Concrete embedded pipeline structure
By arranging a water-soluble sealing layer and arc-shaped channel structure on the concrete embedded pipes, the problems of cement slurry clogging and liquid surface tension are solved, and better drainage and grouting effects are achieved.
Patent Information
- Application Number
- CN202420596448.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-26
AI Technical Summary
Existing concrete embedded pipes are easily blocked by cement slurry during construction, and the water-proof layer formed after the geotextile and concrete are combined and hardened affects the drainage effect. The surface tension of the liquid is difficult to pass through the circular drainage holes, resulting in poor drainage or grouting effects. ideal.
A water-soluble sealing layer is installed on the pipe body, using a flow hole structure with arc-shaped or U-shaped channels. The sealing layer can be composed of water-soluble tape or glue to ensure that it prevents clogging during construction and dissolves after the concrete solidifies. Achieve media circulation.
It effectively prevents cement slurry from clogging, weakens the surface tension of the liquid, improves the water passing capacity, and ensures the water flow and grouting effect of the pipeline during construction and use.
Smart Images

Figure CN221921069U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to a concrete pre-buried pipeline structure. Background Art
[0002] Pipes pre-buried in concrete (such as drainage pipes and grouting pipes) generally use perforated pipes wrapped with geotextiles to avoid clogging of pipes by concrete slurry. However, after the geotextile is combined with the concrete slurry and hardened, a water-insulating layer with low water permeability will be formed on the surface of the pipe, which will affect the flow of water or slurry into and out of the pipe, resulting in unsatisfactory drainage (or grouting) effects. At the same time, due to the surface tension of the liquid, it is difficult for leaking water to pass through the circular drainage holes. These factors will affect the functioning of the pre-buried pipes. Utility Model Content
[0003] In order to solve the above problems, the utility model provides a concrete pre-buried pipe structure, which is pre-buried in a concrete structure and comprises a pipe body, a plurality of flow holes are opened on the pipe body, and a water-soluble blocking layer is provided on the pipe body for blocking the flow holes.
[0004] Furthermore, the blocking layer includes a water-soluble adhesive tape wound around the outer wall of the pipeline body.
[0005] Furthermore, the blocking layer includes a water-soluble glue layer coated inside and / or outside the pipeline body.
[0006] Furthermore, the circulation hole includes a first channel and a second channel, the second channel is connected to the first channel, and the first channel and the second channel are symmetrically arranged.
[0007] Furthermore, the circulation hole also includes a transition channel, and two ends of the transition channel are respectively connected to the first channel and the second channel.
[0008] Furthermore, the first channel, the transition channel, and the second channel are connected to form an arc-shaped channel or a U-shaped channel.
[0009] Further, each of the flow holes is distributed into a plurality of flow hole groups, each flow hole group includes a plurality of flow holes distributed in sequence along the axial direction of the pipe body, and each flow hole group is distributed in sequence along the circumferential direction of the pipe body.
[0010] Furthermore, the pipe body is a drainage pipe or a grouting pipe.
[0011] Due to the adoption of the above technical solution, the utility model has the following beneficial effects compared with the prior art:
[0012] 1) The concrete pre-buried pipeline structure provided by the utility model has a blocking layer for blocking the flow holes on the pipeline body. The blocking layer is soluble in water and can prevent cement slurry from clogging the pipeline body during the construction period. After the concrete solidifies, the blocking layer contacts the seepage water of the surrounding rock or is dissolved during the water pressure test. The pipeline body can play the role of providing medium to flow inside and outside the pipe through the flow holes. Compared with the traditional geotextile wrapped outside, the construction is quick and the cement slurry and the geotextile are prevented from forming a water-proof layer after hardening to affect the function of the pipeline body.
[0013] 2) The concrete pre-buried pipe structure provided by the utility model adopts an arc-shaped channel as a flow hole, which can effectively weaken the surface tension of the liquid and has a stronger water-passing capacity; and when the medium pressure is too high, the arc-shaped channel will deform, increasing the area of the water-passing channel, thereby increasing the discharge volume and improving the use effect of the pipe body. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 The present invention is a schematic structural diagram of a concrete pre-buried pipeline structure provided by the present invention.
[0016] 1- pipe body; 2- circulation hole; 21- first channel; 22- second channel; 23- transition channel; 3- concrete. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. In the drawings, the size and relative size of some parts may be enlarged for clarity.
[0018] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connection" and "connected" should be interpreted in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0019] In the description of the present invention, terms such as "upper", "lower", "left", "right", "front", "back", "center", "horizontal", "vertical", "top", "bottom", "inside" and "outside" and other orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings and are only for the convenience of description and simplification of operation, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0020] In addition, in the description of the present invention, the terms "first" and "second" are only used to distinguish in the description, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. In addition, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0021] As the instruction manual Figure 1 As shown, the utility model provides a concrete pre-buried pipe structure, which is pre-buried in a concrete structure and comprises a pipe body 1, on which a plurality of flow holes 2 are opened, and on which a water-soluble blocking layer for blocking the flow holes 2 is provided.
[0022] Specifically, the pipe body 1 is buried in concrete 3. In order to prevent the concrete slurry from clogging the flow holes 2 on the pipe body 1 during concrete construction, a sealing layer for sealing the flow holes 2 is provided on the pipe body 1 before the pipe body 1 is pre-buried. The sealing layer 2 is soluble in water. After the sealing layer 2 is dissolved in water, the flow holes 2 can allow the medium to flow inside and outside the pipe.
[0023] As one of the specific embodiments, the pipe body 1 can be used as a drainage pipe. After the concrete solidifies, the sealing layer can be dissolved by the seepage water in the concrete. After the water-soluble sealing layer comes into contact with the leakage water in the concrete and dissolves, the leakage water can enter the pipe body 1 through the flow hole 2 to complete the drainage operation.
[0024] As one of the specific implementations, the pipe body 1 can be used as a grouting pipe. After the concrete solidifies, a water pressure test is first carried out. When water contacts the blocking layer at the flow hole 2, the blocking layer can be dissolved to achieve the purpose of unobstructed pipe, and then grouting operation can be carried out.
[0025] As one of the specific implementation methods, the sealing layer adopts water-soluble tape. Specifically, the sealing layer includes a water-soluble tape wrapped around the outer wall of the pipe body 1, and passes through each of the flow holes 2 to seal the flow holes 2. Before the pipe body 1 is pre-buried in the concrete, the water-soluble tape can be used to seal the flow holes 2 on the pipe body 1 to prevent the concrete slurry from clogging the flow holes 2 on the pipe body 1 during construction. After the concrete solidifies, a water pressure test can be carried out to dissolve the sealing layer by water, and the pipe body 1 can be used normally.
[0026] Preferably, to facilitate construction, at least one layer of water-soluble tape is wrapped around the outside of the pipe body 1 to ensure that the sealing layer can play a protective role before the concrete solidifies, and during use, the sealing layer is dissolved by water, and the medium can flow inside and outside the pipe through the flow hole 2.
[0027] As one of the specific implementations, the sealing layer adopts water-soluble glue. Specifically, the water-soluble glue is coated on the inside and / or outside of the pipe body 1, and is coated on each of the flow holes 2 to form a film layer to play a protective role, thereby preventing the concrete slurry from clogging the flow holes 2 on the pipe body during construction. After the concrete solidifies, a water pressure test can be carried out, the sealing layer is dissolved by water, and the pipe body 1 can be used normally.
[0028] Optimally, in order to ensure the sealing performance of the flow hole 2 on the pipeline body 1 during construction, a layer of water-soluble glue can be coated on the outside and inside of the pipeline body 1 to ensure the sealing effect during construction, so that the pipeline body 1 can be used normally after water is passed through.
[0029] As one of the specific implementations, a water-soluble tape may be wrapped around the outside of the pipe body 1, and water-soluble glue may be coated on the inside of the pipe body to improve the sealing performance of the flow holes on the pipe body during construction.
[0030] In an optimized implementation manner, the flow hole 2 includes a first channel 21 and a second channel 22, the second channel 22 is connected to the first channel 21, the first channel 21 and the second channel 22 are symmetrically arranged, and the symmetry axes of the first channel 21 and the second channel 22 are parallel to the axis of the pipeline body 1.
[0031] As one of the specific implementations, the first channel 21 and the second channel 22 are connected to form a V-shaped channel.
[0032] In an optimized implementation manner, the circulation hole 2 further includes a transition channel 23 , and two ends of the transition channel 23 are respectively connected to the first channel 21 and the second channel 22 . The circulation hole 2 is an integrated structure and is provided on the pipeline body 1 .
[0033] As one of the specific implementations, the transition channel 23 is a chamfered channel, and the first channel 21 and the second channel 22 are arc-shaped. Then the first channel 21, the transition channel 23, and the second channel 22 are sequentially connected to form an arc-shaped channel, which can effectively reduce the surface tension of the liquid and have a stronger water flow capacity; when used as a drain pipe, when the water pressure is too high, the arc-shaped channel will deform inward, increase the area of the water flow channel, thereby increasing the drainage volume and achieving a better drainage effect. Preferably, the first channel 21 and the second channel 22 are symmetrically arranged.
[0034] As one of the specific implementations, the transition channel 23 can be a straight channel, one end of which is connected to the first channel 21, and the other end is connected to the second channel 22. The transition channel 23 is perpendicular to the first channel 21 and the second channel 22. The first channel 21, the transition channel 23, and the second channel 22 are connected in sequence to form a U-shaped channel, which can also effectively weaken the surface tension of the liquid and have a stronger water-passing capacity.
[0035] In an optimized implementation manner, the arc-shaped channels are arranged in the same direction, and the center of each arc-shaped channel is located on the same side of the arc-shaped channel.
[0036] In an optimized implementation mode, each of the flow holes 2 is distributed to form a plurality of flow hole groups, each flow hole group includes a plurality of flow holes 2 distributed in sequence along the axial direction of the pipe body 1, and each flow hole group is distributed in sequence along the circumferential direction of the pipe body 1; the spacing and number between adjacent flow holes on the pipe body 1 are set according to actual needs.
[0037] During the use of the pipe body 1, when it is used as a drainage pipe, the cutout of the flow hole 2 will deform inward, increasing the area of the water passage, thereby increasing the drainage volume and achieving a better drainage effect. When used as a grouting pipe, the flow hole 2 will deform outward, increasing the area of the grouting channel, thereby increasing the grouting volume. In order to avoid excessive deformation of the flow hole 2, an elastic member can be arranged between the inner and outer sides of the flow hole 1 to control the deformation of the cutout of the flow hole 1.
[0038] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0039] Those skilled in the art will appreciate that the present invention can be implemented in many other specific forms without departing from the spirit and scope of the present invention. Although the embodiments of the present invention have been described, it should be understood that the present invention should not be limited to this embodiment, and those skilled in the art can make changes and modifications within the spirit and scope of the present invention as defined by the attached claims.
Claims
1. A concrete pre-buried pipeline structure, wherein the pipeline structure is pre-buried in a concrete structure, characterized in that: The invention comprises a pipeline body, a plurality of flow holes are opened on the pipeline body, and a water-soluble blocking layer which blocks the flow holes is provided on the pipeline body.
2. The concrete embedded pipeline structure according to claim 1, characterized in that: The blocking layer comprises a water-soluble adhesive tape wound around the outer wall of the pipeline body.
3. The concrete embedded pipeline structure according to claim 1, characterized in that: The blocking layer includes a water-soluble glue layer coated inside and / or outside the pipeline body.
4. The concrete embedded pipeline structure according to claim 1, characterized in that: The flow hole includes a first channel and a second channel, the second channel is connected to the first channel, and the first channel and the second channel are symmetrically arranged.
5. The concrete embedded pipeline structure according to claim 4, characterized in that: The flow hole further includes a transition channel, and two ends of the transition channel are respectively connected to the first channel and the second channel.
6. The concrete embedded pipeline structure according to claim 5, characterized in that: The first channel, the transition channel, and the second channel are connected to form an arc-shaped channel or a U-shaped channel.
7. The concrete embedded pipeline structure according to claim 1, characterized in that: Each of the flow holes is distributed into a plurality of flow hole groups, each of which includes a plurality of flow holes distributed in sequence along the axial direction of the pipe body, and each of the flow hole groups is distributed in sequence along the circumferential direction of the pipe body.
8. The concrete embedded pipeline structure according to claim 1, characterized in that: The pipeline body is a drainage pipe or a grouting pipe.
Citation Information
Cited By
Drainage pipe and use method thereof in anti-seepage construction of tunnel construction joint
CN118008387A