Step type deep foundation pit supporting structure

By arranging supporting piles and internal support structures of different lengths in the stepped deep foundation pit, combined with plain concrete cushions, the problem in the existing technology that it is difficult to effectively consider the stress state and earth pressure transmission of small foundation pits is solved, and the problem is achieved. The integral connection between the internal and external structures of the foundation pit reduces construction difficulty and risks.

CN221919439UActive Publication Date: 2024-10-29WUHAN MUNICIPAL ENG DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420214874.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-29
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

It is difficult to effectively consider the stress state of the small foundation pit itself and the earth pressure transmission path of the entire foundation pit in the design and construction of the existing technology, which may lead to engineering accidents.

Method used

A stepped deep foundation pit support structure is adopted. First supporting piles and second supporting piles of different lengths are set on both sides of the stepped deep foundation pit outline, and internal support connections are made through the top pressure beams and waist beams. Combined with the plain concrete cushion, the length of the supporting piles and the internal support length are shortened, the amount of earth excavation is reduced, and the disturbance of the foundation soil is reduced.

Benefits of technology

Shorten the length of the outer supporting piles and the total length of the inner supports, reduce the amount of earth excavation inside the foundation pit, reduce the difficulty of construction and the risk of deep foundation pits, connect the inner and outer supporting structures of the foundation pit as a whole, and improve the stress balance and stable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919439U_ABST
    Figure CN221919439U_ABST
Patent Text Reader

Abstract

The utility model relates to a stepped deep foundation pit supporting structure which comprises a first supporting pile and a second supporting pile which are arranged on the two sides of the outline of a stepped deep foundation pit in rows, and the top of the first supporting pile and the top of the second supporting pile are provided with a first capping beam and a second capping beam respectively. The first coping beam and the second coping beam are connected through a first-layer inner support, a first waist beam and a second waist beam are arranged on the inner sides of the waist portions of the first supporting pile and the second supporting pile correspondingly and connected through a second-layer inner support, and third supporting piles are arranged in rows close to the deeper side in the deep foundation pit. A third coping beam is arranged on the top of the third supporting pile, a third waist beam is arranged on the inner side of the second supporting pile, and the third coping beam and the third waist beam are connected through a third layer of inner support. The pile length of the supporting pile on the outer side of the foundation pit and the total length of the inner support can be shortened, the earth excavation volume in the foundation pit is reduced, disturbance to foundation soil is weakened, and the construction difficulty and the deep foundation pit risk are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation pit excavation support, in particular to a stepped deep foundation pit support structure. Background Art

[0002] Municipal underground structures such as drainage pump houses, sewage treatment plants, and regulating reservoirs often have large height differences in the bottom plates of the same main structure, which results in a stepped outline inside the same foundation pit, that is, a pit-in-pit form. In the prior art, the soil at the steps is often retained, and a separate support structure is set up at the pit-in-pit. Although the depth of the small foundation pit in the pit-in-pit form is relatively small, the force of its support structure is still affected by the soil pressure transmitted from the large foundation pit. If it is not properly considered during the design and construction process, it may lead to engineering accidents. Therefore, in the design and construction, it is necessary to consider both the stress state of the small foundation pit itself and the soil pressure transmission path of the entire foundation pit, so as to select a suitable support method to ensure the safety of the foundation pit project. Summary of the invention

[0003] The technical problem to be solved by the utility model is to provide a stepped deep foundation pit supporting structure in view of the deficiencies of the above-mentioned prior art.

[0004] The technical solution of the utility model for solving the above-mentioned technical problems is as follows: a stepped deep foundation pit support structure, comprising a first supporting pile and a second supporting pile arranged in rows on both sides of the stepped deep foundation pit contour, a first top pressure beam and a second top pressure beam are respectively arranged on the top of the first support pile and the second supporting pile, the first top pressure beam and the second top pressure beam are connected by a first layer of internal support, a first waist beam and a second waist beam are respectively arranged on the inner sides of the waists of the first supporting pile and the second supporting pile, the first waist beam and the second waist beam are connected by a second layer of internal support, third supporting piles are arranged in rows near the deeper side in the deep foundation pit, a third top pressure beam is arranged on the top of the third supporting pile, a third waist beam is arranged on the inner side of the second supporting pile at the same horizontal height as the third top pressure beam, and the third top pressure beam and the third waist beam are connected by a third layer of internal support, and a plain concrete cushion layer is arranged between the top of the third top pressure beam and the first supporting pile.

[0005] The beneficial effects of the utility model are as follows: the stepped deep foundation pit support structure of the utility model, by respectively arranging the first supporting piles and the second supporting piles of different lengths on both sides of the stepped deep foundation pit contour, and constructing the first layer of internal support through the first support piles and the first and second pressure beams on the top of the second support piles, and then constructing the second layer of internal support through the first waist beam and the second waist beam, and finally completing the construction of the third supporting piles and the third pressure beam on the deeper side, can shorten the length of the outer supporting piles of the foundation pit and the total length of the inner support, reduce the amount of earth excavation inside the foundation pit, weaken the disturbance to the foundation soil, connect the inner and outer support structures of the foundation pit into a whole, and reduce the construction difficulty and the risk of deep foundation pits.

[0006] On the basis of the above technical solution, the present invention can also be improved as follows:

[0007] Further: two adjacent first supporting piles, two adjacent second supporting piles and two adjacent third supporting piles are arranged at equal intervals on a plane.

[0008] The beneficial effect of the above further scheme is: by arranging two adjacent first supporting piles, two adjacent second supporting piles and two adjacent third supporting piles at equal intervals on the plane, on the one hand, the soil arch effect can be utilized to reduce the number of supporting piles and facilitate pile foundation construction.

[0009] Further: the plain concrete cushion layer is located at the shallower bottom of the foundation pit on the shallower side of the foundation pit, and the top of the third capping beam is arranged flush with the top of the plain concrete cushion layer.

[0010] The beneficial effect of the above further scheme is that by providing the plain concrete cushion layer, the inner and outer supporting structures of the foundation pit are connected into a whole, so that the force of the entire supporting structure is more balanced and stable.

[0011] Furthermore: the concrete strength grade of the plain concrete cushion layer is not less than C20, and the thickness is not less than 30cm.

[0012] The beneficial effect of the above further scheme is that the plain concrete cushion layer can be used as the cushion layer of the bottom plate of the main structure, and can also use its good compressive performance to transfer the internal force of the support structure and reduce the deformation of the support structure.

[0013] Further: the length of the second supporting pile is greater than the length of the first supporting pile, and the length of the first supporting pile is greater than the length of the second supporting pile.

[0014] The beneficial effect of the above further scheme is: by setting the length of the second supporting pile to be greater than the length of the first supporting pile, and the length of the first supporting pile to be greater than the length of the second supporting pile, different pile lengths can be designed according to different depths of the foundation pit, saving engineering costs.

[0015] Further: the first layer of internal supports, the second layer of internal supports and the third layer of internal supports are located in the same vertical plane.

[0016] The beneficial effect of the above further scheme is: by locating the first layer of internal support, the second layer of internal support and the third layer of internal support in the same vertical plane, the vertical force transmission of the entire support structure can be made more stable, and being located in the same vertical plane can conveniently leave enough space for earth excavation operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the plan structure of a stepped deep foundation pit support structure according to an embodiment of the utility model;

[0018] Figure 2 It is a schematic cross-sectional structure diagram of a stepped deep foundation pit support structure according to an embodiment of the utility model.

[0019] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0020] 1. The first supporting pile, 2. The first top beam, 3. The second supporting pile, 4. The second top beam, 5. The first layer of internal support, 6. The first waist beam, 7. The second waist beam, 8. The second layer of internal support, 9. The shallower bottom of the foundation pit, 10. The third supporting pile, 11. The third top beam, 12. The third waist beam, 13. The third layer of internal support, 14. Plain concrete cushion layer, 15. The deeper bottom of the foundation pit, 16. The underground main structure. DETAILED DESCRIPTION

[0021] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0022] like Figure 1 and Figure 2As shown, a stepped deep foundation pit support structure comprises a first supporting pile 1 and a second supporting pile 3 arranged in rows on both sides of the stepped deep foundation pit contour, a first top beam 2 and a second top beam 4 are respectively arranged on the top of the first supporting pile 1 and the second supporting pile 3, the first top beam 2 and the second top beam 4 are connected by a first layer of internal support 5, a first waist beam 6 and a second waist beam 7 are respectively arranged on the inner side of the waist of the first supporting pile 1 and the second supporting pile 3, the first waist beam 6 and the second waist beam 7 are connected by a second layer of internal support 8, third supporting piles 10 are arranged in rows near the deeper side in the deep foundation pit, a third top beam 11 is arranged on the top of the third supporting pile 10, a third waist beam 12 is arranged on the inner side of the second supporting pile 3 at the same horizontal height as the third top beam 11, and the third top beam 11 and the third waist beam 12 are connected by a third layer of internal support 13, and a plain concrete cushion layer 14 is arranged between the top of the third top beam 11 and the first supporting pile 1.

[0023] The utility model provides a stepped deep foundation pit support structure, by respectively arranging first supporting piles 1 and second supporting piles 3 of different lengths on both sides of the stepped deep foundation pit contour, and constructing a first layer of inner support 5 through the first support piles 1 and the second support piles 3 at the top of the first support piles 1 and the second support piles 3, and then constructing a second layer of inner support 8 through the first waist beam 6 and the second waist beam 7, and finally completing the construction of the third supporting piles 10 and the third pressure beam 11 on the deeper side, which can shorten the length of the outer supporting piles of the foundation pit and the total length of the inner support, reduce the amount of earth excavation inside the foundation pit, weaken the disturbance to the foundation soil, connect the inner and outer support structures of the foundation pit into a whole, and reduce the construction difficulty and the risk of deep foundation pits.

[0024] In one or more embodiments of the utility model, two adjacent first supporting piles 1, two adjacent second supporting piles 3, and two adjacent third supporting piles 10 are arranged at equal intervals on a plane. By arranging two adjacent first supporting piles 1, two adjacent second supporting piles 3, and two adjacent third supporting piles 10 at equal intervals on a plane, on the one hand, the soil arch effect can be utilized to reduce the number of supporting piles and facilitate pile foundation construction.

[0025] In one or more embodiments of the present invention, the pile length and diameter of the first supporting pile 1 are determined by calculation according to the distance H1 from the top of the first capping beam 2 to the bottom 9 of the shallow foundation pit.

[0026] In one or more embodiments of the present invention, the length and diameter of the second supporting pile 3 are determined by calculation according to the distance H2 from the top of the second capping beam 4 to the bottom 14 of the deeper foundation pit.

[0027] In one or more embodiments of the utility model, the plain concrete cushion layer 14 is located at the shallower foundation pit bottom 9 on the shallower side of the foundation pit, and the top of the third capping beam 11 is arranged flush with the top of the plain concrete cushion layer 14. By arranging the plain concrete cushion layer 14, the inner and outer supporting structures of the foundation pit are connected as a whole, so that the force of the entire supporting structure is more balanced and stable.

[0028] In one or more embodiments of the utility model, the concrete strength grade of the plain concrete cushion layer 14 is not less than C20, and the thickness is not less than 30 cm. The plain concrete cushion layer 14 can be used as a cushion layer for the bottom plate of the main structure, and can also use its good compressive performance to transmit the internal force of the support structure and reduce the deformation of the support structure.

[0029] Optionally, in one or more embodiments of the utility model, the top of the third pressure beam 11 is arranged flush with the bottom 9 of the foundation pit on the shallower side of the foundation pit. By arranging the top of the third pressure beam 11 flush with the bottom 9 of the foundation pit on the shallower side of the foundation pit, it is convenient to arrange the third pressure beam 11 horizontally, so that the force of the entire support structure is more balanced and stable.

[0030] In one or more embodiments of the present invention, the pile length and diameter of the third supporting pile 10 are determined by calculation according to the distance H3 from the top of the third capping beam 11 to the bottom 14 of the deeper foundation pit.

[0031] In one or more embodiments of the utility model, the length of the second supporting pile 3 is greater than the length of the first supporting pile 1, and the length of the first supporting pile 1 is greater than the length of the second supporting pile 3. By setting the length of the second supporting pile 3 to be greater than the length of the first supporting pile 1, and the length of the first supporting pile 1 to be greater than the length of the second supporting pile 3, the length of the supporting piles outside the foundation pit and the total length of the inner support can be greatly shortened, the amount of earth excavation inside the foundation pit can be reduced, the stepped deep foundation pit support can be realized, the disturbance to the foundation soil can be reduced, and the construction difficulty and the risk of the deep foundation pit can be reduced.

[0032] Optionally, in one or more embodiments of the utility model, the first layer of inner supports 5, the second layer of inner supports 8 and the third layer of inner supports 13 are located in the same vertical plane. By locating the first layer of inner supports 5, the second layer of inner supports 8 and the third layer of inner supports 13 in the same vertical plane, the vertical force transmission of the entire support structure can be made more stable, and being located in the same vertical plane can conveniently leave enough space for excavation operations.

[0033] The utility model discloses a stepped deep foundation pit supporting structure, and the specific construction includes the following steps:

[0034] ① The site is connected and leveled, and the first support pile 1, the second support pile 3 and the third support pile 10 are constructed in sequence. The part above the top of the third support pile 10 is an empty pile;

[0035] ② Excavate to the bottom elevation of the first layer of internal support 5, and construct the first top beam 2 and the second top beam 4 and the first layer of internal support 5;

[0036] ③ After the first layer of internal support 5 reaches the designed strength, continue to excavate the earth to the bottom elevation of the second layer of internal support 8, and construct the first waist beam 6 and the second waist beam 7 and the second layer of internal support 8.

[0037] ④ After the second layer of internal support 8 reaches the design strength, excavate to the shallow foundation pit bottom 9 elevation.

[0038] ⑤Construct the third top beam 11, the third waist beam 12, the third inner support 13 and the plain concrete cushion 14 in the pit-in-pit;

[0039] ⑥ After the third layer of internal support 13 and plain concrete cushion 14 reach the designed strength, continue to excavate the earth to the elevation 15 of the deeper foundation pit bottom;

[0040] ⑦ Construct the underground main structure 16 from bottom to top;

[0041] ⑧After the underground main structure reaches the designed strength, the supporting structures will be dismantled in sequence and the foundation pit backfill will be completed.

[0042] The utility model provides a stepped deep foundation pit support structure with the following advantages and positive effects:

[0043] The utility model can shorten the length of the supporting piles outside the foundation pit and the total length of the inner support, reduce the amount of earth excavation inside the foundation pit, reduce the disturbance to the foundation soil, and reduce the construction difficulty and the risk of deep foundation pit.

[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A stepped deep foundation pit support structure, characterized in that: The invention comprises a first supporting pile (1) and a second supporting pile (3) arranged in a row on both sides of the outline of a stepped deep foundation pit, wherein the tops of the first supporting pile (1) and the second supporting pile (3) are respectively provided with a first pressing top beam (2) and a second pressing top beam (4), the first pressing top beam (2) and the second pressing top beam (4) are connected via a first layer of inner support (5), the inner sides of the waists of the first supporting pile (1) and the second supporting pile (3) are respectively provided with a first waist beam (6) and a second waist beam (7), the first waist beam (6) and the second waist beam (7) are connected via a first layer of inner support (5), The second layer of inner support (8) is connected, and third supporting piles (10) are arranged in a row near the deeper side in the deep foundation pit, and a third top beam (11) is arranged on the top of the third supporting pile (10), and a third waist beam (12) is arranged on the inner side of the second supporting pile (3) at the same level as the third top beam (11), and the third top beam (11) and the third waist beam (12) are connected by a third layer of inner support (13), and a plain concrete cushion layer (14) is arranged between the top of the third top beam (11) and the first supporting pile (1).

2. The stepped deep foundation pit support structure according to claim 1 is characterized in that: Two adjacent first supporting piles (1), two adjacent second supporting piles (3) and two adjacent third supporting piles (10) are arranged at equal intervals on a plane.

3. The stepped deep foundation pit support structure according to claim 1 is characterized in that: The plain concrete cushion layer (14) is located at the shallower foundation pit bottom (9) on the shallower side of the foundation pit, and the top of the third capping beam (11) is arranged flush with the top of the plain concrete cushion layer (14).

4. The stepped deep foundation pit support structure according to claim 3 is characterized in that: The concrete strength grade of the plain concrete cushion layer (14) is not less than C20, and the thickness is not less than 30 cm.

5. The stepped deep foundation pit support structure according to claim 2 is characterized in that: The length of the second supporting pile (3) is greater than the length of the first supporting pile (1), and the length of the first supporting pile (1) is greater than the length of the second supporting pile (3).

6. The stepped deep foundation pit support structure according to claim 2 is characterized in that: The first layer of internal supports (5), the second layer of internal supports (8) and the third layer of internal supports (13) are located in the same vertical plane.