Utility tunnel secondary lining trolley

By designing the second lining trolley for the comprehensive pipe corridor project, using the jacking system and the slot structure, the problem of time-consuming and labor-intensive construction of steel bars for the vault connection wall has been solved, and the rapid setting of reserved steel bars and the pouring of the connection wall have been achieved. Improved construction efficiency and operational convenience.

CN221920983UActive Publication Date: 2024-10-29CHINA RAILWAY NO 2 ENG GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420081557.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-10-29
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

In the comprehensive pipe corridor project, the construction of steel bars for the vault connection wall is time-consuming and laborious, and the connection wall cannot be poured, which affects the construction efficiency.

Method used

Design a comprehensive pipe gallery secondary lining trolley, including the secondary lining formwork and the middle partition wall side formwork. The jacking system drives the middle partition wall side formwork to rotate to form a reserved mold cavity. After pouring, the concrete forms a connecting wall, and the bottom formwork is Set up slots to allow the steel bars to pass through to form reserved steel bars, which facilitates subsequent binding and formwork erection and avoids drilling construction on the vault.

Benefits of technology

It achieves fast and convenient reservation of steel bars for the middle partition wall, improves construction efficiency, simplifies the operation process, and avoids vault drilling construction during secondary lining. The structure is simple and the operation is convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920983U_ABST
    Figure CN221920983U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of tunnel and underground engineering, in particular to a comprehensive pipe gallery secondary lining trolley which comprises a secondary lining formwork and two oppositely-arranged middle partition wall side formworks, the ends, close to the secondary lining formwork, of the middle partition wall side formworks are hinged to the secondary lining formwork, and the ends, away from the secondary lining formwork, of the middle partition wall side formworks extend to form a bottom formwork. A clamping groove is formed in the bottom template; a jacking system is arranged below the mid-partition wall edge template, is hinged to the mid-partition wall edge template, and can drive the mid-partition wall edge template to rotate relative to the secondary lining template; the middle partition wall side formworks are configured in the mode that when the jacking system extends, the two middle partition wall side formworks are close to each other and form a reserved mold cavity, the comprehensive pipe gallery secondary lining trolley can pour a connection wall, so that middle partition wall drilling construction does not need to be conducted on a secondary lining vault, and the comprehensive pipe gallery secondary lining trolley is simple in structure, convenient and fast to operate and low in cost. The reserved steel bars of the mid-partition wall can be rapidly arranged, and the construction efficiency of the comprehensive pipe gallery is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnels and underground engineering, in particular to a secondary lining trolley for a comprehensive pipe gallery. Background Art

[0002] With the continuous acceleration of urbanization, the construction area of ​​integrated pipe corridors is expanding. In order to ensure safety, the second lining of large-section multi-warehouse urban integrated pipe corridors needs to be cast using a lining trolley. When designing the trolley, it is necessary to consider reserving the middle partition wall reinforcement of the arch after closing the mold. In addition, in order to facilitate closing the mold when pouring the middle partition wall again, part of the middle partition wall needs to be poured as a connecting wall during the second lining pouring, so that the middle partition wall formwork can be set up on the connecting wall later to complete the subsequent pouring of the middle partition wall.

[0003] At present, a Chinese patent application with patent publication number CN206874292U discloses a protection device for the reinforcement of the partition wall during the casting of the secondary lining vault, but its operation is cumbersome, the construction time at the reinforcement of the partition wall is long, time-consuming and labor-intensive, and the connecting wall cannot be cast. Utility Model Content

[0004] The invention purpose of the utility model is to provide a second lining trolley for a comprehensive pipe gallery in view of the problem in the background technology that it is time-consuming and labor-intensive to reinforce the arch connecting wall and the connecting wall cannot be cast.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A secondary lining trolley for a comprehensive pipe gallery comprises a secondary lining template and two oppositely arranged middle partition wall templates.

[0007] One end of the middle partition wall side template close to the second lining template is hinged to the second lining template, and one end of the middle partition wall side template away from the second lining template extends to form a bottom template, and a slot is provided on the bottom template;

[0008] A jacking system is provided below the middle partition wall side template, and the jacking system is hinged to the middle partition wall side template, and the jacking system can drive the middle partition wall side template to rotate relative to the second lining template;

[0009] The middle partition wall side templates are configured such that when the jacking system is extended, the two middle partition wall side templates approach each other and form a reserved mold cavity.

[0010] The utility model discloses a secondary lining trolley for a comprehensive pipe gallery, comprising a secondary lining template and two relatively arranged middle partition wall side templates, wherein one end of the middle partition wall side template is hinged with the secondary lining template, and the middle partition wall side template extends away from one end of the second lining template to form a bottom template, and a clamping groove is arranged on the bottom template. When performing secondary lining pouring, the jacking system is first controlled to extend, and the jacking system drives the middle partition wall side template to rotate relative to the second lining template, so that the two middle partition wall side templates are close to each other and form a reserved mold cavity. After pouring and secondary lining, the concrete in the reserved mold cavity forms a connecting wall. At the same time, since the clamping groove is arranged on the bottom template The steel bars of the middle partition wall extend out of the reserved mold cavity after passing through the slot, and reserved steel bars are formed outside the connecting wall after the secondary lining after pouring, so that it is convenient to carry out the subsequent steel bar binding construction of the middle partition wall through the reserved steel bars, and because of the existence of the connecting wall, it is convenient to set up the subsequent middle partition wall template on the connecting wall for construction. The secondary lining trolley of the comprehensive pipe corridor of the utility model can cast the connecting wall, so that there is no need to drill holes for the middle partition wall on the arch of the secondary lining, and it has a simple structure, convenient operation, and can quickly realize the setting of reserved steel bars for the middle partition wall, effectively improving the construction efficiency of the comprehensive pipe corridor.

[0011] As a preferred solution of the utility model, the slot is a trapezoidal slot, and the slot has a bottom notch, and the bottom notch matches the middle partition wall steel bar. By setting the slot as a trapezoidal slot, it is convenient for the middle partition wall steel bar to enter the slot, and the slot has a bottom notch, and the bottom notch matches the middle partition wall steel bar, so that the middle partition wall steel bar fits with the bottom notch and is fixed more firmly in the slot.

[0012] As a preferred solution of the utility model, a plurality of the card slots are arranged at intervals on the bottom template.

[0013] As a preferred solution of the utility model, it also includes a strip template, which is arranged above the bottom template and abuts against the bottom template, and the two sides of the strip template are used to abut against the middle partition wall steel bars that pass through the slot. The strip template is used to cover the gap and the slot between the two bottom templates. At the same time, because the two sides of the strip template abut against the middle partition wall steel bars that pass through the slot, the strip template can also fix the middle partition wall steel bars, so that the gap between the middle partition wall steel bars and the slot is minimized, which effectively improves the template system of the reserved mold cavity and achieves the purpose of improving construction efficiency.

[0014] As a preferred solution of the utility model, it also includes a support frame, which is located below the bottom template and is used to support the bottom template. By setting up the support frame to support the bottom template, the reserved mold cavity is ensured during casting, and the bottom template is effectively prevented from opening, thereby ensuring operation safety.

[0015] As a preferred solution of the utility model, the support frame includes a purlin and a vertical support member, the purlin abuts against the bottom of the bottom template, and the vertical support member supports the purlin.

[0016] As a preferred solution of the utility model, a plurality of purlins are arranged at intervals at the bottom of the bottom template.

[0017] As a preferred solution of the utility model, the jacking system includes a jack and a first hinge, the first hinge is connected to the middle partition wall side template, and the jack is hinged on the first hinge. When the jack is extended, the jack pushes the middle partition wall side template to rotate around the second lining template through the first hinge, so that the two middle partition wall side templates are closed to form a reserved mold cavity.

[0018] As a preferred solution of the utility model, it also includes a door frame, which supports the second lining formwork, and one end of the jack away from the middle partition wall side formwork is hinged to the door frame.

[0019] As a preferred solution of the utility model, the door frame includes an upper longitudinal beam, and one end of the jack away from the middle partition wall side template is hinged to the upper longitudinal beam.

[0020] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0021] 1. The utility model of the utility model of the secondary lining trolley of the integrated pipe gallery comprises a secondary lining template and two relatively arranged middle partition wall side templates, one end of the middle partition wall side template is hinged with the secondary lining template, and the middle partition wall side template is extended away from one end of the secondary lining template to form a bottom template, and a card slot is arranged on the bottom template. When the secondary lining is poured, the jacking system is first controlled to extend, and the jacking system drives the middle partition wall side template to rotate relative to the second lining template, so that the two middle partition wall side templates are close to each other and form a reserved mold cavity. After pouring and secondary lining, the concrete in the reserved mold cavity forms a docking wall. At the same time, since the bottom template is provided with a card slot, the jacking system is controlled to extend first .... The steel bars of the middle partition wall pass through the slots and extend out of the reserved mold cavity. After the secondary lining is built after pouring, reserved steel bars are formed outside the connecting wall, which is convenient for the subsequent binding construction of the steel bars of the middle partition wall through the reserved steel bars. In addition, due to the existence of the connecting wall, it is convenient for the subsequent middle partition wall template to be set up on the connecting wall for construction. The secondary lining trolley of the comprehensive pipe corridor of the utility model can cast the connecting wall, so that there is no need to drill holes for the middle partition wall on the arch of the secondary lining. It has a simple structure and is easy to operate. It can quickly realize the setting of the reserved steel bars of the middle partition wall, effectively improving the construction efficiency of the comprehensive pipe corridor. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the cooperation between the secondary lining trolley and the secondary lining of the comprehensive pipe gallery of the utility model (after the secondary lining is poured).

[0023] Figure 2 yes Figure 1 A partial enlarged view of point A.

[0024] Figure 3 It is a schematic diagram of the bottom template of the utility model.

[0025] Figure 4 It is a schematic diagram of a reserved mold cavity formed by a partition wall side template of the utility model.

[0026] Figure 5 yes Figure 4 Bottom view of .

[0027] Figure 6 It is a plane schematic diagram of the bottom template of the utility model before being matched with the reinforcement of the middle partition wall.

[0028] Figure 7 It is a plane schematic diagram of the bottom template of the utility model after being matched with the middle partition wall reinforcement.

[0029] Figure 8 It is a schematic elevation diagram of the bottom formwork of the utility model before being matched with the reinforcement of the middle partition wall.

[0030] Fig. 9 It is a schematic elevation diagram of the bottom formwork of the utility model after being matched with the reinforcement of the middle partition wall.

[0031] Fig.10 This is a schematic diagram of the coordination between the secondary lining trolley and the secondary lining of the comprehensive pipeline corridor (before pouring the secondary lining).

[0032] Markings in the figure: 1-lifting system, 11-jack, 12-first hinge, 2-bottom template, 21-slot, 211-bottom notch, 3-middle partition wall side template, 4-strip template, 5-support frame, 51-purlin, 52-vertical support, 6-bracket column, 7-upper longitudinal beam, 8-gantry crossbeam, 10-middle partition wall reinforcement, 20-secondary lining template, 30-gantry, 40-connecting wall, 50-secondary lining, 60-secondary lining reinforcement, 70-reserved mold cavity. DETAILED DESCRIPTION

[0033] The utility model is described in detail below in conjunction with the accompanying drawings.

[0034] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0035] Example 1

[0036] like Figure 1-Figure 10 As shown, the secondary lining trolley of the integrated pipe gallery of this embodiment includes a secondary lining template 20 and two oppositely arranged middle partition wall side templates 3.

[0037] One end of the middle partition wall side template 3 close to the second lining template 20 is hinged to the second lining template 20, and one end of the middle partition wall side template 3 away from the second lining template 20 extends to form a bottom template 2, and a slot 21 is provided on the bottom template 2;

[0038] A jacking system 1 is provided below the middle partition wall side template 3, and the jacking system 1 is hinged to the middle partition wall side template 3, and the jacking system 1 can drive the middle partition wall side template 3 to rotate relative to the second lining template 20;

[0039] The partition wall side templates 3 are configured such that when the jacking system 1 is extended, the two partition wall side templates 3 are close to each other and form a reserved mold cavity 70 .

[0040] The secondary lining trolley of the integrated pipe gallery of this embodiment includes a secondary lining template 20 and two oppositely arranged middle partition wall templates 3. One end of the middle partition wall template 3 is hinged to the secondary lining template 20. The middle partition wall template 3 extends away from one end of the second lining template 20 to form a bottom template 2. A card slot 21 is provided on the bottom template 2. When pouring the secondary lining 50, the jacking system 1 is first controlled to extend, and the jacking system 1 drives the middle partition wall template 3 to rotate relative to the second lining template 20, so that the two middle partition wall templates 3 are close to each other and form a reserved mold cavity 70. Fig.10 After the secondary lining 50 is poured, the concrete in the reserved mold cavity 70 forms the connecting wall 40, such as Figure 2 At the same time, since the bottom template 2 is provided with a slot 21, the middle partition wall steel bar 10 passes through the slot 21 and extends out of the reserved mold cavity 70. Fig.10 After pouring and secondary lining 50, the middle partition wall reinforcement 10 forms a reserved reinforcement outside the connecting wall 40, such as Figure 2 , so that it is convenient to carry out the reinforcement binding construction of the middle partition wall through the reserved reinforcement, and because of the existence of the connecting wall 40, it is convenient to set up the middle partition wall template on the connecting wall 40 for subsequent construction work. The second lining trolley of the integrated pipe corridor of this embodiment can cast the connecting wall 40, so that there is no need to drill holes for the middle partition wall on the arch of the secondary lining. It has a simple structure, convenient operation, and can quickly realize the reserved reinforcement setting of the middle partition wall, which effectively improves the construction efficiency of the integrated pipe corridor.

[0041] like Figure 3 As shown, the slot 21 is a trapezoidal slot. By setting the slot 21 as a trapezoidal slot, it is convenient for the middle partition wall steel bar 10 to enter the slot 21. When the reserved mold cavity 70 is closed, the two bottom mold plates 2 move closer to the middle. By setting the slot 21 as a trapezoidal slot, it is convenient for the middle partition wall steel bar 10 to easily enter the slot 21 when the bottom mold plates 2 are closed, and finally the middle partition wall steel bar 10 is completely in place in the slot 21. Furthermore, the slot 21 has a bottom notch 211, and the bottom notch 211 matches the middle partition wall steel bar 10, so that the middle partition wall steel bar 10 fits with the bottom notch 211 and is fixed more firmly in the slot 21.

[0042] like Figure 6 , Figure 8 As shown, when the middle partition wall side template 3 is not closed, the middle partition wall reinforcement 10 is located outside the bottom template 2, as shown in FIG. Figure 7 , Fig. 9 As shown, when the middle partition wall side template 3 is closed to form the reserved mold cavity 70 , the middle partition wall steel bar 10 is located in the bottom notch 211 of the slot 21 , and the middle partition wall steel bar 10 passes through the bottom template 2 through the slot 21 , so that the middle partition wall steel bar 10 extends out of the reserved mold cavity 70 .

[0043] like Figure 3 As shown, a plurality of slots 21 are arranged at intervals on the bottom template 2. In this embodiment, the number and length of the intermediate partition wall reinforcement 10 to be reserved are first determined according to the design drawings, and then the slots 21 with corresponding spacing and number are opened on the bottom template 2.

[0044] In a preferred embodiment, the bottom template 2 is made of Q235B steel plate with a thickness of 15 mm.

[0045] In a preferred manner, when two oppositely disposed middle partition wall side templates 3 approach each other and form a reserved mold cavity 70 , two oppositely disposed bottom templates 2 abut against each other.

[0046] In a preferred manner, when two oppositely disposed middle partition wall side templates 3 are close to each other and form a reserved mold cavity 70, two oppositely disposed bottom templates 2 are close to each other and leave a certain distance.

[0047] like Figure 4 As shown, the strip template 4 is also included. The strip template 4 is arranged above the bottom template 2, and the strip template 4 is abutted against the bottom template 2. Both sides of the strip template 4 are used to abut against the middle partition wall steel bars 10 that pass through the slot 21. By arranging the strip template 4 above the two bottom templates 2 that are closed, and abutting the strip template 4 against the bottom template 2, both sides of the strip template 4 abut against the middle partition wall steel bars 10 that pass through the slot 21, as shown in FIG. Figure 4 , so that the gap between the two bottom templates 2 and the slot 21 are covered by the strip template 4. At the same time, since the two sides of the strip template 4 are abutted against the middle partition wall steel bars 10 passing through the slot 21, the strip template 4 can also fix the middle partition wall steel bars 10, so that the gap between the middle partition wall steel bars 10 and the slot 21 is minimized, effectively improving the template system of the reserved mold cavity 70, thereby achieving the purpose of improving construction efficiency.

[0048] A preferred method is as follows Figure 2As shown, the jacking system 1 includes a jack 11 and a first hinge 12, the first hinge 12 is connected to the middle partition wall side template 3, and the jack 11 is hinged on the first hinge 12. By connecting the first hinge to the middle partition wall side template 3, and then hingedly connecting the jack 11 to the first hinge 12, when the jack 11 is extended, the jack 11 pushes the middle partition wall side template 3 to rotate around the second lining template 20 through the first hinge 12, so that the two middle partition wall side templates 3 are closed to form a reserved mold cavity 70.

[0049] like Figure 1 As shown, the trolley includes a secondary lining formwork 20 and a portal frame 30 . The portal frame 30 supports the secondary lining formwork 20 , and one end of the jack 11 away from the middle partition wall side formwork 3 is hinged on the portal frame 30 .

[0050] like Figure 2 As shown, the portal frame 30 includes a bracket column 6, an upper longitudinal beam 7, and a portal frame cross beam 8. The upper longitudinal beam 7 is arranged on the portal frame cross beam 8, and the bracket column 6 is arranged on the upper longitudinal beam 7. The bracket column 6 is used to support the second lining formwork 20 at the top, and the end of the jack 11 away from the middle partition wall side formwork 3 is hinged on the upper longitudinal beam 7.

[0051] A preferred method is as follows Figure 2 As shown, before pouring the secondary lining 50, the secondary lining steel bars 60 are first connected to the middle partition wall steel bars 10, and then the secondary lining formwork 20 is lifted by the portal frame 30 to make the secondary lining formwork 20 reach the designed position, and then the middle partition wall side formwork 3 is lifted by the lifting system 1 to make the two middle partition wall side formworks 3 close together to form a reserved mold cavity 70, and the middle partition wall steel bars 10 extend out of the reserved mold cavity 70 through the slots 21 on the bottom formwork 2, and then the concrete pouring of the secondary lining 50 is carried out. After the concrete solidifies, the secondary lining formwork 20 is lowered by the portal frame 30, and the lifting system 1 is retracted to separate the two middle partition wall side formworks 3, as shown in FIG. Figure 2 By setting two middle partition wall side templates 3 together to form a reserved mold cavity 70, a connecting wall 40 is formed after the secondary lining 50 is poured, and the middle partition wall steel bars 10 extend out of the connecting wall 40 to form reserved steel bars.

[0052] Example 2

[0053] On the basis of Example 1, the secondary lining trolley of the integrated pipe gallery of this embodiment is as follows Figure 4 As shown, a support frame 5 is also included, and the support frame 5 is located below the bottom template 2, and the support frame 5 is used to support the bottom template 2. By arranging the support frame 5 to support the bottom template 2, it is ensured that when pouring the reserved mold cavity 70, the bottom template 2 can be effectively prevented from opening, thereby ensuring the safety of the operation.

[0054] like Figure 4As shown, the support frame 5 includes a purlin 51 and a vertical support member 52, the purlin 51 is abutted against the bottom of the bottom template 2, and the vertical support member 52 supports the purlin 51, wherein the purlin 51 adopts 1m*4cm*6cm square wood, and the vertical support member 52 adopts 4.5m*9cm square wood for support. Furthermore, one end of the vertical support member 52 away from the bottom template 2 is supported on the door frame 30 of the trolley.

[0055] A preferred method is as follows Figure 5 As shown, a plurality of purlins 51 are arranged at intervals at the bottom of the bottom formwork 2 .

[0056] Example 3

[0057] On the basis of Example 2, this embodiment further discloses a construction method of a secondary lining trolley for an integrated pipe gallery, comprising the following steps:

[0058] (1) Construction preparation:

[0059] like Fig.10 As shown, the middle partition wall steel bars 10 are reserved according to the spacing in the design drawings and are firmly welded to the second lining steel bars 60. The middle partition wall steel bars 10 are clamped with 3*3cm square steel clamps to ensure the spacing and verticality of the middle partition wall steel bars 10. After the trolley is moved into place, first take anti-slip measures on the bottom, and then check whether each middle partition wall steel bar 10 is aligned with the slot 21 of the bottom template 2. After checking that everything is correct, start the jacking system 1. After the jacking is completed, check whether the clearance of the reserved mold cavity 70 meets the partition wall thickness requirements and whether each middle partition wall steel bar 10 has reached the bottom notch 211 of the slot 21.

[0060] (2) Installation of strip template 4 and support frame 5

[0061] The strip formwork 4 adopts 1.5cm thick wooden formwork and is installed on the bottom formwork 2 and between the double rows of middle partition wall steel bars 10. The edges on both sides of the strip formwork 4 clamp the middle partition wall steel bars 10 to minimize the gap between the middle partition wall steel bars 10 and the bottom formwork 2. The purlin 51 adopts 1m*4cm*6cm square wood, and the vertical support 52 adopts 4.5m*9cm square wood to support the purlin 51. The end of the vertical support 52 away from the purlin 51 is supported on the door frame 30 of the trolley.

[0062] (3) Concrete pouring of secondary lining 50

[0063] Concrete is poured by pumping concrete, and the inserted vibrator and the plate-attached vibrator are used to ensure the compactness of the concrete. The undeformed part of the reserved deformation is backfilled with the same grade concrete. The concrete is pumped into the mold by a ground pump and poured in layers. The distribution positions of the pouring ports are as follows:

[0064] Concrete should be vibrated layer by layer. When pouring from the third and following pouring ports, high-frequency vibrators are mainly used for vibration, and attached vibrators are used in conjunction. Each layer is vibrated until the bubbles are discharged to prevent bubbles from appearing on the wall. When pouring from the arch pouring port, attached vibrators are mainly used for vibration, and the focus is on the folding line turning position of the reserved mold cavity 70.

[0065] (4) Removal of support template

[0066] Through field experiments, the concrete with early strength agent added to cast the secondary lining 50 can reach 30Mpa after 3 days of casting, which meets the design demolding requirements.

[0067] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A secondary lining trolley for a comprehensive pipe gallery, characterized in that: It comprises a second lining template (20) and two middle partition wall templates (3) arranged opposite to each other. One end of the middle partition wall side template (3) close to the second lining template (20) is hinged to the second lining template (20), and one end of the middle partition wall side template (3) away from the second lining template (20) extends to form a bottom template (2), and a slot (21) is provided on the bottom template (2); A jacking system (1) is provided below the middle partition wall side template (3), and the jacking system (1) is hinged to the middle partition wall side template (3), and the jacking system (1) can drive the middle partition wall side template (3) to rotate relative to the second lining template (20); The middle partition wall side templates (3) are configured such that when the jacking system (1) is extended, the two middle partition wall side templates (3) approach each other and form a reserved mold cavity (70).

2. The secondary lining trolley of the integrated pipe gallery according to claim 1 is characterized in that: The clamping slot (21) is a trapezoidal clamping slot, and the clamping slot (21) has a bottom notch (211), and the bottom notch (211) matches the middle partition wall steel bar (10).

3. The secondary lining trolley of the integrated pipe gallery according to claim 2 is characterized in that: A plurality of the card slots (21) are arranged at intervals on the bottom template (2).

4. The secondary lining trolley of the integrated pipe gallery according to claim 1 is characterized in that: It also comprises a strip template (4), wherein the strip template (4) is arranged above the bottom template (2), and the strip template (4) abuts against the bottom template (2), and the two sides of the strip template (4) are used to abut against the middle partition wall steel bars (10) that pass through the slots (21).

5. A secondary lining trolley for a comprehensive pipe gallery according to any one of claims 1 to 4, characterized in that: It also comprises a support frame (5), wherein the support frame (5) is located below the bottom template (2), and the support frame (5) is used to support the bottom template (2).

6. The secondary lining trolley of the integrated pipe gallery according to claim 5 is characterized in that: The support frame (5) comprises a purlin (51) and a vertical support member (52); the purlin (51) abuts against the bottom of the bottom template (2); and the vertical support member (52) supports the purlin (51).

7. The secondary lining trolley of the integrated pipe gallery according to claim 6 is characterized in that: A plurality of purlins (51) are arranged at intervals at the bottom of the bottom template (2).

8. The secondary lining trolley of the integrated pipe gallery according to claim 1 is characterized in that: The jacking system (1) comprises a jack (11) and a first hinged component (12), wherein the first hinged component (12) is connected to the partition wall side template (3), and the jack (11) is hinged on the first hinged component (12).

9. The secondary lining trolley of the integrated pipe gallery according to claim 8 is characterized in that: It also comprises a door frame (30), wherein the door frame (30) supports the second lining formwork (20), and one end of the jack (11) away from the middle partition wall side formwork (3) is hinged to the door frame (30).

10. The secondary lining trolley of the integrated pipe gallery according to claim 9 is characterized in that: The door frame (30) comprises an upper longitudinal beam (7), and one end of the jack (11) away from the middle partition wall side template (3) is hinged on the upper longitudinal beam (7).