Quick butt joint device for natural gas pipeline installation
By designing a natural gas pipeline quick docking device including a pillow block, a mounting base, an adjustment mechanism and a fixing mechanism, the problem of being unable to fix and disassemble the position in the existing technology is solved, the pipeline is quickly docked and fixed, the installation difficulty is reduced and the Pipeline protected.
Patent Information
- Application Number
- CN202420372297.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The existing natural gas pipeline connecting device cannot be fixed based on positioning, and needs to be disassembled and adjusted due to accuracy errors during pipeline docking, which is inconvenient to operate.
A quick docking device including a pillow block, a mounting base, an adjustment mechanism and a fixing mechanism is designed. The precise docking and fixation of the pipeline is achieved through the rotation and expansion of the screw and stud, avoiding the disassembly and adjustment of the bottom pillow block.
It realizes the quick and convenient docking and fixing of natural gas pipelines, reduces the difficulty of installation, and protects the pipelines through shock-absorbing pads and rubber pads, reducing vibration damage to the pipelines.
Smart Images

Figure CN221922245U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of gas pipeline construction, and particularly relates to a quick docking device for installing a natural gas pipeline. Background Art
[0002] As an efficient, high-quality and clean energy, natural gas is increasingly used. The demand for natural gas in urban gas is increasing, and the comprehensive utilization of natural gas has attracted widespread attention. With the construction of new stations, a large number of gas pipelines are installed and laid, and the current connection methods of natural gas pipelines include direct welding and flange or other connector docking.
[0003] A Chinese patent with publication number CN215280694U discloses a gas pipeline docking auxiliary device including a pillow block, a top plate, and a jack. The two top plates are arranged in a V shape and are rotatably connected to the pillow blocks respectively. The jacks are respectively arranged between the outer sides of the two top plates and the pillow blocks, and the jacks are rotatably connected to the pillow blocks and the top plates respectively.
[0004] The gas pipeline docking device in the above-mentioned prior art still has certain shortcomings during use. For example, the V-shaped structure formed by the two top plates of the device in the prior art can only achieve the positioning of the pipeline, but cannot be fixed on the basis of positioning. Secondly, when the two pipeline joints are docked, because the installation accuracy error of the pillow block needs to be fine-tuned, one of the devices needs to be disassembled and adjusted, which is very inconvenient. Utility Model Content
[0005] In view of the problems mentioned in the background technology, the purpose of the utility model is to provide a quick docking device for natural gas pipeline installation to solve the problems mentioned in the background technology.
[0006] The above technical objectives of the utility model are achieved through the following technical solutions:
[0007] A quick docking device for natural gas pipeline installation, comprising a pillow block, the upper end of the pillow block is fixedly connected to a mounting seat, the upper end of the mounting seat is provided with an adjustment mechanism, the upper end of the adjustment mechanism is fixedly installed with a first fixing seat, the rear side of the first fixing seat is rotatably connected to a second fixing seat, the inner side of the second fixing seat is provided with a fixing mechanism, the front sides of the first fixing seat and the second fixing seat are fixedly installed by screws, and a positioning groove is provided on the inner side of the first fixing seat;
[0008] The adjustment mechanism comprises a mounting groove, the mounting groove is provided at the upper end of the mounting seat, a moving platform is slidably connected to the inner side of the mounting groove, a screw is rotatably connected to the inner side of the mounting groove, the moving platform is threadedly connected to the outer side of the screw, one end of the screw is rotatably passed through the groove wall of the mounting groove and is fixedly connected to a first hexagonal block, and the first fixing seat is fixedly mounted on the upper end of the moving platform by screws;
[0009] The fixing mechanism includes a clamping block, which is slidably connected to the inner side of the lower end of the second fixing seat, a clamping groove is opened at the lower end of the clamping block, a stud is threadedly connected to the inner side of the second fixing seat, the upper end of the stud is fixedly connected to the second hexagonal block, and the lower end of the stud is threaded through the second fixing seat and the upper end of the clamping block for rotational connection.
[0010] As a preferred technical solution, a shock-absorbing pad is fixedly connected to the lower end of the pillow block, and mounting holes are symmetrically provided on the inner sides of the shock-absorbing pad and the pillow block.
[0011] As a preferred technical solution, a slide rail is symmetrically fixedly installed on the inner side of the installation groove, and the moving platform is slidably connected to the inner side of the installation groove via the slide rail.
[0012] As a preferred technical solution, a mounting plate is symmetrically fixedly connected to the outer side of the first fixing seat, a fixing hole is opened at the upper end of the moving platform, and the first fixing seat is fixedly installed by screws penetrating the mounting plate and the fixing hole.
[0013] As a preferred technical solution, the front side of the first fixing seat is fixedly connected to the second connecting block, the front side of the second fixing seat is fixedly connected to the first connecting block, and the first connecting block is fixedly installed by screws and the second connecting block.
[0014] As a preferred technical solution, rubber pads are fixedly connected to the inner sides of the clamping groove and the positioning groove, and sliding grooves are symmetrically opened on the inner side of the lower end of the second fixing seat, and the clamping block and the sliding groove are slidably connected.
[0015] As a preferred technical solution, a threaded sleeve is fixedly installed on the inner side of the second fixing seat, and the stud is threadedly connected to the inner side of the threaded sleeve.
[0016] In summary, the utility model mainly has the following beneficial effects:
[0017] First, when the spacing deviation problem occurs during the butt joint of the pipeline, it is only necessary to insert the operating instrument into the first hexagonal block and rotate it, so that the first hexagonal block drives the screw to rotate in the installation groove, and the rotation of the screw allows the moving platform connected with the outer thread to slide inside the installation groove, so that the position of the first fixed seat with the positioning groove can be adjusted without disassembling and adjusting the pillow block at the bottom, thus greatly facilitating the butt joint installation of the natural gas pipeline;
[0018] Second, when the natural gas pipeline is connected and installed, if the pipeline needs to be fixed, it is only necessary to flip the second fixing seat at the upper end of the first fixing seat, and fix the first fixing seat and the front end of the second fixing seat with screws, and then use the operating instrument to insert the second hexagonal block and rotate it, so that the second hexagonal block drives the thread of the stud on the second fixing seat to expand and contract, and the lower end of the stud rotates to push the clamping block with the clamping groove to cooperate with the first fixing seat, so as to facilitate the rapid clamping and fixing of the natural gas pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the utility model;
[0020] Figure 2 This is a schematic diagram of the connection between the first fixing seat and the second fixing seat of the utility model;
[0021] Figure 3 It is a schematic diagram of the structure of the adjustment mechanism of the utility model;
[0022] Figure 4 It is a structural schematic diagram of the fixing mechanism of the utility model.
[0023] Figure markings: 1. pillow block, 2. mounting seat, 3. mounting hole, 4. shock-absorbing pad, 5. adjustment mechanism, 501. first hexagonal block, 502. moving platform, 503. screw, 504. mounting groove, 6. first fixed seat, 7. second fixed seat, 8. fixing mechanism, 801. clamping groove, 802. stud, 803. second hexagonal block, 804. clamping block, 9. first connecting block, 10. second connecting block, 11. mounting plate, 12. positioning groove, 13. fixing hole, 14. slide rail, 15. slide groove, 16. screw sleeve, 17. rubber pad. DETAILED DESCRIPTION
[0024] refer to Figures 1 to 4 A quick docking device for installing a natural gas pipeline described in this embodiment includes a pillow block 1, a mounting seat 2 is fixedly connected to the upper end of the pillow block 1, an adjustment mechanism 5 is provided at the upper end of the mounting seat 2, a first fixing seat 6 is fixedly installed on the upper end of the adjustment mechanism 5, a second fixing seat 7 is rotatably connected to the rear side of the first fixing seat 6, a fixing mechanism 8 is provided on the inner side of the second fixing seat 7, the front sides of the first fixing seat 6 and the second fixing seat 7 are fixedly installed by screws, and a positioning groove 12 is provided on the inner side of the first fixing seat 6; when docking, the other end of the pipeline can be placed on an adjustable support platform, and after the front end of the pipeline is docked, the same device can be installed at the other end.
[0025] refer to Figure 1 and Figure 3The adjustment mechanism 5 includes a mounting groove 504, which is provided at the upper end of the mounting seat 2. The inner side of the mounting groove 504 is slidably connected to a moving platform 502, and the inner side of the mounting groove 504 is rotatably connected to a screw rod 503. The moving platform 502 is threadedly connected to the outer side of the screw rod 503. One end of the screw rod 503 rotates through the groove wall of the mounting groove 504 and is fixedly connected to a first hexagonal block 501. The first fixing seat 6 is fixedly installed at the upper end of the moving platform 502 by screws. When the natural gas pipeline is placed in the positioning groove 12 of the first fixing seat 6, In the end, when a spacing deviation problem occurs during the docking of the pipelines, it is only necessary to use an operating instrument to insert the first hexagonal block 501 and rotate it, so that the first hexagonal block 501 drives the screw 503 to rotate in the installation groove 504. The rotation of the screw 503 allows the moving platform 502 connected by the outer thread to slide inside the installation groove 504, so that the position of the first fixed seat 6 with the positioning groove 12 can be adjusted without disassembling and adjusting the pillow block 1 at the bottom, thereby greatly facilitating the docking and installation of the natural gas pipeline.
[0026] refer to Figure 1 and Figure 2 and Figure 4 The fixing mechanism 8 includes a clamping block 804, which is slidably connected to the inner side of the lower end of the second fixing seat 7, and a clamping groove 801 is opened at the lower end of the clamping block 804. The inner side of the second fixing seat 7 is threadedly connected with a stud 802, and the upper end of the stud 802 is fixedly connected with a second hexagonal block 803. The lower end thread of the stud 802 penetrates the second fixing seat 7 and the upper end of the clamping block 804 is rotatably connected. When the natural gas pipeline is connected and installed, it is necessary to fix the pipeline when the second fixing seat 7 at the upper end of the first fixing seat 6 is turned over, and the first fixing seat 6 and the front end of the second fixing seat 7 are fixed by screws, and then the operating instrument is inserted into the second hexagonal block 803 for rotation, so that the second hexagonal block 803 drives the stud 802 to extend and retract on the second fixing seat 7, and the lower end of the stud 802 rotates to push the clamping block 804 with the clamping groove 801 to cooperate with the first fixing seat 6, so as to facilitate the rapid clamping and fixing of the natural gas pipeline.
[0027] refer to Figure 1 A shock-absorbing pad 4 is fixedly connected to the lower end of the pillow block 1, and mounting holes 3 are symmetrically opened on the inner sides of the shock-absorbing pad 4 and the pillow block 1. By adding a shock-absorbing pad 4 to the lower end of the pillow block 1 and opening mounting holes 3 on the shock-absorbing pad 4 and the pillow block 1, the pillow block 1 can be easily installed and the damage to the natural gas pipeline caused by vibration can be reduced.
[0028] refer to Figure 3 The inner side of the mounting groove 504 is symmetrically fixed with a slide rail 14, and the moving platform 502 is slidably connected to the inner side of the mounting groove 504 through the slide rail 14. By installing the slide rail 14 on the inner side of the mounting groove 504, the moving platform 502 can slide conveniently on the inner side of the mounting groove 504.
[0029] refer to Figure 2 and Figure 3 The outer side of the first fixed seat 6 is symmetrically fixedly connected with a mounting plate 11, and a fixing hole 13 is opened at the upper end of the moving platform 502. The first fixed seat 6 is fixedly installed by screws penetrating the mounting plate 11 and the fixing hole 13. By installing the mounting plate 11 on the outer side of the first fixed seat 6 and opening the fixing hole 13 at the upper end of the moving platform 502, the first fixed seat 6 can be conveniently installed on the moving platform 502 using screws.
[0030] refer to Figure 1 and Figure 2 The front of the first fixing seat 6 is fixedly connected to the second connecting block 10, and the front of the second fixing seat 7 is fixedly connected to the first connecting block 9. The first connecting block 9 is fixedly installed with screws and the second connecting block 10. By installing the second connecting block 10 on the front of the first fixing seat 6 and installing the first connecting block 9 on the front of the second fixing seat 7, the first fixing seat 6 and the second fixing seat 7 can be conveniently installed with screws.
[0031] refer to Figure 4 The inner sides of the clamping groove 801 and the positioning groove 12 are fixedly connected with rubber pads 17, and the inner side of the lower end of the second fixing seat 7 is symmetrically provided with slide grooves 15. The clamping block 804 and the slide groove 15 are slidably connected. By adding rubber pads 17 on the inner sides of the clamping groove 801 and the positioning groove 12, it is convenient to protect and fix the natural gas pipeline and reduce damage to the natural gas pipeline.
[0032] refer to Figure 4 A screw sleeve 16 is fixedly installed on the inner side of the second fixing seat 7, and the stud 802 is threadedly connected to the inner side of the screw sleeve 16. By installing the screw sleeve 16 on the inner side of the second fixing seat 7, the stud 802 can be easily threadedly extended and retracted on the second fixing seat 7.
[0033] Principle and advantages of use: When the natural gas pipeline is docked and installed, one end of the pipeline is placed in the positioning groove 12. Then, if a deviation problem occurs during the docking process, it is only necessary to insert the operating instrument into the first hexagonal block 501 and rotate it, so that the first hexagonal block 501 drives the screw 503 to rotate in the installation groove 504. The rotation of the screw 503 allows the moving platform 502 connected with the outer thread to slide inside the installation groove 504, so that the position of the first fixing seat 6 with the positioning groove 12 can be adjusted. After the natural gas pipeline is docked and installed, to further fix the pipeline, it is only necessary to flip the first The second fixing seat 7 is fixed at the upper end of the fixing seat 6, and the front ends of the first fixing seat 6 and the second fixing seat 7 are fixed by screws, and then the operating instrument is used to insert the second hexagonal block 803 and rotate it, so that the second hexagonal block 803 drives the stud 802 to extend and retract the thread on the second fixing seat 7, and the lower end of the stud 802 rotates to push the clamping block 804 with the clamping groove 801 to cooperate with the first fixing seat 6, so as to facilitate the rapid clamping and fixing of the natural gas pipeline. The shock-absorbing pad 4 at the lower end of the pillow block 1 and the rubber pad 17 in the clamping groove 801 and the positioning groove 12 on the fixing basis can reduce the damage to the pipeline caused by external vibration.
Claims
1. A quick docking device for natural gas pipeline installation, comprising a pillow block, characterized in that: The upper end of the pillow block is fixedly connected with a mounting seat, the upper end of the mounting seat is provided with an adjustment mechanism, the upper end of the adjustment mechanism is fixedly installed with a first fixing seat, the rear side of the first fixing seat is rotatably connected with a second fixing seat, the inner side of the second fixing seat is provided with a fixing mechanism, the front sides of the first fixing seat and the second fixing seat are fixedly installed by screws, and a positioning groove is opened on the inner side of the first fixing seat; The adjustment mechanism comprises a mounting groove, the mounting groove is provided at the upper end of the mounting seat, a moving platform is slidably connected to the inner side of the mounting groove, a screw is rotatably connected to the inner side of the mounting groove, the moving platform is threadedly connected to the outer side of the screw, one end of the screw is rotatably passed through the groove wall of the mounting groove and is fixedly connected to a first hexagonal block, and the first fixing seat is fixedly mounted on the upper end of the moving platform by screws; The fixing mechanism includes a clamping block, which is slidably connected to the inner side of the lower end of the second fixing seat, a clamping groove is opened at the lower end of the clamping block, a stud is threadedly connected to the inner side of the second fixing seat, the upper end of the stud is fixedly connected to the second hexagonal block, and the lower end of the stud is threaded through the second fixing seat and the upper end of the clamping block for rotational connection.
2. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: The lower end of the pillow block is fixedly connected with a shock-absorbing pad, and the inner sides of the shock-absorbing pad and the pillow block are symmetrically provided with mounting holes.
3. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: The inner side of the installation groove is symmetrically fixed with a slide rail, and the moving platform is slidably connected to the inner side of the installation groove through the slide rail.
4. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: The outer side of the first fixing seat is symmetrically fixedly connected with a mounting plate, the upper end of the moving platform is provided with a fixing hole, and the first fixing seat is fixedly installed by screws penetrating the mounting plate and the fixing hole.
5. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: The front side of the first fixing seat is fixedly connected with the second connecting block, the front side of the second fixing seat is fixedly connected with the first connecting block, and the first connecting block is fixedly installed by screws and the second connecting block.
6. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: The inner sides of the clamping groove and the positioning groove are fixedly connected with rubber pads, and the inner side of the lower end of the second fixing seat is symmetrically provided with sliding grooves, and the clamping block and the sliding groove are slidably connected.
7. A quick docking device for natural gas pipeline installation according to claim 1, characterized in that: A threaded sleeve is fixedly installed on the inner side of the second fixing seat, and the stud is threadedly connected to the inner side of the threaded sleeve.