneficial effects: in this hot blast furnace waste gas stamping structure, the first hot blast furnace and the second hot blast furnace supply air during normal production, and the hot blast furnace is stuffy when the third hot blast furnace is changed, the No. 3 waste gas valve is opened, the waste gas main valve is closed, and the No. 1 waste gas valve of the first hot blast furnace is opened, so that the gas in the first hot blast furnace passes through the waste gas main pipe and enters the third hot blast furnace from the No. 3 waste gas valve; when the pressures in the first hot blast furnace and the third hot blast furnace are equal, the No. 3 waste gas valve is closed, the waste gas main valve is opened to continue to discharge the residual waste gas in the first hot blast furnace, and the third hot blast furnace continues to stamp, completing one waste gas stamping compensation, saving compressed air use, saving costs, and the waste gas is filtered through the filter during the flow process to prevent particulate matter in the waste gas from accumulating inside each pipe and preventing pipe blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solution of the implementation of the utility model, the utility model will be described in detail below in combination with the drawings and detailed implementation. Obviously, the drawings described below are only some implementations of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0018] Figure 1 This is a schematic diagram of the overall structure of a hot blast furnace waste gas stamping structure of the utility model;
[0019] Figure 2 The utility model is a schematic diagram of the filter part structure of the hot blast furnace exhaust gas stamping structure.
[0020] 100, hot blast furnace mechanism; 110, first hot blast furnace; 120, second hot blast furnace; 130, third hot blast furnace; 140, fourth hot blast furnace; 111, No. 1 exhaust valve; 121, No. 2 exhaust valve; 131, No. 3 exhaust valve; 141, No. 4 exhaust valve; 200, filter; 201, upper end cover; 202, lower end cover; 203, upper connecting pipe; 204, lower connecting pipe; 210, adsorption layer; 220, lower filter layer; 230, upper filter layer; 300, discharge mechanism; 310, exhaust main pipe; 311, exhaust main valve; 320, chimney. DETAILED DESCRIPTION
[0021] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.
[0022] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the implementation of the present invention in detail, for the sake of convenience, the cross-sectional diagram showing the device structure will not be partially enlarged at a general scale, and the schematic diagram is only an example, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0023] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.
[0024] The utility model provides a hot blast furnace waste gas stamping structure, which saves compressed air usage and saves costs. The waste gas is filtered through a filter during its flow, preventing particles in the waste gas from accumulating inside each pipeline and preventing pipeline blockage.
[0025] Figure 1-Figure 2 The structure diagram of an embodiment of a hot blast furnace waste gas stamping structure of the utility model is shown. Figure 1-Figure 2 In this embodiment, a hot blast furnace exhaust gas stamping structure is provided, and its main body includes a hot blast furnace mechanism 100, a filter 200 and a discharge mechanism 300.
[0026] The hot blast furnace mechanism 100 controls the exhaust gas discharge and air intake of the corresponding hot blast furnace through each exhaust gas valve. Specifically, the hot blast furnace mechanism 100 includes a first hot blast furnace 110, a second hot blast furnace 120, a third hot blast furnace 130 and a fourth hot blast furnace 140. In this embodiment, the outlet pipes of the first hot blast furnace 110, the second hot blast furnace 120, the third hot blast furnace 130 and the fourth hot blast furnace 140 are respectively connected to the first exhaust gas valve 111, the second exhaust gas valve 121, the third exhaust gas valve 131 and the fourth exhaust gas valve 141;
[0027] The filter 200 is filtered through the upper filter layer 230 and the lower filter layer 220, and particles are adsorbed through the adsorption layer 210, which is convenient for dismantling, cleaning and maintenance. Specifically, the filter 200 is respectively arranged on the air outlet pipes of the first hot blast stove 110, the second hot blast stove 120, the third hot blast stove 130 and the fourth hot blast stove 140. In this embodiment, the top and bottom of the filter 200 are respectively provided with an upper end cover 201 and a lower end cover 202, the top of the upper end cover 201 is provided with an upper connecting pipe 203, and the bottom of the lower end cover 202 is provided with a lower connecting pipe 204. The inside of the filter 200 is provided with an adsorption layer 210 and an upper filter layer 230 and a lower filter layer 220 respectively located at the top and bottom of the adsorption layer 210;
[0028] The discharge mechanism 300 discharges the waste gas through the chimney 320. Specifically, the discharge mechanism 300 is used to discharge the waste gas from the first hot blast stove 110, the second hot blast stove 120, the third hot blast stove 130 and the fourth hot blast stove 140. In the present embodiment, the discharge mechanism 300 includes a waste gas main pipe 310 connected to the outlet pipes of the first hot blast stove 110, the second hot blast stove 120, the third hot blast stove 130 and the fourth hot blast stove 140 respectively, and a chimney 320 connected to the waste gas main pipe 310. The waste gas main pipe 310 is connected to a waste gas main valve 311.
[0029] Combination Figure 1-Figure 2 , a hot blast furnace waste gas stamping structure of the present embodiment has the following specific use process: during normal production, the first hot blast furnace 110 and the second hot blast furnace 120 supply air, and when the third hot blast furnace 130 is replaced, the hot blast furnace is stuffy, the No. 3 waste gas valve 131 is opened, the waste gas main valve 311 is closed, and the No. 1 waste gas valve 111 of the first hot blast furnace 110 is opened, so that the gas in the first hot blast furnace 110 passes through the waste gas main pipe 310 and enters the third hot blast furnace 130 from the No. 3 waste gas valve 131. When the pressure in the first hot blast furnace 110 and the third hot blast furnace 130 is equal, the No. 3 waste gas valve 131 is closed, and the waste gas main valve 311 is opened to continue to discharge the residual waste gas in the first hot blast furnace 110, and the third hot blast furnace 130 continues to stamp, completing one waste gas stamping compensation, saving compressed air use and cost, and the waste gas is filtered through the filter 200 during the flow process to prevent particulate matter in the waste gas from accumulating inside each pipeline and preventing pipeline blockage.
[0030] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A hot blast furnace waste gas stamping structure, characterized in that: include: A hot blast furnace mechanism (100), the hot blast furnace mechanism (100) comprising a first hot blast furnace (110), a second hot blast furnace (120), a third hot blast furnace (130) and a fourth hot blast furnace (140); A filter (200), wherein the filter (200) is respectively arranged on the air outlet ducts of the first hot blast stove (110), the second hot blast stove (120), the third hot blast stove (130) and the fourth hot blast stove (140); A discharge mechanism (300), the discharge mechanism (300) comprising an exhaust gas main pipe (310) respectively connected to the exhaust pipes of a first hot blast furnace (110), a second hot blast furnace (120), a third hot blast furnace (130) and a fourth hot blast furnace (140) and a chimney (320) connected to the exhaust gas main pipe (310), the exhaust gas main pipe (310) being connected to an exhaust gas main valve (311); the discharge mechanism (300) is used to discharge the exhaust gas from the first hot blast furnace (110), the second hot blast furnace (120), the third hot blast furnace (130) and the fourth hot blast furnace (140).
2. A hot blast furnace waste gas stamping structure according to claim 1, characterized in that: The gas outlet pipes of the first hot blast furnace (110), the second hot blast furnace (120), the third hot blast furnace (130) and the fourth hot blast furnace (140) are respectively connected to a first waste gas valve (111), a second waste gas valve (121), a third waste gas valve (131) and a fourth waste gas valve (141).
3. A hot blast furnace waste gas ramming structure according to claim 2, characterized in that: An upper end cover (201) and a lower end cover (202) are respectively arranged at the top and bottom of the filter (200); an upper connecting pipe (203) is arranged at the top of the upper end cover (201), and a lower connecting pipe (204) is arranged at the bottom of the lower end cover (202).
4. A hot blast furnace waste gas stamping structure according to claim 1, characterized in that: The filter (200) is provided with an adsorption layer (210), an upper filtration layer (230) and a lower filtration layer (220) inside, wherein the upper filtration layer (230) is located at the top of the adsorption layer (210) and the lower filtration layer (220) is located at the bottom of the adsorption layer (210).