Liquid supplementing device for semiconductor equipment
By designing shunt and purge devices in semiconductor equipment, the problem of wafer defects caused by the decomposition of DCE during storage and transportation is solved, the stability of liquid purity and performance is achieved, and the production efficiency and yield of integrated circuit manufacturing are improved.
Patent Information
- Application Number
- CN202420681207.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-04-03
AI Technical Summary
In the integrated circuit manufacturing process, dichloroethane (DCE) is easily decomposed due to its active chemical properties, resulting in the production of highly toxic by-products during storage, transportation and use, affecting the purity of the wafer surface and process yield. Moreover, it is difficult to effectively control the use environment and transportation system with existing technology, resulting in frequent wafer defects and affecting production efficiency and costs.
Design a liquid replenishment device for semiconductor equipment, including a diverter device and a purge device. It realizes flow control and distribution through a diverter valve and a liquid supply pipeline, and uses purge gas to remove impurities and air in the liquid supply pipeline to ensure liquid purity. and stable performance. The device adopts forward or reverse purge mode under different operating machine conditions, combined with the sealing design of the leak-proof cap to avoid external contamination.
Effectively remove impurities and air in the liquid supply pipeline, maintain liquid purity and stable performance, improve the yield rate of the high-temperature oxidation process of furnace tubes, simplify maintenance and production processes, and reduce costs.
Smart Images

Figure CN221923114U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of semiconductor production and manufacturing, and in particular to a liquid replenishing device for semiconductor equipment. Background Art
[0002] In the integrated circuit manufacturing industry, with the continuous advancement of semiconductor process technology and the improvement of precision process equipment, the control requirements for wafer surface defects are becoming more and more stringent. Especially for advanced processes, even tiny defects of only tens of nanometers in size will have a significant impact on the overall yield of the wafer. The furnace tube high-temperature oxidation process occupies a core position in integrated circuit manufacturing due to its excellent scalable production capacity, and dichloroethane (DCE) as a high-purity chlorine source plays a key role in this process. DCE can not only significantly accelerate the oxidation process of silicon wafers and improve production efficiency, but also effectively capture sodium ions to prevent semiconductor devices from being contaminated and ensure the purity of the final product.
[0003] However, the chemical properties of DCE determine that it is extremely sensitive to environmental conditions. Its active chemical properties easily trigger polymerization, chlorination, decomposition and other reactions. Especially when exposed to moisture, sunlight or air, DCE will quickly decompose to produce highly toxic phosgene, hydrogen chloride, polymers and other harmful byproducts. These byproducts not only seriously damage the purity and efficiency of DCE itself, but also have a direct impact on the furnace tube high-temperature oxidation process, resulting in defects on the wafer surface, thereby reducing the overall yield.
[0004] In actual production, the manifestation of wafer defects depends largely on the purity management of DCE during storage, transportation and use. When wafer defects occur, it not only reveals the possible source of contamination in the process flow, but also poses a severe challenge to the subsequent yield improvement. The causes of wafer defects are complex and may involve multiple factors, including but not limited to the sealing performance of the DCE replenishment system, the cleanliness of the delivery pipeline, the effectiveness of gas purge, and the degree of isolation from environmental factors. Solving these problems often requires in-depth process diagnosis, material analysis, and long-term experimental optimization. The entire process may take several months, seriously affecting production efficiency and increasing costs.
[0005] In short, how to effectively reduce the occurrence of wafer defects by strictly controlling the use environment of DCE and optimizing the design of the conveying system is a technical problem that needs to be urgently solved in the current integrated circuit manufacturing field.
[0006] It should be noted that the information disclosed in the background technology section of the present disclosure is only intended to increase the understanding of the overall background of the present disclosure, and should not be regarded as acknowledging or suggesting in any form that the information constitutes prior art already known to those skilled in the art. Utility Model Content
[0007] The present disclosure provides a liquid replenishing device for semiconductor equipment, which can remove impurities and air inside a liquid supply pipeline and maintain the purity and stable performance of the liquid transported inside the pipeline.
[0008] According to one aspect of the present disclosure, there is provided a liquid replenishing device for semiconductor equipment, comprising:
[0009] A flow dividing device, the flow dividing device is configured to distribute the liquid from the liquid supply source to at least one working machine, the flow dividing device comprises at least one flow dividing valve and at least one liquid supply pipeline, the inlet of the flow dividing valve is in fluid communication with the liquid supply source, and the liquid supply pipeline is connected between the outlet of the flow dividing valve and the working machine; and
[0010] The purge device is in fluid communication with the liquid supply pipeline and is configured to introduce a purge gas from a purge gas source to purge the liquid supply pipeline, thereby removing impurities and air in the liquid supply pipeline.
[0011] In some embodiments, the purge device includes a switch valve and an air supply connector connected to the liquid supply pipeline fluid, and the switch valve is arranged between the purge gas source and the air supply connector to control the on-off of the air supply pipeline between the purge gas source and the air supply connector.
[0012] In some embodiments, the gas supply connector includes a first interface connected to the liquid supply pipeline and a second interface connected to the switch valve.
[0013] In some embodiments, the gas supply connector further includes a third interface connected to the diverter valve, and the third interface is in communication with the first interface and the second interface.
[0014] In some embodiments, the purge device includes a three-way valve, one valve port of the three-way valve is used to connect to the purge gas source, and the other two valve ports are respectively connected to the diverter valve and the liquid supply pipeline.
[0015] In some embodiments, the three-way valve is a needle valve or a membrane valve.
[0016] In some embodiments, the purge device includes a one-way valve, and the flow direction of the one-way valve is from the purge gas source to the liquid supply pipeline.
[0017] In some embodiments, the liquid replenishing device of the semiconductor equipment further includes a leak-proof cap, which is configured to seal the inlet of the purging device after the purging of the liquid supply line is completed.
[0018] In some embodiments, the liquid supply line is a PFA line.
[0019] In some embodiments, the liquid replenishing device of the semiconductor equipment further includes an installation box, and the diverter valve and the purge device are disposed in the installation box.
[0020] Based on the above technical solution, the present invention provides a diverter device, which plays a role in flow control and distribution through a diverter valve and a liquid supply pipeline to ensure that each operating machine obtains a suitable flow of liquid; and a purge device is provided to introduce a purge gas to effectively clean the liquid supply pipeline and remove impurities and air that may exist inside it, thereby maintaining the purity and stable performance of the liquid delivered to the operating machine and improving the yield rate of the high-temperature oxidation process of the furnace tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings described herein are used to provide a further understanding of the present disclosure and constitute a part of the present application. The illustrative embodiments of the present disclosure and their descriptions are used to explain the present disclosure and do not constitute an improper limitation on the present disclosure. In the drawings:
[0022] Figure 1 A schematic diagram showing an embodiment of a liquid replenishing device for semiconductor equipment disclosed in the present invention is used in a furnace tube high temperature oxidation system;
[0023] Figure 2 A schematic diagram showing another embodiment of the liquid replenishing device for semiconductor equipment disclosed in the present invention is used in a furnace tube high temperature oxidation system;
[0024] Figure 3 A schematic diagram showing another embodiment of the liquid replenishing device for semiconductor equipment disclosed in the present invention is used in a furnace tube high temperature oxidation system;
[0025] Figure 4 A schematic structural diagram of another embodiment of the liquid replenishing device for semiconductor equipment disclosed in the present invention is shown as being used in a furnace tube high-temperature oxidation system.
[0026] In the figure:
[0027] 1. Liquid supply source; 2. Diverter device; 21. Diverter valve; 22. Liquid supply pipeline; 3. Operating machine; 4. Purge device; 41. Switch valve; 42. Air supply connector; 43. Check valve; 44. Three-way valve; 5. Purge air source. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments will be described clearly and completely below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.
[0029] In the description of the present disclosure, it should be understood that the terms "center", "lateral", "longitudinal", "front", "back", "left", "right", "up", "down", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present disclosure.
[0030] In the integrated circuit manufacturing industry, DCE is used as a high-purity chlorine source in large quantities in the furnace tube high-temperature oxidation process because it can accelerate the oxidation process of silicon wafers in wafer manufacturing and fix sodium ions to prevent semiconductor device contamination. However, DCE has active chemical properties and is prone to reactions such as polymerization, chlorination, and decomposition. When it encounters moisture, sunlight, and air, it can decompose into highly toxic phosgene, hydrogen chloride, polymers, etc., which greatly affects the purity and function of DCE, and further affects the defect performance of the furnace tube high-temperature oxidation process and reduces its production yield. Therefore, avoiding premature contact between DCE and air is of great significance to the process technology.
[0031] refer to Figure 1 As shown, in some embodiments of the liquid replenishing device for semiconductor equipment provided by the present disclosure being applied to a furnace tube high temperature oxidation system, the liquid replenishing device for semiconductor equipment includes a flow dividing device 2 fluidically connected to a liquid supply source 1 .
[0032] In the above embodiment, there are multiple optional types of liquid supply source 1. Liquid supply source 1 can be used to provide DCE liquid to operating machine 3, and can also be used to provide other liquids required in semiconductor manufacturing process to operating machine 3.
[0033] Therefore, the liquid replenishing device for semiconductor equipment provided by the present disclosure can be used in the liquid replenishing process of DCE liquid, and can also be used in the liquid replenishing process of other liquids required in the semiconductor process. Its application scenario can be set according to actual operation needs.
[0034] In some embodiments, in the liquid supply source 1 for supplying DCE liquid, the automatic liquid replenishment type liquid supply source 1 can automatically deliver DCE liquid to the machine according to preset conditions, thereby reducing the frequency of replacing the DCE source bottle of a single machine and improving the available time and production efficiency of the machine.
[0035] The liquid supply source 1 is provided with a control valve 11, which is arranged upstream of the diverter device 2 and is used to open or cut off the output of the liquid.
[0036] The flow diversion device 2 includes a diversion valve 21 and a liquid supply pipeline 22, which play a role in flow control and distribution. The liquid delivered to the operating machine 3 through the diversion valve 21 and the liquid supply pipeline 22 is stored in the source bottle at the machine end. The content of the liquid in the source bottle at the machine end can be maintained in the range of 40-70% to support the operating machine 3 to continuously perform the high-temperature oxidation process.
[0037] The diverter valve 21 includes a diverter valve 21a, a diverter valve 21b, a diverter valve 21c and a diverter valve 21d. The liquid supply pipeline 22 includes a liquid supply pipeline 22a and a liquid supply pipeline 22b.
[0038] exist Figure 1 In the embodiment shown, all the operating machines 3 in the furnace tube high temperature oxidation system are in a non-operating state. In this case, if the operating machines 31 and 32 need to be turned on, the liquid supply pipeline 22a is connected to the corresponding diverter valve 21a and the operating machine 31, and the liquid supply pipeline 22b is connected to the corresponding diverter valve 21b and the operating machine 32, and the operating machine 31, the operating machine 32 and the corresponding liquid supply pipelines 22a and 22b are purged to remove impurities and air introduced during the pipeline installation process to ensure basic liquid supply conditions.
[0039] In this case, the forward purge mode can be used. That is, the purge gas is introduced from the liquid supply source 1, and the purge gas passes through the diverter valve 21 and the liquid supply pipeline 22 in sequence, and finally discharged from the operating machine 3 (the right arrow direction in the figure is the flow direction of the purge gas), thereby discharging impurities and air in the liquid supply pipeline 22a and the operating machine 31, and the liquid supply pipeline 22b and the operating machine 32. After a long period of purge, the purge can be ended after the pressure test in the pipeline is passed.
[0040] During the purging process, the outlets of the diverter valve 21a and the diverter valve 21b are both in a closed state to prevent the liquid from flowing into the liquid supply pipeline 22a and the liquid supply pipeline 22b.
[0041] The purge gas is selected from a gas that will not participate in the chemical reaction when the operating machine 3 is working, such as an inert gas such as nitrogen. The purge flow rate can be set to 10 to 20 L / min, and the purge time is 12 to 48 hours.
[0042] After the purging is completed, the liquid supply pipeline 22 can be used to transport liquid to the operating machine 3 so as to carry out the next production process.
[0043] In the above embodiment, the installation process of the liquid replenishing device for semiconductor equipment is simple and efficient, the purge time cost is low, and the test process defect results are good. However, this liquid replenishing device for semiconductor equipment adopts a forward purge mode when purging, and the purge gas source is introduced from the liquid supply source 1 end, so it is not suitable for purging a single operating machine 3 after the liquid supply source 1 starts to supply liquid.
[0044] Specifically, when some operating machines 3 in the furnace tube high temperature oxidation system are in operation, there is liquid in the connecting pipeline between the liquid supply source 1 and the diverter 2, and the purge gas cannot be passed in this case. Therefore, it is impossible to purge other liquid supply pipelines 22 that need maintenance by forward purge. The maintenance of these liquid supply pipelines 22 can only be carried out after all operating machines 3 in the furnace tube high temperature oxidation system are shut down and the pipelines are emptied. This will bring about problems such as difficulty in maintenance efficiency and low production efficiency.
[0045] In actual production activities, in a furnace tube high temperature oxidation system including multiple operating machines 3, there may be multiple operating machines 3 in different working states. For example, when some operating machines 3 are already in working state, it is necessary to start a new operating machine 3. In this case, in order to ensure the subsequent production safety and product quality, it is necessary to clean the new operating machine 3 to be started and its corresponding liquid supply pipeline 22.
[0046] refer to Figure 2 As shown, in some other embodiments of the liquid replenishing device for semiconductor equipment provided by the present disclosure being applied to a furnace tube high temperature oxidation system, the liquid replenishing device for semiconductor equipment includes a flow dividing device 2 fluidically connected to a liquid supply source 1 .
[0047] In the above embodiments, the liquid supply source 1 has multiple optional types.
[0048] The liquid supply source 1 can be used to provide DCE liquid to the operating machine 3 , and can also be used to provide other liquids required in the semiconductor manufacturing process to the operating machine 3 .
[0049] Therefore, the liquid replenishing device for semiconductor equipment provided by the present disclosure can be used in the liquid replenishing process of DCE liquid, and can also be used in the liquid replenishing process of other liquids required in the semiconductor process. Its application scenario can be set according to actual operation needs.
[0050] The liquid supply source 1 is provided with a control valve 11, which is arranged upstream of the diverter device 2 and is used to open or cut off the output of the liquid.
[0051] The flow dividing device 2 includes flow dividing valves 21 (flow dividing valves 21a, 21b, 21c and 21d) and liquid supply pipelines 22 (liquid supply pipelines 22a, 22b and 22c), which play the role of flow control and distribution to ensure that each operating machine 3 obtains a suitable flow of liquid. The liquid delivered to the operating machine 3 through the flow dividing valves 21 and the liquid supply pipelines 22 is stored in the source bottle at the machine end.
[0052] exist Figure 2In the embodiment shown, the operating machine 31 and the operating machine 32 in the furnace tube high temperature oxidation system are already in working state. At this time, the liquid supply source 1 is in the open state, the control valve 11, the diverter valve 21a and the diverter valve 21b are all open, and liquid flows through the liquid supply pipeline 22a connected to the operating machine 31 and the liquid supply pipeline 22b connected to the operating machine 32. In this case, if a new operating machine 33 needs to be opened, the operating machine 33 and the corresponding liquid supply pipeline 22c must be purged separately to remove impurities and air introduced during the pipeline installation process to ensure basic liquid supply conditions.
[0053] Under the above working conditions, the pipeline from the liquid supply source 1 to the diverter valve 21 is used for liquid to pass through, and it is impossible to use this pipeline for forward purging, so a reverse purging method can be used. That is, first connect the liquid supply pipeline 22c to the operating machine 33, but not to the diverter valve 21c. Introduce purge gas from the end of the operating machine 33 into the liquid supply pipeline 22c, so that the purge gas is discharged from the end of the liquid supply pipeline 22c away from the machine (the direction of the left arrow in the figure is the flow direction of the purge gas). Introduce purge gas for long-term reverse purging from the operating machine 3 to the port of the liquid supply pipeline 22c, and end the purging after the pressure holding test is passed.
[0054] During the purging process, the outlet of the diverter valve 21c is in a closed state to prevent the liquid from flowing into the liquid supply pipeline 22c.
[0055] The purge gas may be a gas that does not participate in the chemical reaction during operation of the operating machine 3, such as an inert gas such as nitrogen. The purge flow rate may be set to 10 to 20 L / min, and the purge time may be 12 to 48 hours.
[0056] After the purging is completed, the liquid supply pipeline 22c is connected to the outlet of the diverter valve 21c, and the diverter valve 21c is opened to transport the liquid so as to proceed to the next production process.
[0057] However, such a purging method is prone to introduce air and impurities during the process from the completion of purging to the connection between the liquid supply pipeline 22c and the diverter valve 21c, thereby causing air and impurities to appear inside the connected pipeline.
[0058] In some cases, the liquid supply pipeline 22 is used to transport DCE liquid. Residual impurities and air mixed into the DCE liquid may easily lead to wafer defects in subsequent products that do not meet conventional process requirements.
[0059] refer to Figure 3 As shown, in some other embodiments of the liquid replenishing device for semiconductor equipment provided by the present disclosure being applied to a furnace tube high temperature oxidation system, the liquid replenishing device for semiconductor equipment includes a diverter device 2 and a purge device 4 fluidly connected to a liquid supply source 1 .
[0060] In the above embodiment, there are multiple optional types of liquid supply source 1. Liquid supply source 1 can be used to provide DCE liquid to operating machine 3, and can also be used to provide other liquids required in semiconductor manufacturing process to operating machine 3.
[0061] Therefore, the liquid replenishing device for semiconductor equipment provided by the present disclosure can be used in the liquid replenishing process of DCE liquid, and can also be used in the liquid replenishing process of other liquids required in the semiconductor process. Its application scenario can be set according to actual operation needs.
[0062] The liquid supply source 1 is provided with a control valve 11, which is arranged upstream of the diverter device 2 and is used to open or cut off the output of the liquid.
[0063] The flow dividing device 2 includes a flow dividing valve 21 and a liquid supply pipeline 22, which plays the role of flow control and distribution to ensure that each operating machine 3 obtains a suitable flow of liquid. The liquid delivered to the operating machine 3 through the flow dividing valve 21 and the liquid supply pipeline 22 is stored in the source bottle at the machine end.
[0064] In the above embodiment, the diverter valve 21 includes a diverter valve 21a, a diverter valve 21b and a diverter valve 21c. The liquid supply pipeline 22 includes a liquid supply pipeline 22a, a liquid supply pipeline 22b and a liquid supply pipeline 22c.
[0065] The purge device 4 is configured to be connected to the purge gas source 5 to introduce the purge gas to purge the liquid supply pipeline 22. The purge device 4 includes a switch valve 41 and a gas supply connector 42 for communicating with the liquid supply pipeline 22. The switch valve 41 is arranged between the purge gas source 5 and the gas supply connector 42 to control the on-off of the gas supply pipeline between the purge gas source 5 and the gas supply connector 42.
[0066] refer to Figure 3 As shown, the operating machine 31 and the operating machine 32 in the furnace tube high temperature oxidation system are already in working condition. At this time, the liquid supply source 1 is in the open state, the control valve 11, the diverter valve 21a and the diverter valve 21b are all open, and liquid passes through the liquid supply pipeline 22a connected to the operating machine 31 and the liquid supply pipeline 22b connected to the operating machine 32. In this case, if a new operating machine 33 needs to be opened, the operating machine 33 and its corresponding liquid supply pipeline 22c must be purged separately to remove impurities and air introduced during the pipeline installation process to ensure basic liquid supply conditions.
[0067] Before purging, the liquid supply pipeline 22c is connected to the diverter valve 21c and the operating machine 33, and the purging device 4 is installed so as to be connected to the purging gas source 5 and the liquid supply pipeline 22c respectively.
[0068] After the above components are connected, the switch valve 41 can be opened to introduce the purge gas to purge the liquid supply pipeline 22c. That is, the purge gas is output from the purge gas source 5, flows through the switch valve 41, the gas supply connector 42, the liquid supply pipeline 22c and the working machine 33 in sequence, and finally discharged from the machine end (the right arrow direction in the figure is the flow direction of the purge gas).
[0069] The purge gas is introduced to carry out long-term purge from the purge device 4 to the operating platform 33, and after the pressure holding test is passed, the switch valve 41 is closed, the connection with the purge gas source 5 is disconnected, and the purge is ended.
[0070] During the purging process, the outlet of the diverter valve 21c is closed to prevent the liquid from flowing into the liquid supply pipeline 22c. After the purging is completed, the outlet of the diverter valve 21c can be opened to carry out the subsequent production process.
[0071] The purge gas may be set to be a gas that does not participate in the chemical reaction when the operating machine 3 is working, such as an inert gas such as nitrogen. The purge flow rate may be set to 10 to 20 L / min, and the purge time may be 12 to 48 hours.
[0072] Furthermore, a leak-proof cap can be provided at the inlet of the purging device 4 to seal the inlet of the purging device 4 (i.e., the inlet of the switch valve 41 in the above embodiment) after the purging of the liquid supply pipeline 22 is completed, thereby ensuring the overall sealing of the system, effectively preventing external environmental factors from polluting the inside of the pipeline, and maintaining the purity of the liquid in the subsequent liquid supply process, thereby ensuring the safety and reliability of production.
[0073] With the above arrangement, there is no need to dismantle any equipment after the purging process is completed, so no unnecessary impurities and air will be introduced.
[0074] In the above embodiment, the switch valve 41 can effectively control the gas on-off status between the purge gas source 5 and the gas supply connector 42, realize on-demand purge, and disconnect the gas supply in time after the purge is completed to avoid waste of resources, and also improve the flexibility and safety of equipment use.
[0075] Specifically, the switch valve 41 can be configured as a valve component with flow rate and flow velocity control functions, so as to control parameters such as flow rate and flow velocity during the purge process.
[0076] Based on the above configuration, such a DCE liquid supply device can be used for the maintenance of a single operating machine 3. The entire purging process is simple to operate, and does not need to consider the working conditions of other operating machines 3, nor will it affect other operating machines 3.
[0077] In the above embodiment, a one-way valve 43 may be further provided in the purge device 4, and the flow direction of the one-way valve 43 is from the purge gas source 5 to the liquid supply pipeline 22c.
[0078] Among them, the one-way valve 43 can be as follows Figure 3 It is shown as being arranged between the purge gas source 5 and the switch valve 41 , and may also be arranged between the switch valve 41 and the gas supply connector 42 .
[0079] The one-way valve 43 can ensure that the purge gas can only flow from the purge gas source 5 to the liquid supply pipeline 22c, thereby preventing the purge gas from flowing back, thereby ensuring the purge effect and the safety of the equipment operation.
[0080] In the above-mentioned embodiment, there are multiple options for the structural form of the gas supply connector 42 .
[0081] For example, in Figure 3 In some of the embodiments shown, the air supply connector 42 has three interfaces, the first interface is connected to the liquid supply pipeline 22c, the second interface is connected to the switch valve 41, and the third interface is connected to the diverter valve 21c. This connection method is convenient for assembly and disassembly, and is convenient for subsequent maintenance of various components.
[0082] The first interface, the second interface and the third interface may be interconnected, that is, the air supply connector 42 is set as a T-shaped pipe connector, and the fluid on and off at the second interface is controlled by the switch valve 41.
[0083] Alternatively, the first interface, the second interface and the third interface may be configured to be selectively connected, in which case a switching structure for adjusting the connection relationship of each interface is provided inside the air supply connector 42. For example, during the purging process of the bleed air, the first interface and the second interface are connected, and the connection between the third interface and the first two interfaces is disconnected to improve the purging efficiency; and after the purging is completed, the first interface and the third interface may be connected, and the connection between the second interface and the first two interfaces may be disconnected to ensure the stability of liquid delivery.
[0084] In the embodiment where the first interface, the second interface and the third interface of the gas supply connector 42 are selectively connected, the on-off of the gas supply can be controlled by controlling the switching structure in the gas supply connector 42. In this case, the setting of the switch valve 41 is not necessary, but the switch valve 41 can also be set to play a role of redundant protection.
[0085] In other embodiments, the gas supply connector 42 may also be provided with only two interfaces, the first interface being connected to the liquid supply pipeline 22c, and the second interface being connected to the switch valve 41. Under this structural setting scheme, the gas supply connector 42 may be a straight pipe connector, one end of which is connected to the liquid supply pipeline 22c, and the other end is connected to the switch valve 41, so that the supply of the purge gas can be controlled by controlling the opening and closing of the switch valve 41. Such a straight pipe connector has a simple structure, high reliability, and a small size, which can save space, simplify installation, and help reduce fluid flow losses.
[0086] In some of the above embodiments, the purge device 4 is configured to be detachably connected to the diverter valve 21c and / or the liquid supply pipeline 22c. Therefore, after the production work of the operating machine 33 is completed, the purge device 4 can be removed, and the removed purge device 4 can also be used for purging other operating machines 3 and their corresponding liquid supply pipelines 22, which helps to save the overall production and maintenance costs of the system.
[0087] refer to Figure 4 As shown, in some other embodiments of the liquid replenishing device for semiconductor equipment provided by the present disclosure applied to a furnace tube high temperature oxidation system, the liquid replenishing device for semiconductor equipment includes a diversion device 2 fluidically connected to a liquid supply source 1 and a purge device 4.
[0088] In the above embodiment, there are multiple optional types of liquid supply source 1. Liquid supply source 1 can be used to provide DCE liquid to operating machine 3, and can also be used to provide other liquids required in semiconductor manufacturing process to operating machine 3.
[0089] Therefore, the liquid replenishing device for semiconductor equipment provided by the present disclosure can be used in the liquid replenishing process of DCE liquid, and can also be used in the liquid replenishing process of other liquids required in the semiconductor process. Its application scenario can be set according to actual operation needs.
[0090] The liquid supply source 1 is provided with a control valve 11, which is arranged upstream of the diverter device 2 and is used to open or cut off the output of the liquid.
[0091] exist Figure 4 In the embodiment shown, the flow diverter 2 includes four diverter valves 21 (diverter valve 21a, diverter valve 21b, diverter valve 21c and diverter valve 21d) and the same number of four liquid supply pipelines 22 (liquid supply pipeline 22a, liquid supply pipeline 22b, liquid supply pipeline 22c and liquid supply pipeline 22d), which play the role of flow control and distribution to ensure that each operating machine 3 (operating machine 31, operating machine 32, operating machine 33 and operating machine 34) obtains a suitable flow of liquid. The liquid transported to the operating machine 3 through the diverter valve 21 and the liquid supply pipeline 22 is stored in the source bottle at the machine end.
[0092] The purge device 4 is configured to connect to the purge gas source 5 to introduce purge gas to purge the liquid supply pipeline 22, and includes a three-way valve 44. One valve port of the three-way valve 44 is used to connect to the purge gas source 5, and the other two valve ports are used to connect to the diverter valve 21 and the liquid supply pipeline 22 respectively.
[0093] exist Figure 4 In the embodiment shown, the operating machine 31, the operating machine 32 and the operating machine 33 in the furnace tube high temperature oxidation system are already in working state. At this time, the liquid supply source 1 is in the open state, the control valve 11, the diverter valve 21a, the diverter valve 21b and the diverter valve 21c are all open, and liquid flows through the liquid supply pipeline 22a connected to the operating machine 31, the liquid supply pipeline 22b connected to the operating machine 32 and the liquid supply pipeline 22c connected to the operating machine 33.
[0094] In this case, if a new operating machine 34 needs to be started, the operating machine 34 and its corresponding liquid supply pipeline 22d must be purged separately to remove impurities and air introduced during the pipeline installation process to ensure basic liquid supply conditions.
[0095] Before purging, connect the diverter valve 21d, the liquid supply pipeline 22d and the operating machine 34, install the purging device 4, connect one valve port of the three-way valve 44 to the purge gas source 5, and connect the other two valve ports of the three-way valve 44 to the diverter valve 21d and the liquid supply pipeline 22d respectively.
[0096] After the above components are connected, the three-way valve 44 can be opened to introduce purge gas to purge the liquid supply pipeline 22d. That is, the purge gas is output from the purge gas source 5, flows through the three-way valve 44, the liquid supply pipeline 22d and the working machine 34 in sequence, and finally discharged from the machine end (the right arrow direction in the figure is the flow direction of the purge gas).
[0097] The purge gas is introduced to carry out long-term purge from the purge device 4 to the operating machine 34, and after the pressure holding test is passed, the three-way valve 44 is closed, the connection with the purge gas source 5 is disconnected, and the purge is ended.
[0098] After the purging is completed, a seal (leak-proof cap) can be installed at the inlet of the purging device 4 to ensure the overall sealing of the system, effectively prevent external environmental factors from polluting the inside of the pipeline, maintain the purity of the liquid in the subsequent liquid supply process, and ensure the safety and reliability of production.
[0099] In the above embodiment, a one-way valve 43 may be further provided in the purge device 4, and the flow direction of the one-way valve 43 is from the purge gas source 5 to the liquid supply pipeline 22c. The one-way valve 43 is provided between the purge gas source 5 and the three-way valve 44, and its flow direction is from the purge gas source 5 to the liquid supply pipeline 22c.
[0100] During the purging process, the outlet of the diverter valve 21d is closed to prevent the liquid from flowing into the liquid supply pipeline 22d. After the purging is completed, the outlet of the diverter valve 21d can be opened to carry out the subsequent production process.
[0101] The purge gas can be set to a gas that does not participate in the chemical reaction when the operating machine 3 is working, such as an inert gas such as nitrogen. The purge flow rate can be set to 5 to 10 L / min, and the purge time can be 12 to 36 hours.
[0102] With the above arrangement, there is no need to dismantle any equipment after the purging process is completed, so no unnecessary impurities and air will be introduced.
[0103] In the above embodiment, the three-way valve 44 can conveniently control the communication relationship between the diverter valve 21, the purge gas source 5 and the liquid supply pipeline 22, thereby simplifying the control of the purge process.
[0104] There are many options for the specific structural type of the three-way valve 44, for example, it can be an L-type three-way valve, a T-type three-way valve, etc.
[0105] In some of the above embodiments, the three-way valve 44 is a needle valve or a membrane valve.
[0106] Needle valves and membrane valves have the characteristics of good sealing, compact size, and high control accuracy. They can ensure connection reliability and can accurately adjust the gas flow rate according to needs to adapt to different purge requirements.
[0107] Furthermore, the material selection of the liquid supply pipeline 22 also has a key impact on ensuring the stability of liquid delivery.
[0108] In some of the above-mentioned embodiments, the liquid supply pipeline 22 is configured as a PFA pipeline.
[0109] PFA material has good chemical inertness and corrosion resistance, which can effectively prevent the purity of the liquid during transportation from being affected by the pipeline material, and can also ensure the durability of the pipeline itself.
[0110] In practical applications, the liquid supply pipeline 22 may also be made of other high-performance corrosion-resistant materials.
[0111] In addition, in some of the above-mentioned embodiments, the diversion device 2 may also include an outer sleeve sleeved on the outer periphery of the liquid supply pipeline 22, and the outer sleeve is used to protect the liquid supply pipeline 22 to ensure the safety and stability of liquid transportation.
[0112] In some of the above-mentioned embodiments, the control valve 11 and the four diverter valves 21 may be integrated into the installation box to form an integral valve group structure.
[0113] By integrating multiple valve components, it is not only beneficial to the overall layout and maintenance management, but also can protect these key valve components and their connection structures from the influence of external environmental factors, further ensuring the stability and safety of the liquid transportation process.
[0114] In some of the above embodiments, the three-way valve 44 and the one-way valve 43 may also be configured as an integrated purge valve group, and the purge valve group may include: Figure 4 When purging is required, the corresponding ports of the purge valve group are connected to the diverter valve 21, the liquid supply pipeline 22 and the purge gas source 5 respectively.
[0115] Specifically, in Figure 4 In some of the embodiments shown, before purging, port A of the purge valve group is sealed and connected to the outlet of the diverter valve 21d, port B of the purge valve group is connected to the corresponding liquid supply pipeline 22d, and the purge gas source 5 is connected to port C of the purge valve group.
[0116] In some of the above embodiments, the diameter of the liquid supply pipeline 22 and the diameters of the ports A and B of the purge valve group are all 1 / 4 inch, and the diameter of the outer sleeve sleeved around the outer periphery of the liquid supply pipeline 22 is 3 / 8 inch.
[0117] In the liquid replenishing device for semiconductor equipment disclosed in the present invention, the number of diverter valves 21 and liquid supply pipelines 22 is not fixed, but is adjusted according to the number of operating machines 3 in actual production, so as to meet the production needs. In addition, the number of diverter valves 21 and liquid supply pipelines 22 can be set to be different (for example, one diverter valve 21 can be connected to two liquid supply pipelines 22, etc.). The number of purge devices 4 can also be set according to actual needs, and a purge device corresponding to each liquid supply pipeline 22 and each operating machine 3 can be set separately. It is also possible to set a number of purge devices 4 that is less than the number of operating machines 3, and before some of the operating machines 3 and their corresponding liquid supply pipelines 22 need to be purged, the purge device 4 can be connected and installed therewith.
[0118] Through the description of multiple embodiments of the liquid replenishing device for semiconductor equipment disclosed in the present invention, it can be seen that the liquid replenishing device for semiconductor equipment disclosed in the present invention can effectively remove impurities and air that may exist in the liquid supply pipeline, prevent the liquid delivered to the operating machine from being contaminated and deteriorated before use, maintain the purity and stable performance of the liquid, and improve the yield rate of the furnace tube high temperature oxidation process:
[0119] A purge device connected to the diverter valve and the liquid supply pipeline is provided to realize positive purge from the purge device to the operating machine, so that a single operating machine and its corresponding liquid supply pipeline can be purged without mutual influence on other operating machines;
[0120] The purging can be performed after the diversion device and the operating machine are connected to avoid the introduction of air and impurities during the disassembly and assembly of components, which is conducive to ensuring the purity of the liquid;
[0121] A leak-proof cap is provided so that the purge device can be sealed with the leak-proof cap after the purge is completed, thereby avoiding the introduction of impurities and air after the purge step.
[0122] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present disclosure rather than to limit it. Although the present disclosure has been described in detail with reference to the preferred embodiments, ordinary technicians in the relevant field should understand that without departing from the principles of the present disclosure, the specific implementation methods of the present disclosure can still be modified or some technical features can be replaced by equivalents, and these modifications and equivalent replacements should be included in the scope of the technical solution for protection of the present disclosure.
Claims
1. A liquid replenishing device for semiconductor equipment, characterized in that: include: A flow dividing device, the flow dividing device is configured to distribute the liquid from the liquid supply source to at least one working machine, the flow dividing device comprises at least one flow dividing valve and at least one liquid supply pipeline, the inlet of the flow dividing valve is in fluid communication with the liquid supply source, and the liquid supply pipeline is connected between the outlet of the flow dividing valve and the working machine; and A purge device is in fluid communication with the liquid supply pipeline and is configured to introduce a purge gas from a purge gas source to purge the liquid supply pipeline, thereby clearing impurities and air in the liquid supply pipeline.
2. The liquid replenishing device for semiconductor equipment according to claim 1, characterized in that: The purge device includes a switch valve and an air supply connector connected to the liquid supply pipeline fluid. The switch valve is arranged between the purge gas source and the air supply connector to control the on-off of the air supply pipeline between the purge gas source and the air supply connector.
3. The liquid replenishing device for semiconductor equipment according to claim 2, characterized in that: The gas supply connector includes a first interface connected to the liquid supply pipeline and a second interface connected to the switch valve.
4. The liquid replenishing device for semiconductor equipment according to claim 3, characterized in that: The gas supply connector further includes a third interface connected to the diverter valve, and the third interface is in communication with the first interface and the second interface.
5. The liquid replenishing device for semiconductor equipment according to claim 1, characterized in that: The purge device comprises a three-way valve, one valve port of the three-way valve is used to be connected to the purge gas source, and the other two valve ports are respectively connected to the diverter valve and the liquid supply pipeline.
6. The liquid replenishing device for semiconductor equipment according to claim 5, characterized in that: The three-way valve is a needle valve or a membrane valve.
7. The liquid replenishing device for semiconductor equipment according to any one of claims 1 to 6, characterized in that: The purge device comprises a one-way valve, and the flow direction of the one-way valve is from the purge gas source to the liquid supply pipeline.
8. The liquid replenishing device for semiconductor equipment according to any one of claims 1 to 6, characterized in that: It also includes a leak-proof cap, which is configured to seal the inlet of the purging device after the purging of the liquid supply pipeline is completed.
9. The liquid replenishing device for semiconductor equipment according to any one of claims 1 to 6, characterized in that: The liquid supply pipeline is a PFA pipeline.
10. The liquid replenishing device for semiconductor equipment according to any one of claims 1 to 6, characterized in that: It also includes an installation box, in which the diverter valve and the purge device are arranged.
Citation Information
Cited By
Apparatus for supplying precursor medium
WO2026152702A1
